Loading...
8.1. SR 01-16-2018 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business January 16, 2018 ustin Femrite, P.E., City Engineer Item Description Reviewed by Corridors of Commerce Project Submittal Calvin Portner, City Administrator Reviewed by Action Requested Pledge, by resolution, support for funding of improvements to TH169 through the MnDOT Corridors of Commerce project solicitation. Background/Discussion The Southeast Sherburne County Transportation Committee is comprised of city, county and Elk River Chamber of Commerce officials. The committee has met on multiple occasions with Senator Kiffineyer and Representative Zerwas to discuss the transportation needs of our area. The Committee is recommending two projects be submitted for funding consideration through the State of Minnesota Corridors of Commerce program. The project will improve safety and traffic flow in Elk River by eliminating the existing stop lights on TH169/101 from the Mississippi River north through the city. Understanding the substantial cost of such a project, the committee supports completing the initial phase, to include a redesigned interchange at TH10 and creation of overpasses at Main Street and School Street, as an increment toward the full vision. Financial Impact Should this project be awarded funding through the Corridors of Commerce program,it is expected to come with a required local match. It is premature to understand the level of match required of the city and Sherburne County. Preliminary estimates put the local participation in the 15% range. Attachments ■ Resolution ■ Project Maps The Elk River Vision A PehoMing community Pitb revolutionary and spirited resourcefulness, exceptional P,`01 W E H E 8 6 T service, and community engagement that encourages and inspires prosperity INAWRE1 City of Elk City of Elk River River City Council Resolution 18- A Resolution of the City Council of the City of Elk River Supporting Corridors of Commerce Funding of Safety and Mobility Improvements on TH 169 in Elk River WHEREAS, Trunk Highway 169 from the Mississippi River to CSAR 33 in Elk River carries in excess of 47,500 vehicles a day with an additional 40,000 side street movements served; and WHEREAS, the safety and performance of this corridor continues to decline every year; and WHEREAS, the State of Minnesota and the Metropolitan Council has identified this segment of Principal Arterial roadway at the highest level of need for conversion to grade separation of the intersections; and WHEREAS, the City of Elk River has vested over $1 million in local funding to complete the preliminary design and environmental review that have received a Find of No Significant hnpact from the Federal Highway Administration; and WHEREAS, it is recognized,beyond the daily commerce and local trips served, this is an important corridor that serves the many recreational users of northern Minnesota and beyond. NOW, THEREFORE, BE IT RESOLVED the Elk River City Council supports a project that would provide grade separation for the five existing at-grade signalized intersections (TH10 ramp, Main Street, School Street, 193Td Avenue, 1971h Avenue) on TH169/101 corridor; and BE IT FURTHER RESOLVED should funding be insufficient for the full project the City of Elk River supports a smaller project that would provide grade separation for three existing at-grade signalized intersections (TH10 ramp,Main Street, School Street) on the TH169/101 corridor,with the remaining intersections (193Td Avenue, 1971h Avenue) to be considered in the future; and BE IT FURTHER RESOLVED the City of Elk River supports MnDOT allocating funding of the above-described improvements through the current Corridors of Commerce project solicitation. Passed and adopted this 161h day of January, 2018. John J. Dietz,Mayor ATTEST: Tina Allard, City NATUREJ d,ϭϬϭͬϭϲϵ^ĂĨĞƚLJĂŶĚDŽďŝůŝƚLJ/ŵƉƌŽǀĞŵĞŶƚƐͲůŬZŝǀĞƌ͕DŝŶŶĞƐŽƚĂŠ‹•’”‘Œ‡…–™‹ŽŽ‹’”‘˜‡•ƒˆ‡–›ƒ†–”ƒˆˆ‹…ˆŽ‘™‹Ž‹˜‡”„›‡Ž‹‹ƒ–‹‰–Ї‡š‹•–‹‰•–‘’Ž‹‰Š–•‘ ͳ͸ͻȀͳͲͳˆ”‘–Ї‹••‹••‹’’‹‹˜‡”‘”–Š–Š”‘—‰Š–Ї…‹–›ǤЇ —ŽŽ”‘Œ‡…–‹…Ž—†‡•ƒ”‡†‡•‹‰‡†‹–‡”…Šƒ‰‡ƒ– ͳͲƒ†…”‡ƒ–‹‘‘ˆ‘˜‡”’ƒ••‡•ƒ–ƒ‹–”‡‡–ǡ…Š‘‘Ž–”‡‡–ǡͳͻ͵”†˜‡—‡ƒ†ͳͻ͹–Š˜‡—‡Ǥ†‡”•–ƒ†‹‰–Ї•—„•–ƒ–‹ƒŽ•‹œ‡ƒ†…‘•–‘ˆ•—…Šƒ’”‘Œ‡…–ǡŠƒ•‡ͳǡ™‘—ކ‹…Ž—†‡ƒ”‡†‡•‹‰‡†‹–‡”…Šƒ‰‡ƒ– ͳͲƒ†…”‡ƒ–‹‘‘ˆ‘˜‡”’ƒ••‡•ƒ–ƒ‹–”‡‡–Ƭ…Š‘‘Ž–”‡‡–ǡƒ•ƒ‹…”‡‡––‘™ƒ”†–Їˆ—ŽŽ˜‹•‹‘ǤDĂŝŶ^ƚ͘^ĐŚŽŽů^ƚ͘ϭϵϯƌĚǀĞ͘ϭϵϳƚŚǀĞ͘&ƵůůWƌŽũĞĐƚWŚĂƐĞϭSoutheastSherburneCountyTransportationCommitteePartners: Corridors of Commerce Submittal January 16 , 2018 11,104190 UN small� ray VA i Is ask J , _ IPA AMR s Y -�s ��'. •� ,►,, 'lir , 1`��� =11111►rI � GI �J- • �t/1:.�11111111111 r��tit111� ✓�� W1_ ,,���t�+';1 '\►,�.�III11111111.I' ����� sr�:'�, �,�.1� �-'r- ` .:r �I/ ,aa...c �t!!/i`i Il1r111tp�iA�M���``�=�f!•�= - - =— +�.� ..- \�.V �fi�I►����I11�ia�I�r:•atul/ru� ' f SwF Elk River Ice Arena/ Field Relocation Proj* ectT*imel *ine January 16 , 2018 • Schematic Design Complete January 15 • Discuss Project Milestones with Council January 16 (Includes timeline for project financing/repayment, rental revenue) • Retail Space Work Session with Council January 16 • .Schematic Design Estimate (3 weeks) January 15-February 2 • Meet w/Team to Review Estimate February 5 • Rental Revenue (Arena, Rec. Facilities and Fields) with Council February 5 • Finalize Softball Field Relocation with Council February 5 • Project Financing discussion with Council February 19 • Design Development Complete February 23 • Design Development Estimate (3 weeks) February 23-March 16 • Meet w/ Team to Review Estimate March 19 • Approval of Design/Advertise for Bid Package 1 (BP1) by Council March 11) • Issue 13P1 (Precast) Advertisement to Bid March 20 City of El W • Issue BP1 Bid Documents March 23 • Issue 95% CD Documents March 23 • BP1 Bid Period (3.5 weeks) March 20-April 12 • 95% CD Estimate (3.5 weeks) March 20-April 12 • Award BP1 by Council April 16 • Approval to Advertise for BP2 (Arena) by Council April 16 • Issue BP2 Advertisement to Bid April 17 • Construction Documents Complete April 27 • BP2 Bid Period (4 weeks) April 27-May 24 • Bid Opening May 24 • RJM Assembly of Final Bids May 24-June 4 • Award BP2 by Council June 4 • Construction Start June 11