Houlton Farm Planning Committee Meeting 2015-08-31I. CALL MEETING TO ORDER 2. CONSIDER AGENDA 3. CONSIDER MINUTES Regular Meeting Houlton Farm Planning Committee AGENDA Monday, August 31, 2015 5:45 p.m. Elk River City Hall Meeting- Protocol ■ No sidebar discussions ■ No interruptions ■ State your concern ■ Ensure you understand ■ Don't take things personally ■ Adhere to time limits ■ Come prepared ■ Ensure all are heard 4. DISCUSSION ITEMS No action to be taken now. Action may be taken in the future. 4.1 Hunting Plan Status and Update 4.2 Friends of the Mississippi River (FMR) Update — Tom Lewanski 4.3 Friends Group 4.4 Review RFP Farm Out Buildings Removals 4.5 Committee Member Vacancies 4.6 Parking Lot Location 4.7 Fishing Plan 4.8 Property Rules and Signage , to 4.9 Property Tour with City Officials � � o 5. ACTION ITEMS 5.1 None 6. ADJOURNMENT This agenda is available in alternate formats upon a 72 hour advanced notice. Auxiliary aids and services are also available upon a 72 hour advanced notice. Please contact the City Clerk at 763. 635.1000 to make a request Examples of alternate formats may include: large print, Braille, audio tape, etc. Examples of auxiliary aids may include a sign language interpreter, assistive listening device, etc. pIIIIIII If NATURE -Houlton Farm Planning Committee Draft Minutes July 27, 2015 Present: Chair Wilson, Members Olsen, Anderson, Seeger, Hecker. Mroz and Benkofstke were excused Bob McGillivray from TPL and visitor Michael Schroeder was also present Wilson called the meeting to order at 5:43 pm. Wilson added to agenda 4.9 Student Seat The minutes from the June 29 meeting were reviewed. Agenda item 4.1 Hunting Plan Status The hunting plan was sent in mid-June to Tim Marion with DNR but it was never forwarded to the DNR Commissioner. Tim Marion has now confirmed that it has been sent to the Commissioner. 4.2 Naming Status and Update The official name of the property is the William H. Houlton Conservation Area. It was approved by City Council on July 6, 2015. 4.3 Building Dispositions It was discussed that the barns and buildings be bid in an RFP as component parts and aggregate. The RFP should be to buy, demolish and/or acquire. The large barn was discussed. It has dimensional wood and no large beams. It was discussed that the property would be better off with no barn since it should not have a purpose. Using the barn for public purposes such as environmental education could be problematic of the funding source. It was discussed that the bids should be due by October 1, 2015 4.4 Friends of the Mississippi Update The attached report from Alex Roth of the FMR was handed out to Committee Members. The FMR has been working with staff on funding for the conservation plan on the property. Committee members requested that Tom Lewanski be invited to the August 31 meeting to discuss the next steps, funding, etc... 4.5 Agricultural Lease The agricultural lease agreement was discussed. A new lease between the City and the farmer Sherman Lehn was approved by City Council on July 6, 2015. The new lease outlines that the city will receive $12,600 for rent on 168 acres. The rent money will go back to the property for improvements. Staff will work with the farmer later this fall on a new lease for 2016. The amount of farming acres will probably decrease each year. N:\Departments\Parks and Recreation\Parks\William H Houlton Conservation Area\Committee Agendas-Packets\Minutes\2015-07-27 Minutes.docx ^• 4.6 Trails The Committee discussed the need to map the trails with GPS this fall. The current trails map is inadequate for the property. It will be important to have a map of the trails that were in existence at the time the property was acquired by the city. 4.7 Island Sanctuary Anderson requested the Committee discuss keeping the 80 acre island on the property an island sanctuary for wildlife. The idea is to leave it undisturbed. It has been a sanctuary for over 15 - years. The idea is no public access from January through July. McGillivray commented that this would need to be amended in the hunting plan and could become an issue. Members discussed that the access to the island is already limited with the river. It was discussed that the idea of an island sanctuary will not be pursued at this time. The could be an agenda item in the future after the property is open to the public. 4.8 Fishinp, Plan The Committee discussed if a fishing plan is needed for the property. We can use current DNR regulations so it might not be needed. No decisions were made and it will be discussed at the August meeting. 4.9 Replacement for Student Seat (added to agenda) The current student representative on the Committee Nate Benkofstke resigned because he is starting college on August 20. It was discussed that another student representative should be recruited to replace Nate. Staff and Committee members will work on a name to replace Nate. It was also discussed that another seat on the Committee should be added. This would be an amendment to the current committee size of 8 to 9 members. Jerry Olsen was going to pursue this with City Council. Michael Schroeder who is a visitor for his second consecutive meeting expressed interest to serve on the Committee as a citizen representative. The committee was approved by City Council in January. Meeting adjourned at 7:40 pm 2 Plans and Specifications Farm Outbuilding Removal Plans and Specifications for Farm Outbuilding Removal Section I: General Information Contract Administration Page 1 of 13 All correspondence regarding this request and the proposed project must be directed to: Michael Hecker Parks and Recreation Director City of Elk River 13065 Orono Parkway Elk River, MN 55330 MHecker(t_i; E1kRiverMN.gov Project Overview The purpose of this solicitation is to provide the City of Elk River (the City) with outbuilding acquisition/ demolition and removal (the Work) services by an insured Contractor (the Contractor) at a competitive rate for the property located at 1801 Main Street, Elk River (the Property). Site location and building descriptions are shown on Attachment A and B. The City is the fee owner of this parcel that once housed an active farm with a homestead and outbuildings. The outbuildings must be removed in accordance with regulations governing the acquisition and future use of the property. The Contractor will be hired to dismantle and remove the identified structures from the property, including any remaining contents inside the structure(s). Removal of in-place concrete slabs and in-place footings is not required as a part of this Work but can be bid for on the Bid Form. The Contractor may bid to remove one or more structure(s). In this matter, multiple bids may be accepted. A combination of removal techniques is acceptable. All materials of each building will become property of the contractor. It is the responsibility of the contractor to dispose of all material off site in a lawful manner. Reuse of the materials is strongly recommended. Section 2: Overall Scope of Services The final scope of services will be developed in collaboration with the selected Contractor. Components of the services, at a minimum, will include: September 14, 2015 Plans and Specifications Farm Outbuilding Removal -------------------------- Page 2 of 13 General Specifications: A. The Contractor shall dismantle and remove all debris from each structure identified by the City. B. The Contractor is responsible for all permits and compliance with all local, state, and federal building, electrical, safety, waste management, and other codes. A Demolition Permit with the City of Elk River is required, at minimum. C. The Contractor shall furnish all supervision, labor, materials, and equipment necessary to accomplish The Work. D. Services are to include removal and proper disposal of the selected outbuildings. If other conditions are present that are not in the scope of this Agreement, the Contractor will notify the City within 24 hours and will send bid and photos to request additional consideration. This includes any hazardous waste located on site. E. The Contractor is responsible for the repair of any damage to the Property caused by the Contractor. F. The Work shall be completed by July 31, 2016. G. The Contractor shall maintain insurance(s) that meets or exceeds the City of Elk River Insurance Requirements. The Contractor shall provide evidence of coverage to the City at the start of any contract award and will advise the City of any changes of coverage; failure to do so may be grounds for revocation of the Agreement. H. The Contractor's hours of operation shall be 7:00 a.m. to 7:00 p.m. (local time) on weekdays. This includes starting and operation of machinery; delivery of equipment, materials, and machinery to the Property; construction activity and any other activity which, in the opinion of the City, may be disruptive to the surrounding community. The operational hours may only be extended following a written request and the subsequent approval of the City. I. Protection and repair of existing facilities and utilities: The Contractor shall perform operations carefully and in such a manner as to protect any existing structures, underground facilities, and utilities that are not part of the contract for removal. The Contractor shall be responsible for damage to existing structures, underground facilities, and utilities resulting from The Contractor's operations, and shall repair or replace damaged items to the City's satisfaction. J. Any required access roads shall be included in the contract price. No additional compensation will be provided. K. All waste material shall be handled in accordance with MPCA and OSHA requirements. This includes, but is not limited to, the use of appropriate DOT, OSHA, and EPA drums and containers, use of appropriate fluid transfer devices, use of suitable absorbent materials, proper transportation, etc. L. All junk and debris shall be properly disposed of off of the Property location. Hazardous Waste and materials prohibited to be landfilled shall be identified, noted, and properly disposed of, September 14, 2015 Plans and Specifications Farm Outbuilding Removal -------------------------- Page 3 of 13 including, but not limited to, batteries, fuel, oil, electronics, appliances, fluorescent bulbs, tires, etc. A list of all collected materials shall be provided to the City upon completion of services. M. The Contractor shall salvage all metal scrap and other salvageable materials from the Work. The Contractor shall pay. all costs or receive all proceeds that may result in salvage of metal scrap and other recycled materials. This includes barn wood, antiques, and other materials. Security and Signage: A. No signs, billboards, or other advertisements shall be erected on the premises by the Contractor. B. The Contractor shall furnish and maintain all warning lights, barricades, informational signs, and watchmen as needed for the execution of the Work as required by the Contract, and applicable laws, and regulations for the protection of persons and property, and control of traffic in accordance with applicable state and federal manuals. C. The Contractor shall be solely responsible for the safety and security of the Property. D. The costs of signs, devices, fences, barricades, safety and security measures, and watchmen required to comply with the above minimum requirements shall be included in the Contract Price and no additional compensation shall be provided. Erosion Control and Dust: A. The Contractor shall furnish, install, and maintain temporary erosion controls as necessary to prevent the erosion of soils and transport of silt, mud and other debris off of the property or to other areas of the property where damage might result or that might otherwise be required by laws and regulations. B. Any dust control measures necessary to comply with State and Federal standards shall be included in the Contract price. No additional compensation will be provided. Cleanup: A. The Contractor shall clean the work area each day and shall remove all trash and waste materials, and shall maintain the Property in a neat and orderly condition throughout the Work. B. At the time of completion of the Work, and debris from the premises as well temporary facilities, and surplus materials for occupancy by the City. Section 3: Contractor(s) Selection the Contractor shall remove all waste materials, rubbish as all tools, construction equipment and machinery, The Contractor shall leave the property clean and ready A. All qualifying bids will be evaluated by the City of Elk River staff before recommendations are submitted to the City Council to award the contract(s). Contractors shall provide individual pricing for each building. Contracts may be awarded for individual buildings. Contractors may provide separate bids for the removal of multiple buildings. Staff will recommend contract awards based on cost and salvage potential of the project. September 14, 2015 Plans and Specifications Farm Outbuilding Removal -------------------------- Page 4 of 13 B. Limitations This request does not commit the City of Elk River to award a contract, to pay any costs incurred in the preparation of the proposal to this request, or to enter into a contract for services. The City is not required to select the lowest bidder, based on other criteria. The City of Elk River reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with any qualified source, or to cancel in part or its entirety this Request for Proposals if it is in the best interest of the City. The City may require the responder selected to provide additional information on their proposals as a result of direct negotiations. Section 4: Contract Terms and Conditions Upon Contractor selection, the attached Contract for Services shall be perfected. The contract shall provide for compensation for actual work completed in accordance with the following conditions. A. Deletions of specific itemized work tasks will be at the discretion of the City. Payment or reimbursement shall be made based on tasks that have been satisfactorily completed. Billing that exceeds the amount bid will not be compensated unless a contract extension has been approved in advance by the Elk River City Council. B. If, for any reason the Contractor is unable to fulfill the obligations under the contract in a timely and proper manner, the City shall reserve the right to terminate the contract by written notice. In this event, the contractor shall be entitled to just and equitable compensation for any satisfactory completed work tasks, as determined by the City. C. The Contractor shall not assign or transfer any interest in the contract without prior written consent of the City. D. The Contractor shall defend, indemnify and hold harmless the City of Elk River, its officials, employees and agents, from any and all claims, causes of action, lawsuits, damages, losses or expenses, including attorney fees, arising out of or resulting from the Contractor (including its officials, agents, subcontractors or employees) performance of the duties required under the contract, provided that any such claim, damages, loss or expense is attributable to bodily injury, sickness, diseases or death or injury to or destruction of property including the loss of use resulting therefrom and is caused in whole or in part by any negligent act or omission or willful misconduct of Contractor. E. The Contract shall be governed by the laws of the State of Minnesota. F. Project summaries shall be submitted with each invoice during the course of the project. G. The City shall retain 5% of payments until final acceptance of the work. September 14, 2015 -11 Plans and Specifications Farm Outbuilding Removal -------------------------- Section 5: Conclusion and Submittal Page 5 of 13 Requests for additional information required for the preparation of the bids should be directed to Parks and Recreation Director Michael Hecker at 763.635.1161, or Nfflecker@ElkRiverMN.gov. All questions must be received before 2:00 p.m., November 5, 2015. No responses will be provided for questions received after that time. Bids shall be addressed to: City of Elk River Parks and Recreation Attn: Farm Outbuilding Removal 13065 Orono Parkway Elk River, MN 55330 MHeckernElkRiverMN.,-,- The following documents shall make up a complete bid package: ■ Completed and signed Bid Form ■ Certificate of Liability Insurance for $1,000,000, indemnifying the City from any claims • List of similar projects completed An Open Tout' of the out -buildings will be scheduled for October 19 from 4:00 to 5:00 p.m., rain or shine. At this time, interested parties may view the exterior and interior of each structure. The Property is closed to the public at all other times, if you wish to schedule a tour at another time, please contact Michael Hecker. Bids will be accepted until 2:00 p.m. on November 5, 2015, at which time they will be opened and publically read. Attachments: ■ Bid Form ■ Attachment A — Site location figures ■ Attachment B — Building descriptions with photos September 14, 2015 Plans and Specifications Farm Outbuilding Removal -------------------------- BID FORM CITY OF ELK RIVER - FARM OUT -BUILDING REMOVAL BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following prices: Page 6 of 13 Building#and Name Desciption of Work to be Done Amount Bid (one or the other) Conditons Induded Additonal cost, to City of Elk River, for removal (ie. Salvage, Partial Salvage, or Payment to be given to Payment to be (ie. Cant remove until silo is removed, etc.) Is Demolish) City of Elk River received by Contractor 2 - Work Shop 3 -Small Grain Bin S $ 4- Corn Crib 1 5 - Corn Crib 2 6- Large Silo 7- Medium Silo 8 - New Barn 10 -Old Barn 11- Small Silo Reduction in net cost, to City of Elk River, for award of all buildings included in bid $ Additonal cost, to City of Elk River, for removal of foundations, regrading, and seeding for all buildings Is Bidder Information September 14, 2015 Company Name Address Phone Number Contact Person Email address Authorized Signature of Owner or Officer Attachment B Site Descriptions See Attachment A for locations *Measurements provided are not exact 1. House. Currently contracted to be removed off site. 2. Work Shop. This structure houses a workshop on the top floor with various work benches and storage. In the cellar, with access located in the rear, unfinished space allows for storage of sawdust, tree stumps, and small boulders. 21'x21'6" 1 a� Front of Work Shop Work Shop (top floor) Work Shop (top floor) Side of Work Shop 3. Small Grain Bin. 20 ft. diameter Rear of Work Shop Interior of Work Shop (bottom floor) f� 4. Corn Crib 1. 60'x 8'3" 5. Corn Crib 2.13'x 22'2" Front View 6. Large Silo. 20 ft. diameter Rear View Large Silo Wood Detail .... . . . . . . . A Silo Detail 7. Medium Silo. 15 ft. diameter Large (left) and Medium (right) silos 8. New Barn. This barn is not new but does have newer siding, windows, and roof The barn is two full stories and there is an attached office on the front end. Lower level 4,340 square feet. Upper level 3,960 square feet. 367' x 1087' Front of Barn Front of Barn with Office r - Rear of Barn Exterior Detail First Floor Interior Second Floor Interior i f i i 1 = Interior Detail -6 Second Floor Interior 9. Quonset Hut. Not a part of this request. This is to remain on site as is. 10. Old Barn. There are a number of indoor animal stalls. There is a half story on the second floor. 3,960 square feet. 40'6" x 98' Front of Barn P r ikgil Exterior Detail I Side of Barn Interior of Barn Interior of Barn Exterior Detail Interior of Barn Interior of Barn 11. Small silo. 20 ft. diameter Silo Exterior Silo Interior Statement of Understanding This Statement is intended to outline the relationship between (Contractor) and the city of Elk River (City) regarding Houlton Farm outbuilding removal activity during ,201 . IIWe} _ , understand the following The Contractor has received the Request for Proposal packet. The Contractor shall furnish all supervision, labor, materials, and equipment necessary to accomplish the Houlton Farm outbuilding removal services (the Work). The Work is to be completed upon , 201_. The hours of operation will be weekdays from 7:00 a.m. to 7:00 p.m. The Contractor is responsible for all permits and compliance with all local, state, and federal building, electrical, safety, waste management, and other codes and laws. Service is to include removal of material as directed in the RFP and any other written communication by the City. If conditions are present that are not in the scope of this Agreement, the Contractor will notify the City within 24 hours of assignment and will send bid and photos to request additional considerations. Any damage to the property caused by the Contractor shall be repaired by the Contractor. All junk and debris removed are to be properly disposed of by the Contractor off of property location and per City standards. All receipts and load tickets much be furnished to the City upon completion. Erosion control and dust elimination measures on the property shall be used. Safety Safety of the Contractor is a first priority. The Contractor understands its obligation to inform the City and remove itself from an unsafe situation due to threats, hazardous materials, or similar situation. All safety and security measures will be put in place by the Contractor. Insurance Any changes to workers compensation and general liability insurance, (i.e carrier, coverage term/ amounts) will be submitted in writing to the City. Billing The accepted bid was for The Not to Exceed price was for After completing authorized work, any invoices, documentation, reports, and pictures should be sent to: City of Elk River Attn: Michael Hecker 13065 Orono Parkway Elk River, MN 55330 or MHecker r . �'JkRiverMN.gov Invoices will be submitted to the City Council for payment upon completion. Invoices will not be paid for work completed without a written order. Signatures City of Elk River BID FORM CITY OF ELK RIVER -FARM OUT -BUILDING REMOVAL BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following prices: Building 4 and Name Descl tion of Work to be Done Amount Bid (one or the other) Conditons Included Additonal cost, to City of Elk River, for removal of (le. Salvage, Partial Salvage, or Payment to be given to Payment to be received (ie. Cant remove until silo is removed, etc.) 1 $ Demolish) City of Elk River by Contractor 2 - Work Shop $ $ 3 -Small Grain Bin 4 - Corn Cri b 1 s 5 - Corn Crib 2 6 - Large Silo 7 - Medium Silo 8 - New Barn 10 - Old Barn 11- Small Silo Reduction in net cost, to City of Elk River, for award of all buildings included in bid $ Additonal cost, to City of Elk River, for removal of foundations, regrading, and seeding for all buildings 1 $ Bidder Information Company Name Address Phone Number Contact Person Email address Authorized Signature of Owner or Officer Date Members of the Lessard -Sams Outdoor Heritage Council Member Ms. Elizabeth Wilkens - Mora MN Ms. Susan Olson - Austin MN Ms. lane Kingston* - Eveleth MN Ms. Julie Blackburn* - Roseville, MN Mr. David Hartwell* - Minneapolis, MN Mr. Ron Schara - Minneapolis, MN Vacant step. ucany McNamara District 54B - Hastings MN Mr. Robert (Bob) Anderson. Chair* - International Falls MN Mr. Barry Tilley - Inver Grove Heights, MN Sen. Bill Ingebrigt _ - District 08 - Fergus ,- Falls Sen. Tom SaxhauZ* - District 05 - Grand Rapids,Bemidji