Loading...
6.2 ERMUSR 02-13-2018 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Tom Sagstetter—Conservation and Key Accounts Manager MEETING DATE: AGENDA ITEM NUMBER: February 13, 2018 6.2 SUBJECT: Landfill Gas Plant to Electric Generation Facility Performance for 2017 ACTION REQUESTED: None BACKGROUND: Consistent with contractual provisions, each year ERMU can provide bonus payments to Sherburne County and Waste Management/Elk River Landfill provided the financial means and plant capacity factors are met. DISCUSSION: For the calendar year of 2017 the landfill gas plant had a capacity factor of 93.3% and generated approximately 25 million kWh. The production was steady and the overall costs of the plant were manageable. The production level fell below the 95%capacity factor threshold;therefore no bonus payment will be made to Waste Management. The overall operating costs for the landfill gas plant acceptable for 2017 with no extra ordinary expenses or failures. Also, Waste Management was very efficient in the routine maintenance for 2017 and kept the operation and maintenance costs very reasonable. Based on the 2017 overall performance of the landfill gas plant project Sherburne County will receive a payment of $25,000. The landfill gas plant produced approximately 25 million kWh which is enough electricity to supply 2,850 average residential customers in Elk River for one year. The landfill gas to electric plant generated the equivalent of 8%of ERMU total sales for 2017. The bonus payments are not guaranteed and can change or be eliminated based on the variability of labor, material, unexpected or increased maintenance costs, or loss of production for various reasons. FINANCIAL IMPACT: As outlined above. ATTACHMENTS: • Letter to Waste Management—LFG to Electric Generation Facility Performance for 2017 • Letter to Sherburne County—LFG to Electric Generation Facility Performance for 2017 Page 1 of 1 162 Elk River Municipal Utilities 13069 Orono Parkway•P.O.Box 430 Phone:763.4412020 Elk River,MN 55330-0430 www.elkriverutilities.corn Elk River Landfill February 7,'2018 Mr.Don Yurecko 22460 Highway 169 Elk River,MN 55330 Subject: LFG to Electric Generation Facility Performance for 2017 Dear Mr. Yurecko; The landfill gas to electric facility had a delivered capacity factor of 93.3%for 2017. As a result of the delivered capacity factor being less than 95%Elk River Municipal Utilities(ERMU)could charge a penalty.ERMU will not charge Waste Management a penalty for 2017. The landfill gas to electric generation plant still achieved great things in 2017. The facility produced approximately 24.85 million kWh in 2017. That is equivalent to the average annual energy consumption of 2,580 residential customers of ERMU. ERMU recognizes and greatly appreciates your willingness to work cooperatively to keep the operating costs manageable for this partnership. We appreciate all of your efforts to operate the plant in a clean, efficient,and safe manner. If you have any questions,please feel free to contact Tom Sagstetter at(763)635-1332. Best regards, ----a/ ....1,',/ / - ,,,,, Thomas J. agstetter Conservation and Key Accounts Manager Cc: Elk River Municipal Utilities Commission Troy Adams—Elk River Municipal Utilities General Manager Dave Lucas—Solid Waste Administrator PDIEHE1 B1 NATURE s Reliable Public POWERED To $ERV E Power Provider 163 Elk River -�--, Municipal Utilities 13069 Orono Parkway•P.O.Box 430 Phone:763.441.2020 Elk River,MN 55330-0430 www.elkriverutilities.com Sherburne County February 7,2018 Mr.Dave Lucas Solid Waste Administrator 13880 Business Center Drive Elk River,MN 55330 Subject: LFG to Electric Generation Facility Performance for 2017 Dear Mr.Lucas; While the landfill gas electric generation facility did not achieve the production goal they did achieve operational efficiency.As a result of the efficiency Elk River Municipal Utilities(ERMU)is providing Sherburne County with a check for$25,000 for the overall operation of the landfill gas to electric facility for 2017. The facilities capacity factor was 93.3%.As a result of the delivered capacity factor being less than 95% ERMU will not penalizing Waste Management for the lower than expected production because of the operational efficiency that was achieved. ERMU recognizes and appreciates the care taken to operate the facility in a safe and efficient manner that benefits the partnership. The landfill gas to electric generation plant still achieved great things in 2017. The facility produced approximately 24.85 million kWh in 2017. That is equivalent to the average annual energy consumption of 2,580 residential customers of ERMU. If you have any questions,please feel free to contact Tom Sagstetter at(763)635-1332. Best re ards, ja#7 Thomas J. gstetter Conservation and Key Accounts Manager Cc: Elk River Municipal Utilities Commission Troy Adams—Elk River Municipal Utilities General Manager Don Yurecko-Elk River Landfill Gas Plant Manager Kathleen Heaney- Sherburne County Attorney P ® N E R E D ® 1 NATURE • Reliable Public PowLaEo To SEavE Power Provider 164