A tour of thp Elk Rivpr Wastewater Trpatment Plant (WWTP) began at
approximately 6:00 p.m. WWTP Superintendent, Darrell Mack, was the tour
leaelpr anel show eel all aspects of the plant to the group. The tour was
completed in approximately one hour.
Members Present:
Elk River Mayor Tralle anel Councilmembers Kropuenske,
Schuldt and Dietz Otsego Mayor Freske and
Councilmembers Roden, Lindenfelser, Black and Fournier
Memhers Ahspnt:
Elk River Councilmemher Holmgren
Also Present:
Darrell Mack, Elk River WWTP Superintendent; Tim Keane,
Elk River City Attorney; Lori Johnson, Elk River Finance
Di rector; Terry Maurer, Elk River City Engineer; Pat
Klaers, Elk River City Administrator; William Radizwill,
Otsego City Attorney; and Larry Koshak, Otsago City
Engineer
1. Call Meeting To Oreler
Pursuant to elue call and notice thereof, the joint meeting of the Elk
River and Otsego City Councils was called to order by Elk River Mayor
Tralle at approximately 7:00 p.m.
2. WWTP Discussion
A general eliscussion took place regarding the length of an agreement
he tween the two communi ties to share thp spwer capacity currently
avai lable at the Elk River WWTP. Concern was expressed regarding
whether or not Elk River could "turn off" the sewer lines extended into
Otsego upon expi rati on of the agreement even if they had not moved
forwRrd with the construction of a future plant, assuming that a future
plant was callt~d for in the original agrpement. It was noted that from
a legal point of view it may he difficult to simply withdraw service
which hael been in pll1('.e. It was also suggesteel that an escalating
cllstomer rate structure would encourage Otsego to move forward in the
construction of its plant in a timely fashion (provieled that the
original agreement called for Otsego to construct its own WWTP).
Discussion continued regarding various capacity and hook up charges for
future plant expansion in Elk River. It was noted that a future plant
expansi on or even a seconel, completely di fferent plant may be a joi nt
eneleavor and that a long term sharing relationship may be possible.
The Elk River City Engineer indicated that with modifications, the Elk
River 1)1ant can accommodate up to 1.1 million gallons per day (MGD) of
Joint Elk River/Otsego City Council Minutes
May 28, 1991
Page 2
e
wastewater. The cost of expanding the plant beyond that capacity is
unknown as are the permit parameters that would be placed on EI k River
hy the Minnesota Pollution Cont.rol Agency (MPCA).
Otsego Council members indicateo that it is not a question of if an
Otsego plant would be constructed but more of a question of when the
pI ant wou I cl be constructed. Otsego Councilmembers noted that they
definitely have plans fOl' their own WWTP.
Elk River representatives stated that they felt more comfortable with a
definate timeframe for requesting sewer capacity and disconnecting from
the Elk River system. Otsego representatives noted that in planning
for a sewer plant, a ten year timeframe is rather short for the
permi ttj ng process ano pI ant construction process. Both Councils
acknowleoged that the length of the agreement and other timeframes
within the agreement plus the financial contingencies within the
agreement can be worked out to the mutual henefit of both communities.
e
Discussion continued regaroing when sewer capacity would be rf-quested.
Otsego Councilmemhers indicateo that it was uncertain when the request
wou1 d come forwaro, hut that the request may very well he based on
po 11 uti on concerns and not new deve I opment. The vacant land in Otsego
where t.he sewer is planned to be extended includes mainly re8ioentially
zoned prOl)f~rty a long wi th a small er amount of commercial and industrial
zoned property next to Highway 101.
The ultimate residential development in the sewer district in Otsego
calls for approximately 1500 new homes to be developed whi ch would
require a capacity of approximately 365,000 MGD. Currently, Elk River
has excess capacity, if the plant was expanded to 1.1 MGD, of
approximately 500,000 MGD.
Elk River representatives noted that when Elk River is fully developed
it alone would exceed the design capacity of the plant if all the
development in the sewer and water di strict takes place as projected.
Discussion continued regarding a future plant to serve both communities.
Representat i ves of both communities felt that the issue deserves more
discussion and that it can be more thoroughly evaluated in a committee
format. It was the consensus of both the Councils that a committee be
fot'med i nc 1 uding the appropriate staff members of each community along
with two elected officials from each community. The committee can be
estflblislwo any time this summer ann would hegin meeting to seriously
o i scuss the components and the possi bil ity of a future agreement in
1 ater SlImmet', 1991.
3. Other ~Isiness
A.
Ma in Street Brioge Reso lutton
e
The Elk River City Council discussed a 5/14/91 memo from the City
Engineer regarding the progress maoe to replace the Main Street
bridge and have this project take place in 1992. The next step in
Joint Elk River/Otsego City Council Minutes
May 28, 199]
Page 3
e
the process calls for the preparation of plans and specifications
for the bridge replacement.
COlINCILMEMBER KROPUENSKE MOVED TO APPROVE RESOLUTION 91-35, A
RESOLUTION ORDERING PREPARATION OF PLANS AND SPECIFICATIONS IN THE
MATTER OF THE MAIN STREET BRIDGE REPLACEMENT IMPROVEMENT OF 1991.
COlINCTLMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 4-0.
B. pity Administrator Update
1. It was noted that a closed City Councll meeting session will
be held on 6/3/91 to discuss the Police Union Arbitration
i SSlles.
2. It was indicated that the City will be asked to make a
recommendation to the County on the new State law that calls
for an additional 1/2~ sales tax. The sales tax can be
initiated at the option of counties. Action by the County
has to be taken by July 1, 1991. This issue will be on the
6/3/91 Agenda for City Council discussion.
3.
Discussi on took place regarding the storage of police
ev idence, supplies, materials and bicycles when the old City
Hall facil i ty (creamery building) is demolished this summer.
It was stated in the 5/28/91 memo to the Council from the
Chief of Police that mini-storage facilities could be rented
for approximately $63 per month and that the Police
Department would need three unt ts. It was also noted that
the use of mini -storage is not the preferred storage option
until a future faei U ty is constructed and that efforts wil]
be made to locate one larger structure to meet all of the
temporary pol ice storage needs. The Council discussed the
poss i bi 1 ity of construct i on of some type of faei Ii ty at the
Street Department garage location that could be used in the
future by the Street/Park Departments.
e
COUNCILMEMBER KROPlJENSKE MOVED TO AUTHORIZE THE RENTAL OF
THREE MINI-STORAGE FACILITIES TO BE USED BY THE POLICE
DEPARTMENT FOR STORAGE, ON A MONTH TO MONTH BASIS, AND THAT
THE CITY EVALUATE THE POSSIBILITY OF CONSTRUCTING A STORAGE
BUILDING AT THE STREET DEPARTMENT GARAGE SITE. COUNCILMEMBER
DIETZ SECONDED THE MOTION. THE MOTION CARRIED 4-0.
4. The Ci ty Administrator noted that. he will be attending the
6/18/91 Li brary Board meeting to discuss library expansion
plans and future needs for the Elk River Public Library.
4.
Acliournment
e
There being no further business, COUNCILMEMBER KROPUENSKE MOVED TO
AD.lOURN THE 5/28/91 CITY COUNCIL MEETING. COUNCILMEMBER DIETZ SECONDED
THE MOTTON. THF: MOTION CARRIED 4-0.
e
e
e
.Toint Elk River/Otsego City Council Minutes
May 28, 1991
Page 4
The joint meeting of the Elk River and Otsego City Councils adjourned at
approximately 8:35 p.m.
Respectfully submitted,
'/. ,) ..'j _,L,~;:;J
. / ;Z~I2:e-{/I~/
Patrick D. Klaers
City Administrator