Public Works
City of Elk River
2004 Annual Report
STREETS
MISSION STATEMENT:
It is the mission of the Street Department to provide prompt and courteous services to
area residents in a financially responsible manner. In doing so, we strive to be safety
conscious, creative, helpful, ambitious, and understanding as we do whatever tasks are
laid before us.
YEAR IN REVIEW
SEAL COATING-CONTRACTOR: ALLIED BLACKTOp.INC.
· Main Street, from Parrish Avenue Bridge to Zane Street
· Freeport, from Main Street to Jackson Road - also re-striped to 3-lane
configuration
· Lafayette Woods Additions I & 4, entire developments
· Cherrywood Hills II, entire development
ASSESSED BITUMINOUS OVERLAYS-CONTRACTOR: UNIVERSAL PAVING CO.
SHOULDER RESTORATION-CITY STREET DEPARTMENT
· Brentwood
· Heavenly Hills
· Belgin Acres
· Greenhead I
· Meadowvale
· Fairhaven Hills
DRAINAGE PROIECTS/NPDES PROGRAM
· 49 outflows inspected
· 19 outflows repaired
· 4 storm water outlets repaired
COMPOSTINGIRECYCLlNG
· Contracted brush grinding
· City hauling costs-232 hours
· City loader costs-I 24 hours
· Biogrind-30 hours
$ 4,608
$ 17,400
$ 11,160
$ 3,750
Total Compost Processed
Total Compost Transported
4,500 c.y.
3,072 c.y.
OTHER PROIECTS
· Mud jacking to level sidewalk panels and concrete curb sections
· Demolition of the Koehler house for Library expansion
· Rebuilt retaining walls on School Street boulevard
City of Elk River
2004 Annual Report
STREET EOUIPMENT
· Purchase multi-use single axle truck.
EOUIPMENT SERVICES
· Upgraded tools and computer software to keep pace with new automotive
technology.
BUILDING MAINTENANCE
· Change from contracted building cleaners to part time city employees for all city
buildings, excluding the Library.
· Hired 4 part time custodians.
· Hired Edwin (Butch) Pelarski as Building Maintenance Assistant.
PARK PROIECT HIGHLlGHTS-IANUARY THROUGH IULY 2004
· Big Tooth Ridge Park-Removal of dead trees.
· Highlands West Park-Re-graded area to correct drainage problem, graded and
installed base for basketball court, and contracted out completion of bituminous
basketball court.
· Lions Park-Contracted out parking lot expansion, bituminous basketball court,
and parking lot & trail overlay. city staff completed storm sewer extension,
topsoil shoulders, and concrete slabs for portable toilets.
· Ridgewood East Park-Contracted basketball court overlay.
· Trott Brook Park-City staff finished barn shelter interior.
· Woodland Trails Park-City staff removed 100 dead trees from trailside.
· Youth Athletic Complex-City staff poured concrete for bench slabs for ball fields
#5 & #6 and rebuilt BMX track.
City of Ell< River
2004 Annual Report
STATISTICS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
STAFF DIRECTORY
NAME
Street Maintenance
Philip Hals
Mark Thompson
Dennis Jenson
Milton Tuttle
Jerry Mackedanz
Joe Pipenhagen
Chris Holzem
Dennis T oth
Mike Zappa
Park Department *
Terry Bye
Phil Barsody
Amy Borst
Steve Stoffers
Case Hayward
Office Staff
Sara Onarheim
Debra Larsen
Building Maintenance
Gary Lore
Edwin (Butch) Pelarski
Allen Pudlick
Fran Wallace
Linda Norquist
Mike Lynch
Kandi Nash
Tim Gasper
Equipment Repair Services
Bob Mahutga
Steve Taylor
Terry Mack
City of Elk River
2004 Annual Report
TITLE
Superintendent
Assistant Superintendent
Maintenance II
Maintenance II
Maintenance II (part time)
Maintenance II
Maintenance II
Maintenance II
Maintenance 1
Park Foreman
Maintenance I
Maintenance I (4/91 to 11/97)
Maintenance I
Share time with Ice Arena
Office Worker/Sign Maker
Office Worker/Sign Maker
Building Maintenance Supervisor
Building Maintenance Assisstant
Custodial Staff (resigned 4/04)
Custodian
Custodian
Custodian
Custodian
Custodian
Lead Mechanic
Mechanic
Maintenance II
* Transferred from Street to Park Department July I, 2004
START DATE
January 1983
September 1981
April 1986
July 1988
March 1994
January 1995
October 1995
October 1998
February 2004
October 1987
December 1997
March 1999
December 2000
September 1998
June 2002
June 200 I
May 2004
February 2000
July 2004
May 2004
May 2004
July 2004
February 2005
March 1997
January 2002
March 1975
City of Elk River
2004 Annual Report
2005 GOALS & PROJECTS
STREETS
Maintain streets and storm water infrastructure to a high level of serviceability in a cost
effective manner.
Task
· Concentrate on preventative maintenance programs such as crackfilling,
sealcoating, cold mill patches, and radiant patches.
· Relocate and expand to compost collection facility.
· Update the Street Department facility with a new salt storage shed, cold
storage building, and tempered equipment building.
· Have streets cleared after a 6-inch snowfall in 10 hours of plowing time.
EQUIPMENT SERVICES
Maintain city equipment and vehicles for the maximum usage and reliability at an
affordable cost.
Task
· Continue training and educational seminars for mechanics.
· Provide updated tools and equipment for mechanics.
· Purchase software for truck system diagnostics.
BUILDING MAINTENANCE
Maintain city buildings so they are economical to operate, functional and pleasant for the
occupants.
Task
· Expand the cleaning program to include all city buildings.
· Staff the Custodial Department so there is opportunity to do occasional cleaning
"extras."
EMPLOYEES
Maintain an adequate well-trained work force.
Task
· Consider hiring an additional plow driver when another 12 miles of new
streets have been accepted for city maintenance.
EQUIPMENT
Continue to update equipment fleet so we can provide timely and reliable service.
ELK RIVER MUNICIPAL UTILITIES
City of Elk River
2004 Annual Report
I
MISSION STATEMENT:
To provide our customers with safe, reliable, cost effective and quality long term electric and water
utility service. To communicate and educate our customers in the use of utility services, programs,
policies, and future plans. These products and services will be provided in an environmentally and
financially responsible manner.
YEAR IN REVIEW
2004 Major Accomplishments
Bryan Adams, General Manager
Administration - Patricia HemzalFinancial Director
I) Continued administrating the Connexus/Great River Energy power purchase agreement
costing approximately $8,560,000.
2) Remained active in MMUA in industry restructuring issues.
3) Remained active in Energy City activities.
4) Completed second year operation of lFG electric generation facility at the Elk River
landfill in partnership with Sherburne County and Waste Management at 102.17% capacity
factor which far exceeded expectations.
5) Moved Administration to City Hall facility.
6) Continued to successfully handle the increase in customers and resulting monthly bills and
collections. Customer monthly billings include approximately 8100 electric, 3800 water,
3800 sewer, and 5300 garbage. Monthly utility billing consistently exceeded
$1,OOO,OOO/month.
7) Contributions to the City of Elk River totaled approximately $615,000.
8) Administer second year's CIP Programs for Elk River which entail, Compact Fluorescent
lamps, AC Trees, Appliance Rebates, Cycled Air Conditioning, Commercial Rebates, and
Air Conditioning Tune-up. Rebates exceeded $190,000.
Water Department - David BerglWater Superintendent
Water & Electric Technologies
I) Complete construction of Well #8, raw water line, and modification to Filter Plant #7.
2) Complete SCADA System field components for Water Department. Computer
monitoring will be added to office in 2005.
3) Expand water mains to Woodland Hills, Twin lakes Estates, Elk Ridge Center, Woods of
Hillside, Trott Brook Crossing, Kliever lake Fields and Trott Brook Farms 9 & 10.
4) Connected 321 new water services to the water system.
5) Increase Security System customers by 31 for a total of 307.
6) Produce over 651 million gallons of water with a peak day of 5.13 million gallons, a
decrease of 3.31 % from the previous year.
7) Secure land for Well # II along with drilling a test well.
City of Elk River
2004 Annual Report
Electric Department - Glenn Sundeen/Line Superintendent
Electric Department
I) Continued territory acquisition from Connexus Energy. Purchased 104 customers.
2) Expanded electrical distribution system into Woodland Hills, Twin Lake Estates, Elk Ridge
Center, Prairie Oaks, Woods of Hillside 4th, Trott Brook Crossings, and Trott Brook
Farms 9 & 10.
3) Construct new feed 85 from West Substation to Substation 14.
4) Construct new feed 63 from Substation North to Co. Rd. 13.
5) Added 570 electric meters to electric system.
6) Purchase over 176 million KWH of energy with a peak day of 37.8 MW for a 3.91%
increase.
7) Replace underground cable at 5th and Dodge.
8) Finish relocating overhead electric lines at Hwy 169 & Co. Rd. 33.
City of Ell< River
2004 Annual Report
ELK RIVER MUNICIPAL UTILITIES
SUMMARY OF YEAR 2004
BUDGETS
ELECTRIC BUDGET SUMMARY
2004
ELECTRIC REVENUE
$ 14,612,605
ELECTRIC EXPENDITURES
13,300,049
ELECTRIC NET FOR CAPITAL
1,3 12,556
CAPITAL EQUIPMENT/CONSTRUCTION
2,585,300
NET
(1,272,744)
WATER BUDGET SUMMARY
WATER REVENUE
1,202,469
WATER EXPENDITURES
1,138,965
WATER NET FOR CAPITAL
63,504
WATER FEES GENERATED (FOR EXISTING &
FUTURE BOND PMTS)
360,000
DEBT RETIREMENT
155,445
GROSS
268,059
CAPITAL PROJECTS FROM CASH
NET
306,800
(38,741 )
STATISTICS
City of Ell< River
2004 Annual Report
Elk River Municipal Utilities Electric Demand
140000
120000
100000
~ 80000
.=
"C
C
III 60000
E
Gl
Q
40000
20000
0
1985
1990
1995
2000
2005
2010
2015
2020
Year
Elk River Municipal Utilities Annual Energy Purchases
700
600
~
r:: 500
0
:E 400
r::
.in
Gl
UI
III 300
..c::
l:!
::s
ll..
iii 200
::s
r::
r::
cl:
100
0
1985 1990
1995
2000
2005
2010
2015
2020
Year
City of Ell< River
2004 Annual Report
Elk River Municipal Utilities Projected Wholesale
Power Costs
$0.065
$0.060
::I:
~ $0.055
8. $0.050
~
.5 $0.045
-
U) $0.040
o
(.)
$0.035
$0.030
1990
1995
2000
2005
2010
2015
Year
The above graph reflects the unit cost of our wholesale power costs from Connexus Energy
through Great River Energy. Our power is purchased through a 10 year rolling all
requirements contract. In 2004 our total power costs were $8,563,925 including fuel
costs adjustments. Fuel cost adjustments at the wholesale level are very commonplace.
Distribution companies like ERMU will pass these costs on to the end user
Elk River Municipal Utilities Security Systems
350
50
300
III
E 250
.2l
III
:; 200
-
o
t 150
J:l
E 100
~
z
o
1990
1992
1994
1996
1998
Years
2000
2002
2004
2006
The above graph reflects the number of security system customers we serve. Due to the
increase in crime in our area, we are placing more emphases on security system marketing.
City of Elk River
2004 Annual Report
Elk River Municipal Utilities Peak Day Pumpage
16000
iii 14000
C)
I:)
I:) 12000
I:)
....
.5 10000
CIl
CIl
l'Cl 8000
Q.
E
:J 6000
D.
>-
l'Cl 4000
C
~
l'Cl 2000
CIl
D.
0
1985 1990 1995 2000 2005 2010 2015 2020
Year
This graph reflects the peak day system usages the water production facilities must satisfy. Growth of the
peak day demand dictates when additional water wells, filter plants, and water towers must be added to the
system. Pumpage projections in the above graph are a function of both weather and growth.
Elk River Municipal Utilities Annual Water Pumpage
2000
~ 1800
o
g 1600
o
~ 1400
....
.5 1200
Gl
l: 1000
c.
g 800
ll.
..
GI 600
i
iii 400
~
c
c
c(
200
o
1985
1990
1995
2000
2005
2010
2015
2020
Year
This graph reflects the annual water use in Elk River. Water use of 651 million gallons is a
3.31 % decrease from 2003 due to unusual wet weather.
...
o
Q)
E
i=
@~
3= ftI
:ll:::: Q)
CD..
.- 0)
>- .5
Q.=
Q.m
:::l
en
~
'u
ftI
LL
City of Ell< River
2004 Annual Report
Elk River Municipal Utility - Facility Supply @ Billing Peak
700
600
500
400
300
200
100
o
rt;~ ~:~ Cf:'
>:-~ &~ ~~
)'6 <<.~
~
'l(-~
o
)V~
~~
'S
r,,"- rIJ.
~ ~
'l(-'S ,&0
00~
rIJ. ~<.. 0<"
r!f'CJ ~0~ ..Qf'
o ~o ,iT
~~
2004 Month
Elk River Municipal Utilities - Facility Monthly Energy Output
::J: 600000
~
500000
.5
1 400000
-
~
o
- 300000
>-
.c
~ 200000
::i
~ 100000
'u
CIS
LL
o
~~ !b~ ~~
>:-v ',9~ ~'/j
':,'/j <<,0
.~
"l'
~~~
>:-0
':,'S
':,~ ~C} ',90<" (5)0<'' ',90- ',90-
'<(-v rt:' cF 0~ #~
00~ ~~"
2004 Month
City of Elk River
2004 Annual Report
MINNESOTA MUNICIPAL UTiliTIES ASSOCIATION
2004 RATE SURVEY RESULTS
Assignments of the members to groups is an attempt to achieve more clearly valid comparisons.
Rates between municipals reflect geographic and other local values which, in most circumstances,
are unavoidable or reflect reasonable local decisions. Therefore, use of these rate comparisons
should reflect care and analysis.
GROUP I:
Those municipals in the northern one-third of the state that do not have WAPA allocations. They
are generally winter peaking.
GROUP 2:
Those municipals which have federal hydro power available to them. It must be noted that some
have more hydro power available than others and that the mix of supplemental resources available
to them will vary.
GROUP 3:
Constitutes the remaining municipals in the state including Elk River.
Rate Survey Results are based upon the following:
)) Rates are tabulated for the month of November 2003.
)) Fuel/power cost adjustments are included.
)) Monthly base charges are included.
)) Sales tax is not included.
)) Large Commercial and Industrial rates are calculated for three phase
metering on secondary.
In conclusion, Elk River's rates are very comparable to all group statistics and we tend to be lower
than group 3 municipals which are our counterparts in the wholesale arena with no Western Area
Power Association (WAPA) power allocation. The triangle symbol on the following spread sheet
reflects Elk River Municipal Utilities rate position in comparison to I st quartile, average, and 3rd
quartile.
City of Elk River
2004 Annual Report
MMUA 2004 RATE STUDY
Residential COST PER KWH
250 KWH 500 KWH 750 KWH 1500 KWH
Total Per KWH Total Per KWH Total Per KWH Total Per KWH
All Groups
Minimum
1st Quartile $20.00 0.0800 $33.92 0.0678 $47.52 0.0634 $87.05 0.0580
Average ... $22.64 0.0906 ... $38.94 0.0779 $54.97 0.0733 $101.54 0.0677
3rd Quartile - $25.05 0.1002 - $43.23 0.0865 .& $60.83 0.0811 A $112.99 0.0753
Maximum
Elk River $24.83 0.0993 $42.63 0.0853 $60.48 0.0806 $113.95 0.0760
Group 3
Minimum
1 st Quartile $22.08 0.0883 $39.53 0.0791 ... $57.09 0.0761 ... $107.94 0.0720
Average .. $23.96 0.0959 .A $42.63 0.0853 ~ $61.04 0.0814 ~ $115.67 0.0771
3rd Quartile - $25.71 0.1029 $44.60 0.0842 $64.18 0.0856 $123.84 0.0826
Maximum
Elk River $24.83 0.0993 $42.63 0.0853 $60.48 0.0806 $113.95 0.0760
Commercial
500 KWH 1000 KWH 2500 KWH 5000 KWH
Total Per KWH Total Per KWH Total Per KWH Total Per KWH
All Groups
Minimum
1 st Quartile $39.25 0.0785 ... $70.46 0.0705 A $163.88 0.0656 ... $308.43 0.0617
Average .. $45.37 0.0907 ~ $79.95 0.0799 $193.32 0.0773 - $343.24 0.0686
3rd Quartile $49.65 0.0993 $87.60 0.0876 $199.50 0.0798 $376.60 0.0753
Maximum
Elk River $45.80 0.0916 $76.60 0.0766 $169.00 0.0676 $323.00 0.0646
GrouD 3
Minimum .. ...
1 st Quartile ... $43.74 0.0875 & $76.72 0.0767 - $180.00 0.0720 - $352.98 0.0706
Average - $48.25 0.0965 $86.39 0.0864 $199.21 0.0797 $385.80 0.0772
3rd Quartile $50.97 0.1019 $94.09 0.0941 $220.13 0.0881 $418.25 0.0837
Maximum
Elk River $45.80 0.0916 $76.60 0.0766 $169.00 0.0676 $323.00 0.0646
Industrial .
22,300 KWH 67,000 KWH 223,000 KWH 446,000 KWH
Total Per KWH Total Per KWH Total Per KWH Total Per KWH
All Groups
Minimum
1 st Quartile $1,149.94 0.0514 $3,372.00 0.0503 $11,029.00 0.0495 $21,971.00 0.0493
Average ... $1,355.91 0.0608 ... $3,863.00 0.0577 $12,753.00 0.0572 ... $25,452.00 0.0571
3rd Quartile $1,562.10 0.0700 - $4,278.00 0.0639 ~ $13,887.00 0.0623 - $28,586.00 0.0641
Maximum
Elk River $1,369.84 0.0614 $4,043.80 0.0604 $13,383.00 0.0600 $26,731.00 0.0599
Group 3
Minimum
1st Quartile ... $1,345.14 0.0603 ... $3,884.00 0.0580 $12,707.00 0.0570 ... $25,166.00 0.0564
Average $1,477.42 0.0663 - $4,142.00 0.0618 ~ $13,693.00 0.0614 - $27,350.00 0.0613
3rd Quartile $1,646.22 0.0738 $4,526.00 0.0676 $15,000.00 0.0673 $29,970.00 0.0642
Maximum
Elk River $1,369.84 0.0614 $4,043.80 0.0604 $13,383.00 0.0600 $26,731.00 0.0599
City of Elk River
2004 Annual Report
27
Elk River Municipal Utilities Service Territory
and Proposed Annexation
R 27 W R 26 W
35
36
31
, , , 't---1
..... ..... ..... I
..... ..... ........... ..
..... ..... ..... ..... ..... -:::-.....
..... ..... ..... ..... ..... .....
..... ..... ...... ..... ..... ...... .....
CONNEXUS
18
26
25
CONNEXUS
.
......
I'
..
................,
Z
N
n
t-
Q
2'
18
...... SERVICE AREA BOUNDARY
...... LIMIT OF FUTURE SERVICE TERRI TORY I 27 19
...... ELK RIVER CITY LIMITS D
[~~=~ YEARS ACQUIRED (1992-2003)
r.- -7-1 PROPOSED YEARS ACQUIRED (2004-2008) N
1t_/_,_~j , 33 3'
NO SCALE
KEY MAP
City of Elk River
2004 Annual Report
STAFF DIRECTORY
Department Staff
Elk River Municipal Utilities Organizational Chart
Utility Worker/Water
Scott Nielsen
Utility Worker/Water
Richard Cline
Elec Tech/Security
Michael Price
Utility Worker/Meter
Adam Freiberg
Utility W orker/W ater
Steve Ziemer
Utility Worker/Security
Rick Schaust
Elec Technologies/Water Superintendent
David Berg
Contractors and Special Vendors:
Marketing Consultant- Vance Zehringer
Safety program- MMUA
Dispatching- GRE
Electric Metering & Relays
Meter Reading- McBrady Meter Reading
Computer Support- Saratoga Co.
Substation Maintenance
Underground Contractors
Electric & Water Customers
Elk River Utility Commission
Jerry Takle - President
James Tralle - Vice Chairperson
John Dietz - Trustee
General Manager
Bryan Adams
Electric Superintendent
Glenn Sundeen
Office Manager
Patricia Hemza
Line Foreman Lead - Lineman Assist Office Manager
Wade Lovelette Mark Fuchs Vivian Schmidt
Lead - Lineman Lead - Lineman Purchasing Clerk
Arthur Gatchell Lloyd Lorenzen Judy McSpadden
Lead - Lineman Lead - Lineman AlP - Payroll Clerk
Scott Thoreson Trevor Gwiazdon Theresa Slominski
Lead - Lineman Lineman Clerk/Receptionist
Michael Thiry Thomas Geiser Betty Belanger
Apprentice Lineman Lineman Clerk/Receptionist
Jeffrey Henning Troy Seter Ryan Westre
Lineman Apprentice Lineman Clerk/Receptionist
Chris Sumstad Chad Grande Dolores Andreasen
Apprentice Lineman Utility Worker/Locator Clerk/Receptionist
Corey Wolff Richard Wagner Gregory Scherber
Utility W orker/Gen Laborer Clerk/Receptionist
Steve Ziemer Christine Holman Staci Althouse
Utility Worker/Locator
Jeff Murray
2005 GOALS & PROJECTS
City of Elk River
2004 Annual Report
Elk River Municipal Utilities' (ERMU) goals are in part reflected in our annual budget which is not
included in this report due to its length. It is safe to say this budget requires ERMU to continue
to provide reliable, cost effective electric and water utility services in a safe and
environmentally friendly fashion.
ERMU's staff spends a significant amount of time analyzing past trends and predicting the future for
physical plant items, financial requirements and human resource needs to insure we have adequate
capacity to successfully carry on our utility business.
The goals for 2005 in order of priority are as follows:
A) Satisfy 2005 Budget requirements and complete projects started in 2004.
B) Continue to investigate and solve long term physical and financial growth needs.
C) The wholesale electric rate from Great River Energy/Connexus is continuing to rise
in the next few years. Staff must continue to explore different strategies to offset
these increased costs thus minimizing electric rate increases.
D) Stay current on Electric Industry Restructuring and Service Territory issues.
E) Improve on marketing efforts in Security System sales, CIP Programs and Water
Conservation.
F) Continue to support Energy City activities.
G) Implement Global Information System (GIS), Global Position System (GPS), and
System Control and Data Acquisition (SCADA) systems.
H) Secure a water production facility site in Eastern Elk River.
WASTEWATER TREATMENT
City of Elk River
2004 Annual Report
MISSION STATEMENT:
To operate the sanitary sewer system in a cost effective and environmentally safe
manner.
YEAR IN REVIEW
The collection system was extended by 20,680 feet in
2004. This brings the total length of the system up to 67
miles of pipe with 19 lih stations.
In 2004 the control systems in the seven smaller Iihs
were upgraded. In addition, the Royal Oaks lih station
was rebuilt. The aher hours call-outs to Iih stations
continue to decrease.
The Primary Digester at the Treatment Facility was
rebuilt with a new cover, heating and mixing system, and Lob at the Wastewater Treatment P/am
control center. This project was carried over into 2005
due to some components having not yet arrived and some problems that occurred with
the new system.
A private firm was hired in the summer of 2004 to dry 520,000 gallons of bio-solids. The
solids were taken to the landfill by department personnel. In addition, another 350,000
gallons were land applied in the fall.
The department had two full-time operators resign and accept new positions in other
communities in 2004. One new employee was hired in November 2004 and another
was hired in January 2005.
This past year was very challenging and I believe the treatment facility and collection
systems will have to be upgraded and expanded for the next several years.
This past year the department was able to jet vacuum approximately two-thirds of the
sewer system. There are certain trouble spots that are done on a regular basis. We will
no longer be able to do the entire system each year.
STATISTICS
Year
987
988
989
990
991
992
993
994
995
996
997
998
999
2000
2001
2002 *
2003
2004
FLOW
Annual Daily Percent
Flow/Gallons Increase
480,000
481,000 .2
497,000 3.4
522,000 4.8
570,000 8.5
558,000 -2.2
593,000 6.0
635,000 6.6
670,000 5.3
754,000 I 1.2
741,000 -1.8
754,000 1.8
780,000 3.4
834,000 6.5
947,000 12.0
1,041,000 11.0
1,082,000 9.6
1,114,000 5.1
City of Ell< River
2004 Annual Report
* First year the average daily flow
exceeded 1,000,000 gallons
Average increase for the past five years
8.8%
Highest 2004 flow-November 2
1,505,000 gallons
The Wastewater Treatment facility has a current design capacity of 1,600,000 gallons
per day. The facility is currently loaded at 71 % of capacity.
CBOD's
CBOD's are a measurement of the oxygen depletion caused by the Wastewater
Treatment facility discharge. Our limit is 25 mglL
Year
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
Average Monthly
Level
10.2
9.7
9.1
5.5
6.0
6.0
7.0
7.5
9.0
11.4
Percent
of Limit
41
39
36
22
24
24
28
30
36
46
Daily Maximum
(mg/I)
25.5
20.0
21.2
14.4
9.0
11.0
13.0
14.0
15.0
18.0
SUSPENDED SOLIDS
City of Elk River
2004 Annual Report
Suspended solids are a measurement of the total solids in the discharge of the
Wastewater Treatment facility. Our limit is 30 mglL.
Year
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
Monthly
Average
8.8
8.8
7.6
5.9
6.0
7.0
5.0
6.1
8.0
10.7
Percent
of Limit
29
29
25
20
20
23
17
20
27
II
Daily
Maximum
(mg/l)
25
23
21
12
21
20
13
13
12
II
City of Elk River
2004 Annual Report
STAFF DIRECTORY
NAME TITLE START DATE
Gary leirmoe Chief Operator June 6, 1993
Austin Whitford lead Operator September 30, 1987
Dave Hubner Probationary Operator November 4, 2005
Matt Stevens Probationary Operator January I, 2005
2005 GOALS & PROJECTS
· The Primary Digester rebuild project should be
completed in early 2005. There have been some
operations problems since it came back online,
but these are being worked out with staff and
Howard R. Green. Also, some of the new
equipment did not arrive in 2004. This project
exposed some structural problems with the
secondary digester. The secondary digester may
have to have the cover removed in 2005 to
correct the problem.
City of Ell< River
2004 Annual Report
Work on the Digestor Cover Durin, 2004
· The Treatment Facility headworks upgrade
project should begin in mid-2005. This will be a major project and could carry
over into 2006. Howard R. Green has been working on the final upgrades to the
Treatment Facility in order to bring it up to final capacity. This will not be done
now but projects such as the headworks will be built to full capacity. The final
plans should be completed in 2005. Expansions will be completed as needed.
· The discharge permit (NPDES) will need to be renewed in 2007. At that time,
we will receive a phosphorus discharge limit. I anticipate this to be a limit of
I mgll or less. A phosphorus removal process will be installed with the
headworks project. Plant personnel will be trained on the operation and
maintenance of a phosphorus removal system. This will also require training on
the lab testing for phosphorus to maintain a level of I mgll or less. By beginning
this in 2005, we will have ample time to meet the limit for the new permit
phosphorus testing planned in 2005 throughout the collection system to identify
any heavy dischargers of phosphorus. The phosphorus levels entering the facility
indicate that most of the phosphorus is domestic rather than industrial. I have
been working with MN Tapp from the University of Minnesota on public
education for reducing phosphorus levels in the home. A possible method would
be to send out brochures with the monthly billing that would provide
information on alternatives for soaps, etc.
· The department has two new operators who will still be on probation during
part of 2005. We should be back to a four employee on-call rotation by June
2005.
· The one-third of the collection system that was not cleaned in 2004 will be
cleaned first in 2005. The old part of the system is cleaned every year. A portion
of the remaining system will be cleaned as time permits. The 2005 budget
contains funding for upgrading the lift at Upland Avenue and Main Street. This is
the last remaining station that has not been upgraded.
City of Elk River
2004 Annual Report
· A private company will be contracted, again, to help with the land application of
bio-solids. I anticipate that there will be approximately 550,000 - 650,000 gallons
of bio-solids to land apply.
· The Wastewater Department is hosting a Minnesota Wastewater Operators
Association (MWOA) Section meeting in April. At this time, MWOA is trying to
take on more of the training or at least assume a major role. As a department,
we have become involved in MWOA. I have been asked to become a sectional
officer this year, but due to time constraints I have declined. MWOA will be an
important player in any new regulations or discharge limits in the wastewater
fjeld. It is important that we become involved so all department personnel will
attend as much training as time permits in 2005.
· This promises to be a very hectic year for the Wastewater Department.
Construction at the Treatment Facility along with increased workloads will keep
us on our toes but I am sure as everyone knows, they are the byproducts of the
growth the city is experiencing. I expect 2005 to be a very busy and challenging
year.
ENGINEERING
MISSION STATEMENT:
City of Elk River
2004 Annual Report
I
To provide safe and efficient infrastructure for the citizens of the City of Elk River.
YEAR IN REVIEW
· Provided full time city engineer representation in City Hall through monthly
retainer agreement.
· Substantially completed construction of digester cover replacement at WWTP.
· City Council adopted Transportation Plan October 16, 2004.
· Substantially completed WWTP Master Plan.
· Substantially completed Trunk Sanitary Sewer extension analysis.
· Developed/refined city National Pollutant Discharge Elimination System (NPDES)
Inspection program for new developments. Created city generic Storm Water
Pollution Prevention Plan (SWPPP).
· Continued to develop positive working relationship with Sherburne County
engineering staff.
· Major development projects:
Elk Ridge Center
Prestigious Woodland Hills
o Twin Lakes Estates
River Place
Kliever lake Fields 2nd Addition
Trott Brook Farms 9th and lOth Additions
Elk River Station 2nd Addition
o Hillside Estates loth Addition
o Jackson Street Villas
City of Elk River
2004 Annual Report
STAFF DIRECTORY
NAME
Terry Maurer
I City Engineer
TITLE
Howard R. Green staff working in City Hall and/or Elk River Field Office on an as
needed basis:
John Anderson
Jeff Row
Tim Lamkin
Lisa Kiewel
Roger Bialke
Developer reviews and coordinates field services; Project
Manager on city initiated projects
Design Engineer/Construction Inspector
Staff Engineer/Construction Inspector
AutoCADD Technician
Lead Construction Inspector
City of Elk River
2004 Annual Report
2005 GOALS & PROJECTS
· Substantially complete 2005 Street Reconstruction Project (5th Street,
Upland/Tipton Avenue areas).
· Final completion of digester cover replacement project.
· Substantially complete WWTP head works renovations.
· Complete King Avenue parking lot expansion.
· Brown property industrial park development.
· Computerize Pavement Management System.
· Begin work on Storm Sewer Map.
· Receive federal funding for alternative analysis on TH lOin downtown area.
· Complete design and bidding of CR 40 (Cleveland Avenue) project.
· Prioritize and begin work on major transportation projects.
· Begin process for development of city "Cargill" land.