03-13-1989 CC MIN
MEETING OF THE ELK RIVER CITY COUNCIL
HELD AT THE COMMUNITY ROOM
MONDAY, MARCH 13, 1989
e
Members Present: Vice Mayor, Gene Schuldt; Councilmembers, Kropuenske
and Holmgren
Members Absent:
Mayor, Jim Tralle; Councilmember, Dobel
Staff Present:
City Administrator, Pat Klaers; City Engineer,
Terry Maurer; Street Superintendent, Phil Hals;
Building Zoning Administrator, Steve Rohlf and
City Attorney, Tim Keane
1. Pursuant to due call and notice therof, the meeting of the Elk River City
Council was called to order at 7:00 p.m. by Vice Mayor Schuldt.
2. Consider 3/13/89 City Council Agenda
COUNCILMEMBER HOLMGREN MOVED TO APPROVE THE 3/13/89 CITY COUNCIL AGENDA.
COUNCILMEMBER KROPUENSKE SECONDED THE MOTION. THE MOTION CARRIED 3-0.
3. Consider 3/6/89 City Council Minutes
COUNCILMEMBER KROPUENSKE MOVED TO APPROVE THE 3/6/89 CITY COUNCIL
MINUTES. COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED
3-0.
e
4. Public Mike
Robert Bischoff presented the Council with a letter regarding the Elk
River Community Theater. He explained that the Elk River Community
Theater has been honored to host the Minnesota Association of Community
Theaters Festival '89. one act play competition on April 7. 8. & 9. He
stated he is looking for representatives of the City to help usher and
assist the audience during this event and requested the Council to
assist. The Council indicated they would get back to Mr. Bischoff within
a week with their answer.
e
5.1 Knollwood Improvements/P.H.
5.2 Tyler Street Improvements/P.H.
Terry Maurer. City Engineer. indicated that a feasibility study for Tyler
Street was presented to the City Council in April. 1985. He indicated
that the project did not proceed because of the extensive right-of-way
acquisition needed to construct the project. Mr. Maurer explained that
the public hearing tonight was to receive public input on the proposed
projects and to determine whether the City Council should order the
preparation of plans and.specifications for Tyler Street improvements and
Kno11wood improvements. He stated that a public hearing had been held
for improvements in the Knollwood area in July. 1986. however. there were
objections raised by residents in the area stating that the overlay was
not necessary. The Council did not order the project at that time. Mr.
Maurer explained that as the Council has authorized a feasibility study
for Tyler Street improvements. they have also determined that the
Knollwood area should be reanalyzed. He stated that the streets are
badly worn and deteriorating and that it is not economical to continue
patching these streets. Mr. Maurer also noted that by combining the two
projects, the City would be able to get a better price from the
contractors.
e
e
e
Page 2
City of Elk River City Council Minutes
March 13. 1989
The City Engineer explained that the City is proposing a 9 ton design
urban section with concrete curb and gutter on the south segment and a
1~ inch bituminous overlay on the north segment of Tyler Street. He
indicated that the construction of the south segment between County Road
13 and 197th Avenue would be eligible for MSA funding as this part of the
street is being constructed to MSA standards. He noted that the total
estimated proj ect cost. for Tyler Street is $447.300 and stated that MSA
Funds would contribute $280.000 to the project. He stated that the City
is proposing that platted single family lots would be considered one unit
and further that one unit would be charged $1500 for the street
construction. Mr. Maurer stated that the properties along the south
segment of Tyler Street are agricultural or large rural lots and the City
is recommending that the assessments for these areas be based on a unit
basis and that 300 feet of frontage would be equivalent to one unit.
Mr. Maurer explained that the proposed improvements for Knollwood consist
of a 1~ inch bituminous overlay of the existing streets within the
Knollwood area. He stated that the estimated construction cost is
$86.200 and that the assessments would be charged on a per unit basis
with an estimated cost of $1.150 per unit. Mr. Maurer then proceeded to
go over the project schedule for both Knollwood and Tyler projects.
Vice Mayor Schuldt opened the public hearing at this time.
Jean Mord - 10906 202nd Avenue - questioned how long of a guarantee the
citizens would have on the overlay in Knollwood as the overlay is only
going to be 1~ inches thick.
Mr. Lindquist 10643 203rd Avenue - indicated that as far as he could
tell there has been no maintenance on the roads in Knollwood and stated
he is concerned about overlaying roads that are in poor condition instead
of redoing the roads.
Dale Jacobson - 19613 Ulysses - indicated that Ulysses between 195th and
197th Avenue had been overlayed approximately 8 to 10 years ago and does
not feel the road is in bad shape or in need of another overlay.
John Bakos - 19718 Tyler Street - indicated that he owns a corner lot on
Tyler Street and questioned the City's policy on assessing corner lots.
City Engineer indicated that he would receive only one assessment; the
highest assessment of the two roads.
Jan Willet - 19741 Ulysses - questioned why the City was assessing people
who abut the streets when everybody uses the roads. She further
questioned why the tax dollars do not take care of overlaying the roads.
Wayne Kellar - 19612 Tyler Street - indicated there is a large ravine by
his driveway and stated that much planning will have to be done in that
area on Tyler Street when the road is improved. The City Engineer
indicated that he will be working closely with Mr. Kellar if the project
is ordered.
Bill Weatherly 19885 Tyler Street questioned what the Engineer
proposed to do with the storm water runoff.
Page 3
City of Elk River City Council Minutes
March 13. 1989
e
--------------------------------------
Bill Harju
lots.
10733 201st Circle - also questioned the policy on corner
Mr. Max Maue - 19215 Tyler Street - stated that some of the larger land
owners are being taxed for one parcel of land and are not allowed to
subdivide their lots. He stated that it is unfair that the City assess
these property owners for more than one unit.
Howard Dolson - 19030 Twin Lakes Road - stated that if parcels can not be
divided by the City then they should be assessed for only one parcel. He
stated that he agreed with Mr. Maue.
Dave Burrandt - 19118 Tyler Street - questioned whether the north end and
south end of Tyler Street would be aligned. He further questioned the
number of parcels he is proposed to be assessed for and also indicated
that he would rather not see concrete curb and gutter in the area.
Mr. Wally Fox 19508 Ulysses - indicated to Mr. Maurer that there is
plastice under the pond in the area. Mr. Fox also questioned whether the
speed limit would be reduced on Tyler Street as it will be an urban road.
Mr. Keith Quammen 19823 Ulysses Street - questioned what the overall
width of the street would be when it was completed.
e
Herb Clausen - Twin Lakes Road - questioned the number of units he would
be assessed for. He stated that he did not feel the assessment was fair
and stated that he would not give the City any land or right-of-way for
the widening of Tyler Street.
Kari Nielson - 19796 Tyler Street - questioned why the City was proposing
curb and gutter for Tyler Street when there currently is no curb and
gutter in that area.
Mr. Mike Wirtz - 20020 Tyler Street - questioned when the City's policy
went into effect requiring curb and gutter in plats.
Mr. Dan Minch 10754 201st Circle - questioned what the interest rate
would be on the assessment.
Mary
$1150
paying
gutter.
Eberley 20204 Smith Street - questioned the equity of charging
for an overlay on Smith Street while Tyler Street residents were
$1500 per unit and receiving a reconstructed street with curb and
Mr. Don Heitland Tyler Street questioned what the speed limit
requirement would be when Tyler Street was reconstructed.
Mike Arnold - Smith Street - questioned whether there was any chance of
Smith Street receiving curb and gutter.
e
Mr. Lindquist 203rd Avenue questioned what type of preventative
maintenance the roads would receive once they were overlayed.
e
e
e
Page 4
City of Elk River City Council Minutes
March 13. 1989
--------------------------------------
Mr. Ron Harrington 19728 Ulysses - questioned the section of Ulysses
from 200th Avenue south. He indicated that this area had been overlayed
not too long ago. He questioned staff as to whether they could research
and find out when this area was overlayed. He stated he did not feel it
was necessary to overlay the road at this time.
Vice Mayor Gene Schuldt closed the public hearing at this time.
City Attorney. Tim Keane. indicated that because the projects are City
initiated a 4/5 vote by the Council would be required. Due to the fact
that only three members of the Council were present. Mr. Keane advised
that the Council close the public hearing and take no action on the
projects at this time.
COUNCILMBMBER KROPUENSKE MOVED TO
KNOLLWOOD IMPROVEMENT PROJECT.
MOTION. THE MOTION CARRIED 3-0.
CLOSE THE PUBLIC HEARING FOR THE
COUNCILMEMBER HOLMGREN SECONDED THE
COUNCILMBMBER HOLMGREN
STREET IMPROVEMENTS.
MOTION CARRIED 3-0.
MOVED TO CLOSE THE PUBLIC HEARING FOR THE TYLER
COUNCILMEMBER KROPUENSKE SECONDED THE MOTION. THE
Vice Mayor Gene Schuldt indicated that the Council would make a decision
on these two projects at the March 20. 1989 City Council meeting to be
held at the Elk River Public Library. He indicated however. that the
public hearing was closed and no public input would be received at that
meeting.
5.3
City Engineer Update
The City Engineer indicated that he has appeared before the Elk River
Utilities Commission regarding the western area sewer and water project.
He indicated that he has requested the Utilities Commission to contribute
funds towards the project. Mr. Maurer indicated that he has not received
a reply from the Utilities Commission at this time. however. they were
going to discuss it at their next meeting.
Mr. Maurer updated the Council on the Main Street bridge. He indicated
that he was working with the Historical Society regarding this matter and
he further stated that it is their hope that the Main Street bridge will
be taken off the Historical Society's list so it will not impede the
western area sewer and water project.
Mr. Maurer updated the Council on the Waco Street bridge north of Highway
#10. He indicated he was working on a cost estimate for the replacement
of this bridge.
Mr. Maurer indicated to the Council that he has prepared an application
on behalf of the City regarding riverbank erosion.
Mr. Maurer stated that he has submitted copies of the feasibility study
of the Highway 169 & 193rd utilities projects to the two property owners.
He indicated that he has not had a response from the property owners at
this time.
e
e
e
Page 5
City of Elk River City Council Minutes
March 13. 1989
--------------------------------------
Mr. Maurer
that they
and MnDOT
April 26.
indicated that he has received a letter from MnDOT indicating
are interested in another luncheon meeting with City Officials
Officials. He indicated that they gave a tentative date of
The Council consented to this date.
6. Consider Hiring of Police Officer
The City Administrator. Pat K1aers. indicated that the Police Department
has completed the hiring process for the vacant Police Officer position.
He indicated that they are recommending Russell Johnson. a Police Officer
from the City of Anoka. to be hired as a Police Officer for Elk River
effective March 22 and further that he be hired at the top step of the
Union pay scale.
COUNCILMBMBER HOLMGREN MOVED TO HIRE RUSSELL JOHNSON AS A POLICE OFFICER
FOR THE CITY OF ELK RIVER EFFECTIVE MARCH 22. 1989. AND THAT HE BE HIRED
AT THE TOP STEP OF THE UNION PAY SCALE. COUNCILMEMBER KROPUENSKE
SECONDED THE MOTION. THE MOTION CARRIED 3-0.
7.
Gambling License Renewal - Eagles
Vice Mayor Gene Schuldt indicated
application to the Charitable Gambling
gambling license. The Council took no
that the Eagles have submitted an
Control Board for renewal of their
action to deny this request.
8.
Building and Zoning Annual Report
Building and Zoning Administrator. Stephen Rohlf. began his annual report
by responding to questions from the City Council. A number of Council
members had questions regarding the percent of multi-family homes in Elk
River as compared to the total housing market. Reference was made to
Figure 2 of the report that showed approximately 12% of the housing stock
as Multi-family in 1984 and this figure dramatically changing to almost
22% in 1988. The Council was concerned over the significant increase of
Multi-family homes in Elk River as compared to single family homes and
the location of these multi-family homes. It was acknowledged that this
increase may have been due to a "catch up" period where the City had an
abnormally low percentage of multi-family homes in the housing stock in
1984. The Council requested that this item be added to the 4/8/89 Joint
City Council/Planning Commission Workshop agenda in order to discuss
possible ways of limiting the maximum percent of multi-family housing
units within the total housing stock. Council also requested that the
concept of phasing in the multi-family units in the future growth area of
the City (PUD areas) be discussed in order to control the number and
location of multi-family units in the future.
The Council asked questions regarding the
in the community and how many additional
the current zoning. Staff acknowledged
to be further reviewed and addressed but
saturated with billboards at this time.
size and location of billboards
billboards are allowed through
that this is an area that needs
noted that the City is somewhat
The Council discussed the Planning Commission Goals in 1989 as listed on
Page 22 of the Report. In this regard the City Council also requested
the working memo that would be sent to the Planning Commission in advance
to requests coming before them for formal action. Additionally. the
Council questioned the need for formal bylaws but concurred that some
guidelines are needed for the general operation of the Planning
Commission.
e
e
e
Page 6
City of Elk River City Council Minutes
March 13, 1989
--------------------------------------
At this time the Building & Zoning Administrator highlighted the
inventory of lots in Elk River. It was noted that in the most recent
eighteen months or so the City has noticed a decrease in the inventory of
lots. More housing permits have been pulled in the last eighteen months
than lots created. This is especially true in the sewer and water
district and the Building & Zoning Administrator noted that we may soon
have a shortage of available lots in the sewer and water district.
The Building & Zoning Administrator highlighted a number of points from
his Annual Report. These points included the fact that 1988, although
not a record year for total housing units constructed, was still a record
year for the number of single family housing permits pulled at the
Building Inspections Department. For the last three years the City has
averaged over 300 total housing units constructed and for the last two
Another point discussed by the Building & Zoning Administrator were the
accomplishments of his Department and the quality work produced by his
employees. Special recognition was given to Cliff Skogstad while working
as the Assistant Building Official when the former Building Official
resigned and Sharon Maue for handling the significant increase in
workload generated by his department. Stephen also praised new employee
Terry Zajac as fitting well into the organization and handling
residential inspections in an efficient and professional manner. Stephen
also thanked the City Council for the hiring of the Zoning Assistant,
Steven Bjork, which allowed himself to concentrate on some of the larger
issues relating to building and zoning. These issues which have required
some of the Administrators time include the landfill issue and the
recycling issues.
The City Council complimented Stephen on his report and the well managed
department that he runs for the City. The Council also acknowledged the
significant increase in activity in this department and the good image
which this department projects on behalf of the entire community.
9. City Administrator Update
The City Administrator showed the City Council a proposed site plan for
the Mork Clinic that is proposed for the intersection of Third Street and
Holt Avenue.
The City Administrator distributed a letter from the Minnesota Pollution
Control Agency which commended the City Sewer Plant operation and
indicated that it would be presenting a Certificate of Commendation to
the City at its annual Wastewater Operations Seminar to be held from
March 22 to 24, 1989.
The City Administrator indicated that he had been informally approached
by a member of the Sherburne County Board to ascertain the interest of
the City in the County property directly north of the Fire Station on
Jackson Avenue. The City Administrator was instructed to obtain
additional information from the County Board on this piece of property
and buildings.
10.
Other Business
No items were discussed at this time.
Page 7
City of Elk River City Council Minutes
March 13. 1989
e
11. Adj ournment
COUNCltMWGER HOLMGREN MOVED TO ADJOURN THE 3/13/89 CITY COUNCIL MEETING.
COUNCILMEMBER KROPU!NSKE SECONDED THE MOTION. THE MOTION CARRIED 3-0.
The meeting of the Elk River City Council was adjourned at 9:50 p.m.
Respectfully submitted.
:~y :JAuVJ~A ocr ~
Recording Secretary
fifud 1). (j alJt4
Patrick Klaers ~
City Administrator
e
e