6.8. SR 04-04-2005
Item # 6.8.
13065 Orono Parkway
Elk River, MN 55330
March 17,2005
File# 819610J-0030
The Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: BROWN INDUSTRIAL PARK
FEASIBILITY STUDY
Dear Council Members:
At the March 14, 2005 Economic Development Authority (EDA) meeting, a motion was
passed recommending to the City Council to authorize the preparation of a feasibility study
on the development of the Brown Industrial Park. As you are aware, this would likely
involve constructing utility and street infrastructure to develop an industrial park as shown
on the attached conceptual layout. Also attached for your consideration is a resolution that
will authorize the feasibility report to be prepared for this project. Since this is a city-
initiated project, adoption of this resolution requires a four-fifths vote of the City Council.
If you have any questions regarding this issue, I will be in attendance at your Apri14, 2005
City Council meeting.
Sincerely,
T!7~~
City Engineer
Phone: 763.635.1000
Fax: 763.635.1090
, . S:\EngineerlmprovProj\200S Improvement Projects\Brown property\04 04 05 cc memo.doc
www.cl.elk-nver.mn.us
'"I
RESOLUTION 05 -
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION FOR THE CITY OF ELK RIVER
ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE
MATTER OF THE BROWN INDUSTRIAL PARK IMPROVEMENT OF 2005
WHEREAS the City has determined that it should consider improving certain property by
constructing utility and street infrastructure (the Improvement); and
WHEREAS Council must first secure a preliminary feasibility study in order to consider making
the improvement;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,
Minnesota:
This matter shall be referred to the City Engineer, who is requested to provide to the City
Council a report advising, in a preliminary way, whether the proposed improvement is
feasible and whether the improvement should thus be made as proposed or in connection
with some other improvement and the estimated cost of the improvement as recommended.
Passed and adopted this 4th day of April, 2005.
Stephanie A. Klinzing, Mayor
ATTEST:
Joan M. Schmidt, City Clerk
s: \EngineerlmprovProj\200S Improvement Projects \Brown property\Prelim feas resolution,doc
.- ...~ ~~; !~~7'-:: - :::: .~.,: : ~:.~:.: ~~:-:
IV'- ,.;:.' "'/'
;/'-'>"
,
,-"""',
',..-1
\
,
"- ,.
,
,
~
RJ~er
EDA BROWN PROPERTY
OPTION 2
DATE:
1/5/2005
DRAWN BY:
CML
SCALE:
NOT TO SCALE
Fl