Loading...
6.8. SR 04-04-2005 Item # 6.8. 13065 Orono Parkway Elk River, MN 55330 March 17,2005 File# 819610J-0030 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: BROWN INDUSTRIAL PARK FEASIBILITY STUDY Dear Council Members: At the March 14, 2005 Economic Development Authority (EDA) meeting, a motion was passed recommending to the City Council to authorize the preparation of a feasibility study on the development of the Brown Industrial Park. As you are aware, this would likely involve constructing utility and street infrastructure to develop an industrial park as shown on the attached conceptual layout. Also attached for your consideration is a resolution that will authorize the feasibility report to be prepared for this project. Since this is a city- initiated project, adoption of this resolution requires a four-fifths vote of the City Council. If you have any questions regarding this issue, I will be in attendance at your Apri14, 2005 City Council meeting. Sincerely, T!7~~ City Engineer Phone: 763.635.1000 Fax: 763.635.1090 , . S:\EngineerlmprovProj\200S Improvement Projects\Brown property\04 04 05 cc memo.doc www.cl.elk-nver.mn.us '"I RESOLUTION 05 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION FOR THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE BROWN INDUSTRIAL PARK IMPROVEMENT OF 2005 WHEREAS the City has determined that it should consider improving certain property by constructing utility and street infrastructure (the Improvement); and WHEREAS Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to the City Engineer, who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 4th day of April, 2005. Stephanie A. Klinzing, Mayor ATTEST: Joan M. Schmidt, City Clerk s: \EngineerlmprovProj\200S Improvement Projects \Brown property\Prelim feas resolution,doc .- ...~ ~~; !~~7'-:: - :::: .~.,: : ~:.~:.: ~~:-: IV'- ,.;:.' "'/' ;/'-'>" , ,-"""', ',..-1 \ , "- ,. , , ~ RJ~er EDA BROWN PROPERTY OPTION 2 DATE: 1/5/2005 DRAWN BY: CML SCALE: NOT TO SCALE Fl