3.5. SR 04-11-2005 *Item 3.5.* MEMORANDUM TO: Mayor and City Council FROM: Bill Maertz, Director of Parks and Recreation DATE: March 7, 2005 SUBJECT: Authorize Staff to Contract with Forest Lake Contracting to Construct a Soccer/Football Field at Y AC BACKGROUND The 2005 Parks Capital Improvement Project included $110,000 for the construction of a full size lighted and irrigated field to be used for youth football and soccer. The Three Rivers Soccer Association has agreed to contribute $50,000 towards this project. Elk River Youth Football has agreed to contribute $20,000 to this project. Staff's initial estimate for field grading was approximately $30,000. Requests for proposal were sent to four qualified contractors, and three proposals were received. SUMMARY PROPOSALS RECEIVED Forest Lake Contractin Veit Com an Inc. Glenn Rehbein Com ames TOTAL $24,700 $71,000 $90,800 Staff called references for Forest Lake Contracting, and learned that they have completed quality projects, similar in scope and price. Forest Lake Contracting has completed field development in Roseville MN, Ramsey MN, Shoreview MN and Mahtomedi MN. Staff believes that the wide range in proposal cost is partly due to higher engineering costs from the higher proposals. The City of Little Canada recently completed a soccer field of similar scope and the grading cost was similar in price to the proposal from Forest Lake Contracting. STAFF RECOMMENDATION Contact with Forest Lake Contracting, 14777 Lake Drive, Forest Lake MN 55025 for the design and grading of a soccer/ football field at the Youth Athletic Complex at a total cost of $24,700. ATIACHMENTS: . Proposals from contractors . References and qualifications From Forest lake Contracting. rn I Apr-D5-2DD5 12:33pm From-FOREST LAKE CONTRAtTING !!rI!'!!!! April 5, 2005 Mr. Bill Maertz City of Elk River Parks and Recreation 1104 Lions Park Drive Elk River, Mimesota 55330 +6514644722 T-459 P.001/004 F-3D4 14m Lalce Drift Forest lake, '" 5502S PH: IlSf} 4644500 FAX: 1651]464.4722 Thank you for the chance to work on this project with you. We are available to start immediately and If you have any questions, please give me a call. Sincerely, ~;z:2- Daniel R. Vollhaber, PE President AN eQUAL OPPORTUNITY EMPloyeR Apr-05-2005 12:33pm Fru.-FOREST LAKE CONTRACTING . +6514644722 T-459 P.002/004 F-304 REQUEST FOR PROPOSAL PROJECT OVERVIEW The City of Elk River'is l;Uttently requesting proposals from qualified :6:r:ms fOJ: the design and const1:uccion of a 240' by 360' sOcceJ:/ football field located at the Elk River Youth Athletic:. CQttJ.pI.ex, 9950165- NW, Elk River MN 55330. The site is rela.tivdy flat with sandy, well draining 5oil. It is assumed that e1cisttng soil will be suitable for ut'lC. REQUIREMENTS The qualified fu:m must have experience of building and designing athletic fields with a list of .references. References should be submitted to the city for review with this propo:sal. Engineering and! or cOl1strUction Uxms must specify which fields they designed built or both designed and built. Desig,n/Construction firms sball COVel a. minimum scope of the following item$ and shall submit pricing in the following bre2kout for the cities review'; 1. Engineering services [0 incll1de at a miohnum: . Survey topography, constmction plan design and deveIopmel1t, plan review, and pla.n submittals. . Finn shall submir qualifications of key ertgin~g penonnel. .$ ~ 600.00 2. Erosion control to inclode: at a minimum: -silt fence, rock construction Ctltl:2.nCe., stJ:eet SW'eepmL . . $::> 0t:lC0 _00 3. Site remov~s to include nt: a minimum:' , Silt fence temoval, clearing a.nd grubbing. $ S-oc. .. eo 4. Field construction to include at a. minh:num: Supemsion, common cxc.nvadon. bean COnBtrI.lctiOI1. finish grading. f 14 ~r(l,O / TOTAL COST FOR FIELD CONSTRUCTION . d. $.:21/900.op Sip- ~L ~ n.'"~/~fs r Sa. t:1~ UTn'L A ~~.+'n:. k"ce. -;0 /?c no. .q-;u:. ~P& Ie... 1~1'1=> h~i..e? .:. Provisions should be made for a berm on the west side of the field for fan vlewmg. .:. Seeding and irrigation by others. ( CONDITIONS 1. Proposals due by April 5, 2005. 2. The City of Elk River reserves the right to reject any and all proposals. 3. Begin construction: Spring 2005, as early as weather and soil conditions permit. 4. Completion date: The field and berm must be prepared and ready for seeding by May 15, 2005. Completion date may be changed with approval of Bill Maertz, Parks and Recreation Director, City of Elk River. 5. The selected contractor shall provide certificates from their insurance carrier showing coverage as follows: Commercial General Liability Insurance ($1,000,000 per occurrence Before starting and until written acceptance of the work by the City of Elk River, the Contractor shall maintain (certificate provided to City of Elk River representative prior to delivery and installation) liability insurance coverage for property damage and personal injury with combined limits of at least $1,000,000 per occurrence. The City of Elk River shall be named as an additional insured and the certificate shall state that the policy of insurance will remain in full force through the period of construction and until final acceptance of the project in writing by The City of Elk River. The Contractor further agrees to defend and hold harmless from any and all claims for property damage, personal injury, or death arising out of the project prior to final acceptance of the project by the City of Elk River COMPLIANCE WITH LAWS AND REGULATIONS The selected contractor shall comply with all Federal, State and City regulations and is totally responsible for understanding and compliance with dlese requirements. CONTRACT PAYMENTS The contractor shall receive 90% of the contract amount within 30 days of completion of the project as agreed to by the contractor and City of Elk River. The remaining 10% shall be paid 90 days following the first payment if all contract/project issues are resolved ATTACHMENTS: 1. Aerial Photo 2. Map of Location 3. Concept Design/Field Alignment Please submit proposals to Bill Maertz, City of Elk River, Parks and Recreation Department. 1104 Lions Park Drive, Elk River MN 53330, no later than 1 :00 PM, April 5, 2005. The City of Elk River thanks you for you interest in this project. RDF PLANT -\. <vV Q;-~ ~ <:.\>' ~ w 155TH -' >- l- I I- ::i: Vl I- 154TH -' w > w (j) 0 0 >- IY U 0- z 153RD 0 ~ CO a ~ 0 -' ....... 0 ~ ~ g ~ Location Map ~ N Case Number: DIRECTIONS TO THE YOUTH ATHLETIC COMPLEX snld po ~rJ;;5e1 dH 'Wd .,.5:>>:Y SOOZ/SY/Z: '6Mp"lnoAe, J3JJos\s6u!MeJO\:)\fA\SlIJed'\DNINNVld\:S " , ,-i'" I I\. , I ~ \ I \ ". "- I \ ~ C'-' "- I ~ \ ..... , xE=: \ I ;:;E -< \\ o:lg I ....4 \ I ga \ I \ L_______-.J ~ w ..... <:( u (I) o I- wI-- ~o .,z II'l o o n ~ID ..~ i..... ~........ ~:::!; ON oU , " " " '" "" -,. "- , , ,---T---i o~ ~ ~ ~, ;- ~D r V ~ '( ~ 1-] _.-J L_ L___--L___-.l \ '....ii_ , >.Ll ffi >- -< b '<:t N :< b \0 ...., ...!:: ii=i \0 ~ ~ ~ ~ ~ 0 U U ~ ~ ~ ~ ::q ~ ~ E-< ::q B >- w ~ -< ~ ~ ....4 w ..::: ~ >.Ll -'" 0 U .;:; U ~ ~ 0 '" ... CI.l '" '" V'l U -< >- ~~ 0 ~2 CJ I \ "-- I." I DNDnIVd '.. ....:. I t:l x~ ;:;E?;; o:l....... ?< >.Ll fIIIPi ..' ;..... i.... " " " ,..., ,..... ",....' ,,' " " .' ..;" ,.' ....,..... ....,.. " ,...... .,., " "", . 00 8l C9 00 8l C9 00 VEIT & COMPANY, INC. 14000 Veit Place Rogers, MN 55374 . Phone 763.428.2242 " Fax 763.428.8348. www.veitcompanies.com EST. 1928 April 5, 2005 Mr. Bill Maertz City of Elk River Parks & Recreation Department 1104 Lions Park Drive Elk River, MN 53330 Project: Elk River Y AC Soccer/Football Field - Elk River, MN Dear Mr. Maertz: Veit & Company, Inc. (Veit) is pleased to submit the following designlbuild proposal for your future soccer/football field at the Elk River Youth Athletic Complex ill Elk River, MN. Veit has teamed up with Brauer & Associates, Ltd. (Brauer) for design and consulting services, and we will self perform the project grading. I have attached resumes for our project team for your review including: . . . . Project Mana~er: Matthew Coz of Veit & Company, Inc. Project Supenntendent: Mark Kraemar ofVeit & Company, Inc. Project Architect: Jason Amberg of Brauer & Associates, Inc. EngineeringlDesignlDraftinglSupport: Brauer & Associates Staff Our proposal is respectfully submitted with the following included qualifications: 1. Engineering Services: · Initial site survey including preparation of an existing conditions topo. · Preliminary construction/grading design and submittal for Parks Department plan review. · Final grading design incorporation Park Department comments. Please note our proposed design assumes suiface water management can be handled with minimal site grading assuming on-site containment. 2. Erosion Control: · Includes containment silt fence (est. 1,400 LF), rock construction entrance & street sweeping. 3. Site Removals: · Includes silt fence removal and clearing/grubbing. 4. Field Construction: · Supervision, topsoil stripping and respread assuming 6 inches of on-site topsoil stockpiling and reuse, common excavation providing surface drainage for storm water without draintile, berm construction and finish grading as necessary. · Final grading design assumes balancing on-site soil quantities resulting in no site export/import. . Thanks for the opportunity to submit a proposal and feel free to call with any questions at 763-428-6730 (direct) or 612-919-0124 (mobile). . :::;;# ~?k:- Earthwork Divisio Veit & Company, Inc. "Best Service in the Business" REQUEST FOR PROPOSAL PROJECT OVERVIEW The City of Elk River is currently requesting proposals from qualified firms for the design and construction of a 240' by 360' soccer/football field located at the Elk River Youth Athletic Complex, 9950 165th NW, Elk River MN 55330. The site is relatively flat with sandy, well draining soil. It is assumed that existing soil will be suitable for use. ( REQUIREMENTS The qualified firm must have experience of building and designing athletic fields with a list of references. References should be submitted to the city for review with this proposal. Engineering and/or construction firms must specify which fields they designed built or both designed and built. Design/Construction firms shall cover a minimum scope of the following items and shall submit pricing in the following breakout for the cities review: 1. Engineering services to include at a minimum: Survey topography, construction plan design and development, plan review, and plan submittals. Firm shall submit qualifications of key engineering personnel. $ '~7 COG' ~ 2. Erosion control to include at a minimum: -silt fence, rock construction entrance, street sweeping $ ,-v ? 000 3. Site removals to include at a minimum: Silt fence removal, clearing and grubbing. $ cO ~, 600 4. Field construction to include at a minimum: Supervision, common excavation, berm constmction, finish grading. fit -')4. 000 ,-v TOTAL COST FOR FIELD ONSTRUCTION $ (.10 1/ , ODD f::> i 6 Tb 77f'- Signature Date 4-'i:-tIS- REHBEIN COMPANIES 8651 NAPLES ST. N.E. BLAINE, MN 55449 Phone (763) 784-0657 Fax (763) 784-6001 www.rehbein.com Equal Opportunity Employer April I, 2005 Mr. Bill Maertz City of Elk River, Parks and Recreation Department 1104 Lions Park Drive Elk River, MN 55330 Ph (763) 635-1150 * Fax (763) 635-1155 Re: 1 65th St Soccer Fields, 240' x 360' Soccer Field, Future Youth Soccer Field Glenn Rehbein Excavating, Inc. is pleased to provide you with a proposal for the project referenced above. Erosion Control . Silt fence - install and removal . Street sweeping for our work · Rock construction entrance $5,000.00 Site Removals . Clear & grub $2,500.00 Site Grading I Field Construction . Supervision . Strip & respread topsoil . Cut & fill · Finish grading of360' x 240' field, grass parking areas $65,000.00 Surveying . Survey topography . Construction staking $9,000.00 Engineering $9,300.00 · Construction plan design and development . Plan review . Plan submittal Lump sum bid for this project: $90,800.00 Exclusions: · Permits/fees, compaction testing, soil borings, any dewatering, tree protection fence, disposal of any hazardous or contaminated materials, turf establishment I tree replacement or relocation, wetland delineation or mitigation, bituminous or concrete paving, all winter conditions, removal or relocation of any existing utilities, retaining wall construction, soil corrections If you have any questions, please do not hesitate to call. Respectfully: Glenn bein Excavating, Inc. 10f1 REQUEST FOR PROPOSAL PROJECT OVERVIEW The City of Elk River is currendy requesting proposals from qualified firms for the design and construction of a 240' by 360' soccer/football field located at the Elk River Youth Athletic Complex, 9950 165th NW, Elk River MN 55330. The site is relatively flat with sandy, well draining soil. It is assumed that existing soil will be suitable for use. REQUIREMENTS The qualified firm must have experience of building and designing athletic fields with a list of references. References should be submitted to the city for review with this proposal. Engineering and/or construction firms must specify which fields they designed built or both designed and built. Design/ Construction firms shall cover a minimum scope of the following items and shall submit pricing in the following breakout for the cities review: 1. Engineering services to include at a minimum: Survey topography, construction plan design and development, plan review, and plan submittals. Firm shall submit qualifications of key engineering personnel. ~ $. le,200 ~ . 2. Erosion control to include at a minimum: -silt fence, rock construction entrance, street sweeping Cl.Sl. $ 5"/ coo 3. Site removals to include at a minimum: Silt fence removal, clearing and grubbing. OQ .;z $"00-- / $ 4. Field construction to include at a minimum: Supervision, common excavation, berm construction, finish grading. ..(" ~S" 000 ~ I TOTAL COST FOR FIELD CONSTRUCTION en;> S"sna~ .. ... $ Date ~tfs- Apr-05-Z005 12:33pm From-FOREST LAKE CONTRACTING +6514644722 T-459 P.DD3/D04 F-3D4 Project References for Forest lake Contracting, Inc. Roseville Soccer Fie'ds - Dale Street Contact Person: Roseville Parks Mr. Jeff Evenson at 651-415-2115 . Designed and constructed by FLC . Converted two soccer fields with drainage problems (Rainwater would percolate too slowly, creating use problems. Solution: Imported both sand and organic sOlis and mixed them on-site to aHow for rapid drying of fields. Shoreview Rice Creek Park Improvements Contact Person: Shorevlew Engineering - Mr. Tom Hammit at 651-490-4650 . Multi-field athletic complex constructed by FLC Mahtomedi Southwest Park Contact Person: Mr. Dan Parks - MFRA - 95.2-47S.e010 . Multivfield Athletic Complex constructed by FlC Ramsey - Alpine Park - Sunfish Lake Blvd. & 153"' Avenue Contact: Mr. Steve Jankowski at 763-427-1410 . Multi-field project constructed by FLC Apr-05-2005 12:34pm From-FOREST LAKE CONTRACTING +8514844722 T-459 P.004/004 F-304 ELK RIVER YOVTlf ATHLETIC COMPW FIRM OUAUrlCATlONS Jolm Oliver & Associates,lnc. is a full service Land Surveying and Civil Engineering linn &erviqgprivatc and local governmental clients. Established in 1968 as a Land Surveyina fmn, we have grown into a multiftdisciplinary fmn providins a full range of'professional services in Civil Engineering, Land Surveying and Land Plarming. Our staff has grown to over seventy with officC$ in Elk River, Burnsville and Brooklyn Center, Minnesota. The Firm hils developed a reputation among its clients for professionalism and excellent work. Technical expertise, a common- sense approacb and a wealth of experienoe have led to $ucoeWbl projects and well-satisfied Clients. John Oliver & Associates, Inc. serves a diverse clientele: including governmental agencies at municipal, County and atate levels. as well as a wide range of private cUenb. 10hn Oliver 4\ Assootatcs, Inc. prides itself on its ability to develop and maintain close working relationships with clients. organizations and agencies. Through years of experience we have pined a clear understanding of their problems and special needs. Jobo Oliver & Associates, Ine., cwrentJy has appro.ximately 200 active projects at various stages of planning, design and eoastruction, with an estimated total construction cost value of over 5100,000,000. Ourprojccts range from small rosidential plats to larger multi-use and corrunercial developments. We believe that the number one need of a Client is service. When our client needs us, we respond immediately. To accomplish this, the Principal In Charge or the designated Project Engineer will act as your representative at John Oliver & Associates. Inc. Each of these key people within John Oliver & Associates, Inc. have a dedicated tecJmical support team. This allows us to be responsive to your needs. When you call your contact person, you will receive a prompt response. The project team committed to your projects will consist of Bill Moonen, PEt as Projeot Manager; Bzyan Balcome, PLS as Land Surveyor IUld Bryan Cliche as Technician Supervisor. These individuals will be responsible for your' needs and schedules. They will obtain the necessary support staf'fto meet the project schedule. John Oliver & Aasociates, Inc. has provided engineering and surveying services for numerous projects oftbis type. These projects include; Zimmerman}uniDl' Higb School (ISD 728) Design of softball fields., soccer/football fields and tennis courts a5 part of construction of II new jWlior high school Rogers Junior High School (lSD 728) Design of softball fields, soccer/football fields and tennis courts as part of construction of a new junior high school Rogers Community Center (City of Rogers) Forest Lake Junior High School (lSD BJ 1) Design of softball fields IlDd. soccer fields for a recreational fitcility Design of softball fl~lds. soccer/football fields and tennis courts 8S part of construction of a new junior high school Rogers Senior High School (ISD 728) De$ignofsoftball fields, socoer/football fields and tennis courts as part of constrUCtion of a new seniOl" high school