5.5. SR 04-11-2005
Item 5.5.
MEMORANDUM
TO:
FROM:
Mayor and City Council
Pat Klaers, City M~tr. ator
yt1 /\jh(;V
April II, 2005
DATE:
SUBJECT:
Capital Improvement Program
The City Council worksession on the Capital Improvement Program (CIP) is scheduled for
April 11, 2005. The first part of the meeting will be a presentation from Finance and
Administrative Services Director Lori Johnson and representatives of EWers and Associates,
Inc. regarding the city Financial Management Plan. The second part of meeting will be a
discussion on proposed projects and equipment expenditures.
The financial material from EWers will be handed out at the meeting on April 11. This
information will help the Council make funding decisions and establish priorities for various
projects.
Attached to this memo is the updated 10 year CIP detail pages. Also attached are three sets
of summary pages. One reviews the projects by department and funding source; one reviews
projects by funding source only; and one reviews the projects by departments. All three
summaries provide very good information when looking at all of our needs and trying to
determine which items should be funded as proposed, which items need to be delayed, and
which items we simply cannot afford.
In looking at the attached CIP it is easy to see that there is lots and lots of information to
review. The CIP includes all projects on a citywide basis that we can anticipate for the next
ten years. The ten year CIP typically provides the most detail in the first few years and much
less detail in later years. A City Council CIP update every two years or so (the typical length
of a street improvement project) helps keep the plan current. The adoption of a ten year CIP
is a reflection of City Council goals and serves as a work program for city staff.
It is likely that the city will not be able to afford all of the requested equipment/vehicles,
buildings, land acquisitions, or street construction projects. This is where priority ranking
from the City Council is important and a distinction is required between truly needed
projects and equipment and ones that are "nice to have."
April II, 2005
Page 20(5
Capital Improvement Program Worksession
It should be noted that the timing and cost for some projects are very difficult to predict. An
example is when expenses will be required to repair or upgrade Ditch 28 and how large of a
project will be required. AdditiQnally, revenues for some projects are simply not available.
An example of this point is the Ice Arena which has needs for a Zamboni and building
improvements; whereby the Ice Arena annually loses money. In this regard, other funding
sources, either reserves or taxes, need to be made available if the Ice Arena improvements
are to be made or the equipment is to be purchased. These two factors (and many other
issues) make the ten year CIP a very difficult document to put together. In many respects,
after the first few years the CIP is an educated guess and this is why the CIP needs to be
updated frequendy.
I think the City Council should concentrate on CIP expenditures related to
equipment/vehicles, buildings, and streets. I am most concerned about expenditure that
direcdy or indirecdy come from tax revenues and reserves. I am less concerned about
expenditures that come from Enterprise Funds (i.e. Sewer Fund) or from Park Dedication
although these expenditures still need to be closely reviewed to make sure the city is not
getting over-extended.
The following comments, broken out by type of expenditures, are offered to help in your
discussion at the April 11 meeting.
Equipment/Vehicles
Equipment and vehicles for the next ten years are going to be needed in almost all city
departments. As the city grows, so does our need for additional equipment/vehicles. The
most expensive equipment and vehicles are street trucks, fire trucks, park equipment, and
police vehicles. The main funding source for equipment/vehicles has been the General Fund
(taxes), Equipment Certificates (tax levy for 3-5 years-with interest payments), and
Equipment Reserves.
One of the goals I have is to equalize on an annual basis the total expenditures for
equipment and vehicles. In 2005 the Equipment Reserve expenditures are $199,200, the
Equipment Certificate expenditures are $780,000, and the General Fund expenditures for
equipment are $131,600. This is over $1.1 million for equipment. This is the high point over
the next five years.
In the future, as much as possible should be moved into the General Fund in order to
decrease our dependence on Equipment Certificates. However, over the past five years our
Equipment Certificate budget has averaged $316,000; and this CIP shows Equipment
Certificates over the next five years averaging $746,000. This increase is in conflict with our
financial management goal of reducing our dependence on Equipment Certificates. Either
some items need to be moved to the General Fund; or some requests for equipment and
vehicles need to be eliminated; or the Equipment Certificate goal will not be achieved.
Given normal increases in the tax base and the desire to keep the tax rate level, part of the
financial equation that the City Council will have to sort out is how much equipment should
be funded from each funding source. This is not an easy equation. Dealing with our growing
s: \ Council\pat\2005\ Worksessions \ CIP.doc
Apri///, 2005
Pagd of 5
Capita/Improvement Program Worksession
equipment/vehicle needs will be one of the biggest financial challenges that the City Council
will have over the next few years.
Buildinis
A number of building projects are fairly certain in the next few years while the timing of
numerous other building projects are difficult to predict. For example, we know that
Westbound is happening in 2005 and some improvements at the Public Works facility (cold
storage and sand/salt shed) are also scheduled for 2005. (please note that the 2006 Public
Works building improvement that is shown in the CIP still needs Council discussion.)
Plans are also moving forward for the Library expansion in 2007 but this needs City Council
confirmation and the funding for this project needs some City Council discussion. A final
decision on funding does not need to be made until 2006; but the quicker the better.
Funding for the Library is somewhat tied to revenues from the Landfill. The Landfill Host
Fee goes into the Government Building Reserve, Street Reserve, and the Library Reserve.
There will not be enough money available in the Government Building Reserve and the
Library Reserve in order to entirely fund the Library expansion project. In this regard, an
EDA lease purchase approach to funding the Library should be considered. This approach
would require tax dollars if there are not funds available to make annual debt payments.
However, if the landfill expansion is approved and the host fees continue to be received,
then non tax money should be available to make these debt payments.
Also included in the ten year CIP is the completion of the second level of the Police Station
in 2014 and Phase II improvements ($2.8 million) at the Public Works Facility. The timing
of the public works project is mosdy dependent upon available monies, while on the other
hand the police expenditure is more modest and will likely be more dependent upon when
the space is needed. Government Building Reserves is (again) the likely revenue source for
both projects.
Another building improvement that is being discussed is an expansion to Fire Station 1. This
expansion will be funded by the Ambulance Association. At this time this project is not in
the attached CIP.
It should be noted that there are no monies in the CIP for the YMCA project, for a
community center project, for a senior center, or for a contribution to an arts building.
In addition to the new buildings that are being proposed, there are also significant expenses
for building repair/maintenance issues. These expenses include a roof at the Ice Arena, a
chiller at City Hall, a roof at the Public Works building, and the remodeling in the Public
Works building.
Streets
This is an area that will need City Council discussion and prioritizing. While there are not too
many streets listed in the CIP it should be noted that some of them could be expensive.
Some of the street issues include:
1. How large of a Pavement Rehabilitation Program we should do every two years;
s: \ Council\Pat\200S \ Worksessions \ CIP.doc
APril II, 2005
Page 4 0(5
Capital Improvement Program Worksession
2. Whether or not we should do such projects as a signal at the School Street and Lions
Park Drive entrance;
3. How big should the Highland Road project be, i.e. whether or not sewer and water
should be included and whether or not the street should be made more narrow; and
4. When are the two east Elk River projects going to happen?
Additionally, some projects are needed but yet don't seem to be urgent, such as Dodge
Avenue between Elk Hills Drive and 5th Street. Furthermore, some streets are on our
"eliminate gravel roads" list of goals and these include 213th Avenue and the
189th /Troy /Pascal projects.
Land Acquisitions
The most common land acquisition that takes place in the city is for parks and trails. Most of
our land for municipal buildings has already been acquired; although new issues could arise
that have yet to be identified.
It is possible that a bond referendum will be proposed for the acquisition of additional park
land. It is essential to obtain key park properties prior to development and prior to them
becoming so expensive that they are unaffordable. The bond referendum for major land
acquisition items may also include an outdoor pool, which is one community amenity that is
frequently noted as being absent in t;he city.
One land acquisition issue to note is somewhat sensitive but very important. This is the
potential relocation of the fairgrounds to Becker and the strong desire for the city to obtain
this property if the fair relocates. This fairground property would be essential to completing
our municipal complex. The fair is located on approximately 30 acres that is bordered by
Joplin Avenue, Orono Parkway, and city property to the east and north. Funding for this
acquisition needs to be identified now and money put aside so that when the opportunity
presents itself we are ready. In this regard, I recommend that for this purchase the City
Council use the twenty-five cents of the Landfill Host Fee that has not yet been designated.
If the landfill expansion takes place and no change happens in the host fee law, then over
time this revenue source should be more than sufficient for this acquisition. (The
fairgrounds would be a great location for a community center.)
Parks
Please see the park dedication expenditures. These expenditures reflect the ten year CIP that
the Parks and Recreation Commission has reviewed. These expenditures are subject to
annual revisions and approval by the City Council. It is likely that the totals being proposed
will be adjusted as revenues are received. There are some ambitious park expenditures in
2006 (Rivers Edge Commons-downtown park, Youth Athletic Complex), and 2008 (Orono
Park), and 2009 (Hillside City Park and Woodland Trails Park).
Other
There are also some atypical expenditures that need to be reviewed by the City Council.
Some of these proposals are unusual because there is no funding source readily available for
them and some of these proposals are unusual because they happen very rarely and are
difficult to classify. In this regard, it should be noted once again that there is no real funding
s: \ Council\Pat\200S \ Worksessions \ CIP.doc
April II, 2005
Page 5 0(5
Capital Improvement Program Worksession
source for the Ice Arena expenditures as the Ice Arena doesn't make money. Funding
sources for the Ice Arena needs will likely be taxes, Equipment Reserves, Equipment
Certificates, and Government Buildings Reserve. It should also be noted that 2005 is the last
year for our payment to the school for the small theater. Additionally, in 2007 it is predicted
that the city will need to spend approximately $152,000 for police radios. This assumes the
800 MHz county wide project will take place and, if this is going to happen, then we will
likely see additional expenditures for radios for other city departments.
The ten year ClP is a very comprehensive and complex document. The listing of desired and
needed improvement projects, land acquisitions, new buildings, and equipment/vehicles is
very important but there needs to be some reality added in terms of what we can afford. The
financial considerations include net tax capacity increases, concerns over the city tax rate,
and the need to add employees into the annual operating budget.
While capital planning is difficult, I believe that the city has been doing very well in meeting
its needs in a financially reasonable manner over the past few years. So far I believe that
everything has balanced out very well based on City Council priorities.
There will be a few items that staff would like City Council decisions on at the April 11 ClP
meeting. These items include:
1. A request to purchase a $30,000 Parks Department truck (1 ton) in 2005 using
Equipment Reserves as the currently used vehicle is no longer in a safe operating
condition.
2. A request to use $72,000 in Equipment Reserves for a new snowblower for snow
removal in the downtown as the old snowblower has broken down and replacement
parts are no longer available.
3. A request to use approximately $25,000 in Equipment Reserves for street sweeper
rental so that two sweepers can be tested before one is purchased (by way of using
Equipment Certificates).
4. Direction on use of the Host Fee for a future land purchase.
5. Council direction on the Library project.
s: \ Council\Pat\2005 \ Worksessions \ ClP.doc
Capital Improvement Plan 2005 thru 2009 Contact city Clerk
City of Elk River, Minnesota Department Administration
Project # AD-Ol Type Equipment
Useful Life
Project Name Administration Office Equipment
Category Office Equipment
Priority 3 Important
Description I
Scanner
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 6,500 6,500
Total 6,500 6,500
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 6,500 6,500
Total 6,500 6,500
2005 elP Draft 3/30/05 Page I of 99
Capital Improvement Plan 2005 thru 2009 Contact City Administrator
City of Elk River, Minnesota Department Administration
Project # AD-02 Type Equipment
Useful Life 5 years
Project Name Smart Board Additions
Category Equipment
Priority 4 Low Priority
Description I
2006 - EOC
2007 - Uppertown Conference Room
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 16,000 16,000 32,000
Total 16,000 16,000 32,000
Funding Sources 2005 2006 2007 2008 2009 Total
Government Buildings Reserve 16,000 16,000 32,000
Total 16,000 16,000 32,000
2005 elP Draft 3/30/05 Page 2 of 99
Capital Improvement Plan 2005 thru 2009 Contact Building & Env. Admin.
City of Elk River, Minnesota Department Building & Environmental
BZ-Ol Type Vehicle
Project #
Useful Life 10 years
Project Name Vehicle Replacement
Category Vehicles
Priority 3 Important
Description I
Replacement trucks for building inspectors based on 10 year useful life. Depending upon mileage, vehicles may need to
be replaced in less than 10 years.
2004 - 4 wheel drive pickup truck
2005 - SUV
2009 - 4 wheel drive pickup truck
2010 - 4 wheel drive pickup truck
2011 - 4 wheel drive pickup truck
2012 - 4 wheel drive pickup truck
2014 - 4 wheel drive pickup truck
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 22,000 26,000 48,000
Total 22,000 26,000 48,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 22,000 26,000 48,000
Total 22,000 26,000 48,000
2005 elP Draft 3/30/05 Page 3 of 99
------
Capital Improvement Plan 2010 thru 2014 Contact Building & Env. Admin.
City of Elk River, Minnesota Department Building & Environmental
BZ-Ol Type Vehicle
Project #
Useful Life 10 years
Project Name Vehicle Replacement
Category Vehicles
Priority 3 Important
Description I
Replacement trucks for building inspectors based on 10 year useful life. Depending upon mileage, vehicles may need to
be replaced in less than 10 years.
2004 - 4 wheel drive pickup truck
2005 - SUV
2009 - 4 wheel drive pickup truck
2010 - 4 wheel drive pickup truck
2011 - 4 wheel drive pickup truck
2012 - 4 wheel drive pickup truck
2014 - 4 wheel drive pickup truck
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Vehicles 24,000 24,000 25,000 25,000 98,000
Total 24,000 24,000 25,000 25,000 98,000
Funding Sources 2010 2011 2012 2013 2014 Total
General Fund Operating 24,000 24,000 25,000 25,000 98,000
Total 24,000 24,000 25,000 25,000 98,000
2005 elP Draft 3/30/05 Page I of 49
Capital Improvement Plan 2005 thru 2009 Contact Building Maintenance Supv.
City of Elk River, Minnesota Department City Hall
Project # CH-Ol Type Building
Useful Life 15 years
Project Name Chiller Replacment Category Building Maintenance
Priority 2 High Priority
Description I
2009 or TBD - Replace roof top liquor chiller
Justification I
15 year life expectancy will end in 2009
Expenditures 2005 2006 2007 2008 2009 Total
Building Maintenance 70,000 70,000
Total 70,000 70,000
Funding Sources 2005 2006 2007 2008 2009 Total
Government Buildings Reserve 70,000 70,000
Total 70,000 70,000
2005 elP Draft 3/30/05 Page 4 of 99
-~ ------..--
Capital Improvement Plan 2005 thru 2009
Contact Gary Lore
City of Elk River, Minnesota Department City Hall
Project # CH-02 Type Building
Useful Life
Project Name Boiler Replacement
Category Building Maintenance
Priority 2 High Priority
Description I
Replace 4 hot water boilers used for heating.
Justification I
These were not replaced during remodeling.
Expenditures 2005 2006 2007 2008 2009 Total
Building Maintenance 20,000 20,000
Total 20,000 20,000
Funding Sources 2005 2006 2007 2008 2009 Total
Government Buildings Reserve 20,000 20,000
Total 20,000 20,000
2005 elP Draft 3/30/05 Page 5 of 99
~--
Capital Improvement Plan 2005 thru 2009 Contact Gary Lore
City of Elk River, Minnesota Department City Hall
Project # CD-03 Type Building
Useful Life
Project Name Flush Valve
Category Building Maintenance
Priority 4 Low Priority
Description I
Install flush valve
Justification I
Sanitary sewer line has inadequate or minimal flow so flush valve is needed.
Expenditures 2005 2006 2007 2008 2009 Total
Building Maintenance 9,500 9,500
Total 9,500 9,500
Funding Sources 2005 2006 2007 2008 2009 Total
ERMU 4,750 4,750
Government Buildings Reserve 4,750 4,750
Total 9,500 9,500
2005 elP Draft 3/30/05 Page 6 of 99
Capital Improvement Plan 2005 thru 2009 Contact Clerk
City of Elk River, Minnesota Department Elections
Project # EL-Ol Type Equipment
Useful Life
Project Name Election Equipment Equipment
Category
Priority 2 High Priority
Description I
2006 - 9 Disability-accessible voting machines required per the Help America Vote Act
,
Justification I
I
I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 58,500 58,500
Total 58,500 58,500
Funding Sources 2005 2006 2007 2008 2009 Total
County Grants 58,500 58,500
Total 58,500 58,500
2005 elP Draft 3/30/05 Page 7 of 99
Capital Improvement Plan 2005 thrn 2009 Contact Fire Chief
City of Elk River, Minnesota Department Emergency Management
Project # EP-Ol Type Equipment
Useful Life 15 years
Project Name Outdoor Warning Sirens Equipment
Category
Priority 3 Important
Description I
Annual Siren Replacement - Old Thunderbeam Sirens
2003 - 221 st and Watson
2004 - 221 st and Monroer
2005 - 209th and Hoover
2006 - 191 st and York Circle
2007 - Mississippi Road & Rawlins
2008 - 181 st and Fillmore
2009-2014 - Location to be determined
Justification I
The old Thunderbeam sirens are now becoming a maintenance problem. They are planned to be replaced one per year
until they are all replaced.
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 16,200 16,700 16,900 17 ,200 17,200 84,200
Total 16,200 16,700 16,900 17,200 17,200 84,200
Funding Sources 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve 16,200 16,700 16,900 17 ,200 17,200 84,200
Total 16,200 16,700 16,900 17,200 17,200 84,200
2005 CIP Draft 3/30/05 Page 8 of 99
----------
Capital Improvement Plan 2010 thru 2014 Contact Fire Chief
City of Elk River, Minnesota Department Emergency Management
--------------._.._._......_......__.._-----~------- ....-- ......---
i Project # EP-Ol Type Equipment
Useful Life 15 years
Project Name Outdoor Warning Sirens
_..__mmm_ .....................-------.---.-..---...... .._-_.........._---------------_..._._._----_.._-~.- Category Equipment
Priority 3 Important
Description I
Annual Siren Replacement - Old Thunderbeam Sirens
2003 - 221 st and Watson
2004 - 221 st and Monroer
2005 - 209th and Hoover
2006 - 191 st and York Circle
2007 - Mississippi Road & Rawlins
2008 - 181 st and Fillmore
2009-2014 - Location to be determined
Justification I
The old Thunderbeam sirens are now becoming a maintenance problem. They are planned to be replaced one per year
until they are all replaced.
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 17,400 17,400 17,500 17,500 18,000 87,800
Total 17,400 17,400 17,500 17,500 18,000 87,800
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Outlay Reserve 17,400 17,400 17,500 17,500 18,000 87,800
Total 17 ,400 17,400 17,500 17,500 18,000 87,800
2005 elP Draft 3/30/05 Page 2 of 49
Capital Improvement Plan 2005 thru 2009 Contact Finance Director
City of Elk River, Minnesota Department Finance
Project # FN-Ol Type Unassigned
Useful Life
Project Name Software
Category Technology/Communiciations
Priority 3 Important
Description I
TBD - Purchase new fmancial, payroll, and related software as new and improved software becomes available as needs
reqUIre.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 40,000 40,000
Total 40,000 40,000
Funding Sources 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve 40,000 40,000
Total 40,000 40,000
2005 elP Draft 3/30/05 Page 9 of 99
Project # FD-Ol
Project Name Vehicle Replacement
2005 thru 2009 Contact Fire Chief
Department Fire
Type Vehicle
Useful Life 10 years
Category Vehicles
Priority 3 Important
Capital Improvement Plan
City of Elk River, Minnesota
Description I
Replace fIre chief and inspector vehicles as follows:
2003 - inspector SUV
2004 - SUV Chief
2009 - SUV - Inspector 2
2012 - SUV - Inspector 1
2017 - SUV - Inspector 2
2013 - SUV - Chief
Justification
I
The fIre chief and fIre inspector's vehicles are used for everyday general use along with response to emergency incidents.
After a period of 7 -9 years, safety for emergency response becomes an issue with the vehicles.
Expenditures 2005
Vehicles
2006
2007
2008
2009
40,000
40,000
Total
40,000
40,000
Total
Funding Sources 2005
Equipment Certificates
2006
2007
2008
2009
40,000
40,000
Total
40,000
40,000
Total
2005 elP Draft 3/30/05
Page 10 of 99
---.-- --- I
,
Capital Improvement Plan 2010 thru 2014 Contact Fire Chief
City of Elk River, Minnesota Department Fire
FD-Ol Type Vehicle
Project #
Useful Life 10 years
Project Name Vehicle Replacement Vehicles
Category
Priority 3 Important
Description I
Replace fITe chief and inspector vehicles as follows:
2003 - inspector SUV
2004 - SUV Chief
2009 - SUV - Inspector 2
2012 - SUV - Inspector I
2017 - SUV - Inspector 2
2013 - SUV - Chief
I
I I
Justification
The fITe chief and fITe inspector's vehicles are used for everyday general use along with response to emergency incidents.
After a period of 7 -9 years, safety for emergency response becomes an issue with the vehicles.
i
Expenditures 2010 2011 2012 2013 2014 Total
Vehicles 40,000 40,000
Total 40,000 40,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 40,000 40,000
Total 40,000 40,000
2005 elP Draft 3/30/05 Page 3 of 49
Capital Improvement Plan
City of Elk River, Minnesota
2005 thru 2009
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 15 years
Category Vehicles
Priority 3 Important
Project # FD-02
Project Name Fire Truck Replacement - Grass Rigs
Description I
Grass Rig replacements as follows:
2004 - Grass Rig 2
2006 - Grass Rig 1
2011 - Grass Rig 3
2018 - Grass Rig 2 (repl. 2003)
2020 - Grass Rig 1 (rep. 2006)
Justification I
The grass rigs are 4X4 I-ton vehicles that are used during emergency response for various responses besides grass fIres.
The emergency response and safety become a factor during the expected life of the vehicles.
Expenditures 2005
Vehicles
Total
2006
45,000
45,000
2007
2008
2009
Total
45,000
45,000
Funding Sonrces 2005
Equipment Certificates
Total
2006
45,000
45,000
2007
2008
2009
Total
45,000
45,000
2005 elP Draft 3/30/05
Page 11 of 99
Capital Improvement Plan
City of Elk River, Minnesota
2010 thru 2014
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 15 years
Category Vehicles
Priority 3 Important
Project # FD-02
Project Name Fire Truck Replacement - Grass Rigs
Description I
Grass Rig replacements as follows:
2004 - Grass Rig 2
2006 - Grass Rig 1
2011 - Grass Rig 3
2018 - Grass Rig 2 (rept. 2003)
2020 - Grass Rig 1 (rep. 2006)
Justification I
The grass rigs are 4X4 I-ton vehicles that are used during emergency response for various responses besides grass fIres.
The emergency response and safety become a factor during the expected life of the vehicles.
Expenditures 2010
Vehicles
Total
2011
50,000
50,000
2012
2013
2014
Total
50,000
50,000
Funding Sources 2010
Equipment Certificates
Total
2011
50,000
50,000
2012
2013
2014
Total
50,000
50,000
2005 elP Draft 3/30/05
Page 4 of 49
Capital Improvement Plan 2005 thrn 2009 Contact Fire Chief
City of Elk River, Minnesota Department Fire
FD-03 Type Vehicle
Project #
Useful Life 25 years
Project Name Fire Truck Replacement - Engines
Category Vehicles
Priority 3 Important
Description I
Fire Engine replacements as follows:
2005 - Engine 2
2022 - Engine 1
2026 - Engine 3
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 375,000 375,000
Total 375,000 375,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 375,000 375,000
Total 375,000 375,000
2005 elP Draft 3/30/05 Page 12 of 99
--
Capital Improvement Plan 2005 thro 2009 Contact Fire Chief
City of Elk River, Minnesota Department Fire
FD-04 Type Vehicle
Project #
Useful Life 20 years
Project Name Fire Truck Replacement - Tankers
Category Vehicles
Priority 3 Important
.
Description I
Fire Tanker replacement as follows:
2007 - Tanker 1
2010 - Tanker 2 - Refurbish (tank only)
2015 - Tanker 2
Justification I
If possible, tanker 1 will be refurbished (tank only) instead of purchasing a new tanker.
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 175,000 175,000
Total 175,000 175,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 175,000 175,000
Total 175,000 175,000
2005 elP Draft 3/30/05 Page I3 of 99
Capital Improvement Plan 2010 thru 2014 Contact Fire Chief
City of Elk River, Minnesota Department Fire
m...._.....mm_._....._.________.____ ......-
FD-04 Type Vehicle
: Project # Useful Life 20 years
Project Name Fire Truck Replacement - Tankers
........-.... . _ __________._m......_m_...... . m._......._...._._._.__ .-~-_.__...__.-. Category Vehicles
Priority 3 Important
Description I
Fire Tanker replacement as follows:
2007 - Tanker 1
2010 - Tanker 2 - Refurbish (tank only)
2015 - Tanker 2
Justification I
Ifpossible, tanker 1 will be refurbished (tank only) instead of purchasing a new tanker.
Expenditures 2010 2011 2012 2013 2014 Total
Vehicles 50,000 50,000
Total 50,000 50,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 50,000 50,000
Total 50,000 50,000
2005 elP Draft 3/30/05 Page 5 of 49
Capital Improvement Plan 2005 thru 2009 Contact Fire Chief
City of Elk River, Minnesota Department Fire
FD-05 Type Vehicle
Project #
Useful Ufe 25 years
Project Name Fire Truck Replacement - Other
Category Vehicles
Priority 3 Important
Description I
Other Fire Truck replacement as follows:
2008 - Rescue 1
2014 - Aerial Ladder
Justification I
Rescue 1 may be moved to station 2 as part of a change in the department's response with pumpers also serving as rescue
units. This enables the designated rescue trucks to become more of an equipment unit.
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 230,000 230,000
Total 230,000 230,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 230,000 230,000
Total 230,000 230,000
2005 elP Draft 3/30/05 Page 14 of 99
Capital Improvement Plan
City of Elk River, Minnesota
2010 thru 2014
Contact Fire Chief
Department Fire
Type Vehicle
Useful Life 25 years
Category Vehicles
Priority 3 Important
Project # FD-05
Project Name Fire Truck Replacement - Other
Description I
Other Fire Truck replacement as follows:
2008 - Rescue 1
2014 - Aerial Ladder
Justification I
Rescue 1 may be moved to station 2 as part of a change in the department's response with pumpers also serving as rescue
units. This enables the designated rescue trucks to become more of an equipment unit.
Expenditures 2010
Vehicles
2011
2012
2013
2014
750,000
750,000
Total
750,000
750,000
Total
Funding Sources 2010
Equipment Certificates
2011
2012
2013
2014
750,000
750,000
Total
750,000
750,000
Total
2005 elP Draft 3/30/05
Page 6 of 49
Capital Improvement Plan 2010 thru 2014 Contact Fire Chief
City of Elk River, Minnesota Department Fire
Project # FD-06 Type Building
Useful Life 99 years
Project Name Fire Station #3
Category Buildings
Priority 5 Future Consideration
Description I
Construct Fire Station #3 to decrease call time for Eastern part of City.
Justification I
Based on current population growth, a station will be needed in the Eastern area as an enhancement for response time.
Land should be secured now. The Comprehensive Plan and Transportation will assist in identifying a site.
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 750,000 750,000
Buildings 1,500,000 1,500,000
Total 2,250,000 2,250,000
Funding Sources 2010 2011 2012 2013 2014 Total
Tax Supported Bond Issue 2,250,000 2,250,000
Total 2,250,000 2,250,000
2005 CIP Draft 3/30/05 Page 7 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Ice Arena
Project # IA-Ol Type Equipment
Useful Life
Project Name Ice Arena Equipment Equipment
Category
Priority 3 Important
Description I .
2009 -Electric Ice Resurfacer
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 95,000 95,000
Total 95,000 95,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 95,000 95,000
Total 95,000 95,000
2005 elP Draft 3/30/05 Page 15 of 99
Capital Improvement Plan 2005 thru 2009 Contact Ice Arena Manager
City of Elk River, Minnesota Department Ice Arena
Project # IA-02 Type Building
Useful Life 20 years
Project Name Ice Arena Major Building Repair
Category Building Maintenance
Priority 5 Future Consideration
Description I
2006 - Manager's Office
2007 - Replace Barn ice plant
2008 - Replace Barn roof;
TBD- Front lobby addition$lm
TBD - Remodel upstairs $100k
TBD - Artificial turf $80k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Buildings 40,000 35,500 100,000 175,500
Total 40,000 35,500 100,000 175,500
Funding Sources 2005 2006 2007 2008 2009 Total
Government Buildings Reserve 40,000 35,500 100,000 175,500
Total 40,000 35,500 100,000 175,500
2005 elP Draft 3/30/05 Page 16 of 99
Capital Improvement Plan 2005 thrn 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Ice Arena
Project # IA-03 Type Improvement
Useful Life
Project Name Ice Arena Non-Major Building Repair & Maintenance
Category Building Maintenance
Priority 3 Important
Description I
2005 - Water softner
2006 - Repalce Co Ray Vac pipes in Barn
2007 - Replace Desiccant Wheelan Dryer/Heater Unit
2008 - Re-skin low pressure receivers on ice plants
2010 - Heating system for Barn locker rooms
TBD - Paint ceiling of Olympic rink
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 8,000 17,000 7,500 10,000 42,500
Total 8,000 17,000 7,500 10,000 42,500
Funding Sources 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve 8,000 17,000 7,500 10,000 42,500
Total 8,000 17 ,000 7,500 10,000 42,500
2005 CIP Draft 3/30/05 Page 17 of 99
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Ice Arena
Project # IA-03 Type Improvement
Useful Life
Project Name Ice Arena Non-Major Building Repair & Maintenance
Category Building Maintenance
Priority 3 Important
Description I
2005 - Water softner
2006 - Repa1ce Co Ray Vac pipes in Barn
2007 - Replace Desiccant Wheel on Dryer/Heater Unit
2008 - Re-skin low pressure receivers on ice plants
2010 - Heating system for Barn locker rooms
TBD - Paint ceiling of Olympic rink
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 12,000 12,000
Total 12,000 12,000
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Outlay Reserve 12,000 12,000
Total 12,000 12,000
2005 CIP Draft 3/30/05 Page 8 of 49
Capital Improvement Plan 2005 thru 2009 Contact IT Coordinator
City of Elk River, Minnesota Department Information Technology
--..-- ....mm.........mm..___.....__ __........._m.._______... _.....~--_...._..
I Project # IT -05 Type Technology
Useful Life
Project Name Information Technology Improvements 2005 Office Equipmeot
.mmnmmmn......___.__________ .mmm..___....................... .. Category
Priority 2 High Priority
Description I
Exchange and Web Servers
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 14,000 14,000
Total 14,000 14,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 14,000 14,000
Total 14,000 14,000
2005 elP Draft 3/30/05 Page 18 of 99
-~-_.- -----
Capital Improvement Plan 2005 thru 2009 Contact IT Coordinator
City of Elk River, Minnesota Department Information Technology
Project # IT -06 Type Technology
Useful Life
Project Name Information Technology Improvements 2006 Technology/Communiciations
Category
Priority 2 High Priority
Description I
Replace exchange email and web servers. New intranet serve. Net work upgrades, security upgrades, phone card and
software upgrade
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 45,000 45,000
Total 45,000 45,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 45,000 45,000
Total 45,000 45,000
2005 elP Drafl3/30/05 Page 19 of 99
-----
Capital Improvement Plan 2005 thru 2009 Contact IT Coordinator
City of Elk River, Minnesota Department Information Technology
Project # IT -07 Type Technology
Useful Life
Project Name Information Technology Improvements 2007 Technology/Commwriciations
Category
Priority 2 High Priority
Description I
Next generation server rack; netmotion server replacement; server operating system upgrades, software upgrades
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 45,000 45,000
Total 45,000 45,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 45,000 45,000
Total 45,000 45,000
2005 CIP Draft 3/30/05 Page 20 of 99
Capital Improvement Plan 2005 thru 2009 Contact IT Coordinator
City of Elk River, Minnesota Department Information Technology
.....- _~_____________._m_....._...... ....mm.._..___..........mm....
! Project # IT -08 Type Technology
Useful Life
i Project Name Information Technology Improvements 2008
__.__._o...mm.....__.... .___..__.__m_.._....._~____._____.._.mm.._ .._..___m.... Category Technology/CommuniciatioDS
Priority 2 High Priority
Description I
Server replacement and network upgrades
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 45,000 45,000
Total 45,000 45,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 45,000 45,000
Total 45,000 45,000
2005 elF Draft 3/30/05 Page 21 of 99
-- ---- ------ -
Capital Improvement Plan 2005 thru 2009 !
Contact IT Coordinator
City of Elk River, Minnesota Department Information Technology
Project # IT -09 Type Technology
Useful Life
Project Name Information Technoloty Improvements 2009
Category Technology/Communiciations
Priority 2 High Priority
Description I
SQL server replacement, creat 10 Gbit backbone, software upgrades
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 45,000 45,000
Total 45,000 45,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 45,000 45,000
Total 45,000 45,000
2005 elP Draft 3/30/05 Page 22 of 99
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
Project # ll-08 Type Improvement
Useful Life 25 years
Project Name Dodge A venue Street Improvements north of 5th St.
Category Street Construction
Priority 4 Low Priority
Description I
Finish widening Dodge A venue between Elk Hills Drive and 5th Street. Includes sidewalk on East side of street.
Justification I
High maintenance
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 300,000 300,000
Total 300,000 300,000
Funding Sources 2005 2006 2007 2008 2009 Total
Special Assessments 150,000 150,000
Street Improvement Reserve 150,000 150,000
Total 300,000 300,000
2005 elP Draft 3/30/05 Page 23 of 99
Capital Improvement Plan
City of Elk River, Minnesota
2005 thru 2009
Contact Engineer
Department Infrastructure Improvements
Project # 11-09
Project Name Highland Road Improvements
Type Improvement
Useful Life 20 years
Category Street Construction
Priority 2 High Priority
Description I
Add sidewalk to Highland Road between Proctor and Jackson.
Justification I
Highwland Road could be reconstructed with concrete curb and gutter with a narrower street width. This would allow
the construction of a detached pedestrian facility in the same area as the wider street. Watermain current loops east and
west high pressure systems. Area is in the Urban Service Area, but not currently served; providing service should be
discussed.
Expenditures
Construction/Maintenance
2005
2006
75,000
75,000
2007
2008
2009
Total
75,000
75,000
Total
.
Funding Sources
Street Improvement Reserve
2005
2006
75,000
75,000
2007
2008
2009
Total
75,000
75,000
Total
2005 elP Draft 3/30/05
Page 24 of 99
Capital Improvement Plan
City of Elk River, Minnesota
2010 thru 2014
Contact Street Supt.
Department Infrastructure Improvements
Project # ll-lO
Project Name Railroad Drive between Jackson and Main
Type Improvement
Useful Life 25 years
Category Street Construction
Priority 3 Important
Description I
Improve street and intersections on Railroad Drive
Justification
I
RR Drive between Jackson and Main is under review by the HRA. RR Drive improvements are contingent upon
outcome of HRA visioning for this area. If an upgrade to RR Drive can be completed that will fit into the long term
vision, a premanent improvement should be completed. If not, the improvement should be a less expensive short term
improvement.
Expenditures
Construction/Maintenance
2010
100,000
100,000
2011
2012
2013
2014
Total
100,000
100,000
Total
Funding Sources
Street Improvement Reserve
2010
100,000
100,000
2011
2012
2013
2014
Total
100,000
100,000
Total
2005 elP Draft 3/30/05
Page 9 of 49
---
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
Project # 11-12 Type Improvement
Useful Life 25 years
Project Name Meadowvale Road (CR 44) Improvement Street Construction
Category
Priority 2 High Priority
Description I
Improve Meadowvale Road and add pedestrian pathway.
Justification I
-
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 750,000 750,000
Total 750,000 750,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 750,000 750,000
Total 750,000 750,000
2005 elP Draft 3/30/05 Page 25 of 99
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructure Improvements
ll-13 Type Maintenance
Project #
Useful Life
Project Name 213th Ave west ofCR 24 (Jarvis)
Category Street Maintenance
Priority n/a
Description I
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 80,000 80,000
Total 80,000 80,000
Funding Sources 2005 2006 2007 2008 2009 Total
Special Assessments 40,000 40,000
Street Improvement Reserve 40,000 40,000
Total 80,000 80,000
2005 elP Draft 3/30/05 Page 26 of 99
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructw"e Improvements
11-14 Type Maintenance
Project #
Useful Life
Project Name 189th, Troy and Pascal Streets
Category Street Maintenance
Priority n/a
Description I
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 120,000 120,000
Total 120,000 120,000
Funding Sources 2005 2006 2007 2008 2009 Total
Special Assessments 60,000 60,000
Street Improvement Reserve 60,000 60,000
Total 120,000 120,000
2005 elP Draft 3/30/05 Page 27 of 99
--------- --- ---.-
Capital Improvement Plan 2010 thru 2014 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructure Improvements
11-15 Type Infrastructure
Project #
Useful Life
Project Name 211th Ave East ofCR 32
Category Street Maintenance
Priority n/a
Description I
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2010 2011 2012 2013 2014 Total
Street Improvement Reserve 100,000 100,000
Total 100,000 100,000
2005 elP Draft 3/30/05 Page 10 of 49
- ----
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
11-16 Type Infrastructure
Project #
Useful Life
Project Name CR 40 Improvements Street & Utility Construction
Category
Priority 2 High Priority
Description I
Land acquisition and street & storm sewer construction $950k
Trunk water construction $450k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,400,000 1,400,000
Total 1,400,000 1,400,000
Funding Sources 2005 2006 2007 2008 2009 Total
Developer 150,000 150,000
Municipal State Aid 800,000 800,000
Special Assessments 450,000 450,000
Total 1,400,000 1,400,000
,
2005 CIP Draft 3/30/05 Page 28 of 99
-
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
11-17 Type Infrastructure
Project #
Useful Life
Project Name Elk Hills Drive Extension to CR 13
Category Street Construction
Priority 2 High Priority
Description I
Extend Elk Hills Drive to connect to County Road 13 to create EastlWest corridor.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 0 0
Total 0 0
Funding Sources 2005 2006 2007 2008 2009 Total
To Be Determined 0 0
Total 0 0
2005 elP Draft 3/30/05 Page 29 of 99
-
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
IT-18 Type Infrastructure
Project #
Useful Life
Project Name I93rd Avenue Extension to CRI3
Category Street Construction
Priority 2 High Priority
Description I
Extend 193rd A venue to connect to CR 13 to create East/W est corridor.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 0 0
Total 0 0
Funding Sources 2005 2006 2007 2008 2009 Total
To Be Determined 0 0
Total 0 0
2005 elP Draft 3/30/05 Page 30 of 99
Capital Improvement Plan 2010 thru 2014 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
Project # ll-19 Type Improvement
Useful Life
Project Name School Street Extension to Meadowvale Road
Category Street Construction
Priority 2 High Priority
Description I
Extend School Street to Meadowvale Road to create East/W est Corridor.
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 0 0
Total 0 0
Funding Sources 2010 2011 2012 2013 2014 Total
To Be Determined 0 0
Total 0 0
2005 elP Draft 3/30/05 Page II of 49
---.---
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructwe Improvements
Project # OV-02 Type Improvement
Useful Life 15 years
Project Name Annual Street Overlay Program - Not Assessed
Category Street Maintenance
Priority 3 Important
Description I
Overlay streets identified by Street Superintendent and Engineer.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000 25,000 25,000 25,000 25,000 125,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000 25,000 25,000 25,000 25,000 125,000
2005 elP Draft 3/30/05 Page31 of 99
Capital Improvement Plan 2010 thru 2014 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructure Improvements
Project # OV-02 Type Improvement
Useful Life 15 years
Project Name Annual Street Overlay Program - Not Assessed
Category Street Maintenance
Priority 3 Important
Description I
Overlay streets identified by Street Superintendent and Engineer.
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000 25,000 25,000 25,000 25,000 125,000
Funding Sources 2010 2011 2012 2013 2014 Total
General Fund Operating 25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000 25,000 25,000 25,000 25,000 125,000
2005 elP Draft 3/30/05 Page 12 of 49
--
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructw"e Improvements
mmm.mm..__________~._.__..__ mm....................-..... ._m..~__.mm..___.___._
! Project # OV-03 Type Improvement
Useful Life 15 years
; Project Name Assessable Street Overlay Projects Street Maintenance
..m...m__~__~____...... ........--------------.---. Category
Priority 3 Important
Description I
Street overlay projects that are assessable to benefitting properties.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 500,000 500,000 1,000,000
Total 500,000 500,000 1,000,000
Funding Sources 2005 2006 2007 2008 2009 Total
Capital Projects - Assessment 500,000 500,000 1,000,000
Total 500,000 500,000 1,000,000
2005 CIP Draft 3/30/05 Page 32 of 99
Capital Improvement Plan 2010 thru 2014 Contact Engineer
City of Elk River, Minnesota Department InfrastructlU"e Improvements
Project # OV-03 Type Improvement
Useful Life 15 years
Project Name Assessable Street Overlay Projects
Category Street Maintenance
Priority 3 Important
Description I
Street overlay projects that are assessable to benefitting properties.
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 550,000 600,000 650,000 1,800,000
Total 550,000 600,000 650,000 1,800,000
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Projects - Assessment 550,000 600,000 650,000 1,800,000
Total 550,000 600,000 650,000 1,800,000
2005 elP Draft 3/30/05 Page 13 of 49
------
Capital Improvement Plan 2005 thrn 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
-.--...- ........._m....._...._..__ _.--
! Project # PM-Ol Type Improvement
Useful Life 25 years
: Project Name Pavement Management Program
--------~_._.- ..........................-....-. .-...-.-....-------........-.-..-.- ...........___m.___ Category Street & Utility Construction
Priority 2 High Priority
Description I
Replace aged and deteriorated streets, water mains, sewer mains, storm drainage, and pedestrian pathways.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,250,000 1,500,000 1,750,000 4,500,000
Total 1,250,000 1,500,000 1,750,000 4,500,000
Funding Sources 2005 2006 2007 2008 2009 Total
Special Assessments 416,667 500,000 583,333 1,500,000
Street Improvement Reserve 416,666 500,000 583,334 1,500,000
Tax Supported Bond Issue 416,667 500,000 583,333 1,500,000
Total 1,250,000 1,500,000 1,750,000 4,500,000
2005 elP Draft 3/30/05 Page 33 of 99
Capital Improvement Plan 2010 thru 2014 Contact Engineer
City of Elk River, Minnesota Department Infrastructure Improvements
Project # PM-Of Type Improvement
Useful Life 25 years
Project Name Pavement Management Program Street & Utility Construction
Category
Priority 2 High Priority
Description I
Replace aged and deteriorated streets, water mains, sewer mains, storm drainage, and pedestrian pathways.
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 2,000,000 2,250,000 4,250,000
Total 2,000,000 2,250,000 4,250,000
Funding Sources 2010 2011 2012 2013 2014 Total
Special Assessments 666,667 750,000 1,416,667
Street Improvement Reserve 666,666 750,000 1,416,666
Tax Supported Bond Issue 666,667 750,000 1,416,667
Total 2,000,000 2,250,000 4,250,000
2005 elP Draft 3/30/05 Page 14 of 49
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructw"e Improvements
Project # SC-02 Type Improvement
Useful Life 3 years
Project Name Annual Street Sealcoat Program
Category Street Maintenance
Priority 3 Important
Description I
Sealcoat streets as identified by Street Superintendent.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 75,000 85,000 90,000 100,000 110,000 460,000
Total 75,000 85,000 90,000 100,000 110,000 460,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 75,000 85,000 90,000 100,000 110,000 460,000
Total 75,000 85,000 90,000 1 DO ,ODD 110,000 460,000
2005 elP Draft 3/30/05 Page 34 of 99
---------
Capital Improvement Plan 2010 thru 2014 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructw"e Improvements
_._.~----~ .........- .........- ......................-...-.. ._....m.___~__.._
Project # SC-02 Type Improvement
Useful Life 3 years
j Project Name Annual Street Sealcoat Program
..-..............._----_........._--_._...__.._~~-_........_.._._..- ...._._.~_._..- Category Street Maintenance
Priority 3 Important
Description I
Sea1coat streets as identified by Street Superintendent.
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 115,000 120,000 125,000 130,000 135,000 625,000
Total 115,000 120,000 125,000 130,000 135,000 625,000
Funding Sources 2010 2011 2012 2013 2014 Total
General Fund Operating 115,000 120,000 125,000 130,000 135,000 625,000
Total 115,000 120,000 125,000 130,000 135,000 625,000
2005 elP Draft 3/30/05 Page 15 of 49
Capital Improvement Plan 2005 thrn 2009 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructure Improvements
SL-Ol Type Infrastructure
Project #
Useful Life
Project Name Signal Lights @ School & Lions Park Drive
Category Street Construction
Priority 2 High Priority
Description I
Justification I
.~
Expenditures 2005 2006 2007 . 2008 2009 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
Street Improvement Reserve 100,000 100,000
Total 100,000 100,000
2005 elP Draft 3/30/05 Page 35 of 99
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructure Improvements
SL-02 Type Infrastructure
Project #
Useful Life
Project Name Signal Light @ Twin Lakes Rd & CR 12
Category Street Construction
Priority n/a
Description I
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50 ,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Municipal State Aid 50,000 50,000
Total 50,000 50,000
2005 elP Draft 3/30/05 Page 36 of 99
Capital Improvement Plan 2010 thru 2014 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructure Improvements
SL-03 Type Infrastructure
Project #
Useful Life
Project Name Signal Lights @ Main at Gates & Parrish
Category Street Construction
Priority nla
Description I
2010 - Gates
2014 Parish
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 150,000 200,000 350,000
Total 150,000 200,000 350,000
Funding Sources 2010 2011 2012 2013 2014 Total
Street Improvement Reserve 150,000 200,000 350,000
Total 150,000 200,000 350,000
2005 elP Draft 3/30/05 Page 16 of 49
Capital Improvement Plan 2005 thrn 2009 Contact Engineer
City of Elk River, Minnesota Department Infrastructw"e Improvements
SL-04 Type Maintenance
Project #
Useful Life
Project Name Street Light Replacement HWY 10 Street Maintenance
Category
Priority 3 Important
Description I
TBD - Replace Highway 10 lighting (estimate 2007-2009)
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2005 2006 2007 2008 2009 Total
. Street Improvement Reserve 100,000 100,000
Total 100,000 100,000
2005 elP Draft 3/30/05 Page 37 of 99
- -.--------.----- --
Capital Improvement Plan 2005 thru 2009 Engineer
Contact
City of Elk River, Minnesota Department Infrastructme Improvements
Project # SL-09 Type Improvement
Useful Life
Project Name Signal Light Painting
Category Street Maintenance
Priority 3 Important
Description I
Paint signal systems
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 20,000 20,000
Total 20,000 20,000
Funding Sources 2005 2006 2007 2008 2009 Total
Street Improvement Reserve 20,000 20,000
Total 20,000 20,000
2005 elP Draft 3/30/05 Page 38 of 99
--
Capital Improvement Plan 2010 thru 2014 Contact Engineer
City of Elk River, Minnesota Department Infrastructlrre Improvements
Project # SL-09 Type Improvement
Useful Life
Project Name Signal Light Painting
Category Street Maintenance
Priority 3 Important
Description I
Paint signal systems
Justification I
i
I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 20,000 20,000
Total 20,000 20,000
Funding Sources 2010 2011 2012 2013 2014 Total
Street Improvement Reserve 20,000 20,000
Total 20,000 20,000
2005 elP Draft 3/30/05 Page 17 of 49
- ---------..-.-
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Infrastructw"e Improvements
SW-Ol Type Infrastructw"e
Project #
Useful Life
Project Name Storm Water Irving Ave from 6th to 7th Street
Category Street Maintenance
Priority 2 High Priority
Description I
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 40,000 40,000
Total 40,000 40,000
Funding Sources 2005 2006 2007 2008 2009 Total
Street Improvement Reserve 40,000 40,000
Total 40,000 40,000
2005 elP Draft 3/30/05 Page 39 of 99
---- -~
Capital Improvement Plan 2005 thru 2009 Contact City Administrator
City of Elk River, Minnesota Department Infrastructure Improvements
Project # TP-02 Type Improvement
Useful Life 25 years
Project Name Highway 10 Transportation Plan Street Construction
Category
Priority 3 Important
Description I
Design AIgematives Analysis for TH 10 .
2006 - local match
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Planning/Design 500,000 500,000
Total 500,000 500,000
Funding Sources 2005 2006 2007 2008 2009 Total
Federal Grants 400,000 400,000
Street Improvement Reserve 100,000 100,000
Total 500,000 SOO,OOO
2005 CIP Draft 3/30/05 Page 40 of 99
Capital Improvement Plan 2005 thru 2009 City Administrator
Contact
City of Elk River, Minnesota Department Lilmuy
--~-~--~-~._..- .m............m....m......m.._.__...__...._______..._~ .................................---
, Project # BL-05 Type Building
Useful Life 99 years
Project Name Library Expansion
...-..........----............--....... .........m__...........__.___.__ Category Buildings
Priority 5 Future Consideration
Description I
Expand public library to accommodate public need.
Parking lot to be constructed in 2006
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 100,000 100,000
Buildings 1,500,000 1,500,000
Total 100,000 1,500,000 1,600,000
Funding Sources 2005 2006 2007 2008 2009 Total
Government Buildings Reserve 1,500,000 1,500,000
Library 100,000 100,000
Total 100,000 1,500,000 1,600,000
2005 elP Draft 3/30/05 Page 41 of 99
Capital Improvement Plan
City of Elk River, Minnesota
: Project # LS-Ol
! Project Name Northbound Building Maintenance
Description I
2008 - Replace Carpeting
TBD - Front Entry Reconstruction
TBD - Resurface or sealcoat parking lot
Justification
I
Expenditures
Other
Total
Funding Sources
Liquor Fund
Total
2005 elP Draft 3/30/05
2005
2005
2006
2006
2005 thru 2009
2007
2007
Page 42 of 99
2008
10,000
10,000
2008
10,000
10,000
Contact Liquor Store Manager
Department Liquor Fund
Type Maintenance
Useful Life 10 years
Category Building Maintenance
Priority 3 Important
2009
Total
10,000
10,000
2009
Total
10,000
10,000
Capital Improvement Plan 2005 thru 2009 Contact Liquor Store Manager
City of Elk River, Minnesota Department Liquor Fund
Project # LS-02 Type Building
Useful Life 50 years
Project Name Westbound Liquor Store
Category Buildings
Priority 5 Future Consideration
Description I
Construct Westbound Liquor on site at Joplin and Hwy 10
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Buildings 1,500,000 1,500,000
Total 1,500,000 1,500,000
Funding Sources 2005 2006 2007 2008 2009 Total
Liquor Fund 1,500,000 1,500,000
Total 1,500,000 1,500,000
2005 elP Draft 3/30/05 Page 43 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PF-61 Type Improvement
Useful Life 99 years
Project Name Park Development
Category Park Improvements
Priority 3 Important
Description I
System Wide Improvements
Annual tree, seed, and landscaping $15k
2005 - Signage Master Plan $15k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Park Improvements 32,000 15,000 15,000 15,000 15,000 92,000
Total 32,000 15,000 15,000 15,000 15,000 92,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 32,000 15,000 15,000 15,000 15,000 92,000
.
Total 32,000 15,000 15,000 15,000 15,000 92,000
2005 elP Draft 3/30/05 Page 44 of 99
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PF-61 Type Improvement
Useful Life 99 years
Project Name Park Development Category Park Improvements
Priority 3 Important
Description I
System Wide Improvements
Annual tree, seed, and landscaping $15k
2005 - Signage Master Plan $15k
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Park Improvements 15,000 15,000 15,000 15,000 15,000 75,000
Total 15,000 15,000 15,000 15,000 15,000 75,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 15,000 15,000 15,000 15,000 15,000 75,000
Total 15,000 15,000 15,000 15,000 15,000 75,000
2005 elP Draft 3/30/05 Page 18 of 49
Capital Improvement Plan 2005 thro 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PF-64 Type Improvement
Useful Life 10 years
Project Name Trail Development
Category Trail Improvements
Priority 3 Important
Description I
Trail Improvements
Trail Connections (to connect existing trails. Costs and funding yet to be identified.)
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 15,000 7,000 15,000 15,000 15,000 67,000
Total 15,000 7,000 15,000 15,000 15,000 67,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 15,000 7,000 15,000 15,000 15,000 67,000
Total 15,000 7,000 15,000 15,000 15,000 67,000
2005 elP Draft 3/30/05 Page 45 of 99
--
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PF-64 Type Improvement
Useful Life 10 years
Project Name Trail Development Category Trail Improvements
Priority 3 Important
Description I
Trail Improvements
Trail Connections (to connect existing trails. Costs and funding yet to be identified.)
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 15,000 15,000 15,000 15,000 15,000 75,000
Total 15,000 15,000 15,000 15,000 15,000 75,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 15,000 15,000 15,000 15,000 15,000 75,000
Total 15,000 15,000 15,000 15,000 15,000 75,000
2005 elP Draft 3/30/05 Page 19 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
PF-90 Type Land
Project #
Useful Life Unlimited
Project Name Land Acquisition Land
Category
Priority 3 Important
Description I
2002 - Grace Church property
2006 - Trail corridor on CR77 North of Ridgewood
2008 - Trail Cooridor (Top of the World) total cost $1.7M less $350k developer park credit reduction
TBD - Gries Property
!
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Land Acquisition 1,350,000 130,000 1,480,000
Total 1,350 ,000 130,000 1,480,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 350,000 130,000 480,000
State Grants/State Aid 1,000,000 1,000,000
Total 1,350,000 130,000 1,480,000
2005 CIP Draft 3/30/05 Page 46 of 99
Capital Improvement Plan 2010 thru 2014 Park & Rec. Director
Contact
City of Elk River, Minnesota Department Park Development & Improve
PF-90 Type Land
Project #
Useful Life Unlimited
Project Name Land Acquisition
Category Land
Priority 3 Important
Description I
2002 - Grace Church property
2006 - Trail corridor on CR 77 North of Ridgewood
2008 - Trail Cooridor (Top of the World) total cost $1.7M less $350k developer park credit reduction
TED - Gries Property
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Land Acquisition 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000 200,000 200,000 200,000 200,000 1,000,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000 200,000 200,000 200,000 200,000 1,000,000
2005 elP Draft 3/30/05 Page 20 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
.............mm..m.m.~_____~. .. ---- onmm................__....._......-... ... ...................- ............-.....-- ................-----
PR-02 Type Maintenance
Project #
Useful Life
. : Project Name Baldwin Park
...........mm.........._____._.._ _onn...... Category Park Improvements
Priority 3 Important
Description I
2006 - Playground
2010 - Fence
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 15,000 15,000
Total 15,000 15,000
2005 ClP Draft 3/30/05 Page 47 of 99
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
PR-02 Type Maintenance
Project #
Useful Life
Project Name Baldwin Park
Category Park Improvements
Priority 3 Important
Description I
2006 - Playground
2010 - Fence
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 3.500 3.500
Total 3,500 3,500
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 3.500 3.500
Total 3,500 3,500
2005 elP Draft 3/30/05 Page 21 of 49
-
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-04 Type Improvement
Useful Life
Project Name Barrington Park
Category Park Improvements
Priority 3 Important
Description I
2006 - Replace BB Court
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 3,000 3,000
Total 3,000 3,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 3,000 3,000
Total 3,000 3,000
2005 elP Draft 3/30/05 Page 48 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-06 Type Improvement
Useful Life
Project Name Big Tooth Ridge Park
Category Park Improvements
Priority 3 Important
Description I
2007 - Shelter
2007 - Trail Improvements
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 35,000 35,000
Total 35,000 35,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 35,000 35,000
Total 35,000 35,000
2005 CIP Draft 3/30/05 Page 49 of 99
- -----..-.-- -
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
---...---.-.........--------------.... ...-- m.......m...m...._.
. Project # PR-08 Type Improvement
Useful Life
Project Name Birch Meadow Park
L._._ -----. ...__m_.._m._._. m............m_.m._..._.____~__m m.m_ m.m.._ ~ Category Park Improvements
Priority 3 Important
Description I
2008 - Benches $2k
2008 - Trail $40k
2009 - Interpretive Signs
Justification I
i
Expenditures 2005 2006 2007 2008 2009 Total :
Construction/Maintenance 42,000 10,000 52,000
Total 42,000 10,000 52,000 I
:
,
,
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 42,000 10,000 52,000
Total 42,000 10,000 52,000
2005 elP Draft 3/30/05 Page 50 of 99
Capital Improvement Plan 2005 thru 2009 Park & Rec. Director
Contact
City of Elk River, Minnesota Department Park Development & Improve
--------~-- ....._.....___m____.___ ...---.. -- ....mm..................._mm___......
Project # PR-14 Type Improvement
Useful Life
Project Name Deerfield Hill Park
------------.--.........--..- mm........_.___................. --------- mmm__ ~ Category Park Improvements
Priority 3 Important
Description I
2007 - Playground
2008 - Swingset
2012 - Slide
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 20,000 3,000 23,000
Total 20,000 3,000 23,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 20,000 3,000 23,000
Total 20,000 3,000 23,000
2005 elP Draft 3/30/05 Page 51 of 99
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-14 Type Improvement
Useful Life
Project Name Deerfield Hill Park
Category Park Improvements
Priority 3 Important
Description I
2007 - Playground
2008 - Swingset
2012 - Slide
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 8,000 8,000
Total 8,000 8,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 8,000 8,000
Total 8,000 8,000
2005 elP Draft 3/30/05 Page 22 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-16 Type Improvement
Useful Life
Project Name Fresno Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Seal & Stripe BB Court .
2006 - Benches & Tables
2017 - Playground replacement
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 2,000 2,000 4,000
Total 2,000 2,000 4,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 2,000 2,000 4,000
Total 2,000 2,000 4,000
2005 elP Draft 3/30/05 Page 52 of 99
- --
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-18 Type Improvement
Useful Life
Project Name Great Northern Trail
Category Park Improvements
Priority 3 Important
Description I
2009 - North of 33
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 140,000 140,000
Total 140,000 140,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 140,000 140,000
Total 140,000 140,000
2005 elP Draft 3/30/05 Page 53 of 99
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-20 Type Improvement
Useful Life
Project Name Guardian Angels Park Park Improvements
Category
Priority 3 Important
Description I
2013 - Trail Replacement
Justification I
Expenditures 2010 2011 2012 2013. 2014 Total
Construction/Maintenance 7,000 7,000
Total 7,000 7,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 7,000 7,000
Total 7,000 7,000
2005 elP Draft 3/30/05 Page 23 of 49
Capital Improvement Plan 2005 thru 2009 Park & Rec. Director
Contact
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-24 Type Improvement
Useful Life
Project Name Highlands East Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Benches & Tables $2k
2005 - Trail $30K
2005 - Prairie restoration $lOk
2008 - Shelter
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 42,000 25,000 67,000
Total 42,000 25,000 67,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 42,000 25,000 67,000
Total 42,000 25,000 67,000
2005 elP Draft 3/30/05 Page 54 of 99
I
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-26 Type Improvement
Useful Life
Project Name Highlands West Park Park Improvements
Category
Priority 3 Important
Description I
2005 - Tennis court - single unlighted $15k
2005 - Trail $1 Ok
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 25,000 25,000
Total 25,000 25,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 25,000 25,000
Total 25,000 25,000
2005 elP Draft 3/30/05 Page 55 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-28 Type Improvement
Useful Life
Project Name Hillside City Park Park Improvements
Category
Priority 3 Important
Description I
2009 - Parking lot $15k
2009 - Playground $60k
2009 - 2 Shelters $50k
2009 - Road $50k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 175,000 175,000
Total 175,000 175,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 175,000 175,000
Total 175,000 175,000
2005 CIP Draft 3/30/05 Page 56 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-30 Type Improvement
Useful Life
Project Name Joplin Park Park Improvements
Category
Priority 3 Important
Description I
2006 - Seal & Stripe BB Court$2k
2006 - Benches & Tables $2k
2015 - Playground $28.2k
2015 - BB Court $8k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 4,000 4,000
Total 4,000 4,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 4,000 4,000
Total 4,000 4,000
2005 elP Draft 3/30/05 Page 57 of 99
Capital Improvement Plan
City of Elk River, Minnesota
Project # PR-32
Project Name Kliever Lake Fields
Description
2006 - Playground $50k
2006 - Benches & Tables $2k
2006 - BB Court (1/2) $2k
2007 - Seal BB Court $lk
2007 - Soccer Fields $80k
2007 - Parking lot $20k
2008 - Baseball field
2010 - Tow rope $20k
2010 - Lights for sliding hill $12k
Justification
Expenditures 2005
Construction/Maintenance
Total
Funding Sources
Park Dedication
Total
2005 elP Draft 3/30/05
2005
2006
54,000
54,000
2006
54,000
54,000
Page 58 of 99
2005 thru 2009
2007
101,000
101,000
2007
101,000
101,000
2008
20,000
20,000
2008
20,000
20,000
Contact Park & Rec. Director
Department Park Development & Improve
Type Improvement
Useful Life
Category Park Improvements
Priority 3 Important
2009
Total
175,000
175,000
2009
Total
175,000
175,000
Capital Improvement Plan 2010 thru 2014 Park & Rec. Director
Contact
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-32 Type Improvement
Useful Life
Project Name Kliever Lake Fields
Category Park Improvements
Priority 3 Important
Description I
2006 - Playground $50k
2006 - Benches & Tables $2k
2006 - BB Court (1/2) $2k
2007 - Seal BB Court $lk
2007 - Soccer Fields $80k
2007 - Parking lot $20k
2008 - Baseball field I
2010 - Tow rope $20k
2010 - Lights for sliding hill $12k
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 32,000 32,000
Total 32,000 32,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 32,000 32,000
Total 32,000 32,000
2005 elP Draft 3/30/05 Page 24 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-34 Type Improvement
Useful Life
Project Name Kliever Point Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Playground $60k
2005 - Benches & Tables $2k
2005 - BB Court (1/2) $2k
2005 - Seal BB Court $lk
I
i
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 69,000 69,000
Total 69,000 69,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 69,000 69,000
Total 69,000 69,000
2005 elP Draft 3/30/05 Page 59 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-35 Type Improvement
Useful Life
Project Name Lions Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Skatepark Improvements $llk
2005 - Off leash dog park $6.5k
2005 - Entrance signs $4.2k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 17,500 17,500
Other 4,200 4,200
Total 21,700 21,700
Funding Sources 2005 2006 2007 2008 2009 Total
Donors 11,000 11,000
Park Dedication 10,700 10,700
Total 21,700 21,700
2005 elP Draft 3/30/05 Page 60 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
....---- _ _______~___.___._.__.__mm._........_.._....._ ...-.........
. Project # PR-40 Type Improvement
Useful Life
Project Name Mississippi Oaks Park
_......_mo_ ............................................ ________________~_____~__.__m_.m.. Category Park Improvements
Priority 3 Important
Description I
2005 - Benches & Tables
2012 - Trail replacement
2017 - Playground replacement
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 2,000 2,000
Total 2,000 2,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 2,000 2,000
Total 2,000 2,000
2005 CIP Draft 3/30/05 Page 61 of 99
~ - --
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-40 Type Improvement
Useful Life
Project Name Mississippi Oaks Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Benches & Tables
2012 - Trail replacement
2017 - Playground replacement
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 4,000 4,000
Total 4,000 4,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 4,000 4,000
Total 4,000 4,000
2005 elP Drafl3/30/05 Page 25 of 49
---------
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-42 Type Improvement
Useful Life
Project Name Mississippi Trail
Category Park Improvements
Priority 3 Important
Description I
2012 - Trail replacement
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 10,000 10,000
Total 10,000 10,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 10,000 10,000
Total 10,000 10,000
2005 elP Draft 3/30/05 Page 26 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
--------~--_......_..._.._..~--"._-~--------------------.-- ..m_..._~~_
i Project # PR-44 Type Improvement
Useful Life
Project Name Oak Knoll Park
-- ._mo....._ ........._....._~..~---------- ___mmm_..____________..__ Category Park Improvements
Priority 3 Important
Description I
2007 - Parlding lot
2012 - Fence replacement $24k
2012 - Irrigation replacement $28k
2018 - Batting cage replacement $3k
2018 - Bleacher replacement $3.4k
.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 35,000 35,000
Total 35,000 35,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 35,000 35,000
Total 35,000 35,000
2005 elP Draft 3/30/05 Page 62 of 99
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-44 Type Improvement
Useful Life
Project Name Oak Knoll Park
Category Park Improvements
Priority 3 Important
Description I
2007 - Parkling lot
2012 - Fence replacement $24k
2012 - Irrigation replacement $28k
2018 - Batting cage replacement $3k
2018 - Bleacher replacement $3.4k
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 52,000 52,000
Total 52,000 52,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 52,000 52,000
Total 52,000 52,000
2005 elP Draft 3/30/05 Page 27 of 49
--- .-------- ----
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-46 Type Improvement
Useful Life
Project Name Oak Savannah
Category Park Improvements
Priority 3 Important
Description I
2010 - Trail
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 6,100 6,100
Total 6,100 6,100
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 6,100 6,100
Total 6,100 6,100
2005 elP Draft 3/30/05 Page 28 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-48 Type Improvement
Useful Life
Project Name Orono Park
Category Park Improvements
Priority 3 Important
Description I
2008 - Splashpark $lOOk; paving $90k; shelters $75k; playground $75k; site amenities $lOk; utility work $lOk; fishing
pier $9.3k
:
I
Justification I I
i
I
I
I
,
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 369,300 369,300
Total 369,300 369,300
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 369,300 369,300
Total 369,300 369,300
2005 elP Draft 3/30/05 Page 63 of 99
_________n__________
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-50 Type Improvement
Useful Life
Project Name Orono Athletic Complex
Category Park Improvements
Priority 3 Important
Description I
2006 - Computerized light monitoring system
2007 - Bleachers $6k
2007 - Fence $12.5k
2007 - Score boards $6k
TBD - Sandbox shelter; storage garage; lighting' irrigation
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 3,000 24,500 27,500
Total 3,000 24,500 27,SOO
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 3,000 24,500 27,500
Total 3,000 24,500 27,500
2005 elP Draft 3/30/05 Page 64 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-54 Type Improvement
Useful Life
Project Name Riverplace Park Category Park Improvements
Priority 3 Important
Description I
2005 - Benches & Tables $1.5k
2005 - Seal BB Court $2k
2016 - Trail $llk
2016 - Playground $39k
2016 - BB Court $4.4k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 3,500 3,500
Total 3,500 3,500
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 3,500 3,500
Total 3,500 3,500
2005 elP Draft 3/30/05 Page 65 of 99
Capital Improvement Plan 2005 thru 2009 Park & Rec. Director
Contact
City of Elk River, Minnesota Department Park Development & Improve
--_._---------~-------_._.._.__._---_.__.._..- ..0........_-------------- ---- ......................-...---......
Project # PR-56 Type Improvement
Useful Life
, Project Name Ridgewood East Park
---.... ---..------"---- ..--.....--... ......................_----._"---. . ------. Category Park Improvements
Priority 3 Important
Description I
2005 - Seal BB Court
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,500 1,500
Total 1,500 1,500
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 1,500 1,500
Total 1,500 1,500
2005 elP Draft 3/30/05 Page 66 of 99
Capital Improvement Plan 2005 thru 2009 Park & Rec. Director
Contact
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-58 "ype Improvement
Useful Life
Project Name Rivers Edge Commons Park
Category Park Improvements
Priority 3 Important
Description I
200S - Design Services & Construction Documents
2006 - Plaza and Stairs $7Sk; Benches & Tables $4k; Fountain $ISk; Lights $20k; Landscaping $20k; paving and
concrete $60k; Gaxebo $2Sk; Structures and bollards $30k; electrical $1 OK; interpretive display & signs $2Sk; plumbing
$IOk
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Planning/Design 40,000 40,000
Construction/Maintenance 294,000 294,000
Total 40,000 294,000 334,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 40,000 294,000 334,000
Total 40,000 294,000 334,000
2005 elP Draft 3/30/05 Page 67 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-60 Type Improvement
Useful Life
Project Name Trott Brook Park
Category Park Improvements
Priority 3 Important
Description I
2005 -Trail $20k
2005- Tennis Court $35k
2005 - Benches & Tables $3k
2005 - Picnic Shelter $15k
2005 - Parking lot & landscaping $20k
2005 - Baseball backstop $3.5k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 96,500 96,500
Total 96,500 96,500
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 96,500 96,500
Total 96,500 96,500
2005 elP Draft 3/30/05 Page 68 of 99
_u
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-62 Type Improvement
Useful Life
Project Name West Oaks Park
Category Park Improvements
Priority 3 Important
Description I
200S - Playground $SOk
200S - Shelter $21k
200S - BB Court (1/2) inc seal & stripe $3.Sk
200S - Tables & Benches $2.Sk
i
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 77 ,000 77,000
Total 77,000 77 ,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 77,000 77 ,ODD
Total 77 ,000 77,000
2005 elP Draft 3/30/05 Page 69 of 99
---------
Capital Improvement Plan 2005 thrn 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-64 Type Improvement
Useful Life
Project Name Windsor Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Shelter $25k
2005 - Swing set $2.5k
2005 - Climbing rock $23k
2005 - Benches & tables $2.5k
2016 - Trail
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 53,000 53,000
Total 53,000 53,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 53,000 53,000
Total 53,000 53,000
2005 elP Draft 3/30/05 Page 70 of 99
Capital Improvement Plan 2005 thru 2009 .
Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-66 Type Improvement
Useful Life
Project Name Woodland Trails Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Entrance sign $1 Ok
2005 - Comprehensive sign system $25k
2005 - Benches $3.5k
2005 - Fill Pond (not included in approved 2005 budget)
2007 - Shelter $25k
2007 - Fire ring $lk
2009 - Interpretive center $300k
2009 - Climbing rock $23k
2009 - Swing set $2k
2010 - Parkling lot trails $123k
2010 - Lighting $14k
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 63,500 26,000 325,000 414,500
Total 63,500 26,000 325,000 414,500
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 38,500 26,000 325,000 389,500
Storm Sewer 25,000 25,000
Total 63,500 26,000 325,000 414,500
2005 elP Draft 3/30/05 Page 71 of 99
-
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-66 Type Improvement
Useful Life
Project Name Woodland Trails Park
Category Park Improvements
Priority 3 Important
Description I
2005 - Entrance sign $1 Ok
2005 - Comprehensive sign system $25k
2005 - Benches $3.5k
2005 - Fill Pond (not included in approved 2005 budget)
2007 - Shelter $25k
2007 - Fire ring $lk
2009 - Interpretive center $300k
2009 - Climbing rock $23k
2009 - Swing set $2k
2010 - Parkling lot trails $123k
2010 - Lighting $14k
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 137,000 137,000
Total 137,000 137,000
Funding Sources 2010 2011 2012 2013 2014 Total
Park Dedication 137,000 137,000
Total 137,000 137,000
2005 elP Draft 3/30/05 Page 29 of 49
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Development & Improve
Project # PR-68 Type Improvement
Useful Life
Project Name Youth Athletic Complex
Category Park Improvements
Priority 3 Important
Description I
200S - Landscape & drainage $10k
200S - Shelter $2Sk
200S - Irrigated field $6Sk (potential TRSF collaberation)
2006 - Restrooms $40k
2006 - Parking lot $12Sk
2006 - Soccer fields $20k
2006 - Pole Shed $20k
2006 - Playground $30k
2008 - Baseball Field Lights $4Sk; Lighting $2S0k
2016 - Dugouts replacement
2017 - Bleachers replacement
2023 - Concession replacement
TBD - Bleachers $14K
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 100,000 275,000 295,000 670,000
Total 100,000 275,000 295,000 670,000
Funding Sources 2005 2006 2007 2008 2009 Total
Park Dedication 100,000 275,000 295,000 670,000
Total 100,000 275,000 295,000 670,000
2005 elP Draft 3/30/05 Page 72 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-05 Type Equipment
Useful Life 15 years
Project Name 2005 Park Maintenance Equipment
Category Equipment
Priority 1 Critical
Description I
Unbudgeted addition to replace One Ton Dump Truck one year early because of safety concerns
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 30,000 30,000
Total 30,000 30,000
2005 elP Draft 3/30/05 Page 73 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-06 Type Equipment
Useful Life
Project Name 2006 Park Maintenance Equipment
Category Equipment
Priority 3 Important
Description I
Snowmobile - 8,000 - high hours on current one
Trimming Mower 12,000 - replace slow walk behind
Snow Plow 3,500 - adds rink cleaning efficiency
Wide Area Mower 90,000 - uses less man hours
Trailer 5,000 - multiple mowers behind one truck
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 118,500 118,500
Total 118,500 118,500
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 118,500 118,500
Total 118,500 118,500
2005 ClP Draft 3/30/05 Page 74 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-07 Type Equipment
Useful Life
Project Name 2007 Park Maintenance Equipment Equipment
Category
Priority 3 Important
Description I
2 Pickup Trucks 48,000 - replace 13 & 14 year old trucks
Zero Turn Mower 10,000 - replaces non-commercial model
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 58,000 58,000
Total 58,000 58,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 58,000 58,000
Total 58,000 58,000
2005 elP Draft 3/30/05 Page 75 of 99
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-08 Type Equipment
Useful Life
Project Name 2008 Park Maintenance Equipment Category Equipment
Priority 3 Important
Description I
Sidewalk Tractor 90,000 - replaces machine with 3000 hours
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 90,000 90,000
Total 90,000 90,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 90,000 90,000
Total 90,000 90,000
2005 elP Draft 3/30/05 Page 76 of 99
-
Capital Improvement Plan 2005 thru 2009 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-09 Type Equipment
Useful Life
Project Name 2009 Park Maintenance Equipment
Category Equipment
Priority 3 Important
Description I
Field Striper 12,000
Pickup Truck 24,000 - replaces 2002 and starts 7 year replacement schedule
Field Groomer 12,000 - meets growing needs
Snowmobile 8,500 - replace aging 2nd machine
Justification 1
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 56,500 56,500
Total 56,500 56,500
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 56,500 56,500
Total 56,500 56,500
2005 ClP Draft 3/30/05 Page 77 of 99
---------------- ~-~ ----
Capital Improvement Plan 2010 thru 2014
Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-I0 Type Equipment
Useful Life
Project Name 2010 Park Maintenance Equipment
Category Equipment
Priority 3 Important
Description I
Utility tractor 40,000 - replaces 1973 John Deere
Pickup Truck 24,000
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 64,000 64,000
Total 64,000 64,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 64,000 64,000
Total 64,000 64,000
2005 elF Draft 3/30/05 Page 30 of 49
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-11 Type Equipment
Useful Life
Project Name 2011 Park Maintenance Equipment Category Equipment
Priority 3 Important
Description I
Trimming Mower 12,000
Snowmobile 8,500 - evaluate hours
Pickup Truck 24,000 - 7 year replacement
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 44,500 44,500
Total 44,500 44,500
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 44,500 44,500
Total 44,500 44,500
2005 elP Draft 3/30/05 Page 31 of 49
-----
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-12 Type Equipment
Useful Life
Project Name 2012 Park Maintenance Equipment
Category Equipment
Priority 3 Important
Description I
Wide Area Mower 96,000 - evaluate hours/trade value
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 96,000 96,000
Total 96,000 96,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 96,000 96,000
Total 96,000 96,000
2005 elP Draft 3/30/05 Page 32 of 49
-- -------- - _______________n_
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-13 Type Equipment
Useful Life
Project Name 2013 Park Maintenance Equipment Equipment
Category
Priority 3 Important
Description I
Sidewalk Tractor 92,000 - evaluate hours/trade value
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 92,000 92,000
Total 92,000 92,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 92,000 92,000
Total 92,000 92,000
2005 elP Draft 3/30/05 Page 330f 49
Capital Improvement Plan 2010 thru 2014 Contact Park & Rec. Director
City of Elk River, Minnesota Department Park Maintenance
Project # PK-14 Type Equipment
Useful Life
Project Name 2014 Park Maintenance Equipment
Category Equipment
Priority 3 Important
Description I
One Ton Dump Truck 30,000
Pickup Truck 24,000
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 54,000 54,000
Total 54,000 54,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 54,000 54,000
Total 54,000 54,000
2005 elP Draft 3/30/05 Page 34 of 49
- - -.-----
Capital Improvement Plan 2005 thru 2009 Contact Planning Director
City of Elk River, Minnesota Department Planning
Project # PN-Ol Type Equipment
Useful Life 5 years
Project Name Office Equipment
Category Equipment
Priority 3 Important
Description I
2006 - E Size Copier
2008 - Plotter
Justification I
The E size copier is 9 years old and needs to be upgraded.
Plotter upgrade to 4000 series.
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 9,000 10,000 19,000
Total 9,000 10,000 19,000
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 9,000 10,000 19,000
Total 9,000 10,000 19,000
2005 elP Draft 3/30/05 Page 78 of 99
Capital Improvement Plan 2005 thru 2009 Contact Police Chief
City of Elk River, Minnesota Department Police
PD-Ol Type Vehicle
Project #
Useful Life 3 years
Project Name Marked Squad Replacement & Additions
Category Vehicles
Priority 3 Important
Description I
Routine replacement of vehicles at or near 100,000 miles. Includes all equipment and setup.
2004 - 3 replacement
2005 - 4 replacement
2006 - 3 replacement
2007 - 1 replacement
2008 - 4 replacement
2009 - 3 replacement; 1 new
2010 - 3 replacement
2011 - 3 replacement
2012 - 4 replacement
2013 - 1 replacement
2014 - 3 replacement
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 116,000 90,000 30,000 124,000 124,000 484,000
Total 116,000 90,000 30,000 124,000 124,000 484,000
Funding Sources 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve 116,000 116,000
Equipment Certificates 90,000 30,000 124,000 124,000 368,000
Total 116,000 90,000 30,000 124,000 124,000 484,000
2005 CIP Draft 3/30/05 Page 79 of 99
--
Capital Improvement Plan 2010 thrn 2014 Contact Police Chief
City of Elk River, Minnesota Department Police
PD-Ol Type Vehicle
Project #
Useful Life 3 years
Project Name Marked Squad Replacement & Additions
Category Vehicles
Priority 3 Important
Description I
Routine replacement of vehicles at or near 100,000 miles. Includes all equipment and setup.
2004 - 3 replacement
2005 - 4 replacement
2006 - 3 replacement
2007 - 1 replacement
2008 - 4 replacement
2009 - 3 replacement; 1 new
2010 - 3 replacement
2011 - 3 replacement
i 2012 - 4 replacement
2013 - 1 replacement
2014 - 3 replacement
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Vehicles 96,000 96,000 132,000 33,000 102,000 459,000
Total 96,000 96,000 132,000 33,000 102,000 459,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 96,000 96,000 132,000 33,000 102,000 459,000
Total 96,000 96,000 132,000 33,000 102,000 459,000
2005 CIP Draft 3/30/05 Page 35 of 49
---.---
Capital Improvement Plan 2005 thru 2009 Contact Police Chief
City of Elk River, Minnesota Department Police
PD-02 Type Vehicle
Project #
Useful Life 3 years
Project Name Unmarked Squad Replacement & Additions
Category Vehicles
Priority 3 Important
Description I
2003 - 1 unmarked
2004 - 1 replacement
2005 - 1 new (captain)
2006 - 2 replacement
2007 - 2 replacement
2008 - 2 replacement
2009 - 1 replacement
2010 - 2 replacement
2011 - 2 replacement
2012 - 2 replacement
2013 - 2 replacement
2014 - 3 replacement
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 29,000 60,000 60,000 62,000 31,000 242,000
Total 29,000 60,000 60,000 62,000 31,000 242,000
Funding Sources 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve 29,000 29,000
Equipment Certificates 60,000 60,000 62,000 31,000 213,000
Total 29,000 60,000 60,000 62,000 31,000 242,000
2005 elP Draft 3/30/05 Page 80 of 99
- _._---
Capital Improvement Plan 2010 thru 2014 Contact Police Chief
City of Elk River, Minnesota Department Police
PD-02 Type Vehicle
Project #
Useful Life 3 years
Project Name Unmarked Squad Replacement & Additions
Category Vehicles
Priority 3 Important
Description I
2003 - 1 unmarked
2004 - 1 replacement
2005 - 1 new (captain)
2006 - 2 replacement
2007 - 2 replacement
2008 - 2 replacement
2009 - 1 replacement
2010 - 2 replacement
2011 - 2 replacement
2012 - 2 replacement
2013 - 2 replacement
2014 - 3 replacement
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Vehicles 64,000 64,000 66,000 66,000 102,000 362,000
Total 64,000 64,000 66,000 66,000 102,000 362,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 64,000 64,000 66,000 66,000 102,000 362,000
Total 64,000 64,000 66,000 66,000 102,000 362,000
2005 elP Draft 3/30/05 Page 36 of 49
Capital Improvement Plan 2005 thru 2009 Contact Police Chief
City of Elk River, Minnesota Department Police
PD-03 Type Vehicle
Project #
Useful Life 10 years
Project Name CSO Vehicle Replacement & Additions
Category Vehicles
Priority 3 Important
Description I
CSO vehicle replacement and additions as follows:
2006 - truck
2009 - truck
2011 - truck replacement and new truck
2012 - truck
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 30,000 31,000 61,000
Total 30,000 31,000 61,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 30,000 31,000 61,000
Total 30,000 31,000 61,000
2005 elP Draft 3/30/05 Page 81 of 99
Capital Improvement Plan 2010 thru 2014 Contact Police Chief
City of Elk River, Minnesota Department Police
PD-03 Type Vehicle
Project #
Useful Life 10 years
Project Name CSO Vehicle Replacement & Additions
Category Vehicles
Priority 3 Important
Description I
CSO vehicle replacement and additions as follows:
2006 - truck
2009 - truck
2011 - truck replacement and new truck
2012 - truck
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Vehicles 64,000 33,000 97,000
Total 64,000 33,000 97,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 64,000 33,000 97,000
Total 64,000 33,000 97,000
2005 elP Draft 3/30/05 Page 37 of 49
Capital Improvement Plan 2005 thru 2009 Contact Police Chief
City of Elk River, Minnesota Department Police ,
Project # PD-04 Type Equipment
Useful life
Project Name Police Department - Other Equipment
Category Equipment
Priority 3 Important
Description I
2005 - 5 Mobile Computers
2006 - 4 Mobile Computers
2007 - 800 mhz radios $152k; bar code software $35k
2009 - 6 Mobile Computers
2010 - 5 Mobile Computers
2012 - 8 Mobile Computers
,
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 30,000 20,000 187,000 36,000 273,000
Total 30,000 20,000 187,000 36,000 273,000
Funding Sources 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve 30,000 20,000 187,000 36,000 273,000
Total 30,000 20,000 187,000 36,000 273,000
2005 elP Draft 3/30/05 Page 82 of 99
----
Capital Improvement Plan 2010 thru 2014 Contact Police Chief
City of Elk River, Minnesota Department Police
Project # PD-04 Type Equipment
Useful Life
Project Name Police Department - Other Equipment Equipment
Category
Priority 3 Important
Description I
2005 - 5 Mobile Computers
2006 - 4 Mobile Computers
2007 - 800 mhz radios $152k; bar code software $35k
2009 - 6 Mobile Computers
2010 - 5 Mobile Computers
2012 - 8 Mobile Computers
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 32,000 44,000 76,000
Total 32,000 44,000 76,000
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Outlay Reserve 32,000 44,000 76,000
Total 32,000 44,000 76,000
2005 CIP Draft 3/30/05 Page 38 of 49
Capital Improvement Plan 2005 thru 2009 Contact Police Chief
City of Elk River, Minnesota Department Police
Project # PD-05 Type Equipment
Useful Life 5 years
Project Name Office Equipment
Category Equipment
Priority 3 Important
Description I
2003 - Voice power dictation system including 22 recorders and 4 transcription stations.
2004 - Copy Machine
2005 - Records Scanner
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 6,600 6,600
Total 6,600 6,600
Funding Sources 2005 2006 2007 2008 2009 Total
General Fund Operating 6,600 6,600
Total 6,600 6,600
2005 elP Draft 3/30/05 Page 83 of 99
Capital Improvement Plan 2005 thru 2009 Contact Building Maintenance Supv.
City of Elk River, Minnesota Department Public Safely Building
Project # PS-Ol Type Building
Useful Life
Project Name Energy Management System Building Maintenance
Category
Priority 4 Low Priority
Description I
Add co2 sensors to energy management system.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Building Maintenance 11,000 11,000
Total 11 ,000 11,000
Funding Sources 2005 2006 2007 2008 2009 Total
Government Buildings Reserve 11,000 11,000
Total 11,000 11 ,000
2005 elF Draft 3/30/05 Page 84 of 99
Capital Improvement Plan 2010 thru 2014 Contact Police Chief
City of Elk River, Minnesota Department Public Safety Building
Project # PS-02 Type Building
Useful Life
Project Name Building Expansion
Category Buildings
Priority 4 Low Priority
Description I
2014 - Complete 2nd story interior
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Buildings 340,000 340,000
Total 340,000 340,000
Funding Sources 2010 2011 2012 2013 2014 Total
Government Buildings Reserve 340,000 340,000
Total 340,000 340,000
2005 elP Draft 3/30/05 Page 39 of 49
Capital Improvement Plan 2005 thru 2009 Contact City Administrator
City of Elk River, Minnesota Department Recreation/Culwe
Project # CR-90 Type Improvement
Useful Life 15 years
Project Name Small Theater at ISD 728 High School
Category Building Maintenance
Priority 3 Important
Description I
Contribution to small theater at Elk River High School.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 112,600 112,600
.
Total 112,600 112,600
Funding Sources 2005 2006 2007 2008 2009 Total
NSP Reserve 112,600 112,600
Total 112,600 112,600
2005 elP Draft 3/30/05 Page 85 of 99
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Sewer Department
Project # WW-02 Type Improvement
Useful Life 15 years
Project Name Lift Station Rehabilitation
Category Utilities
Priority 3 Important
Description I
2004 - Lions Park
2006 - Evans Avenue
2011 - Oldest lift station
2012 - Oldest lift station
2014 - Oldest lift station
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 30,000 30,000
Total 30,000 30,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 30,000 30,000
Total 30,000 30,000
2005 elP Draft 3/30/05 Page 86 of 99
---- -
Capital Improvement Plan 2010 thru 2014
Contact Engineer
City of Elk River, Minnesota Department Sewer Department
Project # WW-02 Type Improvement
Useful Life 15 years
Project Name Lift Station Rehabilitation
Category Utilities
Priority 3 Important
Description I
2004 - Lions Park
2006 - Evans Avenue
2011 - Oldest lift station
2012 - Oldest lift station
2014 - Oldest lift station
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 50,000 50,000 60,000 160,000
Total 50,000 50,000 60,000 160,000
Funding Sources 2010 2011 2012 2013 2014 Total
Sewer Fund 50,000 50,000 60,000 160,000
Total 50,000 50,000 60,000 160,000
2005 elP Draft 3/30/05 Page 40 of 49
-.---
Capital Improvement Plan 2005 thru 2009 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
WW-06 Type Vehicle
Project #
Useful Life 6 years
Project Name Vehicle Replacement
Category Vehicles
Priority 2 High Priority
Description I
2005 - pickup replace 1992 Dodge
2006 - pickup replace 1998 Chevrolet
2007 - pickup replace 2001 Ford
2010 - pickup replace 2004 truck
2012 - pickup replace 2006 truck
2013 - pickup replace
2015 - pickup replace
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 25,000 27,000 27,000 79,000
Total 25,000 27,000 27,000 79,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 25,000 27,000 27,000 79,000
Total 25,000 27,000 27,000 79,000
2005 elP Draft 3/30/05 Page 87 of 99
-
Capital Improvement Plan 2010 thru 2014 Contact Chi
City of Elk River, Minnesota Department Se
WW-06 Type Ve
Project #
Useful Life 6y
Project Name Vehicle Replacement
Category Ve
Priority 2H
Description I
2005 - pickup replace 1992 Dodge
2006 - pickup replace 1998 Chevrolet
2007 - pickup replace 2001 Ford
2010 - pickup replace 2004 truck
2012 - pickup replace 2006 truck
2013 - pickup replace
2015 - pickup replace
Justification I
Expenditures 2010 2011 2012 2013 2014
Vehicles 30,000 30,000 30,000
Total 30,000 30,000 30,000
Funding Sources 2010 2011 2012 2013 2014
Sewer Fund 30,000 30,000 30,000
Total 30,000 30,000 30,000
2005 elP Draft 3/30/05 Page 41 of 49
ef Wastewater Operator
wer Department
hicle
ears
hicles
igh Priority
Total
90,000
90,000
Total
90,000
90,000
Capital Improvement Plan 2005 thru 2009 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
Project # WW-08 Type Improvement
Useful Life 20 years
Project Name Digester Cover Replacement
Category Building Maintenance
Priority I Critical
Description I
Replace primary digester covers that have exceeded their expected life.
2004 - Primary Digester Cover
2005 - Secondary Digester Cover
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 325,000 325,000
Total 325,000 325,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 325,000 325,000
Total 325,000 325,000
2005 elF Draft 3/30/05 Page 88 of 99
---
Capital Improvement Plan 2005 thru 2009 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
Project # WW-09 Type Equipment
Useful Life 15 years
Project Name Upgrade Alarm System
Category Equipment
Priority 2 High Priority
Description I
2006 - Upgrade alarm system at lift stations to SCADA system.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 200,000 200,000
Total 200,000 200,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 200,000 200,000
Total 200,000 200,000
2005 elP Draft 3/30/05 Page 89 of 99
-- - . -- ----- -
Capital Improvement Plan 2005 thru 2009 Chief Wastewater Operator
Contact
City of Elk River, Minnesota Department Sewer Department
Project # WW-12 Type Equipment
Useful Life 10 years
Project Name Heavy Equipment
Category Heavy Equipment
Priority 5 Future Consideration
Description I
Land application equipment for sludge application.
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 150,000 150.000
Total 150,000 150,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 150.000 150,000
Total 150,000 150,000
2005 elP Draft 3/30/05 Page 90 of 99
-- -
Capital Improvement Plan 2010 thru 2014 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
Project # WW-14 Type Equipment
Useful Life 20 years
Project Name Upgrade Boiler
Category Equipment
Priority 2 High Priority
Description I
Replace current boiler for primary digester
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 125,000 125,000
Total 125,000 125,000
Funding Sources 2010 2011 2012 2013 2014 Total
Sewer Fund 125,000 125,000
Total 125,000 125,000
2005 elP Draft 3/30/05 Page 42 of 49
--- --....----------------
Capital Improvement Plan 2010 thru 2014 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
Project # WW-15 Type Equipment
Useful Life 15 years
Project Name Replace Generators
Category Equipment
Priority 3 Important
Description I
Replace 5 mobile generators.
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 110,000 110,000
Total 110,000 110,000
Funding Sources 2010 2011 2012 2013 2014 Total
Sewer Fund 110,000 110,000
Total 110,000 110,000
2005 CIP Draft 3/30/05 Page 43 of 49
Capital Improvement Plan 2005 thru 2009 Contact Engineer
City of Elk River, Minnesota Department Sewer Department
Project # WW-17 Type Improvement
Useful Life
Project Name Plant Expansion Master Plan
Category Plant Expansion
Priority 2 High Priority
Description I
Expand plant capacity from 1.6 MGD to 2.2MGD. Includes grit removal expansion and mechanization.
Includes phosphorous removal.
2005 - Headworks and Secondary Digester Cover
2006 - Filtration, UV Disinfection, Trickling Filter repair
2007 - Aeration Basins, Blowers, Main Building
2009 - Installation of Clarifiers and Digesters
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
Total 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
Total 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
2005 elP Draft 3/30/05 Page 91 of 99
Capital Improvement Plan 2005 thru 2009 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
Project # WW-18 Type Equipment
Useful Life 10 years
Project Name Replace Plant Samplers Equipment
Category
Priority I Critical
Description I
Replace automatic plant samplers from 1995 . Test sewage coming in and going out.
I
Justification I
,
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 12,000 12,000
Total 12,000 12,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 12,000 12,000
Total 12,000 12,000
2005 ClP Draft 3/30/05 Page 92 of 99
Capital Improvement Plan 2010 thru 2014 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
WW-20 Type Infrastructure
Project #
Useful Life
Project Name Sewer Lining Utilities
Category
Priority 3 Important
Description I
Line old sewer lines
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 30,000 30,000 60,000
Total 30,000 30,000 60,000
Funding Sources 2010 2011 2012 2013 2014 Total
Sewer Fund 30,000 30,000 60,000
Total 30,000 30,000 60,000
2005 elP Draft 3/30/05 Page 44 of 49
Capital Improvement Plan 2005 thru 2009 Contact Chief Wastewater Operator
City of Elk River, Minnesota Department Sewer Department
WW-20 Type Infrastructure
Project #
Useful Life
Project Name Sewer Lining
Category Utilities
Priority 3 Important
Description I
Line old sewer lines
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 30,000 30,000 60,000
Total 30,000 30,000 60,000
Funding Sources 2005 2006 2007 2008 2009 Total
Sewer Fund 30,000 30,000 60,000
Total 30,000 30,000 60,000
2005 elP Draft 3/30/05 Page 93 of 99
Capital Improvement Plan 2005 thru 2009
Contact Street Supt.
City of Elk River, Minnesota Department Streets
ST-Ol Type Vehicle
Project #
Useful Life 15 years
Project Name Vehicle Replacement - pickup trucks
Category Vehicles
Priority 3 Important
Description I
Street department pickup truck replacements.
2003 - I Pickup Truck
2007 - I
2011 - I
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Vehicles 27,000 27,000
Total 27,000 27,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 27,000 27,000
Total 27,000 27,000
2005 elP Draft 3/30/05 Page 94 of 99
Capital Improvement Plan 2010 thru 2014 Contact Street Supt.
City of Elk River, Minnesota Department Streets
ST-Ol Type Vehicle
Project #
Useful Life 15 years
Project Name Vehicle Replacement - pickup trucks
Category Vehicles
Priority 3 Important
Description I
Street department pickup truck replacements.
2003 - I Pickup Truck
2007 - I
2011 - I
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Vehicles 30,000 30,000
Total 3D ,000 30,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 30,000 30,000
Total 30,000 30,000
2005 elP Draft 3/30/05 Page 45 of 49
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Streets
Project # ST -02 Type Equipment
Useful Life 20 years
Project Name Dump Truck Replacement Heavy Equipment
Category
Priority 3 Important
Description I
Dump truck replacement and additions. Includes all plow equipment.
2003 - I I Ton Dump Truck (NOT INCLUDED IN FINAL BUDGET)
2004 - I Single Axle with plow
2005 - I Single Axle
2006 - I Single Axle 140k; 1 Tandem Axle 160k; lOne Ton 60k
2007 - 1 Single Axle; lOne Ton 65k
2008 - 1 Single Axle with plow 160k
2009 - 1 Tandem Axle with plow
2010 - 1 Tandem Axle with plow
2011 - lOne Ton
2012 - 1 Tandem Axle with plow
2013 - Sign Truck
2014 - lOne Ton
Justification I
,
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 150,000 360,000 210,000 160,000 175,000 1,055,000
Total 150,000 360,000 210,000 160,000 175,000 1,055,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 150,000 360,000 210,000 160,000 175,000 1,055,000
Total 150,000 360,000 210,000 160,000 175,000 1,055,000
2005 elP Draft 3/30/05 Page 95 of 99
----- -----------------
Capital Improvement Plan 2010 thru 2014 Contact Street Supt.
City of Elk River, Minnesota Department Streets
Project # ST -02 Type Equipment
Useful Life 20 years
Project Name Dump Truck Replacement
Category Heavy Equipment
Priority 3 Important
Description I
Dump truck replacement and additions. Includes all plow equipment.
2003 - 1 1 Ton Dump Truck (NOT INCLUDED IN FINAL BUDGET)
2004 - 1 Single Axle with plow
2005 - 1 Single Axle
2006 - 1 Single Axle 140k; 1 Tandem Axle 160k; 1 One Ton 60k
2007 - 1 Single Axle; lOne Ton 65k
2008 - 1 Single Axle with plow 160k
2009 - 1 Tandem Axle with plow
2010 - 1 Tandem Axle with plow
2011 - lOne Ton
2012 - 1 Tandem Axle with plow
2013 - Sign Truck
2014 - lOne Ton
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Equipment 185,000 70,000 195,000 110,000 75,000 635,000
Total 185,000 70,000 195,000 110,000 75,000 635,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Certificates 185,000 70,000 195,000 110,000 75,000 635,000
Total 185,000 70,000 195,000 110,000 75,000 635,000
2005 CIP Draft 3/30/05 Page 46 of 49
Capital Improvement Plan 2005 thro 2009 Street Supt
Contact
City of Elk River, Minnesota Department Streets
Project # ST -03 Type Equipment
Useful Life 20 years
Project Name Heavy Equipment Replacement
Category Heavy Equipment
Priority 3 Important
Description I
Heavy Equipment replacements & additions as follows:
2003 - front end loader with plow and wing
2003 - H.D. snow plow for loader
2004 - sidewalk plow (not purchased)
2005 - sweeper
2007 - skid loader 35k; rubber tired roller 25k
2008 - front end loader 175K; mini backhoe 40k
2009 - grader l50k
2010 - sweeper
2011 - skid loader
2013 - front end loader 200k; skid loader 50k
2014 - sweeper
Justification I
Expenditures 2005 2006 2007 2008 2009 Total
Equipment 175,000 60,000 215,000 150,000 600,000
Total 175,000 60,000 215,000 150,000 600,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 175,000 60,000 215,000 150,000 600,000
Total 175,000 60,000 215,000 150,000 600,000
2005 CIP Draft 3/30/05 Page 96 of 99
Capital Improvement Plan
City of Elk River, Minnesota
Project # ST -03
Project Name Heavy Equipment Replacement
Description
Heavy Equipment replacements & additions as follows:
2003 - front end loader with plow and wing
2003 - H.D. snow plow for loader
2004 - sidewalk plow (not purchased)
2005 - sweeper
2007 - skid loader 35k; rubber tired roller 25k
2008 - front end loader 175K; mini backhoe 40k
2009 - grader 150k
2010 - sweeper
2011 - skid loader
2013 - front end loader 200k; skid loader 50k
2014 - sweeper
Justification
Expenditures
Equipment
2010
200,000
200,000
2011
40,000
40,000
Total
Funding Sources
Equipment Certificates
2010
200,000
200,000
2011
40,000
40,000
Total
2005 CIP Draft 3/30/05
Page 47 of 49
2010 thru 2014
2012
2012
2013
250,000
250,000
2013
250,000
250,000
Contact Street Supt.
Department Streets
Type Equipment
Useful Ufe 20 years
Category Heavy Equipment
Priority 3 Important
2014
200,000
200,000
Total
690,000
690,000
2014
200,000
200,000
Total
690,000
690,000
Capital Improvement Plan
City of Elk River, Minnesota
Project # ST -04
Project Name Other Equipment Replacement
2005 thru 2009 Contact Street Supt.
Department Streets.
Type Equipment
Useful Life 10 years
Category Equipment
Priority 3 Important
Description I
Replace other Street Department equipment as follows:
2003 - Infra-red asphalt patcher (Requested but not included in budget)
2004 - Trailer
2005 - Infr-red asphalt patcher 20k; GPS Inst. 8500; Crack router 7500
2007 - fuel card system50k
2009 - shouldering machine; salt/sand mixing equip 75k
2011 - skid loader trailer 15k; cold mill attach 20k; air compressor 30k
2012 - asphalt patcher 50k; automatic truck wash lOOk
Justification I
Additional Request not budgeted for 2005: Snowblower to load snow from the downtown. Present Schmidt blower has
experienced mechanical failure and repare parts are no longer available. Cost for Wild Cat model 8000 - $71,365 (inc.
tax).
Expenditures
Equipment
2005
36,000
Total 36,000
2006
2007
50,000
50,000
2008
2009
125,000
125,000
Total
211,000
211,000
Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Certificates 20,000 50,000 125,000 195,000
General Fund Operating 7,500 7,500
Storm Sewer 8,500 8,500
Total 36,000 50,000 125,000 211,000
2005 elP Draft 3/30/05
Page 97 of 99
Capital Improvement Plan
City of Elk River, Minnesota
Project # ST -04
Project Name Other Equipment Replacement
2010 thru 2014 Contact Street Supt.
Department Streets
Type Equipment
Useful Life 10 years
Category Equipment
Priority 3 Important
Description I
Replace other Street Department equipment as follows:
2003 - Infra-red asphalt patcher (Requested but not included in budget)
2004 - Trailer
2005 - Infr-red asphalt patcher 20k; GPS Inst. 8500; Crack router 7500
2007 - fuel card system50k
2009 - shouldering machine; salt/sand mixing equip 75k
2011 - skid loader trailer 15k; cold mill attach 20k; air compressor 30k
2012 - asphalt patcher 50k; automatic truck wash lOOk
Justification I
Additional Request not budgeted for 2005: Snowblower to load snow from the downtown. Present Schmidt blower has
experienced mechanical failure and repare parts are no longer available. Cost for Wild Cat model 8000 - $71,365 (inc.
tax).
Expenditures 2010
Equipment
Total
2011
65,000
65,000
2012
150,000
150,000
2013
2014
Total
215,000
215,000
Funding Sources 2010
Equipment Certificates
Total
2011
65,000
65,000
2012
150,000
150,000
2013
2014
Total
215,000
215,000
2005 elP Draft 3/30/05
Page 48 of 49
Capital Improvement Plan
City of Elk River, Minnesota
Project # ST -09
Project Name Public Works Complex
2005 thru 2009 Contact Street Supt.
Department Streets
Type Building
Useful Life
Category Buildings
Priority 3 Important
Description I
Public Works Master Plan as approved by Council January, 2005
2005 - Master Grading Plan 38k; Bldg Plans & Specs 5k; Salt/Sand Storage 150k; Cold Storage 125k; Parking lot &
driveway improvements 79k
2006 - Site grading & utility improvements
2008 - Remodel interior of existing building 120k
TBD - Tempered Storage #1 1500k;
TBD - Tempered Storage #2 1100k
TBD - Mechanic bay expansion 200k
Justification
I
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 750,000 750,000
Buildings 397,000 120,000 517,000
Total 397,000 750,000 120,000 1,267,000
Funding Sources
Government Buildings Reserve
2005
397,000
397,000
2006
750,000
750,000
2007
2008
120,000
120,000
2009
Total
1,267,000
1,267,000
Total
2005 elP Draft 3/30/05
Page 98 of 99
Capital Improvement Plan 2010 thru 2014 Contact Street Supt.
City of Elk River, Minnesota Department Streets
-------~.- ...mm........................__.............. ~.... -~--_....._.._.._........._.----_._._----.
] Project # ST -09 Type Building
I Useful Life
i Project Name Public Works Complex Buildings
. ........-......--....-.-- .-.-...--------._-_.------------_..._--_...__.._~~. .._m_ .....m_..____...... Category
Priority 3 Important
Description I
Public Works Master Plan as approved by Council January, 2005
2005 - Master Grading Plan 38k; Bldg Plans & Specs 5k; Salt/Sand Storage 150k; Cold Storage 125k; Parking lot &
driveway improvements 79k
2006 - Site grading & utility improvements
2008 - Remodel interior of existing building 120k
TBD - Tempered Storage #1 1500k;
TBD - Tempered Storage #2 1100k
TBD - Mechanic bay expansion 200k
Justification I
Expenditures 2010 2011 2012 2013 2014 Total
Buildings 2,800,000 2,800,000
Total 2,800,000 2,800,000
Funding Sources 2010 2011 2012 2013 2014 Total
To Be Determined 2,800,000 2,800,000
Total 2,800,000 2,800,000
2005 elP Draft 3/30/05 Page 49 of 49
Capital Improvement Plan 2005 thru 2009 Contact Street Supt.
City of Elk River, Minnesota Department Streets
Project # ST-ll Type Improvement
Useful Life 25 years
Project Name Public Works Building Maintenance
Category Building Maintenance
Priority 3 Important
Description I
Replace Building Roof
Justification I
.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2005 2006 2007 2008 2009 Total
Government Buildings Reserve 50,000 50,000
Total 50,000 50,000
2005 elP Draft 3/30/05 Page 99 of 99
Capital Improvement Plan
City of Elk River, Minnesota
PROJECTS BY FUNDING SOURCE
2005
thru
2009
Source Project# Priority 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve
Outdoor Waming Sirens EP-01 3 16,200 16,700 16,900 17,200 17,200 84,200
Software FN-O 1 3 40,000 40,000
Ice Arena Non-Major Building Rep~ir & Maintenance IA-03 3 8,000 17,000 7,500 10,000 42,500
Marked Squad Replacement & Additions PD-01 3 116,000 116,000
Unmarked Squad Replacement & Additions PD-02 3 29,000 29,000
Police Department - Other Equipment PD-04 3 30,000 20,000 187,000 36,000 273,000
Capital Outlay Reserve Total 199,200 53,700 211,400 27,200 93,200 584,700
Capital Projects - Assessment Revenue
Assessable Street Overlay Projects OV-03 3 500,000 500,000 1,000,000
Capital Projects - Assessment 500,000 500,000 1,000,000
Revenue Total
County Grants
Election Equipment EL-01 2 58,500 58,500
County Grants Total 58,500 58,500
Developer
CR 40 Improvements 11-16 2 150,000 150,000
Developer Total 150,000 150,000
Donors
Lions Park PR-35 3 11,000 11,000
Donors Total 11,000 11,000
Equipment Certificates
Vehicle Replacement FD-01 3 40,000 40,000
Fire Truck Replacement - Grass Rigs FD-02 3 45,000 45,000
Fire Truck Replacement - Engines FD-03 3 375,000 375,000
Fire Truck Replacement - Tankers FD-04 3 175,000 175,000
Fire Truck Replacement - Other FD-05 3 230,000 230,000'
Ice Arena Equipment IA-01 3 95,000 95,000
Marked Squad Replacement & Additions PD-01 3 90,000 30,000 124,000 124,000 368,000
Unmarked Squad Replacement & Additions PD-02 3 60,000 60,000 62,000 31,000 213,000
CSO Vehicle Replacement & Additions PD-03 3 30,000 31,000 61,000
2005 CIP Draft 3/30/05 Page 1 of 5
Source Project# Priority 2005 2006 2007 2008 2009 Total
2005 Park Maintenance Equipment PK-{)5 1 30,000 30,000
2006 Park Maintenance Equipment PK-{)6 3 118,500 118,500
2007 Park Maintenance Equipment PK-{)7 3 58,000 58,000
2008 Park Maintenance Equipment PK-{)8 3 90,000 90,000
2009 Park Maintenance Equipment PK-{)9 3 56,500 56,500
Vehicle Replacement - pickup trucks ST-{)1 3 27,000 27,000
Dump Truck Replacement ST-02 3 150,000 360,000 210,000 160,000 175,000 1,055,000
Heavy Equipment Replacement ST-{)3 3 175,000 60,000 215,000 150,000 600,000
Other Equipment Replacement ST-{)4 3 20,000 50,000 125,000 195,000
Equipment Certificates Total 750,000 703,500 670,000 881,000 827,500 3,832,000
ERMU
Flush Valve CH-{)3 4 4,750 4,750
ERMU Total 4,750 4,750
Federal Grants
Highway 10 Transportation Plan TP-{)2 3 400,000 400,000
Federal Grants Total 400,000 400,000
General Fund Operating
Administration Office Equipment AD-{)1 3 6,500 6,500
Vehicle Replacement BZ-{)1 3 22,000 26,000 48,000
Information Technology Improvements 2005 IT-{)5 2 14,000 14,000
Information Technology Improvements 2006 IT-{)6 2 45,000 45,000
Information Technology Improvements 2007 IT-{)7 2 45,000 45,000
Information Technology Improvements 2008 IT-{)8 2 45,000 45,000
Information T echnoloty Improvements 2009 IT-{)9 2 45,000 45,000
Annual Street Overlay Program - Not Assessed OV-{)2 3 25,000 25,000 25,000 25,000 25,000 125,000
Office Equipment PD-{)5 3 6,600 6,600
Office Equipment PN-{)1 3 9,000 10,000 19,000
Annual Street Sealcoat Program SC-{)2 3 75,000 85,000 90,000 100,000 110,000 460,000
Other Equipment Replacement ST-{)4 3 7,500 7,500
General Fund Operating Total 156,600 164,000 160,000 180,000 206,000 866,600
Government Buildings Reserve
Smart Board Additions AD-{)2 4 16,000 16,000 32,000
Library Expansion BL-{)5 5 1,500,000 1,500,000
Chiller Replacment CH-{)1 2 70,000 70,000
Boiler Replacement CH-{)2 2 20,000 20,000
Flush Valve CH-{)3 4 4,750 4,750
Ice Arena Major Building Repair IA-{)2 5 40,000 35,500 100,000 175,500
Energy Management System PS-{)1 4 11,000 11,000
Public Works Complex ST-{)9 3 397,000 750,000 120,000 1,267,000
Public Works Building Maintenance ST-11 3 50,000 50,000
2005 CIP Draft 3/30/05
Page 2 of 5
Source Pro.iect# Priority 2005 2006 2007 2008 2009 Total
Government Buildings Reserve Total 397,000 871,750 1,571,500 220,000 70,000 3,130,250
Library
Library Expansion BL -05 5 100,000 100,000
Library Total 100,000 100,000
Liquor Fund
Northbound Building Maintenance LS-01 3 10,000 10,000
Westbound Liquor Store LS-02 5 1,500,000 1,500,000
Liquor Fund Total 1,500,000 10,000 1,510,000
Municipal State Aid
Meadowvale Road (CR 44) Improvement 11-12 2 750,000 750,000
CR 40 Improvements 11-16 2 800,000 800,000
Signal Light @ Twin Lakes Rd & CR 12 SL -02 0 50,000 50,000
Municipal State Aid Total 800,000 800,000 1,600,000
NSP Reserve
Small Theater at ISD 728 High School CR-90 3 112,600 112,600
NSP Reserve Total 112,600 112,600
Park Dedication
Park Development PF-61 3 32,000 15,000 15,000 15,000 15,000 92,000
Trail Development PF-64 3 15,000 7,000 15,000 15,000 15,000 67,000
Land Acquisition PF-90 3 350,000 130,000 480,000
Baldwin Park PR-02 3 15,000 15,000
Barrington Park PR-04 3 3,000 3,000
Big Tooth Ridge Park PR-06 3 35,000 35,000
Birch Meadow Park PR-08 3 42,000 10,000 52,000
Deerfield Hill Park PR-14 3 20,000 3,000 23,000
Fresno Park PR-16 3 2,000 2,000 4,000
Great Northem Trail PR-18 3 140,000 140,000
Highlands East Park PR-24 3 42,000 25,000 67,000
Highlands West Park PR-26 3 25,000 25,000
Hillside City Park PR-28 3 175,000 175,000
Joplin Park PR-30 3 4,000 4,000
Kliever Lake Fields PR-32 3 54,000 101,000 20,000 175,000
Kliever Point Park PR-34 3 69,000 69,000
Lions Park PR-35 3 10,700 10,700
Mississippi Oaks Park PR-40 3 2,000 2,000
Oak Knoll Park PR-44 3 35,000 35,000
Orono Park PR-48 3 369,300 369,300
Orono Athletic Complex PR-50 3 3,000 24,500 27,500
Riverplace Park PR-54 3 3,500 3,500
Ridgewood East Park PR-56 3 1,500 1,500
2005 CIP Draft 3/30/05 Page 3 of 5
Source Project# Priority 2005 2006 2007 2008 2009 Total
Rivers Edge Commons Park PR-58 3 40,000 294,000 334,000
Trot! Brook Park PR-60 3 96,500 96,500
West Oaks Park PR-62 3 77.000 77,000
Windsor Park PR-64 3 53,000 53,000
Woodland Trails Park PR-66 3 38,500 26,000 325,000 389,500
Youth Athletic Complex PR-68 3 100,000 275,000 295,000 670,000
Park Dedication Total 607,700 1,022,000 271,500 914,300 680,000 3,495,500
Sewer Fund
Lift Station Rehabilitation WW-02 3 30,000 30,000
Vehicle Replacement WW-06 2 25,000 27,000 27,000 79,000
Digester Cover Replacement WW-08 1 325,000 325,000
Upgrade Alarm System WW-09 2 200,000 200,000
Heavy Equipment WW-12 5 150,000 150,000
Plant Expansion Master Plan WW-17 2 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
Replace Plant Samplers WW-18 12,000 12,000
Sewer Lining WW-20 3 30,000 30,000 60,000
Sewer Fund Total 1,630,000 2,672,000 3,569,000 150,000 5,030,000 13,051,000
Special Assessments
Dodge Avenue Street Improvements north of 5th SI. 11-08 4 150,000 150,000
213th Ave west of CR 24 (Jarvis) 11-13 0 40,000 40,000
189th, Troy and Pascal Streets 11-14 0 60,000 60,000
CR 40 Improvements 11-16 2 450,000 450,000
Pavement Management Program PM-01 2 416,667 500,000 583,333 1,500,000
Special Assessments Total 416,667 640,000 500,000 60,000 583,333 2,200,000
State Grants/State Aid
Land Acquisition PF-90 3 1,000,000 1,000,000
State Grants/State Aid Total 1,000,000 1,000,000
Storm Sewer
Woodland Trails Park PR-66 3 25,000 25,000
Other Equipment Replacement ST -04 3 8,500 8,500
Storm Sewer Total 33,500 33,500
Street Improvement Reserve
Dodge Avenue Street Improvements north of 5th SI. 11-08 4 150,000 150,000
Highland Road Improvements 11-09 2 75,000 75,000
213th Ave west of CR 24 (Jarvis) 11-13 0 40,000 40,000
189th, Troy and Pascal Streets 11-14 0 60,000 60,000
Pavement Management Program PM-01 2 416,666 500,000 583,334 1,500,000
Signal Lights @ School & Lions Park Drive SL-01 2 100,000 100,000
Street Light Replacement HWY 10 SL-04 3 100,000 100,000
Signal Light Painting SL-09 3 20,000 20,000
2005 CIP Draft 3/30/05 Page 4 of 5
Source Project# Priority 2005 2006 2007 2008 2009 Total
Storm Water Irving Ave from 6th to 7th Street SW-01 2 40,000 40,000
Highway 10 Transportation Plan TP-Q2 3 100,000 100,000
Street Improvement Reserve Total 416,666 505,000 520,000 160,000 583,334 2,185,000
Tax Supported Bond Issue
Pavement Management Program PM-Q1 2 416,667 500,000 583,333 1,500,000
Tax Supported Bond Issue Total 416,667 500,000 583,333 1,500,000
To Be Determined
Elk Hills Drive Extension toCR 13 11-17 2 0 0
193rd Avenue Extension to CR13 11-18 2 0 0
To Be Determined Total 0 0
GRAND TOTAL 6,647,600 9,645,200 8,773,400 3,102,500 8,656,700 36,825,400
2005 CIP Draft 3/30/05
Page 5 of 5
Capital Improvement Plan
City of Elk River, Minnesota
PROJECTS BY FUNDING SOURCE
2010
thru
2014
Source Pro.iect# Priority 2010 2011 2012 2013 2014 Total
Capital Outlay Reserve
Outdoor Warning Sirens EP-01 3 17,400 17,400 17,500 17,500 18,000 87,800
Ice Arena Non-Major Building Repair & Maintenance IA-03 3 12,000 12,000
Police Department - Other Equipment PD-04 3 32,000 44,000 76,000
Capital Outlay Reserve Total 61,400 17,400 61,500 17,500 18,000 175,800
Capital Projects - Assessment Revenue
Assessable Street Overlay Projects OV-03 3 550,000 600,000 650,000 1,800,000
Capital Projects - Assessment 550,000 600,000 650,000 1,800,000
Revenue Total
Equipment Certificates
Vehicle Replacement FD-01 3 40,000 40,000
Fire Truck Replacement - Grass Rigs FD-02 3 50,000 50,000
Fire Truck Replacement - Tankers FD-04 3 50,000 50,000
Fire Truck Replacement - Other FD-05 3 750,000 750,000
Marked Squad Replacement & Additions PD-01 3 96,000 96,000 132,000 33,000 102,000 459,000
Unmarked Squad Replacement & Additions PD-02 3 64,000 64,000 66,000 66,000 102,000 362,000
CSO Vehicle Replacement & Additions PD-03 3 64,000 33,000 97,000
2010 Park Maintenance Equipment PK-10 3 64,000 64,000
2011 Park Maintenance Equipment PK-11 3 44,500 44,500
2012 Park Maintenance Equipment PK-12 3 96,000 96,000
2013 Park Maintenance Equipment PK-13 3 92,000 92,000
2014 Park Maintenance Equipment PK-14 3 54,000 54,000
Vehicle Replacement - pickup trucks ST-01 3 30,000 30,000
Dump Truck Replacement ST-02 3 185,000 70,000 195,000 110,000 75,000 635,000
Heavy Equipment Replacement ST-03 3 200,000 40,000 250,000 200,000 690,000
Other Equipment Replacement ST-04 3 65,000 150,000 215,000
Equipment Certificates Total 659,000 523,500 712,000 551,000 1,283,000 3,728,500
General Fund Operating
Vehicle Replacement BZ-01 3 24,000 24,000 25,000 25,000 98,000
Annual Street Overlay Program - Not Assessed OV-02 3 25,000 25,000 25,000 25,000 25,000 125,000
Annual Street Sealcoat prog ram SC-02 3 115,000 120,000 125,000 130,000 135,000 625,000
General Fund Operating Total 164,000 169,000 175,000 155,000 185,000 848,000
2005 elP Draft 3/30/05 Page 1 of 3
Source Project# Priority 2010 2011 2012 2013 2014 Total
Government Buildings Reserve
Building Expansion PS-Q2 4 340,000 340,000
Government Buildings Reserve Total 340,000 340,000
Park Dedication
Park Development PF-61 3 15,000 15,000 15,000 15,000 15,000 75,000
Trail Development PF-64 3 15,000 15,000 15,000 15,000 15,000 75,000
Land Acquisition PF-90 3 200,000 200,000 200,000 200,000 200,000 1,000,000
Baldwin Park PR-02 3 3,500 3,500
Deerfield Hill Park PR-14 3 8,000 8,000
Guardian Angels Park PR-20 3 7,000 7,000
Kliever Lake Fields PR-32 3 32,000 32,000
Mississippi Oaks Park PR-40 3 4,000 4,000
Mississippi Trail PR-42 3 10,000 10,000
Oak Knoll Park PR-44 3 52,000 52,000
Oak Savannah PR-46 3 6,100 6,100
Woodland Trails Park PR-66 3 137,000 137,000
Park Dedication Total 408,600 230,000 304,000 237,000 230,000 1,409,600
Sewer Fund
Lift Station Rehabilitation WW-Q2 3 50,000 50,000 60,000 160,000
Vehicle Replacement WW-Q6 2 30,000 30,000 30,000 90,000
Upgrade Boiler WW-14 2 125,000 125,000
Replace Generators WW-15 3 110,000 110,000
Sewer Lining WW-20 3 30,000 30,000 60,000
Sewer Fund Total 155,000 190,000 80,000 60,000 60,000 545,000
Special Assessments
Pavement Management Program PM-Q1 2 666,667 750,000 1,416,667
Special Assessments Total 666,667 750,000 1,416,667
Street Improvement Reserve
Railroad Drive between Jackson and Main 11-10 3 100,000 100,000
211lh Ave East of CR 32 11-15 0 100,000 100,000
Pavement Management Program PM-Q1 2 666,666 750,000 1,416,666
Signal Lights @ Main at Gates & Parrish SL-Q3 0 150,000 200,000 350,000
Signal Light Painting SL-Q9 3 20,000 20,000
Street Improvement Reserve Total 350,000 666,666 20,000 750,000 200,000 1,986,666
Tax Supported Bond Issue
Fire Station #3 FD-Q6 5 2,250,000 2,250,000
Pavement Management Program PM-Q1 2 666,667 750,000 1,416,667
Tax Supported Bond Issue Total 666,667 2,250,000 750,000 3,666,667
To Be Determined
2005 CIP Draft 3/30/05 Page 2 of 3
Source Project# Priority 2010 2011 2012 2013 2014 Total
School Street Extension to Meadowvale Road 11-19 2 0 0
Public Works Complex ST -09 3 2,800,000 2,800,000
To Be Determined Total 2,800,000 2,800,000
GRAND TOTAL 2,348,000 3,129,900 4,202,500 3,270,500 5,766,000 18,716,900
2005 CIP Draft 3/30/05
Page 3 of 3
Capital Improvement Plan
City of Elk River, Minnesota
SOURCES OF REVENUE SUMMARY
2005 thru 2009
Source 2005 2006 2007 2008 2009 Total
Capital Outlay Reserve 199,200 53,700 211.400 27,200 93,200 584,700
Capital Projects - Assessment Revenue 500,000 500,000 1,000,000
County Grants 58,500 58,500
Developer 150,000 150,000
Donors 11,000 11,000
Equipment Certificates 750,000 703,500 670,000 881,000 827,500 3,832,000
ERMU 4,750 4,750
Federal Grants 400,000 400,000
General Fund Operating 156,600 164,000 160,000 180,000 206,000 866,600
Government Buildings Reserve 397,000 871,750 1,571,500 220,000 70,000 3,130,250
Library 100,000 100,000
Liquor Fund 1,500,000 10,000 1,510,000
Municipal State Aid 800,000 800,000 1,600,000
NSP Reserve 112,600 112,600
Park Dedication 607,700 1,022,000 271,500 914,300 680,000 3.495,500
Sewer Fund 1,630,000 2,672,000 3,569,000 150,000 5,030,000 13,051,000
Special Assessments 416,667 640,000 500,000 60,000 583,333 2,200,000
State Grants/State Aid 1,000,000 1,000,000
Storm Sewer 33,500 33,500
Street Improvement Reserve 416,666 505,000 520,000 160,000 583,334 2,185,000
Tax Supported Bond Issue 416,667 500,000 583,333 1,500,000
To Be Determined 0 0
Total 6,647,600 9,645,200 8,n3,400 3,102,500 8,656,700 36,825,400
2005 CIP Draft 3/30/05
Page 1 of 1
Capital Improvement Plan
City of Elk River, Minnesota
SOURCES OF REVENUE SUMMARY
2010 thru 2014
Source 2010 2011 2012 2013 2014 Total
Capital Outlay Reserve 61,400 17,400 61,500 17,500 18,000 175,800
Capital Projects - Assessment Revenue 550,000 600,000 650,000 1,800,000
Equipment Certificates 659,000 523,500 712,000 551,000 1,283,000 3,728,500
General Fund Operating 164,000 169,000 175,000 155,000 185,000 848,000
Govemment Buildings Reserve 340,000 340,000
Park Dedication 408,600 230,000 304,000 237,000 230,000 1,409,600
Sewer Fund 155,000 190,000 80,000 60,000 60,000 545,000
Special Assessments 666,667 750,000 1,416,667
Street Improvement Reserve 350,000 666,666 20,000 750,000 200,000 1,986,666
Tax Supported Bond Issue 666,667 2,250,000 750,000 3,666,667
To Be Determined 2,800,000 2,800,000
Total 2,348,000 3,129,900 4,202,500 3,270,500 5,766,000 18,716,900
2005 CIP Draft 3/30/05
Page 1 of 1
Capital Improvement Plan
City of Elk River, Minnesota
PROJECTS BY DEPARTMENT AND FUNDING SOURCE
2005
thru
2009
Department project# Priority 2005 2006 2007 2008 2009 Total
Administration
Administration Office Equipment AD-01 3 6,500 6,500
General Fund Operating 6,500 6,500
Smart Board Additions AD-02 4 16,000 16,000 32,000
Government Buildings Reserve 16,000 16,000 32,000
Administration Total 6,500 16,000 16,000 38,500
Building & Environmental
Vehicle Replacement BZ-01 3 22,000 26,000 48,000
General Fund Operating 22,000 26,000 48,000
Building & Environmental Total 22,000 26,000 48,000
City Hall
Chiller Replacment CH-01 2 70,000 70,000
Government Buildings Reserve 70,000 70,000
Boiler Replacement CH-02 2 20,000 20,000
Government BuildIngs Reserve 20,000 20,000
Flush Valve CH-03 4 9,500 9,500
ERMU 4, 750 4,750
Government Buildings Reserve 4,750 4,750
City Hall Total 9,500 20,000 70,000 99,500
Elections
Election Equipment EL-01 2 58,500 58,500
County Grants 58,500 58,500
Elections Total 58,500 58,500
Emergency Management
Outdoor Waming Sirens EP-01 3 16,200 16,700 16,900 17,200 17,200 84,200
Capital Outlay Reserve 16,200 16,700 16,900 17,200 17,200 84,200
Emergency Management Total 16,200 16,700 16,900 17 ,200 17,200 84,200
Finance
Software FN-01 3 40,000 40,000
Capital Outlay Reserve 40,000 40,000
Finance Total 40,000 40,000
2005 CIP Draft 3/30/05
Page 1 of 6
Department Project# Priority 2005 2006 2007 2008 2009 Total
Fire
Vehicle Replacement FD-01 3 40,000 40,000
Equipment Certificates 46,000 46,000
Fire Truck Replacement - Grass Rigs FD-02 3 45,000 45,000
Equipment Certificates 45,000 45,000
Fire Truck Replacement - Engines FD-03 3 375,000 375,000
Equipment Certificates 375,000 375,000
Fire Truck Replacement - Tankers FD-04 3 175,000 175,000
Equipment Certificates 175,000 175,000
Fire Truck Replacement - Other FD-05 3 230,000 230,000
Equipment Certificates 230,000 230,000
Fire Total 375,000 45,000 175,000 230,000 40,000 865,000
Ice Arena
Ice Arena Equipment IA-01 3 95,000 95,000
Equipment Certificates 95,000 95,000
Ice Arena Major Building Repair IA-02 5 40,000 35,500 100,000 175,500
Government Buildings Reserve 46,000 35,500 100,000 175,500
Ice Arena Non-Major Building Repair & Maintenance IA-03 3 8,000 17,000 7,500 10,000 42,500
Capital Outiay Reserve 8,000 17,000 7,500 10,000 42,500
Ice Arena Total 8,000 57,000 43,000 110,000 95,000 313,000
Information Technology
Information Technology Improvements 2005 IT-05 2 14,000 14,000
General Fund Operating 14,000 14,000
Information Technology Improvements 2006 IT-06 2 45,000 45,000
General Fund Operating 45,000 45,000
Information Technology Improvements 2007 IT-07 2 45,000 45,000
General Fund Operating 45,000 45,000
Information Technology Improvements 2008 IT-08 2 45,000 45,000
General Fund Operating 45,000 45,000
Information Technoloty Improvements 2009 IT-09 2 45,000 45,000
General Fund Operating 45,000 45,000
Information Technology Total 14,000 45,000 45,000 45,000 45,000 194,000
Infrastructure Improvements
Dodge A venue Street Improvements north of 5th St. 11-08 4 300,000 300,000
Special Assessments 150,000 150,000
Street Improvement Reserve 150,000 150,000
Highland Road Improvements 11-09 2 75,000 75,000
Street Improvement Reserve 75,000 75,000
Meadowvale Road (CR 44) Improvement 11-12 2 750,000 750,000
Municipal State Aid 750,000 750,000
213th Ave west of CR 24 (Jarvis) 11-13 0 80,000 80,000
Special Assessments 46,000 46,000
Street Improvement Reserve 46,000 46,000
189th, Troy and Pascal Streets 11-14 0 120,000 120,000
Special Assessments 60,000 60,000
Street Improvement Reserve 60,000 60,000
CR 40 Improvements 11-16 2 1,400,000 1,400,000
Developer 150,000 150,000
Municipal State Aid BOO,ooo BOO,ooo
2005 CIP Draft 3/30/05 Page 2 of 6
Department Pro j ect# Priority 2005 2006 2007 2008 2009 Total
Special Assessments 450,000 450,000
Annual Street Overlay Program - Not Assessed OV~2 3 25,000 25,000 25,000 25,000 25,000 125,000
General Fund Operating 25,000 25,000 25,000 25,000 25,000 125,000
Assessable Street Overlay Projects OV~3 3 500,000 500,000 1,000,000
Capital Projects. Assessment Revenue 500,000 500,000 1,000,000
Pavement Management Program PM-01 2 1,250,000 1,500,000 1,750,000 4,500,000
Special Assessments 416,6rT 500,000 583,333 1,500,000
Street Improvement Res8lVe 416,666 500,000 583,334 1,500,000
Tax Supported Bond Issue 416,6rT 500,000 583,333 1,500,000
Annual Street Sealcoat Program SC~2 3 75,000 85,000 90,000 100,000 110,000 460,000
General Fund Operating 75,000 85,000 90,000 100,000 110,000 460,000
Signal Lights @ School & Lions Park Drive SL-01 2 100,000 100,000
Street Improvement Res81V8 100,000 100,000
Signal Light@ Twin Lakes Rd & CR 12 SL~2 0 50,000 50,000
Municipal State Aid 50,000 50,000
Street Light Replacement HWY 10 SL~4 3 100,000 100,000
Street Improvement Res81V8 100,000 100,000
Signal Light Painting SL~9 3 20,000 20,000
Street Improvement Res81V8 20,000 20,000
Storm Water Irving Ave from 6th to 7th Street SW-01 2 40,000 40,000
Street Improvement Res81V8 40,000 40,000
Highway 10 Transportation Plan TP~2 3 500,000 500,000
Federal Grants 400,000 400,000
Street Improvement Res81V8 100,000 100,000
Infrastructure Improvements Total 1,350,000 3,105,000 2,435,000 845,000 1,885,000 9,620,000
Library
Library Expansion BL-05 5 100,000 1,500,000 1,600,000
Government Buildings Res81V8 1,500,000 1,500,000
Ubrary 100,000 100,000
Library Total 100,000 1,500,000 1,600,000
Liquor Fund
Northbound Building Maintenance LS~1 3 10,000 10,000
Liquor Fund 10,000 10,000
Westbound Liquor Store LS~2 5 1,500,000 1,500,000
Uquor Fund 1,500,000 1,500,000
Liquor Fund Total 1,500,000 10,000 1,510,000
Park Development & Improvement
Park Development PF-61 3 32,000 15,000 15,000 15,000 15,000 92,000
Park Dedication 32,000 15,000 15,000 15,000 15,000 92,000
Trail Development PF-64 3 15,000 7,000 15,000 15,000 15,000 67,000
Park Dedication 15,000 7,000 15,000 15,000 15,000 67,000
Land Acquisition PF-90 3 1,350,000 130,000 1,480,000
Park Dedication 350,000 130,000 480,000
State Grants/State Aid 1,000,000 1,000,000
Baldwin Park PR~2 3 15,000 15,000
Park Dedication 15,000 15,000
Barrington Park PR~4 3 3,000 3,000
Park Dedication 3,000 3,000
Big Tooth Ridge Park PR~6 3 35,000 35,000
2005 CIP Draft 3/30/05 Page 3 of 6
Department Project# Priority 2005 2006 2007 2008 2009 Total
Park Oed/cation 35,000 35,000
Birch Meadow Park PR-08 3 42,000 10,000 52,000
Park Oed/cation 42,000 10,000 52,000
Deerfield Hill Park PR-14 3 20,000 3,000 23,000
Park Oed/cation 20,000 3,000 23,000
Fresno Park PR-16 3 2,000 2,000 4,000
Park Oed/cation 2,000 2,000 4,000
Great Northem Trail PR-18 3 140,000 140,000
Park Oed/cation 140,000 140,000
Highlands East Park PR-24 3 42,000 25,000 67,000
Park Dedlcallon 42,000 25,000 fil,ooo
Highlands West Park PR-26 3 25,000 25,000
Park Oed/cation 25,000 25,000
Hillside City Park PR-28 3 175,000 175,000
Park DedIcation 175,000 175,000
Joplin Park PR-30 3 4,000 4,000
Park Oed/cation 4,000 4,000
K1iever Lake Fields PR-32 3 54,000 101,000 20,000 175,000
Park Oed/cation 54,000 101,000 20,000 175,000
Kliever Point Park PR-34 3 69,000 69,000
Park Ded/catlon 69,000 69,000
Lions Park PR-35 3 21,700 21,700
Donors 11,000 11,000
Park Oed/cation 10,700 10,700
Mississippi Oaks Park PR-40 3 2,000 2,000
Park Oed/cation 2,000 2,000
Oak Knoll Park pR-44 3 35,000 35,000
Park Oed/cation 35,000 35,000
Orono Park PR-48 3 369,300 369,300
Park Ded/catlon 369,300 369,300
Orono Athletic Complex PR-50 3 3,000 24,500 27,500
Park Ded/callon 3,000 24,500 27,500
Riverplace Park PR-54 3 3,500 3,500
Park Oed/callan 3,500 3,500
Ridgewood East Park PR-56 3 1,500 1,500
Park Oed/cation 1,500 1,500
Rivers Edge Commons Park PR-58 3 40,000 294,000 334,000
Park Oed/cation 40,000 294,000 334,000
Trott Brook Park PR-60 3 96,500 96,500
Park Oed/callan 96,500 96,500
West Oaks Park PR-62 3 77,000 77,000
Park Oed/cat/on n,ooo n,ooo
Windsor Park PR-64 3 53,000 53,000
Park Ded/cation 53,000 53,000
Woodland Trails Park PR-66 3 63,500 26,000 325,000 414,500
Park Oed/cation 38,500 26,000 325,000 389,500
Stann Sew8/' 25,000 25,000
Youth Athletic Complex PR-68 3 100,000 275,000 295,000 670,000
Park Oed/callan 100,000 275,000 295,000 filO,OOO
Park Development & Improvement 643,700 2,022,000 271,500 914,300 680,000 4,531,500
Total
Park Maintenance
2005 CIP Draft 3/30/05 Page 4 of 6
Department Project# Priority 2005 2006 2007 2008 2009 Total
2005 Park Maintenance Equipment PK-05 30,000 30,000
Equipment Certificates 30,000 30,000
2006 Park Maintenance Equipment PK-06 3 118,500 118,500
Equipment Cerlfflcates 118,500 118,500
2007 Park Maintenance Equipment PK-07 3 58,000 58,000
Equipment Cerlfflcates 58,000 58,000
2008 Park Maintenance Equipment PK-08 3 90,000 90,000
Equipment Certiffcates 90,000 90,000
2009 Park Maintenance Equipment PK-09 3 56,500 56,500
Equipment Certificates 56,500 56,500
Park Maintenance Total 30,000 118,500 58,000 90,000 56,500 353,000
Planning
Office Equipment PN-O 1 3 9,000 10,000 19,000
General Fund Operating 9,000 10,000 19,000
Planning Total 9,000 10,000 19,000
Police
Marked Squad Replacement & Additions PD-01 3 116,000 90,000 30,000 124,000 124,000 484,000
Capital Outlay Reserve 116,000 116,000
Equipment Certificates 90,000 30,000 124,000 124,000 368,000
Unmarked Squad Replacement & Additions PD-02 3 29,000 60,000 60,000 62,000 31,000 242,000
Capital Outlay Reserve 29,000 29,000
Equipment Certificates 60,000 60,000 62,000 31,000 213,000
CSO Vehicle Replacement & Additions PD-03 3 30,000 31,000 61,000
Equipment Cerlfflcates 30,000 31,000 61,000
Police Department - Other Equipment PD-04 3 30,000 20,000 187,000 36,000 273,000
Capital Outlay Reserve 30,000 20,000 187,000 36,000 273,000
Office Equipment PD-05 3 6,600 6,600
General Fund Operating 6,600 6,600
Police Total 181,600 200,000 277,000 186,000 222,000 1,066,600
Public Safety Buildin2
Energy Management System PS-01 4 11,000 11,000
Government Buildings Reserve 11,000 11,000
Public Safety Building Total 11,000 11,000
Recreation/Culture
Small Theater at ISO 728 High School CR-90 3 112,600 112,600
NSP Reserve 112,600 112,600
Recreation/Culture Total 112,600 112,600
Sewer Department
Lift Station Rehabilitation WW-02 3 30,000 30,000
Sewer Fund 30,000 30,000
Vehicle Replacement WW-06 2 25,000 27,000 27,000 79,000
Sewer Fund 25,000 27,000 27,000 79,000
Digester Cover Replacement WW-08 325,000 325,000
Sewer Fund 325,000 325,000
Upgrade Alarm System WW-09 2 200,000 200,000
Sewer Fund 200,000 200,000
2005 elP Draft 3/30/05 Page 5 of 6
Department Project# Priority 2005 2006 2007 2008 2009 Total
Heavy Equipment WW-12 5 150,000 150,000
Sewer Fund 150,000 150,000
Plant Expansion Master Plan WW-17 2 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
Sewer Fund 1,280,000 2,415,000 3,500,000 5,000,000 12, 195,000
Replace Plant Samplers WW-18 12,000 12,000
Sewer Fund 12,000 12,000
Sewer Lining WW-20 3 30,000 30,000 60,000
Sewer Fund 30,000 30,000 60,000
Sewer Department Total 1,630,000 2,672,000 3,569,000 150,000 5,030,000 13,051 ,000
Streets
Vehicle Replacement - pickup trucks ST -01 3 27,000 27,000
Equipment Certificates 27,000 27,000
Dump Truck Replacement ST -02 3 150,000 360,000 210,000 160,000 175,000 1,055,000
Equipment Certificates 150,000 360,000 210,000 160,000 175,000 1,055,000
Heavy Equipment Replacement ST -03 3 175,000 60,000 215,000 150,000 600,000
Equipment Certificates 175,000 60,000 215,000 150,000 600,000
Other Equipment Replacement ST -04 3 36,000 50,000 125,000 211,000
Equipment Certificates 20,000 50,000 125,000 195,000
General Fund Operating 7,500 7,500
Storm Sewer 8,500 8,500
Public Works Complex ST-09 3 397,000 750,000 120,000 1,267,000
Government Buildings Reserve 397,000 750,000 120,000 1,267,000
Public Works Building Maintenance ST-11 3 50,000 50,000
Government Buildings Reserve 50,000 50,000
Streets Total 758,000 1,160,000 347,000 495,000 450,000 3,210,000
GRAND TOTAL 6,647,600 9,645,200 8,773,400 3,102,500 8,656,700 36,825,400
2005 CIP Draft 3/30/05
Page 6 of 6
Capital Improvement Plan
City of Elk River, Minnesota
PROJECTS BY DEPARTMENT AND FUNDING SOURCE
2010
thru
2014
Department Pro j ect# Priority 2010 2011 2012 2013 2014 Total
Building & Environmental
Vehicle Replacement BZ-01 3 24,000 24,000 25,000 25,000 98,000
General Fund Operating 24,000 24,000 25,000 25,000 98,000
Building & Environmental Total 24,000 24,000 25,000 25,000 98,000
Emergency Management
Outdoor Warning Sirens EP-01 3 17,400 17,400 17,500 17,500 18,000 87,800
Capital Oul/ay Reserve 17,400 17,400 17,500 17,500 18,000 87,800
Emergency Management Total 17,400 17,400 17,500 17,500 18,000 87,800
Fire
Vehicle Replacement FD-01 3 40,000 40,000
Equipment Certificates 40,000 40,000
Fire Truck Replacement - Grass Rigs FD-02 3 50,000 50,000
Equipment Certificates 50,000 50,000
Fire Truck Replacement - Tankers FD-04 3 50,000 50,000
Equipment Certificates 50,000 50,000
Fire Truck Replacement - Other FD-05 3 750,000 750,000
Equipment Certificates 750,000 750,000
Fire Station #3 FD-06 5 2,250,000 2,250,000
Tax Supporled Bond Issue 2,250,000 2,250,000
Fire Total 50,000 50,000 2,290,000 750,000 3,140,000
Ice Arena
Ice Arena Non-Major Building Repair & Maintenance IA-03 3 12,000 12,000
Capital Outlay Reserve 12,000 12,000
Ice Arena Total 12,000 12,000
Infrastructure Improvements
Railroad Drive between Jackson and Main 11-10 3 100,000 100,000
Street Improvement Reserve 100,000 100,000
211th Ave East of CR 32 11-15 0 100,000 100,000
Street Improvement Reserve 100,000 100,000
Annual Street Overlay Program - Not Assessed OV-02 3 25,000 25,000 25,000 25,000 25,000 125,000
General Fund Operating 25,000 25,000 25,000 25,000 25,000 125,000
Assessable Street Overlay Projects OV-03 3 550,000 600,000 650,000 1,800,000
Capital Projects. Assessment Revenue 550,000 600,000 650,000 1,800,000
Pavement Management Program PM-01 2 2,000,000 2,250,000 4,250,000
2005 CIP Draft 3/30/05 Page 1 of 3
Department Project# Priority 2010 2011 2012 2013 2014 Total
Special Assessments 666,667 750,000 1,416,667
Street Improvement ResfllVll 666,666 750,000 1,416,666
Tax Supported Bond Issue 666,667 750,000 1,416,667
Annual Street Sealcoat Program SC-02 3 115,000 120,000 125,000 130,000 135,000 625,000
General Fund Operating 115,000 120,000 125,000 130,000 135,000 625,000
Signal Lights @ Main at Gates & Parrish SL-03 0 150,000 200,000 350,000
Street Improvement ResfllVll 150,000 200,000 350,000
Signal Light Painting SL-09 3 20,000 20,000
Street Improvement Reserve 20,000 20,000
Infrastructure Improvements Total 1,040,000 2,145,000 no,ooo 2,405,000 1,010,000 7,370,000
Park Development & Improvement
Park Development PF-61 3 15,000 15,000 15,000 15,000 15,000 75,000
Park Dedication 15,000 15,000 15,000 15,000 15,000 75,000
Trail Development PF-64 3 15,000 15,000 15,000 15,000 15,000 75,000
Park Dedication 15,000 15,000 15,000 15,000 15,000 75,000
Land Acquisition PF-90 3 200,000 200,000 200,000 200,000 200,000 1,000,000
Park Dedication 200,000 200,000 200,000 200,000 200,000 1,000,000
Baldwin Park PR-02 3 3,500 3,500
Park Dedication 3,500 3,500
Deerfield Hill Park PR-14 3 8,000 8,000
Park Dedication B,ooo B,OOO
Guardian Angels Park PR-20 3 7,000 7,000
Park Dedication 7,000 7,000
Kliever Lake Fields PR-32 3 32,000 32,000
Park Dedication 32,000 32,000
Mississippi Oaks Park PR-40 3 4,000 4,000
Park Dedication 4,000 4,000
Mississippi Trail PR-42 3 10,000 10,000
Park Dedication 10,000 10,000
Oak Knoll Park PR-44 3 52,000 52,000
Park Dedication 52,000 52,000
Oak Savannah PR-46 3 6,100 6,100
Park Dedication 6,100 6,100
Woodland Trails Park PR-66 3 137,000 137,000
Park Dedication 137,000 137,000
Park Development & Improvement 408,600 230,000 304,000 237,000 230,000 1,409,600
Total
Park Maintenance
2010 Park Maintenance Equipment PK-10 3 64,000 64,000
Equipment Certificates 64,000 64,000
2011 Park Maintenance Equipment PK-11 3 44,500 44,500
Equipment Certificates 44,500 44,500
2012 Park Maintenance Equipment PK-12 3 96,000 96,000
Equipment Certificates 96,000 96,000
2013 Park Maintenance Equipment PK-13 3 92,000 92,000
Equipment Certificates 92,000 92,000
2014 Park Maintenance Equipment PK-14 3 54,000 54,000
Equipment Certificates 54,000 54,000
Park Maintenance Total 64,000 44,500 96,000 92,000 54,000 350,500
2005 elP Draft 3/30/05 Page 2 of 3
Department Project# Priority 2010 2011 2012 2013 2014 Total
Police
Marked Squad Replacement & Additions PD-01 3 96,000 96,000 132,000 33,000 102,000 459,000
Equipment Certificates 96,000 96,000 132,000 33,000 102,000 459,000
Unmarked Squad Replacement & Additions PD-02 3 64,000 64,000 66,000 66,000 102,000 362,000
Equipment Certificates 64,000 64,000 66,000 66,000 102,000 362,000
CSO Vehicle Replacement & Additions PD-03 3 64,000 33,000 97,000
Equipment Cerlificates 64,000 33,000 97,000
Police Department - Other Equipment PD-04 3 32,000 44,000 76,000
Capital Outlay Reserve 32,000 44,000 76,000
Police Total 192,000 224,000 275,000 99,000 204,000 994,000
Public Safety Buildin2
Building Expansion PS-02 4 340,000 340,000
Government Buildings Reserve 346,000 340,000
Public Safety Building Total 340,000 340,000
Sewer Department
Lift Station Rehabilitation WW-02 3 50,000 50,000 60,000 160,000
Sewer Fund 50,000 50,000 60,000 160,000
Vehicle Replacement WW-06 2 30,000 30,000 30,000 90,000
Sewer Fund 30,000 30,000 30,000 90,000
Upgrade Boiler WW-14 2 125,000 125,000
Sewer Fund 125,000 125,000
Replace Generators WW-15 3 110,000 110,000
Sewer Fund 110,000 110,000
Sewer Lining WW-20 3 30,000 30,000 60,000
Sewer Fund 30,000 30,000 60,000
Sewer Department Total 155,000 190,000 80,000 60,000 60,000 545,000
Streets
Vehicle Replacement - pickup trucks ST -01 3 30,000 30,000
Equipment Certificates 30,000 30,000
Dump Truck Replacement ST -02 3 185,000 70,000 195,000 110,000 75,000 635,000
Equipment Certificates 185,000 70,000 195,000 110,000 75,000 635,000
Heavy Equipment Replacement ST -03 3 200,000 40,000 250,000 200,000 690,000
Equipment Certificates 200,000 40,000 250,000 200,000 690,000
Other Equipment Replacement ST-04 3 65,000 150,000 215,000
Equipment Certfflcates 65,000 1so,ooo 215,000
Public Works Complex ST -09 3 2,800,000 2,800,000
To Be Detennined 2,800,000 2,800,000
Streets Total 385,000 205,000 345,000 360,000 3,075,000 4,370,000
GRAND TOTAL 2,348,000 3,129,900 4,202,500 3,270,500 5,766,000 18,716,900
2005 elP Draft 3/30/05
Page 3 of 3
Capital Improvement Plan
City of Elk River, Minnesota
DEPARTMENT SUMMARY
2005
thru
2009
Department 2005 2006 2007 2008 2009 Total
Administration 6,500 16,000 16,000 38,500
Building & Environmental 22,000 26,000 48,000
City Hall 9,500 20,000 70,000 99,500
Elections 58,500 58,500
Emergency Management 16,200 16,700 16,900 17 ,200 17,200 84,200
Finance 40,000 40,000
Fire 375,000 45,000 175,000 230,000 40,000 865,000
Ice Arena 8,000 57,000 43,000 110,000 95,000 313,000
Information Technology 14,000 45,000 45,000 45,000 45,000 194,000
Infrastructure Improvements 1,350,000 3,105,000 2,435,000 845,000 1,885,000 9,620,000
Library 100,000 1,500,000 1,600,000
Liquor Fund 1,500,000 10,000 1,510,000
Park Development & Improvement 643,700 2,022,000 271,500 914,300 680,000 4,531,500
Park Maintenance 30,000 118,500 58,000 90,000 56,500 353,000
Planning 9,000 10,000 19,000
Police 181,600 200,000 277,000 186,000 222,000 1,066,600
Public Safety Building 11,000 11,000
Recreation/Culture 112,600 112,600
Sewer Department 1,630,000 2,672,000 3,569,000 150,000 5,030,000 13,051,000
Streets 758,000 1,160,000 347,000 495,000 450,000 3,210,000
Total 6,647,600 9,645,200 8,773,400 3,102,500 8,656,700 36,825,400
2005 CIP Draft 3/30/05
Page 1 of 1
Capital Improvement Plan
City of Elk River, Minnesota
DEPARTMENT SUMMARY
2010
thru
2014
Department 2010 2011 2012 2013 2014 Total
Building & Environmental 24,000 24,000 25,000 25,000 98,000
Emergency Management 17,400 17,400 17,500 17,500 18,000 87,800
Fire 50,000 50,000 2,290,000 750,000 3,140,000
Ice Arena 12,000 12,000
Infrastructure Improvements 1,040,000 2,145,000 770,000 2,405,000 1,010,000 7,370,000
Park Development & Improvement 408,600 230,000 304,000 237,000 230,000 1,409,600
Park Maintenance 64,000 44,500 96,000 92,000 54,000 350,500
Police 192,000 224,000 275,000 99,000 204,000 994,000
Public Safety Building 340,000 340,000
Sewer Department 155,000 190,000 80,000 60,000 60,000 545,000
Streets 385,000 205,000 345,000 360,000 3,075,000 4,370,000
Total 2,348,000 3,129,900 4,202,500 3,270,500 5,766,000 18,716,900
2005 elP Draft 3/30/05
Page I of 1
Capital Improvement Plan
City of Elk River, Minnesota
PROJECTS BY CATEGORY
2005
tbru
2009
Category Pro j ect# Priority 2005 2006 2007 2008 2009 Total
Building Maintenance
Chiller Replacment CH-01 2 70,000 70,000
Boiler Replacement CH-02 2 20,000 20,000
Flush Valve CH-03 4 9,500 9,500
Small Theater at ISO 728 High School CR-90 3 112,600 112,600
Ice Arena Major Building Repair IA-02 5 40,000 35,500 100,000 175,500
Ice Arena Non-Major Building Repair & Maintenance IA-03 3 8,000 17,000 7,500 10,000 42,500
Northbound Building Maintenance LS-01 3 10,000 10,000
Energy Management System PS-01 4 11,000 11,000
Public Works Building Maintenance ST-11 3 50,000 50,000
Digester Cover Replacement WW-08 325,000 325,000
Building Maintenance Total 445,600 127,500 63,000 120,000 70,000 826,100
Buildings
Library Expansion BL-05 5 100,000 1,500,000 1,600,000
Westbound Liquor Store LS-02 5 1,500,000 1,500,000
Public Works Complex ST -09 3 397,000 750,000 120,000 1,267,000
Buildings Total 1,897,000 850,000 1,500,000 120,000 4,367,000
Equipment
Smart Board Additions AO-02 4 16,000 16,000 32,000
Election Equipment EL-01 2 58,500 58,500
Outdoor Warning Sirens EP-01 3 16,200 16,700 16,900 17,200 17,200 84,200
Ice Arena Equipment IA-01 3 95,000 95,000
Police Department - Other Equipment PO-04 3 30,000 20,000 187,000 36,000 273,000
Office Equipment PD-05 3 6,600 6,600
2005 Park Maintenance Equipment PK-05 30,000 30,000
2006 Park Maintenance Equipment PK-06 3 118,500 118,500
2007 Park Maintenance Equipment PK-07 3 58,000 58,000
2008 Park Maintenance Equipment PK-08 3 90,000 90,000
2009 Park Maintenance Equipment PK-09 3 56,500 56,500
Office Equipment PN-01 3 9,000 10,000 19,000
Other Equipment Replacement ST -04 3 36,000 50,000 125,000 211,000
Upgrade Alarm System WW-09 2 200,000 200,000
Replace Plant Samplers WW-18 12,000 12,000
2005 CIP Draft 3/30/05 Page 1 of 4
Category Project# Priority 2005 2006 2007 2008 2009 Total
Equipment Total 118,800 438,700 339,900 117,200 329,700 1,344,300
Heavy Equipment
Dump Truck Replacement ST -02 3 150,000 360,000 210,000 160,000 175,000 1,055,000
Heavy Equipment Replacement ST-03 3 175,000 60,000 215,000 150,000 600,000
Heavy Equipment WW-12 5 150,000 150,000
Heavy Equipment Total 325,000 360,000 270,000 525,000 325,000 1,805,000
Land
Land Acquisition PF-90 3 1,350,000 130,000 1,480,000
Land Total 1,350,000 130,000 1,480,000
Office Equipment
Administration Office Equipment AD-01 3 6,500 6,500
Information Technology Improvements 2005 IT-05 2 14,000 14,000
Office Equipment Total 20,500 20,500
Park Improvements
Park Development PF-61 3 32,000 15,000 15,000 15,000 15,000 92,000
Baldwin Park PR-02 3 15,000 15,000
Barrington Park PR-04 3 3,000 3,000
Big Tooth Ridge Park PR-06 3 35,000 35,000
Birch Meadow Park PR-08 3 42,000 10,000 52,000
Deerfield Hill Park PR-14 3 20,000 3,000 23,000
Fresno Park PR-16 3 2,000 2,000 4,000
Great Northern Trail PR-18 3 140,000 140,000
Highlands East Park PR-24 3 42,000 25,000 67,000
Highlands West Park PR-26 3 25,000 25,000
Hillside City Park PR-28 3 175,000 175,000
Joplin Park PR-30 3 4,000 4,000
Kliever Lake Fields PR-32 3 54,000 101,000 20,000 175,000
Kliever Point Park PR-34 3 69,000 69,000
Lions Park PR-35 3 21,700 21,700
Mississippi Oaks Park PR-40 3 2,000 2,000
Oak Knoll Park PR-44 3 35,000 35,000
Orono Park PR-48 3 369,300 369,300
Orono Athletic Complex PR-50 3 3,000 24,500 27,500
Riverplace Park PR-54 3 3,500 3,500
Ridgewood East Park PR-56 . 3 1,500 1,500
Rivers Edge Commons Park PR-58 3 40,000 294,000 334,000
Trott Brook Park PR-60 3 96,500 96,500
West Oaks Park PR-62 3 77,000 77,000
Windsor Park PR-64 3 53,000 53,000
Woodland Trails Park PR-66 3 63,500 26,000 325,000 414,500
Youth Athletic Complex PR-68 3 100,000 275,000 295,000 670,000
2005 CIP Draft 3/30/05 Page 2 of 4
Category Project# Priority 2005 2006 2007 2008 2009 Total
Park Improvements Total 628,700 665,000 256,500 769,300 665,000 2,984,500
Plant Expansion
Plant Expansion Master Plan WW-17 2 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
Plant Expansion Total 1,280,000 2,415,000 3,500,000 5,000,000 12,195,000
Street & Utility Construction
CR 40 Improvements 11-16 2 1 ,400,000 1,400,000
Pavement Management Program PM-01 2 1,250,000 1,500,000 1,750,000 4,500,000
Street & Utility Construction Total 1,250,000 1,400,000 1,500,000 1,750,000 5,900,000
Street Construction
Dodge Avenue Street Improvements north of 5th SI. 11-08 4 300,000 300,000
Highland Road Improvements 11-09 2 75,000 75,000
Meadowvale Road (CR 44) Improvement 11-12 2 750,000 750,000
Signal Lights @ School & Lions Park Drive SL-01 2 100,000 100,000
Signal Light@ Twin Lakes Rd & CR 12 SL-02 0 50,000 50,000
Highway 10 Transportation Plan TP-02 3 500,000 500,000
Street Construction Total 975,000 800,000 1,775,000
Street Maintenance
213th Ave west of CR 24 (Jarvis) 11-13 0 80,000 80,000
189th, Troy and Pascal Streets 11-14 0 120,000 120,000
Annual Street Overlay Program - Not Assessed OV-02 3 25,000 25,000 25,000 25,000 25,000 125,000
Assessable Street Overlay Projects OV-03 3 500,000 500,000 1,000,000
Annual Street Sealcoat Program SC-02 3 75,000 85,000 90,000 100,000 110,000 460,000
Street Light Replacement HWY 10 SL-04 3 100,000 100,000
Signal Light Painting SL-09 3 20,000 20,000
Storm Water Irving Ave from 6th to 7th Street SW-01 2 40,000 40,000
Street Maintenance Total 100,000 730,000 135,000 845,000 135,000 1,945,000
Technology/Communiciations Equipme
Software FN-01 3 40,000 40,000
Information Technology Improvements 2006 IT-06 2 45,000 45,000
Information Technology Improvements 2007 IT-07 2 45,000 45,000
Information Technology Improvements 2008 IT-08 2 45,000 45,000
Information Technoloty Improvements 2009 IT-09 2 45,000 45,000
Technology/Communiciations 45,000 45,000 45,000 85,000 220,000
Equipment Total
Trail Improvements
Trail Development PF-64 3 15,000 7,000 15,000 15,000 15,000 67,000
Trail Improvements Total 15,000 7,000 15,000 15,000 15,000 67,000
2005 CIP Draft 3/30/05
Page 3 of 4
Category Project# Priority 2005 2006 2007 2008 2009 Total
Utilities
Lift Station Rehabilitation WW.fJ2 3 30,000 30,000
Sewer Lining WW-20 3 30,000 30,000 60,000
Utilities Total 30,000 30,000 30,000 90,000
Vehicles
Vehicle Replacement BZ-01 3 22,000 26,000 48,000
Vehicle Replacement FD.fJ1 3 40,000 40,000
Fire Truck Replacement - Grass Rigs FD.fJ2 3 45,000 45,000
Fire Truck Replacement - Engines FD.fJ3 3 375,000 375,000
Fire Truck Replacement - Tankers FD.fJ4 3 175,000 175,000
Fire Truck Replacement - Other FD.fJ5 3 230,000 230,000
Marked Squad Replacement & Additions PD-01 3 116,000 90,000 30,000 124,000 124,000 484,000
Unmarked Squad Replacement & Additions PD.fJ2 3 29,000 60,000 60,000 62,000 31,000 242,000
CSO Vehicle Replacement & Additions PD.fJ3 3 30,000 31,000 61,000
Vehicle Replacement - pickup trucks ST.fJ1 3 27,000 27,000
Vehicle Replacement WW.fJ6 2 25,000 27,000 27,000 79,000
Vehicles Total 567,000 252,000 319,000 416,000 252,000 1,806,000
GRAND TOTAL 6,647,600 9,645,200 8,n3,400 3,102,500 8,656,700 36,825,400
2005 CIP Draft 3/30/05
Page 4 of 4
Capital Improvement Plan
City of Elk River, Minnesota
PROJECTS BY CATEGORY
2010
thru
2014
Category Project# Priority 2010 2011 2012 2013 2014 Total
Building Maintenance
Ice Arena Non-Major Building Repair & Maintenance IA~3 3 12,000 12,000
Building Maintenance Total 12,000 12,000
Buildings
Fire Station #3 FD~6 5 2,250,000 2,250,000
Building Expansion PS~2 4 340,000 340,000
Public Works Complex ST~9 3 2,800,000 2,800,000
Buildings Total 2,250,000 3,140,000 5,390,000
Equipment
Outdoor Warning Sirens EP~1 3 17,400 17,400 17,500 17,500 18,000 87,800
Police Department - Other Equipment PD~4 3 32,000 44,000 76,000
2010 Park Maintenance Equipment PK-10 3 64,000 64,000
2011 Park Maintenance Equipment PK-11 3 44,500 44,500
2012 Park Maintenance Equipment PK-12 3 96,000 96,000
2013 Park Maintenance Equipment PK-13 3 92,000 92,000
2014 Park Maintenance Equipment PK-14 3 54,000 54,000
Other Equipment Replacement ST~4 3 65,000 150,000 215,000
Upgrade Boiler WW-14 2 125,000 125,000
Replace Generators WW-15 3 110,000 110,000
Equipment Total 238,400 236,900 307,500 109,500 72,000 964,300
Heavy Equipment
Dump Truck Replacement ST~2 3 185,000 70,000 195,000 110,000 75,000 635,000
Heavy Equipment Replacement ST~3 3 200,000 40,000 250,000 200,000 690,000
Heavy Equipment Total 385,000 110,000 195,000 360,000 275,000 1 ,325,000
Land
Land Acquisition PF-90 3 200,000 200,000 200,000 200,000 200,000 1,000,000
Land Total 200,000 200,000 200,000 200,000 200,000 1,000,000
Park Improvements
Park Development PF-61 3 15,000 15,000 15,000 15,000 15,000 75,000
2005 CIP Draft 3/30/05 Page 1 of 3
Category Project# Priority 2010 2011 2012 2013 2014 Total
Baldwin Park PR-02 3 3,500 3,500
Deerfield Hill Park PR-14 3 8,000 8,000
Guardian Angels Park PR-20 3 7,000 7,000
Kliever Lake Fields PR-32 3 32,000 32,000
Mississippi Oaks Park PR-40 3 4,000 4,000
Mississippi Trail PR-42 3 10,000 10,000
Oak Knoll Park PR-44 3 52,000 52,000
Oak Savannah PR-46 3 6,100 6,100
Woodland Trails Park PR-66 3 137,000 137,000
Park Improvements Total 193,600 15,000 89,000 22,000 15,000 334,600
Street & Utility Construction
Pavement Management Program PM-01 2 2,000,000 2,250,000 4,250,000
Street & Utility Construction Total 2,000,000 2,250,000 4,250,000
Street Construction
Railroad Drive between Jackson and Main 11-10 3 100,000 100,000
Signal Lights @ Main at Gates & Parrish SL-03 0 150,000 200,000 350,000
Street Construction Total 250,000 200,000 450,000
Street Maintenance
211th Ave East of CR 32 11-15 0 100,000 100,000
Annual Street Overlay Program - Not Assessed OV-02 3 25,000 25,000 25,000 25,000 25,000 125,000
Assessable Street Overlay Projects OV-03 3 550,000 600,000 650,000 1,800,000
Annual Street Sealcoat Program SC-02 3 115,000 120,000 125,000 130,000 135,000 625,000
Signal Light Painting SL-09 3 20,000 20,000
Street Maintenance Total 790,000 145,000 no,ooo 155,000 810,000 2,670,000
Trail Improvements
Trail Development PF-64 3 15,000 15,000 15,000 15,000 15,000 75,000
Trail Improvements Total 15,000 15,000 15,000 15,000 15,000 75,000
Utilities
Lift Station Rehabilitation WW-02 3 50,000 50,000 60,000 160,000
Sewer Lining WW-20 3 30,000 30,000 60,000
Utilities Total 80,000 50,000 30,000 60,000 220,000
Vehicles
Vehicle Replacement BZ-01 3 24,000 24,000 25,000 25,000 98,000
Vehicle Replacement FD-01 3 40,000 40,000
Fire Truck Replacement - Grass Rigs FD-02 3 50,000 50,000
Fire Truck Replacement - Tankers FD-04 3 50,000 50,000
Fire Truck Replacement - Other FD-05 3 750,000 750,000
Marked Squad Replacement & Additions PD-01 3 96,000 96,000 132,000 33,000 102,000 459,000
Unmarked Squad Replacement & Additions PD-02 3 64,000 64,000 66,000 66,000 102,000 362,000
2005 CIP Draft 3/30/05 Page 2 of 3
Category Project# Priority 2010 2011 2012 2013 2014 Total
CSO Vehicle Replacement & Additions PD.{)3 3 64,000 33,000 97,000
Vehicle Replacement - pickup trucks ST.{)1 3 30,000 30,000
Vehicle Replacement WW.{)6 2 30,000 30,000 30,000 90,000
Vehicles Total 264,000 328,000 326,000 129,000 979,000 2,026,000
GRAND TOTAL 2,348,000 3,129,900 4,202,500 3,270,500 5,766,000 18,716,900
.
2005 CIP Draft 3/30/05
Page 3 of 3