3 PCSR 06-10-1993 rk./
tJy of TO: PLANNING COMMISSION
1kRiverFROM: STEPHEN ROHLF, B & Z ADMINISTRATOR .
DATE : JUNE 4 , 1993
SUBJECT: ZONE CHANGE REQUEST BY JOHN WEICHT
AND ASSOCIATES/PUBLIC HEARING
APPLICANTS
John Weicht and Associates in cooperation with Elk River
Associated Investors and the following property owners : Clara
Chouinard, Dennis and Lori Anderson, Rita and Robert Walz, and
Betty Munich.
REQUESTED ACTION
A zone change from R-2b Townhouse District, to PUD. The
applicants are also requesting that the underlying land use for
this property be amended to HB, Highway Business . The current
land use designation on this property is MR, Medium Density
Residential .
• LEGAL DESCRIPTION
The affected properties are all situated in the southeast
quarter of the southwest quarter of Section 27, Township 33,
Range 26, lying east of Jackson Road. The actual legal
descriptions are quite long and cumbersome, but can be made
available upon request. The affected properties are the four
single-family houses shown in the southwest corner of the Elk
Park Center site plan. The yards of these four single-family
houses extend into the proposed Menards Lumberyard area.
ZONE CHANGE
The City' s policy now dictates that the a site plan accompanies
a zone change to PUD. The Elk Park Center site plan has been
provided in this packet, which includes the property in
question with this zone change. Apparently, the four
single-family homes are proposed to be owned by the developer
and left as single-family homes to help buffer the project from
adjacent property owners . If this is the case, the Planning
Commission may wish to consider not changing the land use on
the west half of the lots in question where the single-family
homes are situated.
RECOMMENDATION
• Staff will elaborate more on this zone change request and
provide a recommendation at Thursday night ' s meeting.
P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425
\i0/4
of ty,
River
TO: PLANNING COMMISSION
FROM: STEPHEN ROHLF, BUILDING & ZONING
ADMINISTRATOR
DATE: JUNE 4, 1993 ,)r.
SUBJECT: PRELIMINARY PLAT AND CONDITIONAL
USE PERMIT FOR ELK PARK CENTER BY
JOHN WEICHT & ASSOCIATES, ELK
RIVER ASSOCIATES, AND VARIOUS
PROPERTY OWNERS/PUBLIC HEARING
CASE NO. P 93-07 AND V 93-04
OVERVIEW
Elk Park Center, originally "Elk Park Center West, " is the
proposed site of Cub Foods, Wal-Mart, Menards, and various
smaller businesses . The total square footage of building
proposed in this site is 477,885 sq ft. The total acreage of
this site is approximately 50 acres . Other site information
can be found on the attached site plan.
PAST APPROVALS
• Past approvals related to this project include the following:
1 . A zone change on the northern portion of the 50 acre
site from R2b to PUD, was approved by the City
Council on September 23, 1991 . The land use map was
also approved to be changed to Highway Business at
this same Council meeting. This zone change was
applied for by John Weicht & Associates and the six
property owners affected.
2 . A zone change for the southern portion of the project
from R2b and C3 to PUD. The applicants for this zone
change request were John Weicht, Midwest Commercial
Brokerage, with the consent of Arlis Cristek and Bill
Dickenson, property owners . This zone change was
approved on June 15, 1992 . At that time, the land
use map was also amended to reflect Highway Business .
3 . Preliminary plat and conditional use permit for this
project was first considered by the Planning
Commission on August 25, 1992 . The issue was tabled
for lack of information.
Copies of minutes and past memos for the aforementioned items
are available upon request. Staff will have copies available
at the June 10, 1993, meeting for Planning Commission review.
•
P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425
Elk Park Center Project Page 2
June 4 , 1993
• PLANNING COMMISSION CONSIDERATION
The Planning Commission will be reviewing the preliminary plat
of Elk Park Center, a conditional use permit for the
development of the PUD, and a zone change for the property in
the southwest corner of the proposed project. Staff will
prepare a separate memo on the zone change request.
PAST MATERIALS SUPPLIED
The Planning Commission has been supplied with a site plan,
building elevations for the major tenants, a landscaping plan,
a proposed preliminary plat, a grading and drainage plan, a
site lighting plan, and a proposed utility plan. The site
plan, grading and drainage plan, utilities plan, and
preliminary plan have been revised. New copies are included
with this memo. The Planning Commission has also been supplied
with the Environmental Assessment Worksheet and traffic study
for the project, as well as a feasibility study for the
extension of services for the entire undeveloped corridor of
Highway 169 .
NEW MATERIALS INCLUDED WITH MEMO
• A revised site plan, grading and drainage plan, and utility
plan are included as well as a revised preliminary plat. Also
included are the following:
1 . The comments staff received regarding the
Environmental Assessment Worksheet, which includes
comments of concern by the "Citizens Who Care" group.
2 . The minutes from the February 3, 1993, Park and
Recreation Committee meeting when they gave a
recommendation on pedestrian ways and parks for the
project.
3 . Comments from Michael Sheilds, of AKR (the
developer' s architect) responding to concerns raised
by Bill Weber, Planning Consultant for the City.
4 . A letter from the Elk River Chamber regarding the
project.
5 . A letter from David Shay, Attorney for the Elk River
Mall regarding the status of the lease agreement
between Hagen' s Food and the Elk River Mall .
All the above referenced items should be added to the public
• record. A petition from the "Citizen' s Who Care" raising
concerns with the project has already been added to the public
record at the April 25, 1992 , Planning Commission meeting.
Elk Park Center Project Page 3
June 4, 1993
• Lastly, a memo from Terry Maurer, City Engineer, dated June 4,
1993, and Bill Weber, Planning Consultant, dated June 4, 1993,
regarding their review of this project are attached.
Terry Maurer' s and Bill Weber' s memos addressed most of staff ' s
issues regarding this project, however, there are a few
additional points that should be elaborated on.
SPECIFIC SITE PLAN APPROVALS
Staff is recommending the Planning Commission and City Council
review the site plans for each building prior to construction.
This approval is beyond the overall review of this PUD. The
developers would like the specific site plan approval for
buildings A-E . Staff is recommending more detail such as spot
elevations for the parking lots, dumpster locations, location
and type of screen for mechanical equipment, sign detail,
revised lighting plan, revised landscaping plan, etc . , be
provided prior to the Planning Commission considering these
specific site plan reviews .
USES
Staff is recommending that the type of uses listed on the site
plan be incorporated in the PUD Agreement not specific
• tenants . If alternative uses are requested later, it would
take an amendment to this PUD agreement.
The Planning Commission should also consider if there are uses
that do not belong in this location and should be specifically
spelled out as prohibited. This is especially important for
the spaces to have that open-ended designation such as lease
space or retail space. The Planning Commission should
specifically consider open storage and screen storage.
RECOMMENDATION
Staff is recommending that the Planning Commission' s recommend
this project is tabled until the information lacking and
revisions recommended in Mr. Maurer' s memo and in Mr. Weber' s
memo are accomplished. However, the Planning Commission should
open the public hearing, take testimony and then continue it
until a meeting to be advertised. Staff feels that to address
the accumulative effects of the many issues raised, it may
require a reduction in the total square footage of buildings in
this project.
410
' ,ry
^r+= February 15, 1993
Steve Rohlf, Building and Zoning Administrator
City of Elk River
720 Dodge Avenue
Elk River, MN 55330
RE : Environmental Assessment Worksheet (EAW) for Elk Park
Center
Dear Mr . Rohlf :
This letter acknowledges receipt of the EAW for the above-named
project . The Environmental Review Program rules (at Minnesota
Rules, part 4410 . 1500, item B) require that a press release
containing notice of the EAW availability be provided to at
least one newspaper of general circulation within the area and
that copies of the EAW be distributed to all points on the EQB
distribution list. We presume that these requirements have been
met.
Notice of the EAW availability will be published in the EQB
• Monitor on February 15, 1993 . The 30-day comment period will
begin on that day and will expire on March 17, 1993 .
Pursuant to Minnesota Rules, part 4410 . 3100, subpart 1 , no final
governmental decision to grant a permit, approve the project, or
begin the project may be made until a negative declaration or
EIS adequacy determination has been made.
Please contact me if any questions arise about the Environmental
Review process . My phone number is ( 612 ) 296-8253, or you may
call toll-free by dialing 1-800-657-3794 .
Sincerely,
Gregg M. Downing
Environmental Review Coordinator
cc : Scott Erickson, Lynn Caswell
•
ENYIRONMENIAE QUALITY BOARD 858 6f0AR SIKH, Si. PAUL, MN 55155 612 296-2603 FAX 612 296-3696 SiAff PROYIQEO BY III PLANNING
�1VIt D BAR 1 bx
��nn��STATEnnUVEOF
UVJOO irL.a
DEPARTMENT OF NATURAL RESOURCES
• 500 LAFAYETTE ROAD • ST. PAUL, MINNESOTA • 55155-40 10
DNR INFORMATION
(612) 296-6157
March 15, 1993
Stephen Rohlf
Elk River Building & Zoning Administrator
720 Dodge Avenue
Elk River, MN 55330
RE: Elk Park Center
Environmental Assessment Worksheet (EAW)
Dear Mr. Rohlf:
The Department of Natural Resources (DNR) has reviewed the EAW for the Elk Park Center
project. We offer the following comments for your consideration.
Item l lb should have indicated that the Natural Heritage Program has identified a significant
natural mixed oak forest community in the NE 1/4 section 27, T33N, R26W, which is within one
mile of the Elk Park Center project. We have attached a copy of an earlier correspondence with
the Natural Heritage Program for your information.
Item 12 states, "A portion of the storm water will be routed east...to wetlands which are proposed
• to be designated as a city storm water ditch system." The unrestricted and untreated discharge of
stormwaters into a natural wetland is generally opposed by the DNR. This use of wetlands as a
stormwater treatment pond is not advised and we recommend the construction of on-site
sedimentation ponds (with skimmers where needed) for stormwater treatment and retention. The
use of natural wetland systems to treat urban runoff degrades and eventually destroys valuable
wetland habitat through sedimentation, contamination, and increased nutrient loading. We will
review this aspect of the project during the federal permitting process and we will likely
recommend denial of the use of protected wetlands for this purpose.
Item 12 also states, "The water surface elevation of the wetlands east of the site will be
temporarily raised approximately 5.5 feet by the runoff of the project during a 100-year storm
(event)." The information provided in Item 12 is insufficient to determine the overall project
impacts to the wetland in question. The EAW should include an evaluation of expected changes
in water surface elevations for 1, 5, and 10-year storm events to allow a more accurate appraisal of
project impacts. The developer should be required to construct properly sized sediment basins
and retention ponds to prevent the 5.5 foot "bounce"which is expected to occur for large scale
events. Large fluctuations in water levels negatively impact nesting birds and permanent changes
in the water level regime can change the character of vegetation found in wetlands to the
detriment of the existing natural community. The proposed project could benefit, harm, or have
minimal effects on the wetland in question and further information is required to make this
determination.
The appropriate erosion control Best Management Practices (BMPs) should be followed during
construction activity. Every effort should be taken to minimize sedimentation and erosion during
construction. Proper silt fences and floating silt curtains should be used during construction and
• for 72 hours after construction activity ceases. We also recommend the mulching and seeding of
all disturbed areas within 72 hours of project completion; the
AN EQUAL OPPORTUNITY EMPLOYER
• y
Stephen Rohlf
- Page 2
•
revegetation of disturbed areas should include the plantingof native trees, woodyshrubs, and
g
grasses where possible.
Wetland impacts associated with this project must be fully addressed for both the wetland in
question and water management purposes. The information provided indicates further
development is expected in this watershed and the project may require mitigation under the
Wetlands Conservation Act. The EAW should address these issues as well as those mentioned
above. We recommend that decision on the need for further environmental review be postponed
for 30 days as provided by Minnesota Rules 4410.1700, subpart 2a(B), to collect the necessary
information. It may also be possible to provide the needed information during the record of
decision process in your responses to comments made on this EAW. No matter which outcome
unfolds, we request the opportunity to review any future information gathered in this regard.
Thank you for the opportunity to review this document. We look forward to receiving your record
of decision and responses to our comments. Minnesota Rules part 4410.1700, subparts 4 & 5,
requires you to send us your Record Of Decision within five days of deciding this action. Please
contact Don Buckhout of my staff, at (612) 296-8212, if you have any questions regarding this
letter.
Sincerely,
• Thomas W. Balcom, Supervisor
Natural Resources Planning and Review Section
Office of Planning
c: Bob Hance
Steve Colvin
Tom Lutgen
Bonita Eliason
Lynn M. Lewis, USFWS
Gregg Downing, EQB
Scott Erickson, Nu-Western Development Company
#930146-01
ER7.ELKPARK.DOC
410
john Oliver & Associates, Inc.
Civil Engineering
•Land Surveying 580 Dodge Avenue, Elk River,MN 55330
Land Planning (612)441-2072 • Fax:441-5665
April 27, 1993
Steve Rohlf
Building and Zoning Administrator
City of Elk River
something address
Elk River, MN 55330
Re: Environmental Assessment Worksheet (EAW) for Elk Park Center
We have prepared the following responses to the comments received for the above referenced project. If you
have any questions concerning these responses feel free to give us a call.
Minnesota Department of Natural Resources,Thomas Balcolm
Mr. Balcolm comments on item 11b,That there is a significant mixed oak forest within one mile of the project
that should be mentioned in the EAW. At the time of writing the mixed oak forest to which he has referred
had been partially clear cut and partially developed.
. Mr.Balcolm stated concern over the release of untreated water into a natural wetland system from the proposed
project. As a result of his comment and concerns by the city engineer a system of skimmer and sedimentation
basins will be created. This system will completely retain a 2" rainfall on the site. These sedimentation ponds
will incorporate skimmers in the design.
He also raises concerns over the volume of runoff going to the wetland. He states that a rise of 5.5 feet in the
wetland area is unacceptable. The EAW did not state the impact for the creation of this site correctly. The
impact of the entire tributary area to the site after full development is 5.5 feet for a one hundred year storm.
After discussions with the City Engineer sedimentation/water quality ponds will be used throughout the site to
retain the first 2" of runoff. The impact from the subject project itself for a 100 year storm is 1.5 feet. The
following table provides an estimate of the impacts created from the proposed development.
STORM EVENT IMPACT
(year) (ft)
1 0
2 0
5 0.06
10 034
100 0.85
In addition the City Engineer is looking at providing an outlet from this wetland to mitigate the impact of the
runoff to this wetland from a fully developed tributary area.
Erosion control shall be implemented according to the MPCA Best Management Practices manual. The city
will require that such practices be followed.
•
Minnesota Department of Natural Resources.Bonita Elison
• Ms. Elisons concerns are addressed above concerning the mixed oak forest.
Citizens Who Care.Rolf Andre
Mr.Andre states that the project is incompatible with the cities comprehensive plan. We believe that the project
is compatible with the cities comprehensive plan. The area is currently zoned B-3, Highway commercial. This
project will has requested that the project be rezoned to a commercial PUD. This does not change the use for
which the current zoning has reserved the site.
Mr.Andre discusses the need for the ISP to be completed before construction commences. We agree.
Mr.Andre states that MNDOT has stated unofficially that the project will cause gridlock in the area. The City
Engineer in conducting a traffic study identified concerns about the traffic surrounding the site. He has also
identified the necessary mitigation measures to allow traffic to flow freely. The project will incorporate the cities
traffic recommendations.
Corps of Engineers.Ben Wopat
Mr. Wopat states that a 404 permit may be required. At the appropriate time a submittal will be made to the
Corps of Engineers for such a permit.
Minnesota Pollution Control Agency. Paul Hoff
Mr. Hoff states that the EAW does not provide adequate information to evaluate noise and air quality issues.
III
The Indirect Source Permit (ISP) application submitted to the agency does however. This permit application
has or soon will be submitted to the agency for their approval for this project.
Mr. Hoff states that the improvements stated in the EAW for the improvement of traffic conditions will need
to be required to have binding commitments for construction before the ISP is issued. The city will be
constructing these improvements as part of the developers agreement and improvement project.
Mr. Hoff other comments concerning water quality have been addressed above.
Minnesota Department of Health.Judith Ball
Ms. Ball expresses concern about the possibility of some surficial aquifer wells used for potable water being
affected by dewatering during construction. Potable water is supplied by the municipal water distribution system
in the surrounding area.
Sincerely,
J n Oliver & Associates
Bogart, P.E.
111
•_
ti
•
Cvv.t ZENS
O
ARE
March 15, 1993
City of Elk River
Steve Rohlf
Building & Zoning Administrator
720 Dodge Avenue
Elk River, MN 55340
RE: Environmental Assessment Worksheet for Elk Park Center,Elk River, MN
A review of the aforementioned document provides some concern relative to the complete-
ness and accuracy of the worksheet. Several items in the EAW appear to not be in compli-
ance with conditions stipulated in the Zoning Ordinance of the City of Elk River, Section
900.42 - Conditional Use Permits. Also, there are various items within the worksheet that
are not in agreement with other City documents.
1. The Zoning Ordinance requires the use under 900.42, 4.ii.: "Will be consistent with the
comprehensive plan."
• The EAW states in #28 - "The project is compatible with Elk River's comprehensive
• plan." However, a review of the City of Elk River, Focus Area Studies, July 1990, by
BRW, Inc. presents a different plan.
The area under review for the Elk Park Center is identified as Focus Area "B" in the
Focus Area Studies. On page 68, under the Focus Area "B" land use and circulation
plan heading, the study states: "Subarea B-3 (west of Highway 169) would include
approximately 28 acres for commercial development along an extension of Freeport
Avenue, multiple-family housing, single-family and the existing water tower."
Also, the City of Elk River Zoning Map, revised March, 1992, shows a mixture of
commercial, multi-family, and single-family as described in the Focus Area Studies.
The proposed Elk Park Center is showing 50 acres dedicated to commercial develop-
ment which is not in agreement with the two mentioned City documents.
If the area in question has been rezoned to reflect all commercial development, then it is
requested that the rezoning process be reviewed to insure that proper procedures were
followed and notification of affected property owners was accomplished. Also,if the
area has been rezoned,the changes should be reflected in the official City documents
mentioned above.
•
1 �
2. The Zoning Ordinance requires the use under 900.42,4.iv.: "Will be served adequately
• by and will not adversely affect essential public facilities and services including streets,
police and fire protection, drainage,refuse disposal, water and sewer system. parks
and schools; and will not, in particular,create traffic congestion or interference with
traffic on adjacent and neighboring public thoroughfares."
Also, under 900.42, 4.v: "Will not involve uses, activities,processes, materials,
equipment and conditions of operation that will be detrimental to any persons or
property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or
vibrations."
In#23, the EAW requires an Indirect Source Permit. The ISP should be completed and
reviewed before any work begins on this proposed project.
As the EAW states in #32 - "The critical issue of this development is the traffic
increase." An unofficial review of the referenced Traffic Study by an MnDOT traffic
engineer indicates that this area will suffer "gridlock" do to the inability to handle the
increased traffic even with the suggested improvements mentioned in the Traffic Study.
With the proximity of schools to this proposed project, it is imperative that the Indirect
Source Permit be completed and that the Traffic Study and recommendations be further
reviewed.
3. Considering the impact on the proposed area due to water drainage, traffic, noise, and
pollution, and the proximity of schools and residential areas, it is strongly requested
that an Environmental Impact Study be completed before any construction activity is
allowed.
•
It is further recommended that the City prohibit the clearing on this property of trees,
brush,and other natural landscaping until all issues relating to this proposed
development are resolved.
Sincerely,
p
Ci ' 40... o Care
•
i Celebration 2,
1 EC1ivko MAR 29 1993
4,¢ V Minnesota Pollution Control Agency
• Celebrating our 25th anniversary and the 20th anniversary of the Clean Water Act
March 19, 1993
Steve Rohlf
City of Elk River
720 Dodge Avenue
Elk River, Minnesota 55330
Dear Mr. Rohlf:
RE: Elk Park Center Environmental Assessment Worksheet
The Minnesota Pollution Control Agency (MPCA) staff has completed a review of
the above-referenced project. Relative to those areas for which the MPCA has
jurisdiction, the staff does not believe the project has the potential for
adverse environmental impacts and therefore, does not recommend the preparation
of an Environmental Impact Statement (EIS). However, the staff does have the
following comments on the project:
• Air Quality
Although a traffic study was done, the Environmental Assessment Worksheet (EAW)
does not contain the air quality and noise information needed for an adequate
evaluation of the project.
1. An analysis of carbon monoxide ambient air quality with and without the
project for current and projected years is not given for the critical
intersection(s) for the project. Both the EAW and the Indirect Source
Permit (ISP) should contain this information.
2. In addition, worst case noise levels are not evaluated. Both the EAW and
the ISP should contain this analysis.
3. The staff wishes to note that certain geometric improvements, including
traffic signal installations, were assumed in the traffic impact study as
viable improvements that would assist in providing acceptable traffic
operation to the the Elk River Center. As such, traffic assignments,
future conditions, and traffic volumes, as well as capacity calculations
were based on the premise that improvements to these roadways were
completed and were operating as functional facilities. Legally binding
commitments for funding the assumed improvements would be needed before an
ISP is issued in final form.
•
TDD: 297-5353 or, for Greater Minnesota, TDD: 1-800-627-3529
Printed on recycled paper containing at least 15% fibers from paper recycled by consumers
520 Lafayette Rd.; St. Paul, MN 55155-3898; (612)296-6300; Regional Offices: Duluth•Brainerd•Detroit Lakes•Marshall•Rochester
Equal Opportunity Employer•Printed on Recycled Paper
Steve Rohlf
• Page 2
Water Quality
1. Item 17 indicates that measures will be taken to prevent erosion and
sedimentation. We recommend that an erosion/sedimentation plan be
specifically developed for the site including the following items to
prevent sediment runoff by: 1) keeping exposed soil to a minimum; 2) using
sediment barriers such as straw bales and fabric barriers in all drainage
channels; 3) constructing a runoff collection ditch and sediment pond; and
4) mulching and seeding appropriate areas after construction. A system for
routine inspection of the erosion control devices should be developed and
include an inspection regime for after storm events. Erosion devices that
have failed or have been displaced should be re-established or re-evaluated
for a more appropriate device after failure is discovered.
2. The EAW indicates that 100 square feet of wetlands will be filled as part
of this project. This acreage, though perhaps not extensive, should still
be evaluated in accordance with an alternative to avoid this area if
possible. A sequenced action to avoid, minimize, and mitigate should be
demonstrated by the applicant to have been accomplished in order to concur
that the taking and loss of wetlands is the only alternative.
• 3. Item 18 indicates that sedimentation ponds with skimmers will be
constructed along the project to handle the storm water. We are very
supportive of this proposal for treatment of storm water. The EAW also
indicates that 50 percent of the storm water will be routed from the ponds
east under Highway 169 through an existing culvert to a series of wetlands
on the east side of the highway. As a result the surface water elevation
will be temporarily raised approximately 5.5 feet during a 100 year storm.
An increase of greater than one foot in surface water elevation is
considered to negatively impact a wetland. For this reason the impact
wetlands must be mitigated.
Thank you for the opportunity to review this EAW. We regret that our comments
will be received after the close of the comment period. If you have any
questions, please do not hesitate to contact Meri K. Nielsen of my staff at
612/297-1766.
Sincerely,
4)6dr%001..- i4111:7°.'
Paul Hoff, Director
Environmental Analysis Office
Administrative Services Division
PH:pnk
•
1
RECEIVED MAR 04 1993
DEPARTMENT OF THE ARMY
F
r/�, \fin\ ST.PAUL DISTRICT,CORPS OF ENGINEERS
wl '. et
o:z:' .yl 180 E.KELLOGG BLVD.,ROOM 1421
4.' SLP MIN ES A 51091973 march-:',1111i:'.. /,,7�• `
L.
REPLY TO
Construction-Operations
Regulatory (93-02310-SF-GAE)
Mr. Scott Erickson
Nu-Western Development Company
6489 City West Parkway
Eden Prairie, Minnesota 55344
Dear Mr. Erickson:
We have reviewed the information provided us about a project proposed by
Nu-Western Development Company to grade and fill isolated wetland basin(s) to
facilitate commercial development (Elk Park Center) at a site located in the
S 1/2 Section 27, T. 33 N. , R. 26 W. , of Sherburne County, at Elk River,
Minnesota.
We believe that a Department of the Army permit may be required for this
proposed commercial development because of the proximity of the project to a
wetland basin(s) located in the area and its potential to have an adverse
impact on this wetland resource. Enclosed are application materials. The
orange booklet (EP-1145-2-1) gives background information about our program
III
and instructions for preparing the application.
Because we must notify certain other agencies about your project and
provide them a reasonable opportunity to comment, our review for most projects
may take at least 90 days. You can help expedite this procedure if you --
* Fill out the application completely and specifically. Please note the
instructions on pages 10 and 11 of the orange booklet.
* Send accurate drawings, including smaller 8 1/2 by 11 inch copies for our
public notice, illustrating the wetland areas to be filled and/or altered
for the proposed project. See the check list on pages 14 and 15 and the
examples on pages 16 and 17 of the booklet. Following these examples
will help ensure that the drawings will be accurate and usable.
* Describe any and all alternatives to the project as planned that have
been considered. This consideration should include other potential sites
and other methods of accomplishing the proposed activity. Federal laws
and guidelines often prevent issuance of permits when there are less
environmentally damaging alternatives available. For instance, if the
project involves placing fill in a waterbody or wetland, there may be
alternatives available that would accomplish the project purpose but
would not require filling, or would not require as much fill in as large
an area.
•
If your project would include any temporary placement of excavated or
• fill material into a waterbody or wetland, you may need authorization for that
work. Be sure to include that information in your permit application. Also,
• you may need State, County, and/or city permits for this project.
If you have any questions, please call Gary Elftmann of this office at
(612) 220-0355.
Sincerely,
41-1-41 474i 't---tL /4-4—
Ben Wopat
Chief, Regulatory Branch
Construction-Operations Division
Enclosures
Copy furnished:
Mr. Steve Rohlf
" City of Elk River
720 Dodge Avenue
Elk River, Minnesota 55330
Ms. Lynn Caswell
John Oliver and Associates, Inc.
580 Dodge Avenue
Elk River, Minnesota 55330
•
•
STATE OF
• DEPARTMENT OF NATURAL RESOURCES
500 LAFAYETTE ROAD • ST. PAUL, MINNESOTA • 55155-40 07
DNR INFORMATION
(612) 296-6157
August 10, 1992
Lynn Caswell
John Oliver and Assoc. , Inc.
922 Main St.
Elk River, MN 55330
Re: Proposed developments in sec. 27, T33N R26W, Sherburne Co.
Dear Mr./Ms. Caswell:
The Minnesota Natural Heritage database has been reviewed to determine
if any rare plant or animal species or other significant natural features are
known to occur within one mile of the above referenced project. There is a
record for a mixed oak forest in the NE 1/4 of sec. 27 that was identified
during 1989 survey work in connection with the Minnesota County Biological
Survey (MCBS) as a. good quality example of this vegetation type.
The MCBS is a joint project of the Natural Heritage and Nongame Wildlife
Programs of the Minnesota Department of Natural Resources. The survey gathers
information, county-by-county, on sensitive natural habitats (plant
communities) , and rare plant and animal species, evaluates their importance
and establishes priorities for their protection. Relatively undisturbed
examples of natural communities such as mixed oak forests are becoming
increasingly rare. The Natural Heritage program supports protection of the
highest quality remnants as important components of the state' s natural
biological diversity. The forested portion of your project area in the NW 1/4
of the SE 1/4 of sec. 27 also represents an example of a mixed oak forest. It
was eliminated from detailed survey by MCBS because examination of recent air
photos showed fragmentation by cultivation on three sides, as well as other
evidence of disturbance.
The Natural Heritage database is maintained by the Natural Heritage
Program and the Nongame Wildlife Program, units within the Section of
Wildlife, Department of Natural Resources. It is the most complete source of
data on Minnesota' s rare, endangered, or otherwise significant plant and
animal species, plant communities, and other natural features, and is used in
fostering better understanding and protection of these rare features.
• Thank you for consulting us on this matter, and for your interest in
minimizing impacts on Minnesota' s rare resources. Please be aware that review
by the Natural Heritage and Nongame Programs focuses only on rare natural
features. It does not constitute review or approval by the Department of
AN EQUAL OPPORTUNITY EMPLOYER
2 •
Natural Resources as a whole.
An invoice for the work completed will be forthcoming. You are being
billed for map and computer search and staff scientist review. Billings are
done quarterly by the State Department of Administration in March, June,
September, and December.
Sincerely,
Bonita Eliason
Endangered Species Environ:;ental Review Coordinator
Natural Heritage and Nongame Wildlife Programs
612/297-2276
•
I Minnesota Department of Health
_ Division of Environmental Health
925 Delaware Street Southeast
P.O. Box 59040
Minneapolis, MN 55459-00400
(612) 627-5100 :1LGLI Y'!
.ED Nal ) 8 199T
March 17, 1993
Steve Rohlf
Building and Zoning Administrator
City of Elk River
720 Dodge Avenue
Elk River, Minnesota 55330
Dear Mr. Rohlf:
Minnesota Department of Health (MDH) staff has reviewed the Environmental Assessment
Worksheet (EAW) for the proposed Elk Park Center in the City of Elk River and offers the
following comments for consideration.
Re: permits. Well sealing notifications must be submitted prior to sealing abandoned wells.
Also, dewatering well permits must be applied for and approved prior to construction of
• dewatering wells greater than 45 feet deep (or greater than 25 feet deep, if constructed after
June 30, 1994).
Re: water use. The EAW indicates about seven wells will be abandoned. These wells must
be sealed by a licensed well contractor or licensed well sealing contractor.
Dewatering wells greater than 45 feet in depth must be constructed by a licensed well
contractor or licensed dewatering well contractor. After June 30, 1994, a license will also
be required to construct dewatering wells greater than 25 feet in depth.
The EAW also states that dewatering should have little long term impact because the
immediate area has full utilities. There are several potable water supply wells near the site;
most are deep wells not likely to be affected by dewatering. Our computer records indicate
that some wells in the area are completed in the surficial aquifer. Depending on the
location and extent of the dewatering, these shallow water supply wells may be affected. A
licensee (well contractor) who installs a dewatering well that causes the loss of an adequate
private potable water supply must provide the private well owner with a temporary supply
of potable water during the operation of the dewatering well. The supply must be adequate
for drinking, cooking, and other household uses. The commissioner (of health) may require
the private well to be tested to determine if a health risk exists before the licensee
discontinues an alternate water supply. The licensee must assure that the required testing
• is completed and reported to the commissioner.
An Equal Opportunity Employer
• Page Two
Steve Rohlf
March 17, 1993
If you need to discuss these comments, please call Ed Schneider, Well Management Unit,
218/723-4642. Thank you for the opportunity to review this EAW.
Sincerely,
Judith A. Ball
Environmental Review Coordinator
JAB:sdr
cc: Ed Schneider
•
•
1Z
• MINNESOTA HISTORICAL SOCIETY
March 5, 1993
RECEIVED
Mr. Lynn P. Caswell Ste/61
John Oliver & Associates, Inc. JOHN OLIVER&ASSOC.
580 Dodge Avenue
Elk River, Minnesota 55330
Dear Mr. Caswell:
Re: Elk Park Center commercial development
SW/4 SE/4 & E/2 SW/4 S27, T33, R26, Elk River, Sherburne County
MHS Referral File Number: 93-1163
Thank you for providing this office a copy of the Environmental Assessment
Worksheet for the above-referenced project. It has been reviewed pursuant to
responsibilities given to the Minnesota Historical Society by the Minnesota
Historic Sites Act and the Minnesota Field Archaeology Act and through the
process outlined in Minnesota Rules 4410.1600.
There are no properties in the project area that are listed on the National
Register of Historic Places or included in our inventory. In the absence of
• reported properties, we have also evaluated the likelihood that unreported
historic or archaeological properties may be present. Although we cannot
state with certainty that there are no significant unreported historical or
archaeological properties within the project area, we feel that the probabil-
ity of such properties being present is low. Therefore, in our opinion, the
"no" response to question 26a is appropriate.
Please note that this comment letter does not address the requirements of Sec-
tion 106 of the National Historic Preservation Act of 1966 and 36CFR800, Pro-
cedures of the Advisory Council on Historic Preservation for the protection of
historic properties. If this project is considered for federal assistance, it
should be submitted to our office with reference to the assisting federal
agency.
Please contact Dennis Gimmestad at 612-296-5462 if you have any questions
regarding our review of this project.
Sincerely,
ritta L. B1 omberg
Deputy State Historic Preservation Officer
BLB:dmb
• cc: Office of the State Archaeologist, c/o Donn Coddington, MHS
345 KELLOGG BOUT EVARD WEST I SAINT PM II. MINNF Sf1TA SS 1(19_IQn ,TF[ FNF7(1NR f l9_9Q!_/196
O1 �� 5 1993
actGE
• o0�NN OT4 Minnesota
o Department of Transportation
Transportation Building
6' 395 John Ireland Boulevard
+''0F TFPN�Q Saint Paul, Minnesota 55155 (612) 296-1641
April 12, 1993
Steve Rolf,
Building and Zoning Administrator
City of Elk River
720 Dodge Avenue
Elk River, MN 55330
Subject: Elk Park Center
Dear Mr. Rolf:
Mn/DOT staff recently completed a review of the EAW which you circulated on the above
• referenced project. We had no environmental comments on the proposed project.
However, we do have some questions regarding the frontage road signal system which
may be required for the project.
The service road shown as Freeport could have a negative impact on Minnesota Trunk
Highway 169 if a signal is placed at its intersection with School Street. This could present
a potential safety hazard. We urge the city or the developer, or both, to contact our
Brainerd Office to fully discuss these issues. Please contact Mr. Bob Nibbe at our Brainerd
Office. Mr. Nibbe can be reached at (218) 828-2482.
Yours truly,
Geralon
Acting Environmental Coordinator
cc: R. Nibbe
•
An Equal Opportunity Employer
JUN 04 '93 11:06 ERW INC. P.2
•
Memorandum
B NX/1
DATE: June 4, 1993
TO: Steve Rohlf, Elk River Building Official
a R w INC. FROM: William Weber, Planning Consultant
Thomas Harrington, Landscape Architect
Planning SUBJECT: Site Plan and Conditional Use Permit Review for Elk Park
Transportation Center
Engineering
Urban Design
Thresher Square
700 Third Street So. Scope of Our Review
Minneapolis,
MN 55115 This review address the content and quality of the submitted site plan
612/3740700 including allowable activities, access and internal circulation, parking,
Fax 6121370-1378
• building arrangement, setbacks, open spaces, landscaping.and screening.
Denver The City Consulting Engineer will be addressing traffic flow to and from
Milwaukee the site, sewer and water utilities and drainage.
Minneapolis
Orlando Zgaikkg
Phoenix
Portland All of the site is zoned Planned-Unit District except for two.parcels along
San Diego Jackson Street that contain single-family houses, which are zoned R-2b
Seattle (Townhouse and Multiple-Family Residential District).
Donald W.Rirgrose Allowable Activities •
Richard P.Wolsfeld
Thomas P.Carroll The allowable activities should be those approved by the City Council,
Craig A.Amundsen
Donald E,Hunt since the site is zoned Planned-Unit Development. The Council has broad
John B.McNarnara discretion in regulating the allowable uses as long as it is reasonable and
Richard D.Pilgrim bases its decision on grounds of good city planning, urban design, public
Dale N.Beckmann safety or welfare. The types of activities should be specified in a
Jeffery I..Benson Developer's Agreement that includes the approved site plan. Specific
Ralph C.Blum businesses (e.g., Taco Bell) should not be regulated.
Gary J.Erickson
John C.Lynch Access
Paul N.Bay
Sabri Ayac There are three major points of access to the site: one along Highway 169,
• Gary A.Ehret one along Jackson Road and a third along School Street via the proposed
Anthony'Heppelmann
Arijs Pakalna extension through the site of Freeport Avenue. Each of these is
Martha McPhee appropriately located relative to the site development and other
Howard P.Prest<<n intersections on the streets. Detailed traffic analysis is being conducted to
Dennis P.Probst
JUN 04 '93 11:07 ERN INC. P.3
• Steve Rohlf
June 4, 1993
Page 2
affirm or disprove this. Mn/DOT will have to approve the location and
the design of the intersection along Highway 169.
There are five secondary intersections along Jackson Road, and
approximately three more are possible with the development of the
remaining land parcels. Two of them align with Highland Road and 191st
Lane, which is good from the point of view of traffic safety but it also
allows views from those two streets into the loading areas and the rear of
the buildings. The design of the intersection opposite Highland Road is
skewed to intercept some of this view.
The driveways to Building A and Cub Foods should be combined at a
point midway between Highland and 191st Avenues. The access to the
shared driveway for Wal-Mart and Menard's should be moved to the south
to increase the offset from 191st Avenue.
• Internal Circulation
Roadways within the site are properly designed and offer a relatively safe
and understandable progression from the entries to the parking spaces.
Intersections are properly spaced or aligned.
Parking
Supply
Overall, the parking supply is lower than what major retailers usually
demand. The supply is probably adequate near the north end of the site
but inadequate at the south end. However, the supply meets or exceeds
the City's requirements, which are probably low.
The plan provides 5.05 spaces per 1,000 square feet of floor area for
buildings A-E plus the three majors tenants. Cub and Wal-Mart have 5.9
spaces per thousand in front of them.
Menard's and Building,E share a parking area that supplies only 3.4 spaces
per 1,000 square feet of floor area, which is far below what is normally
• supplied, and which I feel is inadequate. Stores such as Cub Foods and
Wal Mart typically want 7 or 8 spaces per 1,000 square feet, and Menard's
usually wants about 5 spaces per 1,000 square feet.
Some of the parking for the Payless Shoes store would have to occur in the
remote part of the parking for the southerly retail building.
JUN 04 '93 11:07 ERW INC. P.4
• Steve Rohlf
June 4, 1993
Page 3
Zoning Requirements for Parking
Overall, the site plan provides more parking than required by the Zoning
Ordinance. There would be 5 parking spaces per 1,000 square feet of floor
area for the major tenants (Cub Foods, Wal-Mart and Menard's), which
exceeds the requirements of the Zoning Ordinance of 3 spaces per 1,000
square feet of floor area. Parking for the other buildings matches the
Zoning requirements of 2.2 square feet of parking area per 1,000 square
feet of building.
Arrangement of Building, Parking and Open Space
The arrangement of buildings and parking lots is generally orderly and
efficient except for the area west of Menard's and Wal-Mart. There is not
enough building and driveway setback along the south side of the site nor
behind Wal-Mart. The open spaces along the west side of the site near
• Menard's are not well used. The buildings do not relate well to the
neighborhood to the west nor to the schools to the south.
Eastern Side
One of the major concerns from the outset of this review process has been
the appearance of the finished product, both from Highway 169 and,
especially, from Jackson Road and the neighborhood to the west. Along
Highway 169, most of the buildings, except for Midas Muffler and Tires
Plus, have only minimal setback from the parking lot to the right-of-way.
Although the green edge of the highway right-of-way is quite wide there,
this leaves little space for landscaping.
Western Side
The design of the western edge is inadequate. In some locations, there is
excess, wasted land and in other locations the setbacks are inadequate.
The setbacks for the Wal-Mart building and the bank parking lot are
inadequate. The bank parking setback is 10 feet and should be increased
to at least fifteen feet.
• The landscaping and grading plan do not take advantage of the setbacks
to create an adequate buffer. Therefore, we recommend that the
landscaping and grading plan along the entire western edge of the site be
totally revised.
JUN 04 '93 11:08 ERW INC. P.5
• Steve Rohlf
June 4, 1993
Page 4
Also, there are large open areas well removed from Jackson Road north of
the Menard's storage yard and near the Cub and Wal-Mart expansion
areas. These open areas do not contribute to the appearance of the project
nor buffer the site from the housing to the west. These areas should be
totally redesigned to be more efficient and aesthetic.
Southern Side
The building and driveway along the southern edge (adjacent to the school
site) is inadequate. The Zoning Ordinance requires at least a 40 foot
setback for the building, while only 30 feet is provided. The driveway
setback is only 10 feet, which is not enough to for adequate landscaping.
A 100-foot-wide landscaping and ponding easement will be provided on
the School District property. I think that landscaping and buffering should
be provided on-site. In either case, the planting plan is inadequate.
•
Truck Docks and Loading Areas
There would be truck docks for each of the three major tenants. The
access and turning area of Wal-Mart and Menard's is shared and also
seems to be much larger than needed. We recommend that this area be
redesigned so that there is less pavement and that the associated green
space is moved toward Jackson Road. It may also be possible then to
reconfigure Menard's outdoor storage yard so as to leave more room along
Jackson Road for future development.
The truck docks and loading areas along the western side of the site are
not adequately screened from the neighborhood to the west nor are the
receiving areas behind Buildings A and E properly screened.
Landscaping Plan
Existing Vegetation
Because of the rolling nature of the site and the intensity of the proposed
development, it appears that nearly all trees within the property will be
removed.
•
The site plan does not indicate the location and extent of the major
overstory trees nor include an inventory by location, species -and
approximate height and spread of significant evergreen and deciduous
trees having calipers of six inches or greater. It would have been
JUN 04 '93 11:08 ERW INC. P.6
• Steve Rohlf
June 4, 1993
Page 5
preferable to try to save some of the ornamental trees currently on the
residential properties by temporarily transplanting them. Some of these
trees can be moved to new locations on the site to supplement plantings
as proposed on the landscape plan.
Planting Plan
Number of Trees:
The Planting Plan is inadequate. While a significant number of trees are
proposed (more than required by the Zoning Ordinance), it only represents
a bare minimum relative to the total paved and built areas. Trees planted
every 120 and 250 feet apart do not adequately reduce the visual impact
of the large expanses of parking. Thus, the number of trees shown on the
plan is inadequate.
• Screening along Jackson Road:
The visual screening of the rear of the project from Jackson Road and the
neighborhood to the west is inadequate. The number and variety of
overstory and ornamental trees and shrubs should be greatly increased in
the private setback between the property line and the parking and truck
dock areas along the west side. In addition, sodded, earthen berms four
to five feet in height should also be used here. A low, wooden fence could
be incorporated with the berming and planting.
A new, more detailed landscaping plan for the entire western edge should
be submitted. It should be coordinated with the grading plan and should
include cross-section drawings to help explain it. A more successful screen
can be achieved by using larger plant materials such as the evergreen trees
in clusters, on 10-12 foot spacing.
Southern Edge:
The landscaping along the school property should be increased, especially
in light of the fact that the access to the Menard's entrance will run along
the southern side of Building E.
iOther Locations:
The planting plan for other locations is also inadequate. Shrub materials
could be utilized at the access road from Highway 169, along entrance
roads, building entrances,and other public areas. Screening is also needed
JUN 04 '93 11:09 ERW INC. P.7
• Steve Rohlf
June 4, 1993
Page 6
around the Menard's outdoor storage area. Earth berms should be used
along the east and west sides of Freeport Ave. to minimize views to the
large parking areas. There appears to be enough space between the
sidewalk and the parking lot for a 3-4 foot sodded berm.
There is no indication on the site plan whether the developer proposes to
ask Mn/DOT to remove any trees in the highway right-of-way. We
recommend that these trees, if any,be spared unless they are destroyed by
grading. Since no vegetation analysis drawing was submitted, it is difficult
to tell where the trees are.
Other Landscaping Recommendations
We have included a list of other recommendations for the landscaping plan
in Appendix A.
. Facade Materials
•
A building facade design has been proposed that will make the project
appear as a coordinated unit, except for the outlot buildings, which will
have individual designs dictated by the franchise. The basic materials are
rock-face concrete block, face brick, decorative glazed concrete block and
prefinished metal canopies. Colors should be proposed for City approval.
The materials on the rear sides of the buildings will be the same rockface
block as used on the front along with decorative, colored banding.
Minimum standards for the materials for outlot buildings should be
submitted for City review and approval.
In front of the parking lot between Cub Foods and Wal-Mart there will be
a wrought iron fence with a low wall and pilasters made of the same
materials as the building facades.
Signs
Wall Signs
. The building facade design has created a "sign band" which will guide the
placement of walls signs. It is not clear whether the tenants will be
required to install signs with individual back-lit letters or whether they will
be able to use the less attractive back-lit plastic panels. We recommend the
use of the individual letters. This information should be submitted for
City review prior to final approval and made part of the Developer's
JUN 04 '93 11:09 ERW INC. P.8
. Steve Rohlf
June 4, 1993
Page 7
Agreement. No wall signs should be allowed to face the west or the south.
Freestanding Signs
Freestanding, pylon signs are proposed for each outlot business and the
center as a whole. Along Highway 169, there would be two signs for the
center and two signs for outlot business, and along Freeport Avenue there
would be five signs for outlot businesses. No single business would have
more than one freestanding sign.
We recommend that the principal pylon sign for the center be allowed to
exceed the normal maximum of 64 square feet in face area (Section 900.22
(4)(d)(ii)) if:
(a) The proposed second pylon sign is deleted and
1111 (b) The materials and design of the center's pylon sign be.
coordinated with the design of the major buildings, that
restrictions, that the sign be designed to appear as an
integrated unit rather than several individual signs hung
together, and that guidelines be agreed upon for the colors
and number of tenant names within this sign.
A pylon sign for the center is also proposed at the intersection of Jackson
Road and Freeport Avenue. This location should be restricted to a
"monument" sign, no taller than approximately 6 feet above grade, to
announce the entrance. This sign must be within the private property and
set back far enough from Jackson Avenue so that the view for drivers
exiting Freeport is not obstructed.
There is no indication of the proposed area, height, illumination or design
of the pylon signs. This information should be submitted for City review
prior to final approval and made part of the Developer's Agreement.
Outdoor Storage
Menard's would have a large yard behind their building for the storage of
lumber and other items. This is potentially a very unsightly from the west.
• The present design is insufficient to determine whether that impact would
be properly mitigated. A fence is indicated but there is no indication of its
design. The landscaping plan to the west is inadequate (refer to the
section on landscaping, above).
JUN 04 '93 11: 10 ERW INC. P.9
• Steve Rohlf
June 4, 1993
Page 8
Fencing
Wal-Marts typically have an outdoor garden center surrounded by an open
fence. None is shown on the site plan, but we recommend that this matter
be conclusively determined.
Fencing is shown along Jackson Road but its design is not specified. This
fence, if included after the planting and berming plan is improved, should
be coordinated better with that element.
There should also be a fence to physically separate the school site from the
shopping center and the proposed pond.
Sidewalks
• Sidewalks are proposed along both sides of Freeport Avenue with links to
the shopping center buildings. Additional connections could be provided
to the outlots on the north and east sides of Freeport Ave.
The Focus Area Studies (1990) recommended a pedestrian and bicyclist
trail along the eastern side of Jackson Road from School Street to and
across Highway 169. This should be incorporated into the project. We do
not have a recommendation on who should pay for that facility.
It may also be a good idea to have a sidewalk linking Jackson Road to the
front of the center through the parking lot between Cub Foods and Wal-
Mart.
Trash Handling
No indication is given on the site plan regarding where dumpsters would
be located or how they would be screened. This information should be
submitted for City review before City Council approval.
Lighting
Our main concern with lighting is that the nuisance to the neighbors to the
11111
west be absolutely minimized. We would like more information about the
design of the Type III luminaire proposed for the Jackson Road edge. We
recommend that this luminaire be designed to cast light only toward the
building with a sharp cutoff to the west.
RECOMMENDATION
JUN 04 '93 11: 10 ERN INC. P. 10
• Steve Rohlf
June 4, 1993
Page 9
We offer the following conclusions and recommendations in the spirit of
improving the site plan.
1. Western and Southern Areas
The layout, setback and screening of the western and southern
edges of the site are inadequate. These areas should be redesigned
to provide more protection for the adjacent neighborhood and
schools. All required setbacks for buildings and driveways should
be met or exceeded. Landscaping, berming and fencing should be
generous. Lighting should be directed away from the housing.
The inadequate layout is also demonstrated by the shortage of
parking near Menard's and the shortage of on-site ponding. If the
amount of building square footage and/or outdoor storage were
• reduced, the site plan could be reconfigured and the problems
described above would be much easier to solve. The additional
remaining land could be devoted to activities that would be more
compatible with the neighborhood even if some of them have access
from Jackson Road. It may be logical, therefore, to delete Menard's
from the project.
2. Access
The driveways to Building A and Cub Foods should be combined
at a point midway between Highland and 191st Avenue. The access
to the shared driveway for Wal-Mart and Menard's should be
moved south to increase the offset to 191st Avenue.
3. Parking
Although zoning requirements are met, our experience with similar
projects tells us the parking supply will be inadequate in the area
of Menard's and Building E.
4. Landscaping
• The planting and screening plans are inadequate all across the site.
5. Sidewalks
Additional sidewalk connections should be provided to the outlots
on the north and east sides of Freeport Avenue. A sidewalk along
JUN 04 '93 11:11 ERW INC. P. 11
• Steve Rohlf
June 4, 1993
Page 10
Jackson Road should be shown. There should be a pedestrian
connection between Jackson Road to the front of the center through
the parking lot between Cub Foods and Wal-Mart. The Park and
Recreation Board will be presenting recommendations about trails
also.
6. Signs
There should be revisions and elaboration to the sign plan as
described above.
7. Facade Design
The design and materials for the outside of Buildings A through E
and Cub Foods are acceptable.
• S. Lighting
Additional information should be provided about the lighting plan
on the western perimeter.
9. Trash Handling
Acceptable details about trash handling should be submitted.
10. Developer's Agreement
There should be a Developer's Agreement that provides guarantees
to the City for all public or private improvements that are agreed
upon.
11. Road Rights-of-Way
There should be concurrence by the City Consulting Engineer on the
width of public road rights-of-way.
• WCW/dc
R128$8
JUN 04 '93 11: 11 ERW INC. P. 12
APPENDIX A:
DETAILED RECOMMENDATIONS FOR THE LANDSCAPING PLAN
1. Coordinate all aspects of the site design, including existing trees,
grading and berming, site design, signage and lighting.
2. Establish a theme or concept when designing the landscaping.
3. Provide plant materials in sizes that are generally accepted
minimums. Two-and-one-half inch caliper for all deciduous
trees, 6-8 foot height for evergreen trees, and 24-36 inch height for
shrubs.
4. Sod all landscaped areas not planted with shrubs and trees.
5. Minimize the use of large rock mulch beds with few small shrubs.
6. Install underground irrigation for the maintenance of all sodded
lawn areas, at a minimum.
• 7. Install a minimum of one tree and eight shrubs per typical interior
parking lot island (approximately 200 square feet).
8. Cluster shrubs plantings in planting beds, using edging materials
such as steel or vinyl to separate mulch from sodded lawn areas.
9. Maintenance should be an important consideration when developing
a design concept.
•