3 PCSR 10-19-1993 AK
mc,(
( /
City of _6 TO: PLANNING COMMISSION
i
ClkRiver �FROM: STEVEN B. ACH, CITY PLANNE _.
DATE : OCTOBER 19, 1993
SUBJECT: CONDITIONAL USE PERMIT REQUEST FOR
PLANNED UNIT DEVELOPMENT, ELK PARK
CENTER/PUBLIC HEARING, CASE NO. CU
93-15
This memorandum is to be made part of the previous report
distributed on Friday, October 15, 1993 . This issue came up
late in the day Friday preventing the inclusion with the
original report.
PARKING/BUILDING SETBACKS
Based on the preliminary building/parking setback plan (C6)
submitted by John Oliver & Associates, some additional comments
need to be brought to the Planning Commission' s attention.
This drawing represents the minimum building and parking
setbacks that will be applied throughout the entire PUD.
Although the building and parking layouts shown on the outlots
are conceptual, I think it is important to point out that the
Sparking setback is not met on Lot 1, Block 3, and Lots 1, 2,
and 3, Block 1 .
Again, these site plans are subject to modification based on
the prospective user of those individual lots . Nevertheless,
all setback requirements will be reviewed by the Planning
Commission and City Council as part of the specific site plan
package presented to develop each individual parcel .
410
P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425
tyof ,
1kRiver
October 11, 1993
Elk River Associates
Attn: Scott Erickson
6409 Citywest Parkway
Suite 201
Eden Prairie, MN 55344
Dear Mr. Erickson,
The following are a list of comments based on the revised Elk
Park Center plan dated 9/15/93 . The majority of these comments
will apply to the conditional use permit for the Planned Unit
Development as it is brought forth before the Planning
Commission and City Council next week. Some of these comments
will apply at the time of specific site plan review. Your
• cooperation in making the appropriate revisions to these plans
prior to the Planning Commission and City Council meetings,
will demonstrate your initiative to address all the issues .
A. General Information
1 . Provide information verifying easements have been
obtained from the School District for Freeport
extension, drainage and landscaped areas .
2 . If the four single family homes along Jackson Avenue
are not being purchased by the developer, information
must be provided indicating the property owners
cooperation for establishing a landscape and drainage
easement.
3 . A petition/application signed by all property owners
directly involved with the project must be provided.
4 . A letter from United Power Association needs to be
provided authorizing use of their easement for
parking and ponding purposes .
B. Preliminary Plat
1 . All easements shown in the plat shall be dedicated to
• the public.
P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425
• 2 . Outlot A should be deeded to the City for drainage
and utility purposes . However, the perpetual
maintenance of Outlot A will be the responsibility of
the developer and included as part of the development
agreement.
3 . Outlot B should be deeded to the City.
4 . Drainage and utility easements on school property
should be granted to the City as public.
5 . Each lot contained within the preliminary plat should
be listed indicating proposed lot size.
6 . Lot 1, Block 2, may need to be revised in accordance
with recommendation to redesign the area around the
proposed fast food and Building D.
7 . Park Dedication will be required. Cash payment will
be calculated at the time of final plat based on the
City' s fee at that time. Currently, the park
dedication rate is $1,500 . 00 per acre.
8 . A Developer' s Agreement will need to be prepared and
executed prior to releasing the final plat for
• recording.
C. Site Plan
1 . Site plan should be adjusted to meet established
setbacks .
2 . All parking and building setbacks have been
identified by staff on a plan on record in the
Planning Department. This will be presented at our
10/12/93 meeting.
3 . Concrete curb and gutter (B612) will be required
throughout the parking area. However, a note should
be made on the site plan acknowledging this
improvement.
D. Parking and Circulation
1 . According to the City's parking requirements, there
appears to be a shortage of parking on the Taco Bell,
Perkins, and Midas Muffler sites . The area of
greatest concern is the Taco Bell and Perkins area
where there appears to be no space for additional
parking.
• 2 . The area around Building D and the fast food parcel
(Lot 8) is a concern. First of all, any access onto
Freeport Avenue should align with the drive
• immediately to the north. Secondly, pedestrians
crossing a drive aisle is unacceptable. Lastly, the
4,500 square foot retail building is a new element
that has been introduced since the last plan was
submitted to the Planning Commission in June of
1993 . A solution to this area may be to consolidate
the development into one building and redesign the
site plan to accommodate traffic circulation needs .
3 . The number of access points off of Freeport Avenue to
the main retail area should be limited to five
locations . Four of these may be along the eastern
side of the project and one on the north side. The
three access points on the east side may need to be
adjusted to accommodate convenient access to this
retail area.
4 . The service drive area west of Cub Foods should be
extended south connecting with the service area west
of Building B. This will allow the middle access
drive onto Jackson Road to be eliminated.
5 . The Perkins parking lot has been proposed with a
dead-end parking design. This particular design will
be recommended to be eliminated at the time of site
• plan review.
E. Pedestrian Circulation
1 . The sidewalk in front of Building E should be
extended to the sidewalk in front of Wal-Mart.
F. Landscaping
1 . A landscaping theme should be considered for this
project. This design element can be carried
throughout the entire project and become an integral
part in the continuity aspect of the Planned Unit
Development. An example may include a typical
planting bed located at all entrances .
2 . Plans should indicate if every parking aisle will be
landscaped.
3 . Every attempt should be made to save existing trees
and incorporate into the projects design.
4 . Extensive berming along Jackson Road will be
required. Berms natural in appearance and a minimum
of five feet high along with landscaping will be
111 necessary to screen loading facilities .
S5 . Proposed plant materials around ponding areas should
compliment the natural appearance of the ponds ( i .e. ,
dogwoods, river birch, service berry) .
6 . The type of landscaping proposed for the landscape
easement both south and west of Wal-Mart should be
shown on the plans . A plant material that is
conducive to the proposed slopes within both these
easements should be considered.
7 . If possible, illustrate landscaping in front of the
buildings as shown on the building elevation plans .
This concept will be recommended on final design of
the landscaping plan.
8 . Undulating berms along Freeport Avenue along with
landscaping should be included to reduce the view of
the large parking area.
G. Building Elevations
1 . The proposed building materials consisting of
decorative rock face block, face brick, and
decorative glazed concrete block and pre-finished
metal canopies is acceptable. These same materials
• shall be included on all building elevations .
2 . Consideration should be given to establishing an
architectural design element or a common material
that is incorporated into every building within the
Planned Unit Development. This would accomplish
continuity and unify the project as requested in the
ordinance.
3 . An elevation of the fence/wall in front of Wal-Mart
garden center should be shown. Staff will recommend
a design that includes a block wall with wrought iron
fencing, similar to other Wal-Mart stores in the area.
H. Signs
1 . One freestanding sign will be allowed along Highway
169 identifying the development. This sign must be
of a monument style and be constructed of materials
which compliment the building. The exact size of the
sign should be submitted for staff review and
comment.
2 . The development monument sign at the intersection of
Freeport and Jackson should not exceed eight feet
• above grade and eight feet in width for a total of
sixty-four square feet.
3 . Freestanding signs for Cub Foods and Wal-Mart will
not be permitted. Both of these anchors can use
space on the development sign and utilize wall
signage as shown on the building elevation plans .
4 . It will be recommended that all freestanding
development sites have one freestanding sign of a
monument style. Each of the signs will have an
approximate size of eight feet high and eight feet in
width or a maximum square footage of sixty-four
square feet.
5 . All wall signage on the building shall consist of
individual letters and have a uniform design and
color scheme.
6 . Ideally, a specific sign package should be submitted
for approval by the Planning Commission and City
Council as part of the Planned Unit Development.
I . Trash Enclosure
1 . Trash enclosures consisting of materials that match
the building shall be provided. Selected locations
shall be out of public view and provide easy
• accessibility by service trucks .
2 . Enclosures should be large enough to accommodate any
recycling needs .
This concludes a preliminary review of the elements that will
be discussed as part of the Planned Unit Development. Assuming
the City Council approves the conditional use permit for the
Planned Unit Development, specific site plans will need to be
provided and a more detailed review will take place at that
time. If you have any questions, please feel free to contact
me at 441-4902 .
Sincerely,
tev Ach
City Planner
SBA:akh
•
StOCT 1 5 193
CONSULTING ENGINEERS
October 15, 1993
File: 230-152-11
Mr. Steve Ach
City Planner
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: Elk Park Center Review
Dear Mr. Ach:
As requested, we have reviewed the latest revised submittal for the Elk Park Center
development. The submittal consisted of the following five plan sheets prepared by John
Oliver and Associates with a revision date of October 14, 1993:
• 1. Preliminary Plat
2. Preliminary Site Dimension Plan
3. Preliminary Sanitary Sewer and Watermain Plan
4. Preliminary Drainage and Grading Plan
5. Soils Map
Based on our review, we would offer the following comments:
A. PRELIMINARY PLAT
1. Lots 1, 4 and 8 Block 2 are under 1.0 acre in area.
2. No building setback lines are shown on any of the lots. Therefore, it is
impossible to tell if the proposed buildings shown on the site plan meets the
City's setback requirements.
3. Outlot B should be deeded to the City and become part of the elevated water
tower site.
1326 Energy Park Drive 4. No side yard easements for drainage and utility purposes are shown.
St.Paid,M6 55I0S-5202 However, there does not appear to be a need for these for utility service
6I2-644.4389 purposes.
Fax:6I2-644.9446
9800 Shelard Parkway,Ste.102
Minneapolis,MS 55441.6451
612-546.0432
Fax:612-544-6398 152-1501.0cr
Steve Ach
•
October 15, 1993
Page Two
5. An administrative subdivision of the Dickenson property will need to be
accomplished either prior to or concurrently with this platting process in order
to divide that property into the portion to be included in the plat and the
portion to be excluded as exception #2.
6. It is not clear if the existing buildings on the exception to the Dickenson
property meet City setbacks. If they do not meet setbacks, the amount of
property excluded from the plant should be increased slightly to facilitate
meeting the City ordinance.
7. It would be the intent of the Elk River Municipal Utilities to provide electrical
service to the rear of the main buildings in the proposed development.
Adequate easements for these purposes will need to be provided on the final
plat.
B. PRELIMINARY DRAINAGE AND GRADING PLAN
1. Lot and block numbers should be added to the grading plan for ease of cross-
reference.
•
2. There are difficult grades to work with in the area of Block 1. The building
on Lot 3 is set at a maximum elevation of 955. However, no 954 contour is
shown. Elevations in this area result in parking lot grades of 4-6 percent.
This may be excessive for these types of developments. Closer review of this
area will need to be undertaken during the site plan review.
3. There is a substantial amount of grading along the east property line in the
MnDOT right-of-way which will require a MnDOT permit for work within the
highway right-of-way.
4. No lot lines are shown for Lot 4, Block 2. These should be added to the
grading plan. Also, the grading on Lot 4, Block 2 is extremely flat. This
should be reviewed relative to drainage.
5. At the southwest corner of Lot 6, Block 2, the grading plan indicates the need
for a retaining wall. We estimate that the maximum elevation of this retaining
wall would be 14 feet high. If a retaining wall of this height is allowed on
this site, we would recommend that it be designed by a professional registered
engineer and the design calculation reviewed by the City Building Inspector
prior to construction. Consideration should be given to terracing the wall to
reduce its visual affect.
•
152-1501.0cr
Steve Ach
• October 15, 1993
Page Three
6. There is a pond along the entire southern property line between this
development and the School District property. Consideration should be given
to providing a fence along the ponding area between the pond and the School
District property.
7. The main access off of Jackson Avenue for service vehicles to the proposed
Wal-Mart store has a driveway opening which exceeds the City standard of 30
feet. However, this may be necessary to facilitate the turning movements of
large commercial vehicles. It should also be noted that this driveway has a
grade in excess of 4%. Consideration should be given to lessening this grade
if at all possible for ease of access during the winter months.
8. There is a low area shown on the grading plan on the Dickenson property
which is Exception #2 to the preliminary plat. No attempt has been made to
pick up drainage in this area. Consideration should be given to providing a
storm water inlet in this area to pick up any runoff that accumulates there.
10. There is an existing 100 foot wide U.P.A. easement running through Block 2
and Outlot A. This existing easement runs through the middle of the proposed
III
Sedimentation Pond #3 which is proposed to be constructed in Outlot A. Due
to the fact that the proposed pond is to be constructed in an outlot, it is likely
that the City would end up with ownership of this particular pond. That raises
the question of whether it is appropriate to have these types of utilities under
the storm drainage pond because of the potential maintenance problems
associated between the two.
13. The grading plan shows cuts up to 12 feet over the U.P.A. easement
alignment. There are no indications as to how to avoid conflicts between the
grading plan and the location of utilities within this easement. This item needs
to be addressed.
C. STORM DRAINAGE PLAN
1. The majority of storm drainage from the proposed development is shown to
flow easterly under TH 169 to an existing ponding area on the east side of the
highway. The amount of storm drainage proposed to flow into this pond will
cause a rise in the water level of between 2 and 3 feet. Negative comments
were received relative to this increase in water level as part of the E.A.W.
The City has recently completed development of a Draft Comprehensive Storm
II/
Drainage Plan. One of the recommendations of the plan was to provide an
outlet to this large ponding area on the east side of TH 169 with the outlet
ultimately flowing to the Mississippi River. The City is currently working on
the preliminary design of this outlet, cost estimates, and funding scenarios.
152-1501.00T
• Steve Ach
October 15, 1993
Page Four
It will be necessary to coordinate the construction of this outlet with the
proposed development of the commercial areas such that there is not a
negative impact from the rise of the water elevation in this ponding area.
2. A much smaller portion of the development site is proposed to flow southerly
into the existing storm sewer system. The system ultimately outlets to the
Mississippi River near the old City Hall site at TH 10 and Main Street. This
is the same system that in recent large storms has caused isolated flooding at
the intersection of Main Street and Evans Avenue. The increase in flow to
this system from the proposed development is relatively small at 14 cfs in a
100-year rainfall event. However, unless provisions are made to provide an
alternate outlet for the Main and Evans intersection, this additional flow will
only aggravate the existing problem and large frequency rainfall events. Also,
this storm drainage flowing south from the proposed development opens up the
portion of the School District property which may ultimately develop as
commercial property to providing additional flow into this system.
As part of the Draft Comprehensive Storm Drainage Plan, a solution to the
Main and Evans isolated flooding problem has recommended. The City has
• authorized additional work on preliminary design of this including cost
estimates and funding scenarios. Coordination of the Main and Evans
improvements will be necessary to preclude any increase in problem in that
area caused by additional flow from this proposed development.
3. The storm drainage design for the Elk Park Center Development has been
revised such that the sedimentation ponds now meet the design criteria laid out
in the Best Management Practices guidelines. There are a total of six
sedimentation ponds proposed on the site. These will all have existing
standing water ranging from 3 to 6 feet. During a 100-year rainfall event, the
maximum depth of water in these ponds will increase to a minimum of 7 feet
and a maximum of 10.9 feet. These existing standing water depths and
maximum depths raised the issue of whether or not the liability associated with
these types of ponds would require that some type of fencing be provided.
4. The design of the ponds calls for a 4:1 side slope above the static water level
with a benched area approximately 10:1 at the water level. The pond slopes
beneath the standing water level are shown as 3:1. These slopes are in
accordance with the Best Management Practices guidelines. However, the 3:1
slope below the water level may also be a concern given the fact that these
ponds will have a standing water depth of approximately 3 to 5 feet. Should
• a small child wander into one of these ponds, it would be difficult to exit
given a 3:1 side slope. If the ponds are not to be fenced, consideration should
be given to lessening the slope below the water level to something that
individuals could easily get out of if they should fall in.
152-1501.00T
Steve Ach
•
October 15, 1993
Page Five
5. All the sedimentation ponds on the site are designed for 100-year rainfall
event. However, the storm drainage collection system is designed for a 10-
year event. This raises the question of whether or not the storm runoff in a
100-year rainfall event will actually get to the ponds and, if so, how long and
how much isolated flooding can be expected at the collection points. There
are two major collection points proposed in the parking lot in front of the Wal-
Mart Store. The elevation of these collection points is approximately 927.
The first floor of the Wal-Mart store is only 3 feet above this at 930. The
method of overland flow to the ponds needs to be carefully reviewed during
the design phase to ensure no negative effects. It is not shown in the drainage
calculations how deep or how long flooding can be expected at these locations.
Additional information should be provided to show that there will be no
negative impact by the size of the storm sewer collection system.
6. The Comprehensive Storm Drainage Plan shows additional tributary area for
this district lying north of 193rd Avenue on the west side of TH 169.
Provisions should be made as part of this development to convey that runoff
to the regional pond on the east side of TH 169.
• 7. Consideration needs to be given to potential storm drainage runoff from
Jackson Avenue into this system. This is a likely scenario, especially when
Jackson Avenue is upgraded.
D. TRAFFIC ISSUES
1. The revised traffic projections based on the new site plan show a reduction in
the PM peak trip generation of approximately 12%. This reduction in total
traffic generated by the development does not change or eliminate any of the
recommendations for improvements necessary to the external facilities to
accommodate traffic generated by this development as outlined in the Traffic
Impact Study which was previously completed. Consideration needs to be
given to each of these improvements and the timing established to coordinate
with the development of this project.
2. Parking stalls are shown to be 19 feet deep by 9.5 feet wide with 24-foot wide
isles. This is adequate spacing for parking.
3. Freeport Avenue should be a 52-foot wide roadway as it comes through the
development and the access road providing right-in and right-out turns at TH
• 169 should be wide enough to facilitate three lanes of traffic, one out-bound
and two in-bound.
152-1501.0cr
Steve Ach
•
October 15, 1993
Page Six
4. Consideration should be given to opening the traffic pattern between Lots 2
and 3 and Lot 1 of Block 1. This would provide for a better circulation
pattern.
5. Each parking lot must have a sufficient number of handicap parking stalls.
6. There is no clear method shown on the plan to provide delivery vehicle access
to Lot 7 or 8, Block 2. This raises a potential problem of delivery access in
conflict with customer traffic patterns. The site plan should be revised to
provide better delivery vehicle access to these two facilities.
7. The number of access points from Freeport Avenue to Block 2 has been
reduced from eight to five. This is a vast improvement and provides for much
better access on to and off of Freeport Avenue.
8. An access road is provided across the front of the main buildings on Block 2.
An adequate number of pedestrian crossings need to be provided with the
appropriate signing and striping. It may also be necessary at some point to
• provide speed humps to reduce the speed of traffic in this area.
9. The number of access points on Jackson Avenue for delivery vehicles has been
reduced to two with the driving/delivery areas all connected. This provides
for the minimum delivery vehicle trips on Jackson while providing good flow
for emergency vehicles.
E. SANITARY SEWER AND WATER
1. An elevated water tower in the high pressure zone is required to provide water
service to this site. The Elk River Municipal Utilities recently awarded a
contract for construction of this elevated water tower. It is anticipated the
water tower will be in service by the end of July 1994. Sanitary sewer service
to the site will be provided by extending the existing trunk line currently
located south of School Street through the site, ultimately serving properties
to the north and east of the proposed development. It is anticipated that the
sanitary sewer and water to serve the site would be constructed as part of a
public improvement project, thus requiring a feasibility study after the
preliminary plat is approved. The feasibility study would provide detailed
information relative to the sizing and location of these facilities.
• 2. The preliminary layout of sanitary sewer and water to serve the site appears
to be adequate with one exception. The watermain shown in Block 1 should
be looped to provide adequate service to the three commercial lots.
152-15O1.0cr
• Steve Ach
October 15, 1993
Page Seven
F. MISCELLANEOUS
1. Street lighting is not shown on any of the submitted drawings. However,
street lighting should be a requirement along Freeport Avenue.
2. The ownership of the utilities contained within the site will likely need some
discussion. We would recommend that all sanitary sewer and watermain be
owned and maintained by the City and/or Municipal Utilities. We would also
recommend that Freeport Avenue and the access to TH 169 be considered
public roadways. All other internal roadways should be considered private.
Finally, we would recommend storm sewer, including the sedimentation
ponds, be considered private. This may be difficult to accomplish with
Sedimentation Pond #3 which is shown in an outlot; therefore, this may need
to be considered the start of the City's overall storm drainage system and, as
such, become owned and maintained by the City.
If you have any questions regarding these comments, please call.
4111
Sincerely,
MSA, CONSULTING ENGINEERS
Terry J. Maurer, P.E.
TJM:tp
•
152-15O1.0cr
[ 1/ I/
^rr February 15, 1993
Y•`
Steve Rohif, Building and Zoning Administrator
City of Elk River
720 Dodge Avenue
Elk River, MN 55330
RE : Environmental Assessment Worksheet (EAW) for Elk Park
Center
Dear Mr . Rohif:
This letter acknowledges receipt of the EAW for the above-named
project. The Environmental Review Program rules (at Minnesota
Rules, part 4410 . 1500, item B) require that a press release
containing notice of the EAW availability be provided to at
least one newspaper of general circulation within the area and
that copies of the EAW be distributed to all points on the EQB
distribution list. We presume that these requirements have been
met .
Notice of the EAW availability will be published in the EQB
• Monitor on February 15, 1993 . The 30-day comment period will
begin on that day and will expire on March 17, 1993 .
Pursuant to Minnesota Rules , part 4410 . 3100, subpart 1, no final
governmental decision to grant a permit, approve the project, or
begin the project may be made until a negative declaration or
EIS adequacy determination has been made.
Please contact me if any questions arise about the Environmental
Review process . My phone number is ( 612 ) 296-8253, or you may
call toll-free by dialing 1-800-657-3794 .
Sincerely,
Gregg M. Downing
Environmental Review Coordinator
cc : Scott Erickson, Lynn Caswell
•
t� ENYIRONMENIAI 0011111' BOARR 658 CEDAR STREET, ST. PARI, TNN 55155 612 296-2603 [Al 612 296-3696 STAFF PROVIDED BY m PIANNIN6
CC. lVEu ;puri ..�.
�
STATEnOF
MUV
UVESD1TQ
DEPARTMENT OF NATURAL RESOURCES
• 500 LAFAYE I it ROAD • ST. PAUL, MINNESOTA • 55155-40 10
DNR INFORMATION
(612) 296-6157
March 15, 1993
Stephen Rohlf
Elk River Building & Zoning Administrator
720 Dodge Avenue
Elk River, MN 55330
RE: Elk Park Center
Environmental Assessment Worksheet (EAW)
Dear Mr. Rohlf:
The Department of Natural Resources (DNR) has reviewed the EAW for the Elk Park Center
project. We offer the following comments for your consideration.
Item l lb should have indicated that the Natural Heritage Program has identified a significant
natural mixed oak forest community in the NE 1/4 section 27, T33N, R26W, which is within one
mile of the Elk Park Center project. We have attached a copy of an earlier correspondence with
the Natural Heritage Program for your information.
Item 12 states, "A portion of the storm water will be routed east...to wetlands which are proposed
• to be designated as a city storm water ditch system." The unrestricted and untreated discharge of
stormwaters into a natural wetland is generally opposed by the DNR. This use of wetlands as a
stormwater treatment pond is not advised and we recommend the construction of on-site
sedimentation ponds (with skimmers where needed) for stormwater treatment and retention. The
use of natural wetland systems to treat urban runoff degrades and eventually destroys valuable
wetland habitat through sedimentation, contamination, and increased nutrient loading. We will
review this aspect of the project during the federal permitting process and we will likely
recommend denial of the use of protected wetlands for this purpose.
Item 12 also states, "The water surface elevation of the wetlands east of the site will be
temporarily raised approximately 5.5 feet by the runoff of the project during a 100-year storm
(event)." The information provided in Item 12 is insufficient to determine the overall project
impacts to the wetland in question. The EAW should include an evaluation of expected changes
in water surface elevations for 1, 5, and 10-year storm events to allow a more accurate appraisal of
project impacts. The developer should be required to construct properly sized sediment basins
and retention ponds to prevent the 5.5 foot "bounce"which is expected to occur for large scale
events. Large fluctuations in water levels negatively impact nesting birds and permanent changes
in the water level regime can change the character of vegetation found in wetlands to the
detriment of the existing natural community. The proposed project could benefit, harm, or have
minimal effects on the wetland in question and further information is required to make this
determination.
The appropriate erosion control Best Management Practices (BMPs) should be followed during
construction activity. Every effort should be taken to minimize sedimentation and erosion during
construction. Proper silt fences and floating silt curtains should be used during construction and
• for 72 hours after construction activity ceases. We also recommend the mulching and seeding of
all disturbed areas within 72 hours of project completion; the
AN EQUAL OPPORTUNITY EMPLOYER
Stephen Rohlf
Page 2
•
revegetation of disturbed areas should include the plantingof native trees,woodyshrubs, and
g
grasses where possible.
Wetland impacts associated with this project must be fully addressed for both the wetland in
question and water management purposes. The information provided indicates further
development is expected in this watershed and the project may require mitigation under the
Wetlands Conservation Act. The EAW should address these issues as well as those mentioned
above. We recommend that decision on the need for further environmental review be postponed
for 30 days as provided by Minnesota Rules 4410.1700, subpart 2a(B), to collect the necessary
information. It may also be possible to provide the needed information during the record of
decision process in your responses to comments made on this EAW. No matter which outcome
unfolds, we request the opportunity to review any future information gathered in this regard.
Thank you for the opportunity to review this document. We look forward to receiving your record
of decision and responses to our comments. Minnesota Rules part 4410.1700, subparts 4 & 5,
requires you to send us your Record Of Decision within five days of deciding this action. Please
contact Don Buckhout of my staff, at (612) 296-8212, if you have any questions regarding this
letter.
Sincerely,
• Thomas W. Balcom, Supervisor
Natural Resources Planning and Review Section
Office of Planning
c: Bob Hance
Steve Colvin
Tom Lutgen
Bonita Eliason
Lynn M. Lewis, USFWS
Gregg Downing, EQB
Scott Erickson, Nu-Western Development Company
#930146-01
ER7.ELKPARKDOC
•
_ —
������M( STAATEE OF
• DEPARTMENT OF NATURAL RESOURCES
500 LAFAYETTE ROAD • ST. PAUL. MINNESOTA • 55155-40 07
ONR INFORMATION
(612) 296-6157
August 10, 1992
Lynn Caswell
John Oliver and Assoc. , Inc.
922 Main St.
`\/*\ Elk River, MN 55330
Re: Proposed developments in sec. 27, T33N R26W, Sherburne Co.
K1 Dear Mr./Ms. Caswell:
The Minnesota Natural Heritage database has been reviewed to determine
if any rare plant or animal species or other significant natural features are
7 known to occur within one mile of the above referenced project. There is a
record for a mixed oak forest in the NE 1/4 of sec. 27 that was identified
during 1989 survey work in connection with the Minnesota County Biological
II!! Survey (MCBS) as a good quality example of this vegetation type.
The MCBS is a joint project of the Natural Heritage and Nongame Wildlife
Programs of the Minnesota Department of Natural Resources. The survey gathers
information, county-by-county, on sensitive natural habitats (plant
communities) , and rare plant and animal species, evaluates their importance
and establishes priorities for their protection. Relatively undisturbed
examples of natural communities such as mixed oak forests are becoming
increasingly rare. The Natural Heritage program supports protection of the
highest quality remnants as important components of the state' s natural
biological diversity. The forested portion of your project area in the NW 1/4
of the SE 1/4 of sec. 27 also represents an example of a mixed oak forest. It
was eliminated from detailed survey by MCBS because examination of recent air
photos showed fragmentation by cultivation on three sides, as well as other
evidence of disturbance.
The Natural Heritage database is maintained by the Natural Heritage
Program and the Nongame Wildlife Program, units within the Section of
Wildlife, Department of Natural Resources. It is the most complete source of
data on Minnesota's rare, endangered, or otherwise significant plant and
animal species, plant communities, and other natural features, and is used in
fostering better understanding and protection of these rare features.
Thank you for consulting us on this matter, and for your interest in
minimizing impacts on Minnesota' s rare resources. Please be aware that review
by the Natural Heritage and Nongame Programs focuses only on rare natural
features. It doe's not constitute review or approval by the Department of
.z•
vY• ,•�
...+,<..�. ...a z. •. ... ...-. .J."a;... .. ._ ... . .. -i _ ..e..,, � oos.:tom.:�:..
41110
MINNESOTA HISTORICAL SOCIETY
March 5, 1993
/RECEIVED
Mr. Lynn P. Caswell �r $/q
John Oliver & Associates, Inc. JOHN OLIVER&ASSOC.
580 Dodge Avenue
Elk River, Minnesota 55330
Dear Mr. Caswell:
Re: Elk Park Center commercial development
SW/4 SE/4 & E/2 SW/4 S27, T33, R26, Elk River, Sherburne County
MHS Referral File Number: 93-1163
Thank you for providing this office a copy of the Environmental Assessment
Worksheet for the above-referenced project. It has been reviewed pursuant to
responsibilities given to the Minnesota Historical Society by the Minnesota
Historic Sites Act and the Minnesota Field Archaeology Act and through the
process outlined in Minnesota Rules 4410.1600.
There are no properties in the project area that are listed on the National
Register of Historic Places or included in our inventory. In the absence of
• reported properties, we have also evaluated the likelihood that unreported
historic or archaeological properties may be present. Although we cannot
state with certainty that there are no significant unreported historical or
archaeological properties within the project area, we feel that the probabil-
ity of such properties being present is low. Therefore, in our opinion, the
"no" response to question 26a is appropriate.
Please note that this comment letter does not address the requirements of Sec-
tion 106 of the National Historic Preservation Act of 1966 and 36CFR800, Pro-
cedures of the Advisory Council on Historic Preservation for the protection of
historic properties. If this project is considered for federal assistance, it
should be submitted to our office with reference to the assisting federal
agency.
Please contact Dennis Gimmestad at 612-296-5462 if you have any questions
regarding our review of this project.
Sincerely,
: Leftil\ - --
ritta L. 131 mberg
Deputy State Historic Preservation Officer
BLB:dmb
• cc: Office of the State Archaeologist, c/o Donn Coddington, MHS
345 KELLOGG Rour.RVARII WF.ST i SAINT PAI1I. MIN/WC/WA sc1n9.1onc iTF1 RPH(lNR• !11.9ob_l.11A
T t
• cw :ZEN
March 15, 1993
City of Elk River
Steve Rohlf
Building &Zoning Administrator
720 Dodge Avenue
Elk River, MN 55340
RE: Environmental Assessment Worksheet for Elk Park Center,Elk River,MN
A review of the aforementioned document provides some concern relative to the complete-
ness and accuracy of the worksheet. Several items in the EAW appear to not be in compli-
ance with conditions stipulated in the Zoning Ordinance of the City of Elk Ritter, Section
9000.42 - Conditional Use Permits. Also, there are various items within the worksheet that
are not in agreement with other City documents.
1. The Zoning Ordinance requires the use under 900.42, 4.ii.: "Will be consistent with the
comprehensive plan."
The EAW states in #28 - "The project is compatible with Elk River's comprehensive
• plan." However, a review of the City of Elk River, Focus Area Studies, July 1990, by
BRW, Inc. presents a different plan.
The area under review for the EIk Park Center is identified as Focus Area "B" in the
Focus Area Studies. On page 68, under the Focus Area "B" land use and circulation
plan heading. the study states: "Subarea B-3 (west of Highway 169) would include
approximately 28 acres for commercial development along an extension of Freeport
Avenue, multiple-family housing, single-family and the existing water tower."
Also, the City of Elk River Zoning Map, revised March, 1992, shows a mixture of
commercial. multi-family, and single-family as described in the Focus Area Studies.
The proposed Elk Park Center is showing 50 acres dedicated to commercial develop-
ment which is not in agreement with the two mentioned City documents.
If the area in question has been rezoned to reflect all commercial development,then it is
requested that the rezoning process be reviewed to insure that proper procedures were
followed and notification of affected property owners was accomplished. Also,if the
area has been rezoned, the changes should be reflected in the official City documents
mentioned above.
•
2. The Zoning Ordinance requires the use under 900.42,4.iv.: "Will be served adequately
• by and will not adversely affect essential public facilities and services including streets,
police and fire protection, drainage,refuse disposal, water and sewer system. parks
and schools; and will not, in particular,create traffic congestion or interference with
traffic on adjacent and neighboring public thoroughfares."
Also, under 900.42, 4.v: "Will not involve uses, activities, processes, materials,
equipment and conditions of operation that will be detrimental to any persons or
property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or
vibrations."
In #23, the EAW requires an Indirect Source Permit. The ISP should be completed and
reviewed before any work begins on this proposed project.
As the EAW states in #32 - "The critical issue of this development is the traffic
increase." An unofficial review of the referenced Traffic Study by an MnDOT traffic
engineer indicates that this area will suffer"gridlock" do to the inability to handle the
increased traffic even with the suggested improvements mentioned in the Traffic Study.
With the proximity of schools to this proposed project, it is imperative that the Indirect
Source Permit be completed and that the Traffic Study and recommendations be further
reviewed.
3. Considering the impact on the proposed area due to water drainage, traffic, noise,and
pollution, and the proximity of schools and residential areas, it is strongly requested
that an Environmental Impact Study be completed before any construction activity is
• allowed.
It is further recommended that the City prohibit the clearing on this property of trees.
brush, and other natural landscaping until all issues relating to this proposed
development are resolved.
Sincerely,
p /9 .4c__
oCare
•
����� fele.„,... n 2�
,,,,,-.:-...,z....„..•; E C l Y D MAR 2 9 1993o
r Minnesota Pollution Control
Agency
Y�
• Celebrating our 25th anniversary and the 20th anniversary of the Clean Water Act
March 19, 1993
Steve Rohlf '
City of Elk River
720 Dodge Avenue
Elk River, Minnesota 55330
Dear Mr. Rohlf:
RE: Elk Park Center Environmental Assessment Worksheet
The Minnesota Pollution Control Agency (MPCA) staff has completed a review of
the above-referenced project. Relative to those areas for which the MPCA has
jurisdiction, the staff does not believe the project has the potential for
adverse environmental impacts and therefore, does not recommend the preparation
of an Environmental Impact Statement (EIS). However, the staff does have the
following comments on the project:
• Air Quality
Although a traffic study was done, the Environmental Assessment Worksheet (EAW)
does not contain the air quality and noise information needed for an adequate
evaluation of the project.
1. An analysis of carbon monoxide ambient air quality with and without the
project for current and projected years is not given for the critical
intersection(s) for the project. Both the EAW and the Indirect Source
Permit (ISP) should contain this information.
2. In addition, worst case noise levels are not evaluated. Both the EAW and
the ISP should contain this analysis.
3. The staff wishes to note that certain geometric improvements, including
traffic signal installations, were assumed in the traffic impact study as
viable improvements that would assist in providing acceptable traffic
operation to the the Elk River Center. As such, traffic assignments,
future conditions, and traffic volumes, as well as capacity calculations
were based on the premise that improvements to these roadways were
completed and were operating as functional facilities. Legally binding
commitments for funding the assumed improvements would be needed before an
ISP is issued in final form.
•
TDD: 297-5353 or, for Greater Minnesota, TDD: 1-800-627-3529
Printed on recycled paper containing at least 15% fibers from paper recycled by consumers
520 Lafayette Rd.; St. Paul, MN 55155-3898; (612)296-6300; Regional Offices: Duluth•Brainerd•Detroit Lakes•Marshall•Rochester
Equal Opportunity Employer•Printed on Recycled Paper
Steve Rohlf
Page 2
4111
Water Quality
1. Item 17 indicates that measures will be taken to prevent erosion and
sedimentation. We recommend that an erosion/sedimentation plan be
specifically developed for the site including the following items to
prevent sediment runoff by: 1) keeping exposed soil to a minimum; 2) using
sediment barriers such as straw bales and fabric barriers in all drainage
channels; 3) constructing a runoff collection ditch and sediment pond; and
4) mulching and seeding appropriate areas after construction. A system for
routine inspection of the erosion control devices should be developed and
include an inspection regime for after storm events. Erosion devices that
have failed or have been displaced should be re-established or re-evaluated
for a more appropriate device after failure is discovered.
2. The EAW indicates that 100 square feet of wetlands will be filled as part
of this project. This acreage, though perhaps not extensive, should still
be evaluated in accordance with an alternative to avoid this area if
possible. A sequenced action to avoid, minimize, and mitigate should be
demonstrated by the applicant to have been accomplished in order to concur
that the taking and loss of wetlands is the only alternative.
• 3. Item 18 indicates that sedimentation ponds with skimmers will be
constructed along the project to handle the storm water. We are very
supportive of this proposal for treatment of storm water. The EAW also
indicates that 50 percent of the storm water will be routed from the ponds
east under Highway 169 through an existing culvert to a series of wetlands
on the east side of the highway. As a result the surface water elevation
will be temporarily raised approximately 5.5 feet during a 100 year storm.
An increase of greater than one foot in surface water elevation is
considered to negatively impact a wetland. For this reason the impact
wetlands must be mitigated.
Thank you for the opportunity to review this EAW. We regret that our comments
will be received after the close of the comment period. If you have any
questions, please do not hesitate to contact Meri K. Nielsen of my staff at
612/297-1766.
Sincerely,
Paul Hoff, Director
Environmental Analysis Office
Administrative Services Division
PH:pnk
S
RECEIVED MAR 04 1993
� "�T DEPARTMENT OF THE ARMY
/4� '�\ St PAUL 01STRIC.CORPS OF ENGINEERS
W. ;. a•: NIIII 180 E.KELLOGG MVO_ROOM 1421
P L.MINN ET5517;79
/ I�arcri 3, 1993
REPLY TO
Construct& -operations
Regulatory (93-02310-SF-GAE)
•
Mr. Scott Erickson
Nu-Western Development Company
6489 City West Parkway
Eden Prairie, Minnesota 55344
Dear Mr. Erickson:
We have reviewed the information provided us about a project proposed by
Nu-Western Development Company to grade and fill isolated wetland basin(s) to
facilitate commercial development (Elk Park Center) at a site located in the
S 1/2 Section 27, T. 33 N. , R. 26 W., of Sherburne County, at Elk River,
Minnesota.
We believe that a Department of the Army permit may be required for this
proposed commercial development because of the proximity of the project to a
wetland basin(s) located in the area and its potential to have an adverse
impact on this wetland resource. Enclosed are application materials. The
•
orange booklet (EP-1145-2-1) gives background information about our program
• and instructions for preparing the application.
Because we must notify certain other agencies about your project and
provide them a reasonable opportunity to comment, our review for most projects
may take at least 90 days. You can help expedite this procedure if you --
* Fill out the application completely and specifically. Please note the
instructions on pages 10 and 11 of the orange booklet.
* Send accurate drawings, including smaller 8 1/2 by 11 inch copies for our
public notice, illustrating the wetland areas to be filled and/or altered
for the proposed project. See the check list on pages 14 and 15 and the
examples on pages 16 and 17 of the booklet. Following these examples
will help ensure that the drawings will be accurate and usable.
* Describe any and all alternatives to the project as planned that have
been considered. This consideration should include other potential sites
and other methods of accomplishing the proposed activity. Federal laws
and guidelines often prevent issuance of permits when there are less
environmentally damaging alternatives available. For instance, if the
project involves placing fill in a waterbody or wetland, there may be .
alternatives available that would accomplish the project purpose but
would not require filling, or would not require as much fill in as large
an area.
If your project would include any temporary placement of excavated or
fill material into a waterbody or wetland, you may need authorization for that
work. Be sure to include that information in your permit application. Also,
• you may need State, County, and/or city permits for this project.
If you have any questions, please call Gary Elftmann of this office at
(612) 220-0355.
Sincerely,
co 4
Ben Wopa
Chief, Regulatory Branch
Construction-Operations Division
Enclosures
Copy furnished:
Mr. Steve Rohlf
City of Elk River
720 Dodge Avenue
Elk River, Minnesota 55330
Ms. Lynn Caswell
John Oliver and Associates, Inc.
580 Dodge Avenue
Elk River, Minnesota 55330
•
•
"` Minnesota Department of Health
• Division of Environmental Health
925 Delaware Street Southeast
41.---..
P.O. Box 59040
Minneapolis, MN 55459-0040
(612) 627-5100 . f IJ L( V. D MAR 18 1993"
March 17, 1993
Steve Rohlf
Building and Zoning Administrator
City of Elk River
720 Dodge Avenue
Elk River, Minnesota 55330
Dear Mr. Rohif:
Minnesota Department of Health (MDH) staff has reviewed the Environmental Assessment
Worksheet (EAW) for the proposed Elk Park Center in the City of Elk River and offers the
following comments for consideration.
Re: permits. Well sealing notifications must be submitted prior to sealing abandoned wells.
Also, dewatering well permits must be applied for and approved prior to construction of
II
dewatering wells greater than 45 feet deep (or greater than 25 feet deep, if constructed after
June 30, 1994).
Re: water use. The EAW indicates about seven wells will be abandoned. These wells must
be sealed by a licensed well contractor or licensed well sealing contractor.
Dewatering wells greater than 45 feet in depth must be constructed by a licensed well
contractor or licensed dewatering well contractor. After June 30, 1994, a license will also
be required to construct dewatering wells greater than 25 feet in depth.
The EAW also states that dewatering should have little long term impact because the
immediate area has full utilities. There are several potable water supply wells near the site;
most are deep wells not likely to be affected by dewatering. Our computer records indicate
that some wells in the area are completed in the surficial aquifer. Depending on the
location and extent of the dewatering, these shallow water supply wells may be affected. A
licensee (well contractor) who installs a dewatering well that causes the loss of an adequate
private potable water supply must provide the private well owner with a temporary supply
of potable water during the operation of the dewatering well. The supply must be adequate
for drinking, cooking, and other household uses. The commissioner (of health) may require
the private well to be tested to determine if a health risk exists before the licensee
discontinues an alternate water supply. The licensee must assure that the required testing
• is completed and reported to the commissioner.
An Equal Opportunity Employer
•
Page Two
• Steve Rohif
March 17, 1993
If you need to discuss these comments, please call Ed Schneider, Well Management Unit,
218/723-4642. Thank you for the opportunity to review this EAW.
Sincerely,
•
Judith A. Ball
Environmental Review Coordinator
JAB:sdr
cc: Ed Schneider
•
i