Loading...
5.5 PCSR 01-30-1995 Me o Planning mmission Page 2 anuary 24, 199 orance. This concept accomplishes one of the goals in developing this • property as business park which was to restrict access onto 183rd Avenue. 183rd Avenue is intended to be a residential street and was not designed to accommodate business park traffic. LOT SIZES The minimum lot size in the business park zone is 1-1/2 acres. All three lots well exceed this minimum requirement. As mentioned above, the lots identified in the conceptual subdivision of Outlot B also satisfy the minimum requirements. ROADS The preliminary plat as submitted identifies two major streets, Joplin along the east and Business Center Drive acting as a frontage road towards the west. The one street not shown on the plat is the frontage road as it extends east of Joplin. Therefore, provisions will need to be made for the extension of this street at a later time. The alignments of the proposed streets in the preliminary plat are generally • acceptable. However, the City Engineer has completed a study of the entire Business Park area to determine the total number of trips that may ultimately be generated, from which he has suggested a few modifications to the design presented in the preliminary plat. The Joplin Street and Business Center Drive alignment along with the appropriate amount of right-of-way is critical to facilitate long term traffic demands as this area develops. Please refer to Terry Maurer's memo for a complete explanation of the street design for those streets within the plat and how they may be extended further to the west as the business park continues to develop. PARK AND RECREATION RECOMMENDATION The Park and Recreation Commission reviewed the preliminary plat at the January 11th meeting. The Park and Recreation Commission indicated that park dedication is not typically collected on industrial plats, however, the business park zone offers both industrial and commercial opportunities. Therefore, based on the uses proposed at this time which are all commercial in nature, the Park and Recreation Commission recommends a cash payment based on the commercial rate of $1,500 per acre for all three lots. In the future, as Outlot B continues to be further subdivided, if there are additional commercial uses, a park dedication fee will be collected. On the other hand, if the balance of Outlot B is developed as industrial, there will be no park • dedication collected. s:planning:pc:P94-14 Memo to Planning Commission Page 3 January 24, 1995 IP SIDEWALK VS. TRAIL Another issued discussed by the Park and Recreation Commission related to improvements for pedestrians along Business Center Drive. It was recommended a ten (10) foot wide bituminous trail or an eight (8) foot wide concrete sidewalk be provided along the south side of Business Center Drive. In addition, the Business Park Task Force also had an opportunity at a previous meeting to emphasize the need to establish a professional and quality image for the Business Park. Therefore, the Business Park Task Force felt that a concrete pedestrian system would provide a better appearance than a bituminous trail along Business Center Drive. Staff would agree with a concrete pedestrian system along Business Center Drive. The standard sidewalk width that is typically constructed with a public improvement is six (6) feet. Therefore, treating this road similar to other public streets that have sidewalks, it would be recommended that the pedestrian system be a concrete six (6) foot wide sidewalk. RECOMMENDATION It is recommended that the Planning Commission recommend approval of the • preliminary plat for Country Ridge Partnership's request to subdivide approximately 37 acres into 3 lots and two outlots with the following conditions: 1. All comments in Terry Maurer's memo dated 1/19/95 be incorporated into the revised preliminary plat drawings. 2. Coordination with U.S. West to establish a corridor along with the construction of Joplin be accomplished. 3. A decorative street light be installed along Joplin and Business Center Drive. This street light detail shall be coordinated with Elk River Utilities and the City Engineer during the preparation of plans and specifications. 4. Payment of park dedication in the amount of $1,500 per acre for the three lots being proposed in this preliminary plat. This park dedication shall be paid prior to the release of final plat for recording. 5. A storm drainage impact fee in the amount of $720 per acre be paid prior to the release of the final plat for recording. 0 s:planning:pc:P94-14 Memo to Planning Commission Page 4 January 24, 1995 • 6. A developer's agreement outlining the terms and conditions for the public improvements associated with the proposed preliminary plat be prepared and executed prior to the release of final plat for recording. 7. Outlot A be deeded to the City prior to release of final plat for recording. 8. Appropriate permits from Mn/DOT be obtained for any work within the right-of-way. 9. Restricted access along Highway 10 be included on the final plat. 10. Appropriate easements for drainage and utilities be provided as requested by Elk River Utilities and City Engineer. 11. A six (6) foot sidewalk be provided along the west side of Joplin and south side of Business Center Drive. 12. A ten (10) foot wide trail be provided along the east side of Joplin up to Highway 10. s:planning:pc:P94-14 . IISL ►Y►V S►I;P►1G Eti GIMEEMS 1326 Energy Park Drive January 19, 1995 File: 230-259-11 SI.Paul,MN 55108 612-644-4389 1-800-888-2923 Mr. Steve Ach Fax:612-644-9446 City Planner City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: COUNTRY CROSSINGS BUSINESS CENTER PRELIMINARY PLAT AND SHOPPING CENTER Dear Mr. Ach: CIVIL ENGINEERING: ENVIRONMENTAL As requested, we have reviewed the information submitted for the Country Crossings MUNICIPAL Business Center preliminary plat and the shopping center proposed on Lot 1 Block 1. The PLANNING information we received relative to the plat consisted of a preliminary plat, Preliminary SOLID WASTE Utility Plan, and Preliminary Grading Plan, all prepared by John Oliver and Associates, STRUCTURAL and dated December 27, 1994. For the proposed shopping center, we received a SURVEYING Preliminary Site and Utility Plan and Preliminary Grading Plan also prepared by John TRAFFIC Oliver and Associates, and dated December 27, 1994. In addition, we received a TRANSPORTATION Comprehensive Drainage Study for the area, again prepared by John Oliver and Associates, dated December 23, 1994. Based on our review of these documents, we would offer the ELECTRICAL/MECHANICAL following comments: ENGINEERING: HVAC —A. PRELIMINARY PLAT POWER DISTRIBUTION SCADA The major issue concerning the preliminary plat is the alignment of Business Center SYSTEM CONTROLS Drive and the right-of-way widths for the eastern portion of Business Center Drive and the northern portion of Joplin Street. On the west end of Business Center Drive, the right-of-way alignment intersects with the west plat boundary at a jog in the MnDOT right-of-way. In other words, if the right-of-way were continued westerly from the plat boundary, it would be partially within MnDOT right-of-way because the right-of-way is wider west of this proposed plat. Therefore, we would recommend that the alignment of Business Center Drive be brought slightly farther to the south so that the north right-of-way line of Business Center Drive aligns with the south right-of-way line of TH 10. •OFFICES IN: MINNEAPOLIS PRIOR LAKE ST.PAUL WASECA 230/259-1905 Jan • Mr. Steve Ach January 19, 1995 Page Two At the east end where Business Center Drive intersects with Joplin Street, there is approximately 275 feet from the south TH 10 right-of-way to the centerline of Business Center Drive. We believe that this distance is too short and would not adequately allow for traffic movements along this section of Joplin Street. Therefore, we would recommend that Business Center Drive be moved a minimum of 50 feet south where it intersects Joplin Street, to increase distance between the intersection of Business Center Drive and Joplin and the intersection of TH 10 and Joplin. An analysis undertaken by the City relative to road widths in this area would indicate that Business Center Drive as it meets Joplin Street will be five lanes wide, two lanes westbound and three lanes eastbound, requiring a minimum right-of-way width of 100 feet. Also, Joplin Street as it approaches Business Center Drive and then carries northerly to TH 10 will also be five lanes wide and also require a right- of-width of 100 feet. The remainder of the right-of-way widths within this plat are adequate at 80 feet wide. • It is recommend that Outlot A within the plat be dedicated to the City. This will allow its use for drainage purposes and potentially, in the future, the extension of a roadway easterly from Joplin Street to Orono Road. At the southeast corner of this plat, the right-of-way width is shown as 97.17 feet. It appears that this dimension is incorrect and should be 96.5 feet. The Preliminary Grading Plan for the plat shows a berm along the entire west side of Joplin Street. We would recommend that berm not be arbitrarily placed here, but be designed into each lot after consideration of traffic movement and driveway locations. B. COUNTRY CROSSING SHOPPING CENTER The proposed shopping center shows a right-in only entrance off of Joplin Street. We see no problems with this type of approach; however, we would recommend that it be moved slightly further south to maximize the distance from TH 10, and that it also be slightly redesigned with a narrower width and perhaps a sharper curve to preclude any opportunities for vehicles to exit onto Joplin Street from this entrance. We question how the drive-thru traffic utilizing the gas station will operate. • Currently, if a vehicle were to enter off of Joplin Street and access the pumps, they would be headed directly toward an exit onto Business Center Drive. The design of this roadway will include a median down the center which will make this entrance a right-in/right-out only. Vehicles wanting to get back to Joplin Street will 230/259-1905.jan Mr. Steve Ach January 19, 1995 Page Three be unable to do so from this access onto Business Center Drive. This may lead to movements of traffic behind the building in the loading zone or trying to turn around in the pump locations. We believe it may be better to turn the pump islands so that they are perpendicular to the store entrance, allowing vehicles to come in and be directed toward the store after fueling. They could then leave along the northern portion of the store accessing the westerly entrance and exit to Business Center Drive which will allow left turn movements. We have been unable to come up with a reasonable flow of traffic around the drive- up window location. If there is any substantial amount of vehicles accessing this drive-up window at any time, they will interfere with normal traffic and parking movements in the remainder of the lot. We would recommend that this issue be further evaluated and, at a minimum, a concrete median be placed to define the drive-up lane adjacent to the building. There is also a concern for vehicles leaving the drive-up window location, as they exit onto Business Center Drive and conflict with vehicles entering at that location, since they have to cross the entrance lane of traffic. • Utilities are planned along Joplin Street as part of the current contract the City has for the Western Area Phase II improvements. These utilities have not been constructed yet, so it will be relatively easy to modify their locations to correspond with the layout of this plat. There are no utilities planned for Business Center Drive yet, so these will need to be constructed as part of a change order or by the Developer. The Fire Chief has reviewed the layout of water servicing the site and has asked for the two hydrants on the north side of the building be relocated to the islands in the center parking lane, and has also asked for the hydrant shown on the south side of Business Center Drive to be relocated to the north side for easier access in the case of a fire at the shopping center. The final issue with utilities is the need for a water loop. Currently, the plat as it is proposed would not provide for looping of the watermain. Consideration may need to be given to whether or not the water system needs to be looped immediately to service this area. Certainly, in the long range plan as this area further develops, there will be several opportunities for the loop of watermain as utilities are extended both westerly and southerly. The Fire Chief has requested that the service drive behind or south of the building be expanded to a minimum of 20 feet in width at all locations. This will provide adequate width for this to be used as a fire lane. • The Grading Plan shows a series of spot elevations along the eastern portion of the gas station island area. These appear to be misstated and should be reviewed and revised accordingly. 230/259-1905.j an • Mr. Steve Ach January 19, 1995 Page Four C. STORM DRAINAGE The storm drainage plan submitted by the Developer consists of a series of small ponds spread throughout the proposed plat that are intended to restrict the runoff from the site to its current rate. Runoff currently leaves the site through a 24-inch diameter culvert under TH 10. The intent of the Drainage Plan is to continue to utilize this existing culvert to its fullest extent. At this point in time, it is difficult to give definitive comment on the Storm Drainage Plan because the City has just authorized a Comprehensive Drainage Plan for the entire western area of the City. We would indicate, however, we are somewhat negative on the layout of the ponds in this development, since they overlap drainage and utility easements. In other words, these easements in a storm situation would be flooded and virtually useless for telephone, electric, or cable installations that are above ground. We would like to reserve final comment on the Storm Drainage Plan and the layout of the ponds until we have been able to complete our preliminary analysis of the overall western area which should be accomplished prior to this plat being submitted to the City Council. We would indicate, however, that the concept is reasonable and we do not believe that the issue of final layout of the storm drainage system should be reason to hold up the progress of this plat. If you have any questions regarding any of these comments, please call. Sincerely, MSA, CONSULTING ENGINEERS Terry J. aurer, P.E. TJM:tw • 230/259-1905.jan al Ns,/..t.• • D'. ,... Ti/Pli "j 1 t 11 ' ' CO.RD / `p. •#3.3 / Eit 'A'< w _ Z_ O Ilmillei Cbu icH '4).6 On . Pt 1i %IC .''''l '11 Ilt LOCATION pall ► • N . q r. ivii wA. I I II I lOwNig el mw **CV Ilh. ',, YIP ' . (.....\‘ of ,te11,1Ow ,v)I 1IMPI4 War Aseviditto -p,..... ., : -- .& 'II 1. tos2 o s.111 I r;tw A' • )._ � h ,�,•' / )11114 ter=--1111.11 m�""" VRIGHT - *A\ 0 0 U U gi i. `/ city of W F I1 River h = z N ¢ LOCATION MAPy. s?T �C ti 1 • ' `� - -_SRI Y!/' ` CASE: P 94-14 �D r i )I) PARK 'f — — — — \ ° \ r F /F•� /' ›.,:,;, :, dory Ijl ®v is. ,firipipm �� lJgjgiIIit . , . ali ii,1 ,. .,,„.... _maid ImAxE c .- 0,fr • . 7------ R)1i -------): —— — ---- 1 . - 4 ) -'.., i ,... .,1110.,,,.,z, . , ,, ., lali • ELK Ilii : G I O LAKE O �., 1 .....n RIVER C nal i z IIIII ij PARK W I ,„ . B 4k.'-------`,. . 1 r L' 11 MR , �' CITYy idly A A _IN LA i -,s IGHWA - - - , - .-- - -- ..,PYA ,:': •>..•:::.:i.:.:..:... COUNTY .:,.., �:�€-, sr;.:•::•s'`s''- , :vs'• o0 fig " ':{; �•. .•- , `, SOFTBALL tiY ♦':S F>Xi::: i"¢.^::i P4Ry per, .) COURT l - w;t .'!•••.iy;•.3 ;';:i:t ::::::::::;:i::::;.:• «:x:•y;inr;. .'i:�.::01 HALL LI HOUSE ri 1 • t.:,::_.n F:::: ?y:%" : "1�f. . , .. ..; - _. ..- - - -� MI®. - .. . •-••• PARKWAY- pp__��__ O! Z ell KM 1 r : l� IT:B:i,71y9a,1'v .. FAk• 1 '�4 �� Ki d • •�,.,,1 n ,• 2 W rS. •vrc WIVissiE 4.3 , h 7 ;,3 • 1110111N f ' dim t$1NL A ,RIE s Rr wow �� am Ear mil� 2 32 .ium go : a IY .. . Sys` I - � uM ° �� I mi �d�ro►�IP s�SK •: - - ,-- — ; Nall v>.11rra eilli gar so a ''? ‘te 7 , .. .E , . AD 2. . 4% vii ,,, •:BMW tk frillm tis , .., _ iv .... ,',,N1)04b olio COMPREHENSIVE LAND USE MAP HR High Density Residential p OuptcSpace CB Central BusinessOS HB Highway Business A Agricultural LILight Industrial LR Low Density Residential h • / ~�f Ml Medium Industrial MR Medium Density Residential AII_ ( J CAS. P 94-14 ��. Ci of " / _ . IFlliJjy 4er P'�' 1306 Orono Parkway • Elk River, MN 55330 • (612) -,--1-7 ._0 JAN2U 1995 !*r1NESto . �►� ZO • 10: Minnesota Department of Transportation ��T OF ii; District 3 1991 Industrial Pk. Rd. Baxter, Minnesota 56401 (218) 828-2460 Quality Service Through Individual Commitment January 17, 1994 Mr. Steven B. Ach City Planner P.O. Box 490 Elk River, MN 55330 Dear Steve: RE: C.S. 7102 (T.H. 10) COUNTRY CROSSING BUSINESS CENTER As requested, our engineering staff has reviewed the preliminary plat for Country Crossing Business Center. In response, we offer the following comment: • The Business Center Drive appears to encroach on T.H. 10 right of way. We do not advocate this type of encroachment. We would need to have justification why the service road could not be located farther from T.H. 10 before con- curring with this proposal. It would also be beneficial to see what the plans are for the extension of this service road beyond this plat. Thank you for the opportunity to comment. Should further questions or concerns arise, feel free to call SinQerely, 4/ /772 Anthony J. Kempenich District Traffic Engineer cc: D.L.Raisanen/G.N.Kreutzer/Jim Povich Roger Busch Cal Puttbrese AJK:mc 111111 An Equal Opportunity Employer / --- _` ""��'"--- � \\\ GUARDIAN ANGLES 1 \ t1 1 \ ..- ..- 1 \ \�\ 141r. /// / // I 11 \\ / / / 1 1 GUARDIAN ANGLES \ / - / / V` V / / V / 31-132 / / II 11 / ' / j./ /,z /// THOMAS E NARTYAN 'I TIONA9 E.HARTAAN 1 � . J _ I�� Fe -- ,.�- , NrDr SNE Or 111E N.w.I/4. .w.I/4 s 1 _ _ 7. r i1@p:►x 885.6 ......-.7--........-- 1 1 � _ -.,.. ^- - § N " � ' y � n �- 886 ^' f.�.. r ^_' - - _�' .---II-.---....- --..., J,�. 887 088.1 ��,/"' -- 1 __ O x 1 ' 8872 ...�siLef3-1 , 1 A _ r � .,-fes / ` M85{,�•..,,..._..•� ��lRG. .• . j♦ r� / _.9]8.3 f .�ix\ `R �4._SY tILR•'�. _ _'- 88 5 x J ' .`"\ t\-..... +`c �•V 1 r i] 1 882•�.;1 -1,P_. 4'8 __`63758__ _ _ � �•✓ �� f I 1 \ l I '''?5‘-0' I A , � n.7e p \ I1/4\,� I // l „, ( \ �k -•'L 8,8 I t', //-� > t 85\ 1 888.3 �•...\ eBfS I c i t i x� �gO\ i ; :L � fIf883.4 ;rJ� i 294\74 ft+---'_44 1 � ` 4____,..._____:._ ..- --4 , 5 a --I 0 -''''',?'‘i \ 1 a `. ` y B �SINE3 Al DR -ax's `I n,;: ,. ®687.8 L a, v _ x 879.0 i x 879.8 860 - I. ` i j . II .,•-"' N ___,_ `` ^•. �-.88Y ^•--__.,--f `J`. ! _ 1,424.53 - - _ _� 1 { xW •- A ,,,,,. ,,.. -, ,s„ `/ 18673` / .........7-:_---t. J 888844.1' & I g ( z ,` I / j O 4.6 t/ \X i \ .... . ` /_ f •884.1 f \ .894 ' t� . - I {,I ` 884.8 / !I \5\ .✓� I i. "' et>IJ / 1.1 MAPoON Y.4000. }-___: &883.9 X 883.1 MARIERICHARD AND GE,'• pI ' \ DEdEl AND WILFRED ._'1 tp N-_ GAGNE -- m 2 /.,1 { x 884.5 I f \ L A OD _-__ _ I �f �X 885.4 l x \J.,..x 884.2 j Yr; j / iv\ Vx 884.9 / I ro 01 II-- -`-4 . I ' NORTI UNE Or COUIIRY CROSSING SECOND 808)8 6 f 1 'tig ° ; 42'45'00". = 42'32'19' Q3.7 - - \a sit = 330.00 #a= 251.00 - .S IV24.• W ---6 . C\-1 DANFl PDS AND � X y. __ ___ '--...2. ��; CNERYL FA__ I .• : _ ,_L.-222 L = 186.35 Il-) .;:-1:v _ri.�0111rIC:'x:/'+•.•4rp I�Wrr+ i ul•;%�-� •i: 4rr r,•ie-�ri`-�+-`wvrr , i 0= 75e31'21 los(3° air Dr WI my 11tt 0.11WW `IYl(OT S�iONMPY' tj R 20IIA , .00 x 88CO 9 g4i T1 CD 8 i 1 1 T' �ti` ,�• '4 �� \ L = 28.36 m�.q�' C1.1 d { -.�.`_i ,c„,://: ,5 )I I LrLJJ /84cJ\J C- 3.--n _3-`-a 17f't='0-- 1!A..II J te C ,ra -• =8-. x `tfl 1 l .sc...al 1 ' 3 r�!-I it Lft.�� ____ �[[[++• Ilir PA 4 LJ-J 1 �,,, , r Y L� f4J IIP D • g6 41.E n -``' ea4.7 x se�v J�* l>J 1 ! / ,�f 31 ; , _ e& /�. '\`•\,*�1 `. I� / S \ !. 88%.8 j .,, amu," I1 _ ' - !\ J I .„04.-7,. ,e i \ 3.z u �� \ i8/,✓' 1___, I • I ›_..r...1‘`)` _ j�C I I 1 Yv ------2: eels y Q 61.1 I \ Y J-�rS t ;- L, "1 I ^3. . g <�` - _ - lam_ CL f= .- `` __,,,c- 884. I -'--'J- /,,... 880 "`-:.::._,."�.... 1 I C _/` V CL v ` J . t w - (,7---,-----,--!:7,-.171 ei:=-:a ----- " �' ' ! 1,• �'�, _-_ t r. „,.�' ,_______... ` -'+ -- t A:, {I l� ____.- KINg4AN BIR[51NC \..i i `i, 111Itt E .`� L g, ; - ,-, - 8 \\__-_ C lii411� 814 -1-----"---'-•-•8.3 _ 1, W if l�; "' - c W 860-8i8-•6------- -------';:--`"=,'"���l"+``�. `-1i'1t t t j�••�--'2_1\,, rte""-� 1 i '. � Cn ; I 'i`,ti w--•- - 882 4- -+- _ ••2`. ::':'..• ' ...,..' I•..Z.'R. Ii 1 I� !1CI..N -"i 1 v' l `•-...-_"----"-+----884 1 t I � i E o l t� it-1 f i x;e�a *11r� 1 8980., 886\\`"'-'"` 1 --r------r-----\ i Oti•-9,. .""w..,... SI', L ti di _- l Q I I jam:. .,N . . , ,, ,-,"::.,-I:: ',1( -1. ,1i,. 1 aesiX__`'.\., ` -'. 1 Elft\&-� ! .., \'�'� a V3A' _639 /1 '/ Preliminary Plat FOR COUNTRY CROSSING EX RATED COOPS BUSINESS CENTER ve-r�e�o- N -=• 0 100 200 300 ' I - SCALE IN FEET Drainage and Utility Easements are shown thus: 1a r- 1 I _ 1 I I 101----� L J 10 i • Being 10 feet in width and adjoining right- of-way lines, also being 10 feet in width and adjoining lot lines, unless otherwise indicated, as shown on the plat. OWNER&DEVELOPER: Country Ridge Partnership 10738 Hanson Blvd. Coon Rapids,MN 55433 (612)755-6554 ZONING: Business Center Park LEGAL DESCRIPTION: ALL THAT PART OF THE N.W.1/4 OF THE S.W. 1/4 SECTION 32 TOWNSHIP 33 RANGE 26 SHERBtRNE COUNTY,MN.LYING SOUTH OF US HIGHWAY NO. 10&LYING NORTH OF COUNTRY CROSSING SECOND ADDITION, TOGETHER WITH OUTLOT A COUNTRY CROSSING SECOND ADDITION. AREA: 37.66 Acres,more or less. — — —Denotes building setback lines: 35' from road right-of-way. E. 20'sids yord; 20'rem yard. RONO RKW-,Ay �yyy�880.7 x 8136.G_; _ t x ``� 879.3-L. DATE: 12/27/94 1 hereby certify that this plan was ,roam OWer a Aasoaiiteae ha. COUNTRY CROSSING BUSINESS CENTER deo, BK/PG: prepared by me or under my direct terra sns...Ins.?ens s.o..v.e.use Planning DRAWN BY: GL/PG supervision and that I am a duly 680 Dodge Avenue ELK RIVER( MN CHECKED BY: JO Licensed Land Surveyor under the NIA Rq,e,,MNs..eota 1\, laws of the State of Minnesota. (6¢441-2078(741)44,-se5s FOR REVISIONS: za,T.Trawlers mart,star 200 COUNTRY RIDGE PARTNERSHIP 8793 BurnmstUs,MN 56887 (612)894-3045(74:)114-3049 PRELIMINARY PLAT Signed: DRAWING FILE: TEXT FILE: Z FILE NO. Date: 12/27/94 Lic. No. 8194 BC-PPIAT DISC:\NAME SHEET _ 1 OF3 6719.30- 0: \DRAWINGS\6703\BC-UPLAN Tue Dec 27 08: 10: 56 1994 BOB • II \ Q I I \ `\ W / ,es. / Fa.,..n., ,r-3.,-0, ] 7 \\\ \ • ,•- i / • N\ \\ ri,..fti i ' i� I I / / ,- A I \\ -.\,-,‘I",11 I- 1 V //''. I —I\ �`// / mmA T1..=--_ L I r r I ` ' 1 -'.1 'x "--v------1. i pi "= '-"'0 I 1 .'�> `_..''� r�--- I 1 1 -' X111 �•N - , �- � t� ' Iz I 1 \ \ rT ���i� I Ic I 1 ' 1 /-, i C..-7.-,.2 yJ �^� h I ,' ‘i— — I i 'I \ / i / _ tI ti\I \ \ /// 4-.1,-) <�-/ > // / I ' \ \ //� c 1 \ -� I � \\, Preliminary Utility Plan FOR COUNTRY CROSSING BUSINESS CENTER o aoAD- 100 200 300 N FEET LEGEND Denotes Proposed Sanitary Sewer Denotes Proposed Watermain Denotes Proposed Hydrant Proposed storm sewer DR ON 0 ARK WAY . DATE: 12/27/94 - hereby certify that this plan w.s. John Giver a Associates, inc. COUNTRY CROSSING BUSINESS CENTER BK/PG: prepared by me or under my cI.w w s,.,,..µ.�y. w DRAWN BY: GL/PG supervision and that I am a d:. na sec oayr Avenue ELK RIVER, MN CHECKED BY: JO Licensed Engineer under the elle en.r,Afume.om lows of the State of Minnesota FOR REVISIONS: (6/P)OII-Ya72(PA.TJ011-5665 - Pal ..„a„eter,rra:(S.;te LOO COUNTRY RIDGE PARTNERSHIP (61284MN 66887 Burnsville. 45(PAI)804-3048 PRELIMINARY UTILITY PLAN 8 (6IYM Signed: — DRAWING FILE: TEXT FILE: CLJ SHEET ry OF Z FILE NO. Date: 12/27/94 Un. No. 12699 BC-UPLAN.DWG DISC:\NAME , fl L _ r J 6719.30-03_ \DRAWINGS\603\BC—GPLAN Tue Dec 27 OB: 07: 02 1994 BOB • . . . 4 . • ...„ , , ,,‘ " ,,", „ ,_. % . :::,, ,...:.: : :_,, ,,,:::_ `1', \�h { \\ {I m I `rte B8a 1-........ ■ y,.l N \ \\ m x ..//. ..- ---;---11-=';17-7 \ \ i / i f /yr'4W:,:9 111- , '/1/11,,,, 11.1 i I .' '\I ', \ ) \.) \ - Y � II \l � • \ii Ill ‘1‘ — .� '1 ,, g JJ / \ , ' • ' \''Ali,' ! 11.:\\I Itl 1111 \ :/' - 1 ,, ' , I., 1 1 -1 0 '111 --Pi/ ' fe. t / / I / ___-- , I/ i g ; i 1 , I ' V: \ . 11 il-=---- 1-- 1 .,i fm . l .b ":,.-7---- N I It 1 IV Y _ t / m, 2 x I c 1 1 1 .' i.\\1 I \ _ \ ,,,:to, `, S 1 l 1 .11 rs \ , > I f..t, } i/ 1 •� - A1C ;. - / I 1.% 1 a '111, \ 11 --- , -. I sl \ i:t 1 g, , . ( , \ I ' 11 F .� x t} f 111 �� f x i, -,--,.)1 �=:;,_'tel ' + , '` \------- l 1 . , , .\_ \ , 3 ;. /,;/� , ; r 1i y _ — �i \ .1' 1 e x [,,,1 {�:10 ' 1 j -•.Q Ex .� t1 it I 1 1 . s, ,f, \, ,,,,\\\\,. , i ' :,://„..../ „ill:ft-7_, , ts, ? , , / ,, , ----.8„,-----..... o„ • ./is / \ /:// / i; Fid Y �i //1 / a IIm1 y \\ \I 1; C.'''t I / .,/� ' 4 x ,---w.�. i �........_ \ ,� \\ , J s _ \ ' V....'`....^`...t yge- °Rk t/1-'.•L/J'\j `� /�A // 1 '`, ,, \. _ \ c�! '.'' ....... `��i ill ` i 7'11,1 .011.11001 y - -, x�r-', 1 f } x 1 ;\- I '\^ • \ k' // �►` 00 \ r 1 r► t f 1 .,;( .111,.... .;.-----.."__,... - i 11 . L\ i . _./ L_ r.,_rei \?...1,3 ® , _�- - m N e f i .---- Preliminary Grading Plan FOR COUNTRY CROSSING - - BUSINESS CENTER ._ _ NE)_.,),,,,_ ___ _ _ R 14MAGOCirr AREA N 0 100 200 300 SCALE IN FEET es- A LEGEND 1 Evergreen �. opproretl al ----SW Existing Contours b' 6'-8'HGT.BB x/62---_ Proposed contours spaced 12'O.C. staggered 'r q 2'left&right of -- �lz 44/../-;•, centerline f berm. Silt fence Road side A.1IMP y, Berm Area of side -11111}-F Proposed storm sewer 3 TYPICAL LANDSCAPED BERM DETAIL General Drainage Direction NTS 0Sod Boring 4'CROWN FE 80' ` 26' / 26' II � , -- 27 -'" I r/ \jB612 CONCRETE CURB&GUTTER FILA BEHIND_ 4:1 SLOPE TO CURB MATCH EXISTING _ 2"BIT MAT(2341,WEAR) 2'BIT MAT(2331,BASE) —6"CLASS 5 GRAVEL —COMPACTED SUBGRADE TYPICAL STREET SECTION NOTE: Final storm sewer to be ( Designed by others. 883A X -ONO PROPER-"SILT STOP'FABRIC KWAY..,,,, 2"x2".4'wood_.� ,� STAKES 0 4'O.C. 10'MINIMUM 8807 BACKFILL / EXISTING GROUND / . 6"OF FABRIC p.\ PROPOSED X 860.g.'-;`‘ / EMBANKMENT I -II SILT FENCE Ir f 879.3 r4"'^ DATE: 12/27/94 I hereby certify that this plan was John cher a Associates. an COUNTRY CROSSING BUSINESS CENTER .k BBO.," BK/PG: prepared by me or under my direct ors auewrro..ave .eve surwytn PIMA DRAWN BY: GL/PG supervision and that I am a duly ELK RIVER, MN CHECKED BY: JO Licensed Engineer under the laws of theStateof Minnesota. :168,tifs200A472:.:11704f--3506,659P4ZN<I-5665 FOR REVISIONS: .„��9rnr 700 COUNTRY RIDGE PARTNERSHIP 1 8793 u M 559975(FA%)99+-3049 PRELIMINARY GRADING PLAN Signed: '- DRAWING FILE: TEXT FILE: FILE NO. Dote: 12/27/94 Llc. No. 12692 BC-GPLAN.DWG DISC:\NAME SHEET 3 OF 3 6719.30-03