Loading...
5.6 PCSR 01-30-1995 Memo to�iannin Commission Page 2 n} Jax�ry 24, 199 `f l S ANALYSIS The Planning Commission is directed to Section 900.12(15)(j) "Standard for Retail Shops and Stores". This brief section identifies the guidelines for approving a conditional use within the business park zoning district. Staff believes the convenience center is the exact type of commercial that was envisioned when drafting the business park zoning text. The convenience center as a whole will include some service-type businesses (fuel/convenience, dry cleaning), and others that will complement the business park (restaurants). As presented to the Planning Commission and City Council at previous meetings, the ideal concept within the business park would be to have certain commercial uses in close proximity to the intersections such Joplin and Highway 10, and from there transition into more of the industrial-type uses that fit within the business park. Once again, this proposed convenience center, given its location and size falls within those locational guidelines. ZERO LOT LINE DEVELOPMENT • The application also includes a request for a zero lot line development for a common driveway. The driveway would provide access to both the proposed convenience center and the commercial lot to the west. The zero lot line request has a benefit to both the City and developer. The common driveway eliminates the need for the developer to provide setbacks along the side property line, allowing more land within the lot to be utilized by building and parking area. At the same time, the City gains some benefit by reducing the number of curb cuts onto Business Park Drive and controlling access by way of shared driveways. For the most part, landscaped areas are still provided and the overall intent for required green space is not lost. SITE PLAN REVIEW The conditional use permit application has included a set of development plans for the convenience center. The following comments are offered based upon staffs review of the submitted plans. The developer has provided revised plans dated 1/18/95 addressing some of the earlier comments, however, the revised plans have also included some new elements such as the car wash. These new elements have not been fully analyzed and therefore, we will just have some general comments related to these new additions. • s:planning:pc:cu94-40 Memo to Planning Commission Page 3 January 24, 1995 1111 A. Parking and Circulation 1. Concrete curb and gutter should be used throughout the entire parking area. 2. The right-in-only off of Joplin will need to have a design and proper location as approved by the City Engineer. 3. The parking lot in the vicinity of where the right-in comes in off of Joplin could use some additional traffic control (i.e., landscaped island). 4. The original plans showed a drive-up window on the west side of the convenience center that raised several concerns by staff. The revised plans appear to address several of those concerns by providing separation between the drive aisle and drive-up lane, additional stacking space and improving the exiting from the drive-up lane into the drive aisle. This particular design may need some additional slight modification, however, it appears to function much better than originally presented. III 5. All traffic control islands within the parking lot shall be curbed and landscaped. This will break up the large paved area with some aesthetic design elements. 6. Site visibility triangles will have to be kept clear of signs and landscaping to allow safe vehicular movement to occur on site. 7. One of the new additions to the plan is a car wash behind the convenience store. The location of this use may present some traffic conflicts; as vehicles exit the car wash they will immediately be in the drive aisle. B. Landscaping 1. The landscaping area behind the convenience center and along Business Park Drive shall include earth berming and landscaping to screen the service area behind the building. 2. The landscaping plan does not include any overstory or ornamental trees within the landscaped area along U.S. Highway 10. It would be recommended that some of these IIItrees be included to provide balance throughout the site. s:planning:pc:cu94-40 Memo to Planning Commission Page 4 January 24, 1995 • 3. Underground irrigation shall be provided throughout all landscaped areas as set forth in the business park standards. C. Pedestrian Circulation 1. It is recommended that a sidewalk connection be provided to the interior parking area from the sidewalk along Joplin. This will provide a convenient access for customers either biking or walking from the residential area to the south to the convenience center. D. Refuse Collection 1. Each of the three trash enclosures proposed behind the convenience center shall be screen with an enclosure comprising of masonry materials that will complement those included on the principal building. 2. Each of the enclosures shall be large enough to accommodate the collection of recyclable materials. • 3. The trash enclosure shall be incorporated into the landscape plan to maximize the screening from Business Center Drive. E. Building Elevations 1. Additional information needs to be provided regarding the specific materials planned to be used on the building. F. Other Issues 1. Efforts should be made to buffer the appearance of any vent pipes from the underground tanks. 2. Any grading within MnDOT right-of-way will require a permit. This will need to be obtained prior to issuance of a building permit. G. Signage 1. A complete sign package will need to be submitted for review and approval. • 2. Free-standing sign shall be a monument style and wall signs consist of individual letters. s:planning:pc:cu94-40 Memo to Planning Commission Page 5 January 24, 1995 RECOMMENDATION It is recommended that the Planning Commission recommend approval of the conditional use permit request to construct a 19,000 square foot convenience center with the following conditions: 1. All of the comments contained in this memo dated 1/24/95 be included in the revised plans and submitted for review prior to issuance of a building permit. 2. All of the comments within Terry Maurer's memo dated 1/19/95 be included in the revised set of plans. • • s:planning:pc:cu94-40 I'II.ISI LTI\l F I IIEI RS 1326 Energy Park Drive January 19, 1995 File: 230-259-11 St.Paul,MN 55108 612-644-4389 1-800-888-2923 Mr. Steve Ach Fax 612-644-9446 City Planner City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: COUNTRY CROSSINGS BUSINESS CENTER PRELIMINARY PLAT AND SHOPPING CENTER Dear Mr. Ach: CIVIL ENGINEERING ENVIRONMENTAL As requested, we have reviewed the information submitted for the Country Crossings MUNICIPAL Business Center preliminary plat and the shopping center proposed on Lot 1 Block 1. The PLANNING information we received relative to the plat consisted of a preliminary plat, Preliminary SOLID WASTE Utility Plan, and Preliminary Grading Plan, all prepared by John Oliver and Associates, STRUCTURAL and dated December 27, 1994. For the proposed shopping center, we received a SURVEYING Preliminary Site and Utility Plan and Preliminary Grading Plan also prepared by John TRAFFIC Oliver and Associates, and dated December 27, 1994. In addition, we received a TRANSPORTATION Comprehensive Drainage Study for the area, again prepared by John Oliver and Associates, dated December 23, 1994. Based on our review of these documents, we would offer the ELECTRICAL/MECHANICAL following comments: ENGINEERING: HVAC A. PRELIMINARY PLAT POWER DISTRIBUTION SCADA The major issue concerning the preliminary plat is the alignment of Business Center SYSTEM CONTROLS Drive and the right-of-way widths for the eastern portion of Business Center Drive and the northern portion of Joplin Street. On the west end of Business Center Drive, the right-of-way alignment intersects with the west plat boundary at a jog in the MnDOT right-of-way. In other words, if the right-of-way were continued westerly from the plat boundary, it would be partially within MnDOT right-of-way because the right-of-way is wider west of this proposed plat. Therefore, we would recommend that the alignment of Business Center Drive be brought slightly farther to the south so that the north right-of-way line of Business Center Drive aligns with the south right-of-way line of TH 10. • OFFICES IN: MINNEAPOLIS PRIOR LAKE ST.PAUL WASECA 230/259-1905.jan • Mr. Steve Ach January 19, 1995 Page Two At the east end where Business Center Drive intersects with Joplin Street, there is approximately 275 feet from the south TH 10 right-of-way to the centerline of Business Center Drive. We believe that this distance is too short and would not adequately allow for traffic movements along this section of Joplin Street. Therefore, we would recommend that Business Center Drive be moved a minimum of 50 feet south where it intersects Joplin Street, to increase distance between the intersection of Business Center Drive and Joplin and the intersection of TH 10 and Joplin. An analysis undertaken by the City relative to road widths in this area would indicate that Business Center Drive as it meets Joplin Street will be five lanes wide, two lanes westbound and three lanes eastbound, requiring a minimum right-of-way width of 100 feet. Also, Joplin Street as it approaches Business Center Drive and then carries northerly to TH 10 will also be five lanes wide and also require a right- of-width of 100 feet. The remainder of the right-of-way widths within this plat are adequate at 80 feet wide. • It is recommend that Oudot A within the plat be dedicated to the City. This will allow its use for drainage purposes and potentially, in the future, the extension of a roadway easterly from Joplin Street to Orono Road. At the southeast corner of this plat, the right-of-way width is shown as 97.17 feet. It appears that this dimension is incorrect and should be 96.5 feet. The Preliminary Grading Plan for the plat shows a berm along the entire west side of Joplin Street. We would recommend that berm not be arbitrarily placed here, but be designed into each lot after consideration of traffic movement and driveway locations. B. COUNTRY CROSSING SHOPPING CENTER The proposed shopping center shows a right-in only entrance off of Joplin Street. We see no problems with this type of approach; however, we would recommend that it be moved slightly further south to maximize the distance from TH 10, and that it also be slightly redesigned with a narrower width and perhaps a sharper curve to preclude any opportunities for vehicles to exit onto Joplin Street from this entrance. We question how the drive-thru traffic utilizing the gas station will operate. • Currently, if a vehicle were to enter off of Joplin Street and access the pumps, they would be headed directly toward an exit onto Business Center Drive. The design of this roadway will include a median down the center which will make this entrance a right-in/right-out only. Vehicles wanting to get back to Joplin Street will 230/259-1905.jan • Mr. Steve Ach January 19, 1995 Page Three be unable to do so from this access onto Business Center Drive. This may lead to movements of traffic behind the building in the loading zone or trying to turn around in the pump locations. We believe it may be better to turn the pump islands so that they are perpendicular to the store entrance, allowing vehicles to come in and be directed toward the store after fueling. They could then leave along the northern portion of the store accessing the westerly entrance and exit to Business Center Drive which will allow left turn movements. We have been unable to come up with a reasonable flow of traffic around the drive- up window location. If there is any substantial amount of vehicles accessing this drive-up window at any time, they will interfere with normal traffic and parking movements in the remainder of the lot. We would recommend that this issue be further evaluated and, at a minimum, a concrete median be placed to define the drive-up lane adjacent to the building. There is also a concern for vehicles leaving the drive-up window location, as they exit onto Business Center Drive and conflict with vehicles entering at that location, since they have to cross the entrance lane of traffic. • Utilities are planned along Joplin Street as part of the current contract the City has for the Western Area Phase II improvements. These utilities have not been constructed yet, so it will be relatively easy to modify their locations to correspond with the layout of this plat. There are no utilities planned for Business Center Drive yet, so these will need to be constructed as part of a change order or by the Developer. The Fire Chief has reviewed the layout of water servicing the site and has asked for the two hydrants on the north side of the building be relocated to the islands in the center parking lane, and has also asked for the hydrant shown on the south side of Business Center Drive to be relocated to the north side for easier access in the case of a fire at the shopping center. The final issue with utilities is the need for a water loop. Currently, the plat as it is proposed would not provide for looping of the watermain. Consideration may need to be given to whether or not the water system needs to be looped immediately to service this area. Certainly, in the long range plan as this area further develops, there will be several opportunities for the loop of watermain as utilities are extended both westerly and southerly. The Fire Chief has requested that the service drive behind or south of the building be expanded to a minimum of 20 feet in width at all locations. This will provide adequate width for this to be used as a fire lane. • The Grading Plan shows a series of spot elevations along the eastern portion of the gas station island area. These appear to be misstated and should be reviewed and revised accordingly. 230/259-1905.jan • Mr. Steve Ach January 19, 1995 Page Four C. STORM DRAINAGE The storm drainage plan submitted by the Developer consists of a series of small ponds spread throughout the proposed plat that are intended to restrict the runoff from the site to its current rate. Runoff currently leaves the site through a 24-inch diameter culvert under TH 10. The intent of the Drainage Plan is to continue to utilize this existing culvert to its fullest extent. At this point in time, it is difficult to give definitive comment on the Storm Drainage Plan because the City has just authorized a Comprehensive Drainage Plan for the entire western area of the City. We would indicate, however, we are somewhat negative on the layout of the ponds in this development, since they overlap drainage and utility easements. In other words, these easements in a storm situation would be flooded and virtually useless for telephone, electric, or cable installations that are above ground. We would like to reserve final comment on the Storm Drainage Plan and the layout of the ponds until we have been able to complete our preliminary analysis of the overall western area which should be accomplished prior to this plat being submitted to the City Council. We would indicate, however, that the concept is reasonable and we do not • believe that the issue of final layout of the storm drainage system should be reason to hold up the progress of this plat. If you have any questions regarding any of these comments, please call. Sincerely, MSA, CONSULTING ENGINEERS a Terry J. aurer, P.E. TJM:tw • 230/259-1905.jan O tyrey ,. • __ -70, r h. � T— 41 1 4111 0 ti- C) CO.RO r/ . ' •#33 / 41* �o <e A. ' ,:: • .;.-- � Z_ ._ o_ U Roll . lari, co . 'IA -id Rd ! `° I It E i 1 , *till LOCATION 1 ,' W4* ro ftwowilt.zytiii t iii `�1 ■ ■ 4 -.-i Anqamii17--- , c..) . • c , ;... 4,- 4 iini t---.. ' a' 4"' .4 % '� ��`�`:tic&52 .4!)) 4100� IC..:''moi , • s �� r` 1, r r j� ,) .,,,,.. . , ., nAU t , 4 0i3m""" VRIGNT A ,, ,, Z Z oho U U gi i civ , W L _i, _ , LOCATION MAP \� . • 1 - —(R\e, s A CASE: CU 94-40 ,\ r� JAN 2 0 1935 • • • 19 January 1995 KICEk ATTN: Steve Ach City of Elk River It11111106111MIL 13065 Orono Parkway 55330 DEVELOPMENT 4 CORPORATION Re: Subway Drive-Through GENERAL Dear Steve, CONTRACTOR r To whom it may concern, in reference to Subway, after-speaking with Corporate Headquarters and Subway owners locally and nationally, concerning the maximum amount of car stocking needed fora drive through window. Thegreatest amount 1500 of cars at Subway is generally between three-five(3-5) cars. However, there are usually 1 or two (1 or 2) cars at a time. • JACKSON As per the city on the newest site plan for the mall, we have created a median to separate cars leaving the center versus cars going through the drive through. STREET N.E. „ It is not definite that Subway will be leasing the end space, as we have had other inquiries, one of them being Leeanne Chin Chinese Cuisine restaurant. It is our hope that you would accept the drive through as per our site plan. But maybe we MINNEAPOLIS could review the drive through as per tenant(s)who use spaces. MINNESOTA We also have added some additional parking spaces for the center, which we feel will be more than adequate to accomodate the mall. Thank you for your consideration and time for allowing us to present this project to you. If there are 55413 any questions, please feel free to call me. Thank you. 612 - Sincerely a 788-6840 / Daniel P. chmann FAX 612 , • - 789-0608 IIMMIMNIMMINM • JAN 2 i995 $NEso . �� ZO • a Minnesota Department of Transportation ��T OF TKPa� District 3 1991 Industrial Pk. Rd. Baxter, Minnesota 56401 (218) 828-2460 Quality Service Through Individual Commitment January 17, 1994 Mr. Steven B. Ach City Planner P.O. Box 490 Elk River, MN 55330 Dear Steve: RE: C.S. 7102 (T.H. 10) COUNTRY CROSSING BUSINESS CENTER As requested, our engineering staff has reviewed the preliminary plat for Country Crossing Business Center. In response, we offer the following comment: The Business Center Drive appears to encroach on T.H. 10 right of way. We do not advocate this type of encroachment. We would need to have justification why the service road could not be located farther from T.H. 10 before con- curring with this proposal. It would also be beneficial to see what the plans are for the extension of this service road beyond this plat. Thank you for the opportunity to comment. Should further questions or concerns arise, feel free to call SinQerely, Anthony J. Kempenich District Traffic Engineer cc: D.L.Raisanen/G.N.Kreutzer/Jim Povich Roger Busch Cal Puttbrese AJK:mc • An Equal Opportunity Employer .---•- ..---"' -e-"2".--- -.---- ,- ..-- ....-- -- „... --' .. "- ''.--- .........„ —.5.27:;.,-;':;—• --- ..- .„.„...----- ___.... ..:----- • ;',:.„ ..--*.--''. '... ', r-""- .- -:;---;--- .-------- ...,....:,". ........„.„- ., ..... , • - _..,. ...„..,.._---- .„----- . , .....„.„.., ..... .....„ ..........., ......„ ....„----- ............... , ..... ...„.....,..- .,..,_:,.. i ......, ..,. .„------.. .....__ ,7,\_ _._..........„ ..._ , „.. , \ i .... .... .••••• ...e" --,----" : "."...,........- \ \ '''D ..1.. ../..‘......... :...... \ ‘ I ...---- ••••"*".... ....... ....... ..•••• ""ST...O... RMWATER MANAGEMENT AREA i ..." /-------- .--- ..," ...-- --- ..-- .---' ..-- ,...---- ..-- .--- \ .--- ..." ----N.--- .--- _.------, .."' 'N -c) ..------- / ...----- t•-• ."' ..•*" ..•-•-•t —1- ............."..... a' .00's ---r0 is .‘P . • -... --- -,--07- 1 8 s -co--\-- ,. 0 N 0 26 STALLS 0 9FT co t-3 cv cO co + i 12 6 24 9 0 * N 8 co 14 14 . 18 STALLS 0 9FT 13 STALLS 0 9FT & 2 HANDICAP 0 13.5FT clw2\-\l'• V I 4- i co OCfr'C' • TI- -1 00 0 1 N + C7 + 1 0 6 T i 14 14 12 GENERAL RETAIL • i 0 1.1.1 I—I co N. -‹ ik 111 114 * in Wcv - 15 15 CC , ..< ---- UJ ---- ------- ----_____-- --- ----- - — — — — -- — — — — CT) CO ----- ---' CO _ ---- --- ..---- Cri ..--- ----- '.1: --•••""'..-'''''''''''''.. CT) ,-I C al --) = I- 1111, , Cf) C-) C.f) .----" •c-i Cr) 0) a-I . r---- �. I N ‘ikii, \ , ... .... ..,, , \ „.... --,____ _.......\... N. , ....................,..________....____. \ \ r Iiii L._ \ \ _\ \\ _ _ , _ \ \ . \ \ 1 \ GRAPHIC SCALE so IS 30 pIn \ \ \\ , �4' (a:>�) \ \ \ \ L web- ao it \ 15 \ \ \ \ i \ \ l ?. \ \ \ STORM\ MANAGEMENT \ l AREA f C../ 2 T� \ \ `\ LOT 1 , BLOCK 1 COUNTRY CROSSING BUSINESS CENTER t 0ti� \ \ I AREA : 3.30 ACRES 143,750 SF. *z5 f \ \ 9�� \ \ I BUILDING AREA : 19000 SF. *3 \\ \\ \\ HANDICAP PARKING : 4 STALLS o�c^�� \\ \ \ I, . STANDARD PARKING : 89 STALLS P�oQ� 2n \\ \\ \\\ 1 TOTAL PARKING 93 STALLS � • s ,G za \ \ >111 vyoT. � .p \ \ ,„ •9 tis \ S-5143- \ ..... to 1z \ , i • „0 I cca s cc i / \ z {{ / RA ��� � \ i 0 : -- ---- \ \ \ \\ ' .--- ,...- \ \' \ \ \ �i \ \ \ \ i POND \\ \\ 1 , \I 1 t/ \ '1 1 ' I \ I 1 4v �xr '?L44 REVISIONS PER CITY STAFF COMMENTS DATE: 12/27/94 I hereby certify that this plan was JoluiOliver d Associates, Inc. COUNTRY CROSSING DESIGN BY: GL prepared by me or under my direct ewe .�.......v....-.n r.-.aw SHOPPING CENTER DRAWN BY: GL supervision and that I am a daly saw Oodg.ev.,w.. CHECKED BY: TLH Registered Engineer under the laws da;te,,yi„�.v. ELK RIVER, MN of the State of Minnesota. (t12)441-2072(8.X)441-6686 REVISIONS: FOR SITE LAYOUT 1/18/95 201 W.Travelerff Troll TravelerAdd,200 RIVER WOOD DEVELOPMENT Durn.via.,I01 66837 (0l2)894-8048(FAI)894-3040 PRELIMINARY SITE & UTILITY PLAN Signed: DRAWING FILE: TEXT FILE: S OF 2 IFILE NO. Date: 12/27/94 Reg. No.12699 IGL:\6719.31\SC-SRII 1 DISC:\NAME ,.....-- ,,,,,.......,-;.----.....-' ,--..-•---. •--------2.- ''''' .„.....-----•' ,..,•'-'-' ' --_,...-.,.:::„ ____....---• -- - — . _.------ . ------ ....-- 5:"':;--- ------- -..c44---- -- ...----- .-.-- ...------ ---------- _.— _....- No. -- -- _. •-,--c•-:-•-•-:-.--- =:.-..'...--= -- '.....-••• : . _ -- -- i ..-.- ..-------- ...--- ---,..... ---- .- .- -..----- -- .-- --- . ,..„.- -- --...--. I .- ) - -. -- ................--!--7-\\--- ---, .......,,,,,•...*'' .11 ...... S ..----- --'1 __----"-: .-- --_, --.-- ....' .....'• ......"'"*"..**.................--* ...---' .."'") ...---' ..." ......--------- .... ..---- .....- ....--'' / .' _---------- _- ----• STORMWATER MANAGEMENT AREA ....„.---- ,.-- / -.---- --- --- --- / ., ,-. • ...... ...... --------"" \ --- / 4 - - -\ 14 „c;Ole t1-4_xB / • ° 5 ..,b . 0 s.t..0.,• • c4 F iiIIS ,0 ,...."/ 27 STALLS 0 9FT c4 co ro No eWATER 6-WA I L I-? t// / iN 23 STALLS 0 9FT o4 (....\ \\k,...,., 38 [i 8 i o oi • i / 0 6 c•3 1 I 4O cp c, .. ,... ..„.. - 11 STALLS 0 9FT & 2 HAN DIC AP CO 13.5FT 4.01111 ,-: 1 CC . , ....,....-. ...„...,....... , 30 3 MilliliZiligigli!iiiilleidEN 8., .\ '‘i), , - kil ,,.•:,,-:-, -- -. ,..:',,,-.Agit, *114.....ii!!kii;5119K,'„ Z La 0 Mi910..egiliiiifiiiiiiiiiiilliiiihighlar.41D . ,010111:014014 ','`.4 .9 m i-- n iiiiligetiVV:tii:Igilli:.:iitliiiiminitiitiligi 0, .- . . . -- "- . ,, - 4-° co ...0.411i•iiiikeptyrt.144.1*4411g, . lAJ < Z-7iiiiiigi:21Migffifiliiiiii..„...... .:--,.„••:••••:•,•,•••.•-• ••:.-,...,•-•,.-•••:•.:,,,,,,,,,,,,,,,-...:1-..,....,„,„'„..„.:::,„„—s,„,.„;.:„„olguipt.;9010M.,bovelitin, 0 3 < lo *-teiiiiii,gelitigniiiiii'11111,11161100141101444.01010004.41111111,:11144 giliwirraliMINIMONNUNII 167001,21,0inggiiliL. • 3 1 z m ce < m 0-;ranNINIM110111,4110144#11104102111111100111PAOPtifilaNINP_!5011111:14114,01§0' 'Tr.'.- -..14,94,V.APRPROMAINt,.,,iilefilOgigetillia!,,,..iNEVI,11,,,tV tliiidrailligliP.,1111;411141,,i,i.,,.. i, ff . 011112001100000 40„,011Pailiiiiritiltin011991§t"10,01001611111111111 tentegilliOniiitirrA -,--''''t'. ...,..,•.:.ov,iv!4vvv.i•itiiiiii,v1.:0...,-.1,4111111101 on•it;•21:.%....0.1/0.5 LT,ot-v. I agnipitio,:4,• 'WfilWilimiarigiiiiiimeiligio roillogrk..-'-.avt?,iitIkolp.iligeilit14:0'.,1,104.1400*.•:Akio iiii...milaqrnattaigiiPAtior* 3° :ilitAiP,A,::W:',':•*Wl'itit':1117411101IPYIP•:':EN-45:31bigiVigli LIPTI113',ijiiilliM00:411041-11104,P...''D,','...!,•.',,,,tilit'''''' .p. g••:a...` ,..••.,in.a.r,l1•811.ilifililliiegiiig NaleigliimmkkOkiliklitianio:.:aingiV N1E.th,.Atith,D4,34441;1.11. .4 ..., 6 2 wA .R ili5g•:,!;il'i,illmii,ifIZialli!!i::]:•..qiii0,199011399103t9iiia.090411,',41919191i4194'.49i109101AN EIT 4__„----- 1. 0 I 1 ..- )"- .- ...__ LU ,/20 — .----• ...-- __ 17-. t2- CB ---- ...----------- '6 ...„..„......-:„..)(...---;., 30 o .0 N CV< .--- I'. ........ te, ...... ....... C3 ....... \ ,,.._ .....-- ...--- .__ ,--...- ,•'. ..-'. \ .‹ '--. ....... ....... cn 5 111 ....... -- cr I=-- .......- _ ----r -.— - fit-.. -___-- _ ' BUSINESS CEN'TER DRIVE -----11---- ::---- ----,.. „..„---------.. cn 4- a-) c, I ; .1 c,.. . Lc)" ,--,--c--1 / . I r---,-----1-1—. 1 "'J cn Ai 1 I I . , ,, , k . . . r -1 U 1 ",, 1, \ ‘` I. r-- LJ CL) 0 CD = I— Ilk , CD cn , ,- .---- co c3-) <--, 1--- i 7j f.. .51.—°- 6/v CD t Z \ ... S N \ii k. \ GRAPHIC SCALE 10 le 22 00 120 \ \_ 1 1 i1 tIN>�i \ ��i _ . I I inch_ 30 ft la-- \ .... s, \s I \IFI \�`�\ I (i �� \ \ \ \ STORM WATER I iv cr \t \. , \ MANAGEMENT AREA I co \\ \ \ \ I I LOT 1 , BLOCK 1 COUNTRY CROSSING BUSINESS CENTER . P 0 \ \ �� I \ \\ \ I AREA : 3.09 ACRES , 134,600 SF. \\ \ \ `\ I [ BUILDING AREA : 19000 SF. ' \ \ I € HANDICAP PARKING : 4 STALLS Cf?'( p 03 \\ \\\\ \\ i STANDARD PARKING : 82 STALLS \ \ I ' TOTAL PARKING : 86 STALLS -46 918 1.5 \\ A \ I 1 \` \ I Ae \ I �0 1 \\,.2)\ \ I (---;:,<', CB 3 / ` CrU /� / \ \\ \ Z 0 / ` I U i ........ \ \\\% / ` \ I 1 \ \ I \ tN J I ....-1 \POND N fl \ 1 \_J I. \-.., \ I \ \ t I I DATE: 12/27/94 I hereby certify that this plan was Jon pew A Associates. bc. COUNTRY CROSSING DESIGN BY: L prepared by me or under my tired ma s,.N....r..um:s.....y,taw rr.rr DRAWN BY: GL supervision and that I am a duly SHOPPING CENTER CHECKED BY: TLH Registered Engineer under the laws Rivenlib of the State of Minnesota. (012)441-2072(7.1r)441-2225 ELK RIVER, MN REVISIONS: FOR Le,e„'.",MN a•22"a�`SLUE f00 RIVER WOOD DEVELOPMENT 01.0054-80445(1a101124-2042 PRELIMINARY SITE & UTIUTY PLAN Signed: .— DRAWING FILE: TEXT FILE: r� LE O. Date: 12/27/94 Reg. No.12699 GL-\671931\SC-SrlE DISC:\NAME SHEET 1 OF r G 19g1:.% -03 A/ ._ rte.._ .� r • ,,., ....�.._.__�_ rte..,. ;�;�..-' ..../.1,....---m-"fes. t 0 .....--- .,....'•-----------. ' . �. ` f fmoi r_ " . � / ' •. �. 6 . '" Jam • by ----- ,r r-!r /// ///' ; f 0 //OOP° r, ✓ • 0 ms.' ryr 874 �i2288. 1.• A-y-''--^' er ' B76 •♦. I [ .60 °,•2 I pR4 a. . / 878 ',I� J co ' •r eeo ter N '. 4. . 88312 .2.42 :82.6082.30 882.90 882.4 / f 0 l 862.74 x::3.0 f j - 882.:• 882.74 882.84 j r I i / i 882.9•841-, RI 7I i m I 'l' 883.95 i I 83.95 i 883. 883.44 1 I 883.24 �,. 883..' I { f I 884 8$4.10 84 884. • I / .. E• 684.3 /1, Z' 884.40 �; 884.415 1 • 884.20 i+ 884.20 88'(4.50 • 84.40/ 884.25 :84.25 ,,; 884. 0 v 884.40 f` 884.40 :84.40 m m / r l f .884.40 • m } r rg ' i l f mss' 8873 n •' li f 884.16} N m .84 40 /f 88 96 .J { x 884.02 106 q i •,:';';',•'" fr/ . .. „rf .r • :a► ..4..•:84.80 884 •I�� 884.80 ':4.80 884 • 884.80 / :7: 884.66 (001 , jf W J , 884.60 i 884.10 •••••• �k•. / -r . I /CBf / _ �t 88 .72 *864.40 ..-- / / 1 CO if3.6 K84.20 ' / /f� a 584 J. 80" -- -_------ /Air i ____; 884 U:7 1 ''"'",..„\\\c-..---11:78: I T--f--r ell \--.74,.--)1,e2R79Q f CV U Cll C1 CJ 1- 0 C_J U Cn m CT) I Nw ry \ 7\\�/'\� "-----`\� �` _884'.'_'"""_�.�_.__...._.....,._.....•-.'i- »___.-"' '..�....""._."." 888888 /� "" ......._.„-- ......... _ ,..;,:_,. . ._--------------F------, \ tAk N. . .. :<\ \ .---\--A lik 1 ' \ \ —�-- \ \\ x GRAPHIC SCALE \\ � \ - - =MI Illii" tenon- SD ft \ \\....„.1.-"-\\..\ • fit_\_ a85.1. a .\' \ V Di . , m \ \ .85. m LEGEND � D mV \ \ m ---8d:'----- Existing Contours \ \ r, /J• .I A is 2-- Proposed contours \ ,\\'j '"111. T ■����■ Silt fence J 884.30 \'; \ \ /84. \ \ $ E Berm Area a o / \ 884.30 \\ g -4.4-6- Proposed storm sewer ::5.5 X 884.00 v \:86.8 �:� General Drainage Direction \\,,,, I. ' \`• - 884. 0 i t 0 Soil Boring I I 884.15 :84.30 1884.00 f j I 883.80 \\ t \ • I,t• � 8 II. 883.. /� PRcWEX-'SILT StI' FABRIC ' ��� / / \ I i ST Kx4'WOOD STAKES O 4.O.C. 7 HY MMMUM yyy��// / \3' t 0/ 0/ie'r- / / 1BACKFBlOld /�/�/ 1} !� /� / /,\�\ f%i /BURY BOTTOM / // t X--/Y/ - 4\ j rJ cosnv 6RIXMD /L \ 6-OF FABRIC PROPOSED EMBANIOAENT ,r/ 4 SILT FENCE / iI 1 I t ✓ `r \ t \\\ j 1 (TO BE PLACED AS DIRECTED BY THE ENGINEER) L 1 f }l 1 l I 1E STORM SEWER STRUCTURE 1 '` I AN [IIIiI iNTO THE GROUND. I `• \�Jl /J({ t ^^° 1 87.8 X � ~ BALES { 1 / - ' m TEMPORARY BARRIER OF SEDIMENT CONTROL BALES TO ' PREVENT SEDIMENT-LADEN WATER FROM ENTERING -__- 886.8 i 1 ( INCOMPLETE STORM SEWER SYSTEM. i / SUGGESTED PLACEMENT OF SEDIMENT CONTROL BALES EROSION OONTROL MEASURES (R-18) DATE: 12/27/94 I hereby certify that this plan was JnJ%p Oahe(a Assoolrtes, ha COUNTRY CROSSING DESIGN BY: GL,JR prepared by me or under my direct rw•,.v.....Nes c.r e....s w.cod......, DRAWN BY: GL supervision and that I am a duly SHOPPING CENTER Dodge Ammar CHECKED BY: TLH Registered Engineer under the laws �6. Mawr,Memererte of the State of Minnesota. Off5)441-10,11)44I-5155o7! tr)44f-Ossa ELK RIVER, MN REVISIONS: FOR `rti eel T5 HUM!Oe RIVER WOOD DEVELOPMENT (818)894-J045(MA4884-3048 PRELIMINARY GRADING PLAN Signed: — DRAWING FILE: TEXT FILE: Date: 12/27/94 Reg. No.1269S 0.:\B71g.m\SC-dtADE DISC:\NAME SHEET 2 OF 2 1 FILE NO. 6719.31-03 l 10 • . S slE i' SEED i \ E/2 �.�' C. A/5 \ \ OF • • SEED l PONDING AREA SEE ) \G i• i' GRADING PLAN 'SW' • • \ \ -.- I -_ A/5..• \ II A/6 SOD WITH IN 10'OF CURB _-- ------ /5 A/5 SOD WffH IN 10'OF CURB •; • G 1\ r E • • •• • -f• •• • i • •• • • • •• •A/5 �`j �P4,4,S � �,a 27 1 I \ \\ ‘, • 1. 0 3 N'\ \ ..\ I SOD • 15 44 7- I .....- • 4 '77---< ' / _ _ ........----.... _11 (5--(30,, 0/00. ---- C I ; D/5 j =ot= Else W= -CL- _ J. /�'nnmunn; annum: m1111 11111117 �muunun= /moi;,' /_� /.:<, p _.sly.,16,i,,,ww,„_t ara"Idailrekik.11407:411°111 -'' '''' .>'. ANDSCAP // SEE GRADING PLAN /• BUSINESS CENTER DRIVE i I PLANT SCHEDULE I 4aARK PLANT SIZE ROOT OTY I LANDSCAPE PLAN A LILAC,CHINESE 18• B&B 31 I SCALE 1" =30'-0" NOR SYRINGRA CHNENSIS 9 NORWAY MAPLE 2 112" B&6 5 ACER PLATANOIDES"POND' C BERGESON ASH 2 1/Y B S B 8 FRAXINUS PENNSYLVANICA LANCEOLATA D BLACK HILLS SPRUCE 6' B&B 14 PICEA DENSATA E SCOTT PINE 6' B&B 12 PINUS SYLVESTRIS • NOTE: ALL SOD AND PLANTING AREAS TO HAVE WATER IRRIGATION SYSTEM EVERGREEN TREE-GROUND DECIDUOUS TREE-PRUNE BACK LINE TO BE SAME AS EXISTING 114-WITH ANTIDESICCANT AT NURSERY r „i II 1An/g� wj r.ikIi�,r�■;��, 3 GUY WIRES OF 10GA.WIRE - iir 120 DEGREES APART •-.-.- '.-.-. `•. 2. TURNBUCKLE f / ro 45' FOLD BACK BURLAP FROM TOP OF BALL 111101111-1 24-XTXT STAKE DRIVEN Xliii\---71111.11Nim FLUSH WITH GRADE 12-MIN.. OOSENED SUBSOIL MI TWICE BALL DIA. TREE PLANTING DETAIL NO SCALE E/3 \ 61 ..A LSCA• 8.,. �/ SEE ,•DI P).• FOLD BACK BURLAP FROM \ \ TOP OF BALL \‘‘ ,4,,:, \. 11111111111Fai \ . V -->it OOSENED SUBSOIL j �_� \' �_ , TWICE BALL DIA. Z - SHRUB PLANTING DETAIL ibis" / , `�'� �,�\,_ � NO SCALE ..,4r ti.., \ U / LL ' / / Iz / / \ \ Io /' \ \ CIT.PAVING /' •\ .\ // 8/12 CONC.CURB \ ,A-1,_-_-_---,..,_.-- DECORATIVE ROCK LANDSCAPE FABRIC \ -..- SUB SOIL \ '\ 1 1 \ PLANTING BED DETAIL 1 '' • ' NO SCALE 1 i ' \ 1 VH I 1 ' REGISTRATION ENGINEER DEVELOPER ARCHITECT PROJECT SHEET DATA JOHN OLIVER RIVER WOODS CHARLES J.RADLOFF COUNTRY _ REVISIONS Sr ASSOCIATES, DEVELOPMENT CROSSING '12/27 94 ISSUED FOR INC CORP ARCHITECT SHOPPING G PRELIMNARY CITY REVIEW 9071 VALLEY VIEW RD j 580 DODGE AVE. 1500 L\CKSON ST N.E. SUITE#251 CENTER ELEK RIVER,MN 55330 MINNEAPOLIS,MN 53413 EDEN PRAIRIE,MN 55.344 VOICE 441 2072 VOICE 788 6840 VOICE 941 5474 STATE HIGHWAY#10 SHEET TITLE JOPLIN ROAD_ LANDSCAPE PLAN FAX 441 5665 FAX 7890608 FAX 941 5240 ELK RIVER,MN Psi ;4 '' H OF3 SHEET NUMBER 1 l ,.. \ ,A N\io A° • sl PSE Ir\\G- ......• _•_• ,_0.. ,......• 1 \ ` G \\ � t1rl1 ,,,,v-s ‘ . 27 LIGHT, M POLE 0 3 N\\Pil,)\\\ \ OIE ' LIGHT i LIGHT DOUBLE POLE DOUBLE i LIGHT ! DOUBLE 1 1 5 I 4k1 • I --•---\-7- — _ _ _ o POLE P _ _ „`p�OY LIGHT EO== =�= EINE•11 =E]== s? 0`WALL �� SINGLE • I // /�i� 1111111111 111C unnnmr:. :mmrnm:, nuuumx� ��AC� I WALL ----- WAf-L�— .. ---------------- RAC--- A _-- I POLE LIGHT SINGLE "f r—T /'' BUSINESS CENTER DRIVE 1 I 1 1 LIGHTING PLAN 1 SCALE r =30•_0" NORTI'. • /2" a--7/y/ Pc; //e J Cr \ - - An.Mount.d ReetInnev Cstoff L:ol.Gws KSF2 400M CC'.V MEIN YA'JOt ti'a6'C'.uis� _ 4,74 f.ti.•Mvroirr.. 1}L'I ?'t:KPV,hCGL11 A...IMM I POLE LIGHT FIXTURE Twp METAL NAME 100/1TSW r Ia IS'MwaCnp ' \ .0 M000111 I oh 14.. � A \ � o Co; z J, = WALL PAC FIXTURE \ ''''.'' 1:3_,,, \ . /' .. � �� Z \ �z \ /• \ / LIGHT POLE / \ / /•/ \ I •�-�-I-GROUT / \ \• \ ..1/4 ,.••••• '\ \ o ANCHOR BOLTS N \ • \ z - 24-DIA.CONC. / \; \ of r; FOOTING 1 \ 1 1 \ I • 1 LIGHT POLE BASE DETAIL j1 1,2.=1-0' j 1 l 11 1 I REGISTRATION . ENGINEER DEVELOPER ARCHITECT PROJECT SHEET DATA JOHN OLIVER RIVER WOODS CHARLES J.RADLOFF COUNTRY REVISIONS &ASSOCIATES, DEVELOPMENT CROSSING '12/27/94 ISSUED FOR INC CORP ARCHITECT SHOPPING PREUMNARY CITY REVIEW 9971 VALLEY VIEW RD 580 DODGE AVE. 13(x)JACKSON ST N.E. SUITE#251 CENTER ELEK RIVER,MN 55330 MINNEAPOLIS,MN 35413 EDEN PRAIRIE,MN 55344 I VOICE 441 2072 VOICE 798 68-40 VOICE 941 5474 STATE HIGHWAY 410 SHEET TITLE JOPLIN ROAD SITE LIGHTING FAX 441 51,65 FAX 7590608 FAX 941 5240 ELK RIVER,MNNNN���� 2 of 3 //� , ets ti j SHEET NUMBER PUMP CANOPY ..:;s9.4,:.„.. ::-. WITH MASONRY -:`<"N. ..!,Wee,':. ui"-'i COLUMNS a e i:.snx ;;R : 9 H)/dXfG E - n �__-- :.: i; :..lid iriy_ ;Fii1�IIMUNIOIWumu0 pllllllinll►III�LOIUI AIllIIE' NI�IINIII�911�� -I11� 1I"" pU In�i�li101iil�Il9 " 'II n�I�iIIII�iiLi :'I'llll�pi "I„ I�ull "�"'u'1 �1� 1��N " O i _ _ 5: .0 !- : ,--- ELEVATION - STATE HIGHWAY #10 SCALE 1 - 1 0-0 ROOFING ROOF BEYOND SCf SHINGLES -\ E, M q - CEDAR ME, 2 ";„, - SIGN BAND STORE FRONT ? LI,jjIIIIIIIIIQu11MINIANIrlirHi $TORE FRONT }- — GAS STORE MASONRY x2 ? _ COLOR GLASS ? -`, ®=.. . BRICK 01 - COVERED `.,°- b - LIGHTED OUTLINE SIGNAGE ,.may;,. ROOFING ..,14 .,. i SHINGLES R . i �i H tit .„,„,,,,,,,,„„a.,2, ` SGNABAND M I m,w, �� I ���,� I ,� '�W�ul� 'pll I0' II 1I�Iil 1111 I I' III�IICa"� II'1 P o BRICK 1 *2 i � I = i I Y�Y+IY�II�IIIIIII III I N re n lll-�11.1 I_ BRICK*1 •_Ai _1.1.1g.9 EIN_;• Emil V1 -__-1-11-11111i MASONRY u2 i MASONRY COLUMNS ANOD ALUM COLORED STORE FRONT GLASSN 1:.,,,,,,1,,1#.,...4: #.:4.-1/:,,,iROOFING EENED " _ - ' ".'::<: SHINGLES :F TOP ....,, -- CEDAR H.EOUIP 4 H;• i0'�, ,:""%°"'i �� '?"•' SIGN BAND . ',vim.., ��. n MASONRY 42 _ r\ _.FOODQ -SHOP'.'—',-,..1::'•-4 :- , • _� ' BRICK#1 'Qo • c 1i .-=� _- = 9 ' - MASONRY#2 ON WEST ELEVATION SCALE 1' - 1'8'-0" EEN MAIL ATCH ROOF )UND ry H ..,roil" n, :i,.ii lb r imnImenmummumm _ 1111I1mIIIIIHEIll lnhllIlillIullif : vi: 11 Il MASONRY TRASH ENCLOSURE .0 i 21 PUMP ISLAND CANOPY &to SEE SITE PLAN \ \ •4 \ N. \� / FIEL _L a, ' ' C-STORE I \ _.._i 3168F I\ y 1 \ 1 I i.. ‘II •-e - REGISTRATION 4 TRASH I o ENCLOSURE - ='�` ------- IENGINEER DEVELOPER ARCHITECT PROJECT SHEET DATA JOHN OLIVER RIVER WOODS CHARLES J.RADLOFF COUNTRY REVISIONS &ASSOCIATES, DEVELOPMENT CROSSING 12/27/94 ISSUED FOR INC CORP ARCHITECT SHOPPING PRELIMINARY CITY REVIEW 4071 VALLEY VIE\V RD 5011Lx)UCE.\VE. 1501I.\CKSONSTN.E. SUITE#25I CENTER ELEK RIVER.MN 55110 NMI NNE.\POLIS.MN 55411 EDEN PRAIRIE,MN 55344 —________.___.-_. SHEET TITLE VOICE 44I 21172 VOICE 7'LS.SW VOICE "1415474 ST.\TE I ICHW\Y\10 ELEVATIONS F.\X 441 5r,L5 F.\X-•"tli#S FAX `14I 52411 ELK RI\'ER.\IN FLOOR PLAN 3 of 3 6i/i/ _' SHEET NUMBER At, 409, 1