Loading...
5.1 PCSR 05-23-1995 ITEM 5.1. •ty of ElkRiver MEMORANDUM TO: Planning Commission FROM: Steven B. Ach, City Planner DATE: May 23, 1995 SUBJECT: Conditional Use Permit Request by Kraus-Anderson of Elk River, Inc., Public Hearing Case No. CU 95-8 Request Kraus-Anderson of Elk River, Inc. is requesting a conditional use permit for site plan review to construct approximately a 6,000 square foot building for Video Update. • Location Lot 2, Block 4, Elk Park Center (lying between Highway 169 and Freeport Avenue immediately south of the new First National Bank building. Zoning/Land Use PUD (Planned Unit Development) / HB (Highway Business) Attachments • Memo from City Engineer dated May 17, 1995 • Location Map • Zoning Map • Development Plans Overview The Elk Park Center Planned Unit Development requires a conditional use permit for all new construction. Therefore, Kraus-Anderson is requesting a conditional use permit allowing construction of a 6,000 square foot building • to be occupied by Video Update. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 Memo to Planning Commission Page 2 May 23, 1995 • The specific parcel will be the last free-standing lot along Highway 169 to be developed. The proposed site is located between the First National Bank and the Taco Bell, which recently began construction. The proposed development will have to comply with all of the standards approved as part of the Elk Park Center Planned Unit Development. Site Plan Review The following is a list of comments based on the proposed development plans submitted by Kraus-Anderson: A. Site Plan 1. The proposed building location and parking lot construction meet all of the required setbacks for the Planned Unit Development. B. Parking and Circulation 1. Based on the proposed use as a Video Update, the number of parking stalls provided will easily meet the City's parking • requirements. This type of use would require one space for every two hundred square feet of building area. Therefore, 30 stalls are required and the plans show 55. 2. All parking areas are shown on the plans as having concrete curb and gutter. This improvement is in conformance with the standards required for Elk Park Center. 3. A valley gutter section shall be provided through the driveway in Freeport Avenue. This is necessary to continue the street drainage to the next available catch basin in Freeport Avenue. 4. With there being additional parking stalls to serve the business, it would be recommended to eliminate the two parking stalls closest to Freeport Avenue. By doing this, it allows a vehicle to pull completely off Freeport and wait for the vehicle to leave that particular stall. Generally, the traffic movements at the entrance would be less congested. C. Landscaping III 1. The City's landscaping requirements are based on the perimeter distance of the subject property divided by 40. Based s:planning:pc:cu95-8 Memo to Planning Commission Page 3 May 23, 1995 • on this formula, the proposed development would be required to have 19 trees. This total number is then broken into three classifications; overstory, ornamental, and conifer trees. Staff would recommend that the proposed plan be modified to be in conformance with the City's landscaping requirements. 2. The proposed landscaping at the entrance drive off of Freeport Avenue should be properly located and sized to prevent the obstruction of visibility of vehicles both entering and leaving the site. 3. The proposed landscaping plan should be designed with consideration given to the adjoining projects' plans that have been approved. 4. As part of previous three plans that have been approved along Highway 169, some medium size shrubs and ornamental trees have been included along the Highway 169 frontage. This same type of landscaping improvement should also be included on the proposed development. • 5. All disturbed areas shall be sodded and irrigated as set forth in the PUD requirements. D. Pedestrian Circulation 1. The proposed plans include a 6 foot wide sidewalk extending to sidewalk along Freeport Avenue. This improvement is consistent with other developments in Elk Park Center which encourages pedestrian traffic throughout the project. E. Refuse Collection 1. The enclosure shall be designed with a masonry material that will complement the building. 2. The location of the trash enclosure should be positioned on the site to allow easy accessibility and minimize its visual appearance from Highway 169. 3. It is also recommended that the enclosure itself be designed to provide easy accessibility for delivering refuse to the enclosure. This is often accomplished by providing an entrance that can be IIIused without having to open the enclosure's gates. s:planning:pc:cu95-8 Memo to Planning Commission Page 4 May 23, 1995 • F. Drainage and Utilities 1. Refer to the City Engineer's memo dated May 17, 1995 for additional comments. 2. Appropriate erosion control shall be utilized during construction. G. Building Elevations The proposed building consists of a decorative rock-faced block along with accent bands of smooth concrete block. Video Update's color scheme is primarily a white building with red accent bands. The Planning Commission may recall one of the elements in the Planned Unit Development was to maintain some architectural consistency throughout the development. One of the prominent building materials used on the Target building and each of the multi-tenant buildings (Buildings B and C) on each side of Target is a brick material. This same material has been incorporated into a couple of the free-standing buildings (First National Bank and Wendy's). This brick material has not only provided some consistency in the type of masonry material use • in the development, but also maintained the earthtone color scheme. Staff would suggest the proposed Video Update building accomplish one of the following two: • The proposed color scheme be modified to be more consistent with the predominant earthtone colors that are being used throughout the development; or, • Incorporate a similar brick material providing the continuity discussed in the planned unit development agreement. H. Signage 1. Attached is a proposed monument-style sign for Video Update. This particular sign design is consistent with the planned unit development agreement for Elk Park Center and is the same type of sign that has been approved with other free-standing sites in the development. I. Lighting i1. On-site lighting should consist of a similar lighting design found s:planning:pc:cu95-8 Memo to Planning Commission Page 5 May 23, 1995 • throughout the development. Once again, this a common design feature that was approved as part of the planned unit development agreement. Recommendation It is recommended that the Planning Commission recommend approval of the conditional use permit request by Kraus-Anderson of Elk River, Inc., allowing construction of a 6,000 square foot commercial building for Video Update with the following conditions: 1. All comments stated within this memo and those included in the City Engineer's memo dated May 17, 1995, being incorporated into the proposed development plans. 2. Three sets of revised plans be submitted for approval prior to issuance of a building permit. • • s:planning:pc:cu95-8 •1ISI COISLLTIIG EIGIIEEIIS May 17, 1995 File: 230-272-11 1326 Energy Park Drive St.Paul,MN 55108 612-644-4389 Mr. Steve Ach 1-800-888-2923 City Planner Fax:612-644-9446 City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: VIDEO UPDATE SITE PLAN REVIEW Dear Mr. Ach: As you requested, we have reviewed the site plan submittal information for the proposed Video Update facility in the Elk Park Center. Based on our review, we would offer the CIVIL ENGINEERING following comments. NVIRONMENTAL NICIPAL 1. The grading of the site indicates that all surface drainage would be conveyed PLANNING directly onto Freeport Avenue. This is not an acceptable situation. Catchbasins SOLID WASTE should be constructed internal to the site with all surface drainage picked up prior STRUCTURAL to discharge onto Freeport Avenue. The grades at the driveway should be adjusted SURVEYING slightly to create a high point such that overland flow from the site onto Freeport TRAFFIC is eliminated. TRANSPORTATION ELECTRICAL/MECHANICAL 2. The Fire Chief has reviewed the spacing of the fire hydrants on Freeport Avenue ENGINEERING: and indicates that these are adequate to provide fire protection to the proposed HVAC facility. POWER DISTRIBUTION SCADA 3. The trash receptacle area located just off the southeast corner of the building will SYSTEM CONTROLS be very difficult for a large garbage truck to access. We would recommend that this location be reconsidered and designed in such a way that access is much easier. 4. The grading on the south side of the building indicates a swale for overland flow toward the west at a 0.66% grade. We would recommend that this swale be graded to a minimum of 1% to ensure adequate drainage from this area. Drainage along the south side of the building also needs to consider the north side of the lot adjacent to Video Update. There is no information provided on the grading plan relative to drainage in this area. This needs to be added and considered in the •FFICES IN: overall drainage of the two areas. Perhaps a swale located along the lot line MINNEAPOLIS between the two would be a reasonable solution to drainage in this entire area. PRIOR LAKE ST.PAUL WASECA • Mr. Steve Ach May 17, 1995 Page Two 5. As the driveway opening is cut into the site, pedestrian ramps will need to be provided on both the north and south side for continuation of the sidewalk through the driveway opening. 6. There is a spot elevation just to the north of the driveway opening which appears to be erroneous. It is listed as 936.51. It appears this should be 934.51. 7. The sign location shown on the site and grading plan does not match with the landscape plan. However, we understand that the future parking area is proposed to be built immediately which would tend to follow the layout shown on the landscaping plan. If you have any questions regarding any of these comments, please call. Sincerely, MSA, CONSULTING ENGINEERS ID G�G � Terry . Maurer, P.E. TJM:tw 272-1716.may • 0 i .3111111V .* . --, Or ,� I o ----9 O CO. • koX33 / / c C LOCATION\n ,,,,, A , w Dr 47, ,.., — _ . > ,+ r- C U It rT1 u • co•RXL . 32 ,„ - Nil' a�w 1 4r:,) i lit! *1 I _ . wit 6141IF 0 --..................... ' .. ...Mann IP I IlliF N II — -,* . VA': (.., z � � te l- tom;,_ ,, 141 `�V.� �_ �� I =��' mmoi'. k A -,HWY 10 3c 52 �- � �/ •,� � 1 us I ' 'e. ' S}iERHUR ��L• r Nil 7 min..._ yRIGHT - �• A� zfz / V U Q D 1 ,...,. city of W .„ W Z � LOCATION MAP y � j CC/ H�� • CASE: CU 95-08 , --- • ------ ___ --6K-. ______ _,- ... .---;..„.------ - .......'" ....... _------ __ _ - - - - . -- - , ..._,-.----" .„... .............................„ ........../ .....-- 111 ____-_,.. _ _ - _----- ...-- ,_-„- • ,.....- „.....- -- - __ . --.- ...--- ...---• - - _- ...____---/------:\ . ....... ,..-- _ --- .- - ,,.-—- - --- _------ ‘,1•1) -----" - - - - . ___ __- ,..„......• - - -----::1-1 .--; . _ - .._.- . ,- - -- - _ .......' - .- -- .---- - .__ - ,- ---------- ./ ---:----- X 937.. ... _ ..... .-- _____ _--- 7 ' • \ t.... . • •.96 ) / 0.f..tii',1‘,•/Y-.z.'.:--..,e.•..-'..''......•..,,•-.•. ,... .......•. --)/1-_--_--_----.-0-----_-____, ,—_,— --_ / ".14%4. I-fit33f ;t',.'a.-j\:''''3o'o'5\'.'.\''S,'6',\\•4\-2-,,59)\503'.\.7-.;3.-' 6 '.0 0•'1,\.F,i,oN2,iJ.c(4‘.rba s;5-,..-_-.i*.'.V3os.--6:.-i.4-w':-_,9, -.'.t.-4.„S.7.-,-‘.-/9-•--o--'"n4\-- 93-'—bP-0'--'.3.f--Ci-.2I..-.\No0,',,,fr4.•-t9x-• 5-o\-- •--j i\'1-V9i3'c• '.o'... %r c\",•,. r-- IIII\I I - t, \ \ - \ A . 934.46 . 6 1 tv ' 92 93 \ 1ã0 A' • . °1L. \ \\\\ , . / \ 1 A , 0 7- • \\ \ S z/ \./I \ ___...-- 4, .t. , -- rj, ,..y .4\\ ..0 ‘0•'. \ i % '.. 0 I 'l - ':,;e _ ,_. ..°'Is 0 ' 935.04 - 61 \ '-- • t 0 1 ii, 3-.-\ 44. • %$..‘ . \to \ - ••- r \ ' U, .. , \ 'e, e - \ • \ . T,_ - tA • I ,,. . 0 • ''‘‘D. ik • ' tratillir ,,, \ 4, \_ ....,_, 24 . 0---- . V •‘,..., • ,,,. :rY.0 . '--.'''• ,.'. „ 0 - ' .. \ „--- .•' • ..\ ,, ) ( , „--464.09 5* --- ...0 r/ c,r • 3.5.13 . -6* \ __..-- • ._.--- ".. '.--- \ 934'"'N 6 As \... •. _,- Vir ----. \•___-----; r% _......„. ..- , . \ 904'60'6.904AAA i',2°° \' 93A'g' A4.50 ---.71.-..7:7"-- 4 1,‘ Ar" „,‘,„,...%......?.....- --- .• \ \., - _ i , •''' -'5' . --'- _ . - ,.4. „...a...ne/ .;',:i....1..i..-i7 --• "") ' 02 ......, .......,„X i” *-- ---'"'----:,„,„17.-.:--1r94 05-%T.47/2--/1„......-. ----- ...--------------.---'- .0\61. .. -------934; --------- \ '.. ,..- SPS.. , _.,' „„....-----" \ \J • • : '... , ,.,/ \5 \ ......... _......%." 936.4 et--- , w . , f-------:>' \ _--- .. ----- ......r_--,,='- . ---- ._.--,-,:::„........„,,,,- -;-4........_-- _____ 0 ,,...„.... _ \---<. .......- ...., _...--- --...- ...--,.. .......--- . . ___-- _ -_-__-_;---- ,-_, z ,-...., -..--.\-K,__ --___-;;;;---•- __-_--- .....- . . ,,----_--- 93 78 • .1 . --1,•4 LI n s------------ ----- .-------- -- --- .. \ .„.• ,...-- _.----- _ ....---- --- ,.., ., IRAE=t33.91 IEs.912.48 . - / ..,----*.i."-.------------- ,,e-% .g --',...-- -. -----"------- -----"*.:'.. -. en ----- / „......--- 0 0,,5% .... ......!"-*• ,......---- ...,......./. . i /1 /5„ st.AA. --... --„,„.0-- _.----- „.-- ..,,,....0....' ,- 1, ' - .,..---,; "-----------. •a _----- ...•5ft- ,.. , • ----- -/6 - f ,.... - , *4_ . • ,,.:..,. . . • : • NOTES: -" l��P "-- 1 . ALL BLDG TIES ARE AT RIGHT • ANGLES TO PROPERTY LINES. 0 20 40 60 2. ALL DIMENSFONS ARE TO FACE OF wwwwwimiss• CURB OR FACE OF BUILDING WALL. • SCALE N FEET 3. ALL SPOT ELEVATIONS ARE TOP OF CURB ELEVATION OR AS NOTED OTHERWISE. 4. CONTRACTOR TO VERIFY LOCATION AND DEPTH OUTFALL GUTTER .-----.---- -----77--7--- OF EXIST. 6" SANITARY SEWER SERVICE AND 2" WATER SERVICE BEFORE CONNECTING l e• PROPOSED SERVICES. CONTRACTOR TO COORDINATE II I/2•R WITH ARCHITECT FOR EXACT LOCATION OF t TOP BIT.MAT —/ SERVICES IN THE BUILDING. 31R 3E SR = /' — - • 3/4'PER FT. J `_ r 1, n \\ n 1/2'R � - \ -- vARIES BASS 1 \ \ -- \ BROOM FINISH • SLOPE VARIES t I 12 e 1 IIIMBIEM — .•CONCRETE -I \ � n COMPACTED SUBGRADE Bs:uaonED PROCTOR STANDARD GUTTER \\\ \\ TYPICAL SIDEWALK SECTION 6• G 1/2•R I \ -73 TDP BIT.MAT I r \ c''\ 3/8" R 3r. 3•R. \ \ `` ` 1 3/4.RER FTm \ \ ` 1.�\ )‘\.Cci .\ r I/2•R I \ \\ _ BASE - � ri 1 2 1/2•BITUMINOUS MAT \ \ (2331)TYPE 41 �� \ \ 6•CLASS 5 GRAVEL 12• e• 1 \\- APPROVED S1IBORADE \ \ 8-612 CONCRETE CURB & GUTTER \ \\ APPROVED PAVEMENT SECTION \ \ \ 1 \ -k CONC. RB GUTTER \ A // r►B 84/1 \\ \ 5.______...------;-'9 -?..1" 4A \l•►B B /. 59 �=- E%PANStON JOINTS) INTEGRAL CAST WITH CURB 935.1 4f .,,,,e.:::---- PLAN A 32 SECTION A-A • \ f4 REBAR(TYP) 13\\\I ✓ .-' � MIN. 3/A': FT. I I mom / WIDTH VARIES le' G IB' - -•"----.a=`.> SECTION A-A SECTION B-B CONCRETE VALLEY GUTTER DATE: 4/26/95 I hereby certify that this plan won ,/o% OIver 6 Associates, Inc. VIDEO UPDATE DESIGN BY: GL prepared by me or under my direct tie esvwww y,err w,..,.,f,L.,.eiwww, DRAWN BY: GL supervision and thot I am o duly6110 pages ELK RIVER, MN ' CHECKED B1': JKB Registered Professional Engineer Ilk River,•w.e..Th• under thelows of the Stole of (112)44I-1072(145)441-5fe4 FOR • R t N.p _ Minnesota. KRAUS—ANDERSON ROI F.1ran.1...TML Suite too ."eww r 85337 (I (f/t)flldf4 5 ry111+11-404/ SITE AND GRADING PLAN • Signed: DRAWING FILE: TEXT FILE: FILE NO. Dote: 4/ /95 Reg. No.19900 GL:\6476-1Q' SITE DISC:\NAME SHEET 1_OF 1 6476.10-49 f' 2 •. / �/ � —:7A---1 ' — . -. --MaNMENt�dJ i " \ \ �� L "� Idrt'1:x5'•4q W \\------7-1 , ? _�• , OW.)TRM,0 Fa1GAr uCG qui..J-uNF Fie Gl4tES fi • \ 11 ISP W6wo0D - �. \ ------ oval --- C ��\ y�� ��'a\ 5AvNN�C{AZBlF#4 '% / �. 'swam+��e*% `��, 4PIRf �(INTEi�iR C • 4 NoRTN�M4 —- ,•r REu ^Arm - �1 \. .a s.ANDIA,JUNItall e M�.1r�o�r 'i# �� 11111111 vit,., k... __ __ _____- ___. . .• ,. ,. _ ,. 4 - __ Is«rr�T,. ,jk.,\_ \... 1 6 . VI2UIWJhL N„ '. ,..... 0 Pa _� `'. \ 4-0' �. rot � • � • , N+ N� y,>, e.,• sc *ALL. LAW . Ar.F.A...re v6 IFIcicATEv �I.NNTIN6 P.£h•T,r4 ' Aut,wacv 0"Mel,Fal`) ` / C01 "\ . _ . '„ �. �, l seANbiA JuWPEF V--% / •I I MINT JuLFr JUNIPER / —4 coMpAcT AM VICURNUM • • ht-FNTING Pt.AN V `7 1..:u• .u Nei rt+ -40.xt 00.11010 ur Lt1F?PS _, .nem e►•409 S i E f I I I L U S U , _ - -0.109n4( P.*OAO)too.bu e.Thr. r• it• 1t4YAWATBO K1a1T PS.f)(IYo) •• ...i11' •611."1.0.0. Mfalit wvwa.(0.o) -- �/%UE� UPC = — .— sero-$ 8JJ0LI91ES L111 . I �_ ( 1 � - �� 1 iii! • • •I L.-,e , 9•-s• .�_4`• -4" .. ;fid,_ q0F•7 1- F-1.2 VAT1CN , tF i___._.--....114•_b" -k --- — _—-- I! _ . - yotecePA S*uTIt1RLS —4•oaR1Lo[•,µL 0.srw MAMA',t" AL?tM1MW05Mm1N/RctFfA480 A1a•►•(12") f.u.imitorreG AaCtWT Er JO(Pen)9"H.,« -= (id) 1 )////////n//��/�// ��r \\\gip\ Riga E 1 u F V tS\ I ewer-rh.rtFO elkrtG t'IrKM. f= v R.rL AN6F -- f -�'- 1-..,:z,.; Wit: 4.:. .. WP�6N M • ., L114— : 666..'. ._•. �- -- 0.NLA•tattO Atom. P , ._ hottiorXUURaUal.sem 0'00A4.0 9wa. 'I ��ir) .. WII"UJPR Iu'+A..40.r. I K,O„_ At e'II n•0." . I ',• , , 1 1,i'..,f I„ Y f 1 ,411 -----------._paa-rA68aA§ {16 a.mr-(10•) (fP-0•^ rWN.Ret) OW#41,n:lb''-*SI'•9.,,'jb.I.1,0.10%•136//4GMPK.61!?4. 1.1'TKMI',V-o'r',0=1.'•01.4,,0. If Nti)rt.CPQ(tE0 1 Q ' — IWn11ANTF_0 P (00% t. � — . 666..: .___, • 2-:€7. 0 - --_u pt 1\-\_%:- 44 '.j _ �_ �`r`-- C' phyRED01(R•T+feMJ WO _ ' TvA;J ( -- -- ----1(b" UIDEO UPOAT ELK PRIM CENTER ELK RIUER,MINNESOTR -I LXILIM TEC K•rµT a.•O - ove4eto1./*Alms. FOR KRRUS-RNOERSON 1 ----- ---`--.-_ ---- ---."�"'__. ._._. ____. —___�__.. :.�__ ._.a... t o � - - •-- - ' • •• LANDSCAPE PLAN 1 t _ — _ _ rR l - '``•— - --_- — -- -- -- _ BUILDING BUILDING ELEVATIONFj r L _�-Y - - - -- - - -_ •__ 7. ._-- .-" I DATE . 1 eL .VATION 1(0.• 4 )- • , ill 11111111) I ii Lai )00,00•.'". ,..- 1:: - \ 1411 1 ::1 P.n.- y 111111111111111111111 0..., .111111411 CI ‘`--'7,---.0 C i' \ it 1 1 4 a_ (3 11.5