Loading...
6.1 ter { ITEM 6.1. tI'ty of � lkMEMORANDUM River TO: Planning Commission FROM: Steven B. Ach, City Planner,` ? DATE: March 26, 1996 SUBJECT: Conditional Use Permit Request by Menards, Inc., Public Hearing Case No. CU 96-2 Request Menards, Inc. is requesting a conditional use permit for site plan approval to construct a 160,680 square foot commercial building in Hillside Crossing II. Location The southeast corner of Highway 169 and 197th Avenue. Zoning/Land Use PUD (Planned Unit Development) / HB (Highway Business) Attachments • Memo from the City Engineer dated 3/22/96 • Location Map • Zoning Map • Letter from the Fire Chief • Letter from the Police Department • Letter from Resident • Letter from Menards regarding parking • Development sign • Development plans Project Overview Menards, Inc. is proposing a 160,680 square foot facility in the Hillside • Crossing II planned unit development. The project is located on an 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 Memo to Planning Commission/CU 96-2 Page 2 March 26, 1996 • The Menards store will have its floor area divided up in the following fashion: Sales area - 104,370 sq. ft. Receiving area - 13,410 sq. ft. Warehouse - 42,900 sq. ft. Surrounding the building on the south, east and north side will be a 14 foot high wall constructed of 2'x 8' vertical wood siding and a pre-finished metal roof extending towards the interior of the storage area. On the inside of this wall will be a series of racks to accommodate product (i.e., lumber and other products) storage. This fenced-in storage area will be completely secured with customer control at the southwest corner of the building. The fire chief has also asked for a emergency access point into the storage area at the northwest corner. However, that access will be secured at all times except in the event of an emergency, whereby the access may be utilized. Traffic/Access/Parking Two curb cuts are proposed off of Evans Avenue, both of which are consistent with the development plans that were approved for Hillside Crossing II. The • southerly access is slightly larger to allow convenient semi traffic accessibility, as well as customers leaving the site following their pick up of lumber and other home improvement supplies from the yard storage area. The site plan includes a total of 410 parking stalls (including handicap) as recommended by the Planning Commission. As discussed in the staff's previous report to the Planning Commission, the parking stalls proposed by Menards is less than the City's standards for retail space. Typically retail space is required to have one space for every 200 square feet of floor area. Menards' proposal provides parking based on a ratio of one stall for every 255 square feet of retail (104,370 square feet) space. Attached is a letter from Menards outlining the number stalls that have been provided at other stores. The Police Department has also included a memo referencing the parking issue. Outdoor Display The proposed site plan illustrates a 20' x 90' yard barn display area at the northwest corner of the building. In addition to this yard barn display area, Menards will also be proposing to have various fence displays attached to the front face of the building between the northwest corner of the building and the main entrance to the building. There is no additional outdoor display proposed for the sidewalk areas along the front of the building. The • Planning Commission may want to discuss whether these outdoor display areas should occur in the areas proposed or be relocated either within the s:\planning\pc\cu96-2.doc Memo to Planning Commission/CU 96-2 Page 3 March 26, 1996 • yard storage area or at another location on site. Relocating the yard barn display area will provide additional opportunity for impervious landscaped areas. If the barn display remains at its proposed location a ten foot setback will need to be established. Site Plan Review Staff has reviewed the proposed site plans submitted by Menards and would offer the following comments: Site Plan 1. The perimeter screening structure (14 ft. wall) will need to maintain a 10 ft. setback from the property line. As presented the setback appears to be met. 2. If the outdoor yard barn display area is to occur at its proposed location, it will need to be set back 10 feet from the property line. Parking and Circulation • 1. The southerly access off of Evans Avenue should have a width no greater than 36 feet. The curb cut radius' onto Evans Avenue can be increased to improve the turning movements for both semi traffic and customer traffic. 2. Traffic control/landscaped islands will need to be provided throughout the parking area. These locations are generally at the ends of every other parking row, with the exception of islands being provided at the end of each parking row along the northerly entrance into the site. 3. Revised plans should include a typical parking stall detail with dimensions for staff review. 4. Parking area will need to be bound with B612 concrete curb and gutter. Refuse Collection 1. Menards has indicated that all of their refuse collection will occur within the enclosed yard area; therefore, no screened enclosures will be necessary. IP s:\planning\p c\cu96-2.doc Memo to Planning Commission/CU 96-2 Page 4 March 26, 1996 IIFire Protection 1. An emergency access will need to be provided just north of the northwest corner of the Menards building, providing a secondary access to the enclosed yard storage area. This access can be secured at all times with the exception of emergency events where the access may be utilized. 2. Fire hydrant locations will need to be identified and included as part of the final set of plans. These locations will need to be verified and approved by the fire chief. 3. "No Parking Fire Lane" signs will need to be provided primarily along the west side of the building and possible other locations throughout the site. Once again, the exact location and spacing of these signs will need to be coordinated with the fire chief. * Please see attached memo from the fire chief dated March 8, 1996. Landscaping • 1. The quantity of landscaping proposed on site meets the City's ordinances. However, staff would recommend having the number slightly increased to improve the buffering to the east residential area, as well as increasing some additional landscaping along Evans Avenue. 2. In talking with Menards apparently a typical underground irrigation system will not be provided; however, Menards will be installing a system that they have utilized in their other facilities. 3. The proposed landscaping along 196th Avenue will have to be placed outside of the right-of-way. 4. It is recommended that additional landscaping be provided in the southeast corner of the site to improve the buffering to the residential. 5. There may be some existing trees that are saved immediately south of the proposed building. If this is to occur, obviously the landscaping plan will need to be revised. 6. All of the traffic/landscaped islands in the parking lot should include landscaping as shown on a typical landscape island detail on the . proposed plans. s:\planning\pc\cu96-2.doc Memo to Planning Commission/CU 96-2 Page 5 March 26, 1996 • 7. As part of the planned unit development, a landscaping theme has been utilized within Hillside Crossing I and is proposed to continue into the Hillside Crossing II. These themes will need to be incorporated along Evans Avenue and at the entrance points to the Menards facility. 8. Size of proposed landscaped material will need to meet the City's performance standards. Overstory trees will need to be a minimum of two inches in diameter and conifers 6 feet in height. Building Materials 1. The building is proposed to be pre-cast concrete insulated wall panels with a decorative smooth band along the front entrance (west elevation) of the building. It is recommended that an attempt be made to incorporate common architectural elements that may be implemented throughout the planned unit development. Signage 1. As shown on the proposed plans Menards will have eight product . identification signs along the west elevation of their building, along with a red neon internally lit "Menards" sign between the entrance and exit. In addition, an internally lit "Welcome" sign will also be provided between the entrance and exit to the building. 2. No signage will be used on the north, east or south elevations of the building. 3. Free-standing sign will be limited to the project development sign as approved as part of the planned unit development. See attachment A. Drainage and Utilities 1. The City Engineer will be reviewing the grading and utility plan. At the time of this memo a grading plan had not been submitted. Recommendation It is recommended the Planning Commission recommend approval of the conditional use permit request for site plan review by Menards, Inc. to construct a 160,680 sq. ft. facility with the following conditions: • s:\planning\pc\cu96-2.doc Memo to Planning Commission/CU 96-2 Page 6 March 26, 1996 III 1. All of staff's comments outlined in the report to the Planning Commission dated March 25, 1996, be incorporated into the revised set of plans prior to issuance of a building permit. 2. All of the City Engineer's comments in the memo dated March 22, 1996, be incorporated into the development plans prior to issuance of a building permit. 3. All outdoor storage and display along the front of the building shall be approved by the City Council. • III s:\planning\p c\cu96-2.doc • i1st St CONSCLTING ENGINEERS March 22, 1996 File: 230-302-11 1326 Energy Park Drive St.Paul,MN 55108 612-644-4389 Mr. Steve Ach 1-800-888-2923 City Planner Fax:612-644-9446 City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: MENARDS SITE PLAN REVIEW Dear Mr. Ach: As requested, we have reviewed the site plan for the proposed Menards facility to be CIVIL ENGINEERING: located in the Hillside Crossing II development. The site plan we received was prepared ENVIRONMENTAL by Menards and dated February 20, 1996. As of the date of this memo, we have not MUNICIPAL received a drainage and utility plan or any drainage calculations. Based on our review, •PLANNING we would offer the following comments: SOLID WASTE STRUCTURAL 1. One of the proposed driveway entrances off of Evans Avenue is shown as 40 feet SURVEYING wide. The ordinance limits commercial driveways to 30 feet. Unless a reason can TRAFFIC be shown to allow a wider driveway, we would recommend that the driveway be TRANSPORTATION reduced to 30 feet and larger radii used to facilitate turning movements of trucks. ELECTRICAL/MECHANICAL 2. The plantings shown around the perimeter of the site will generally fall in the ENGINEERING: drainage and utility easements. This may cause a slight conflict with the placement HVAC of utilities in these easements. POWER DISTRIBUTION SCADA 3. The sign located in the southwest corner of the site will also fall within the SYSTEM CONTROLS drainage and utility easement. 4. The parking stalls located along the south line near the west end are undesirable, given the traffic expected to be entering and exiting the yard at that point. 5. Additional concrete islands should be placed on the east end of the parking lanes to delineate the parking from the drive isles. 6. The Fire Chief has reviewed the site and indicated his desire for an additional • OFFICES IN: emergency entrance into the yard at the north side of the building. This will MINNEAPOLIS require some reconfiguration of the yard barn display, landscaping in this area, and PRIOR LAKE parking. ST.PAUL WASECA An Equal Opportunity Employer • Mr. Steve Ach March 22, 1996 Page Two 7. I have had a number of conversations with the engineer working on the grading, drainage, and utility plan for this site. From these conversations, I am reasonably confident that the plan when submitted will comply with the overall grading, drainage, and utility plan for the Hillside Crossing II development. If you have any questions regarding any of these comments, please call. Sincerely, MSA, CONSULTING ENGINEERS 6:G` )fiat Terry J. Maurer, P.E. TJM:tw 302-2211.mar • • ! iiii __, _ , 4Y-021-74424,t,_xt-'-' •ifill . ipl lei , 1 mlitmalomm,,,,i, ......, .. fI 0 . fr `�, �� ":;iiil er4iiii :i:! LOCATION _ ,_�..,,r J Oa .-44. libra, 1 .__ ____ _____..i 1 _____ ,„,,.....„(, _ Islit ...,. . ... ;:, t. ,____ -� _ 1z • - -_ i . _ __-_ -L L11., ..I 11111 , - 1�■ *1 ■, Mk t MIL irl �,.. 1 .`IIr!R: 11 !1 :mop * s_ .� • - L Va00' NW' '! Pk Mkt _Apt l/ '‘ INA IIII VIP* r 10"""" G ►� Aø 'i: i 'i _ �/n* �,: Ing\1.1 =_ _. 1�ms 1 �! Wig► Llgliiiiiiiiii t onimiYln% mom ditIPPA ►, w4 Wit' i�!I*IV;IR!!�'l/ -- __ __ iqpir • o Killill7.-- I —ter--111 ''\ 1b�� 22.'4 K• ,• 4 // Is< t�.t►�i i �;�•X400 `1.' PIMP IN I' °' ieppr ILK IMP MA INN W1012. O , 11.1 U{Mr . E211r 1 c;1173 ILIILP.aAamaL la ..:‘:., : WM */ - -- -11: :Tim inn .,;\ m.1E...is a,. .:r/n Iron t BIM -IA il -11- _.-�A ' i : : :cal- �1JV:y��� ,1 _rarluu�►E��i " �� . ...-.. ...,,,„...r- os • .,:i= mum: 74: ot..• . 11 I. liStim;41E Til= usinummaL.' SS,-. ' :',', 1111113it i. eV)\ , _ Itanii Els i::17:,/' -.\;Vii I g•. r. { LOCATION N City of v.' MAP Elk River 13065 Orono Parkway • P.O. Box 490 CASE: CU96-2 Elk River, MN 55330 I ,. (Ra) l i . / . I / �� , :, r� n ',lc,' • :� `,look-. 1 / t�,,.„„.3.1 . . )-_; . .„„ , ,, ..„ ,: ,7 A I , •Raller ..ei. oftlima opt TION15Rg -›re � ` ! f . LOCA \Milli'. 11 ir4k-100. :, ��� ?LID• It PUD - Rte l 1 Ellattii. , •. .:.• . . . A . .•�® p�/, •���.�napRLddi • n s.�r R ' R ISI �i♦� � = .0'�L�Aif I� Aid ali I 141Z9A:.1 ajd...1S;!EMILY .... low' ea ' I ' • -- 077 0 _P.! Al .1 j Vi 1471.',. - C jora PPP = 1,MNIViltar,.. �� mimi area 1.1,...... dol/Wriliain":= . ' "1 um 1; 0, MI .../.1? V!Pliiilt..WIWI- . a, !�0 _ •.;„ mo♦ 11. 111 � t� • � �- R \ 1E a � - = � I \- 1701I , z. r I\ \ '.. \ :e1' IT ` i 1�1 1.1.6•2 -- ...."Oii -1 r< .. ry1 'l „? 1....-,, ti . 1Millmemo 13... t'''-- '/''''. ' I = Mn 0 _ ,� i � I a _ ,. : �i � R- ..: =49. I mo' 1.0...--....aur:Ar •,"i: N 1._ =[- 17-l' -•N 'tauir�.'.c2� °� t 1�"_► - 1� 1:'. u lcr !!!r: 9111: 9�de.''N Ni �, +�e� ,:yam ,•., _ WM r,�•au • • P' ::IUB. w _ . +_ ..a;+ _ ;4'4.4►• ai.r�` * mom. . N .� ZONING City of ti . MAP ' ?' Elk River 13065 Orono Parkway • P.O.Box 490 CASE: CU 96-2 Elk River,MN 55330 ty of / MEMORANDUM lkRi• ver TO: Steve Ach FROM: Bruce A.West Fire Chief DATE: March 8, 1996 SUBJECT: Menards, Elk River Minnesota Proposed Site Plan After review of the Menards proposed site plan, and with discussion during staff review, I have a few comments that I would like to make reference to at this time. 1. Designated no parking fire lane area. The entire westside of the Menards complex which entails the front elevation or entrance area shall be designated a "no parking fire lane" area. This includes the • entire west area north to south side. 2. Emergency access in the northwest corner of the complex near the yard barn display area. After review of the site layout plan, one of my concerns is access to the west side of the building in an emergency situation. A gate added to the northwest corner chainlink fence near the yard barn display, would allow emergency vehicles access to all area of the Menards complex. This gate could be locked at all times with accessibility only in an emergency situation for Police or Fire. We would like to see a gate with a fourteen foot clear opening in this area. 3. After review of the hydrant locations surrounding the complex, I have one change or concern referencing the hydrant in the southwest corner by the yard gate canopy. I would like to see the hydrant moved from the present proposed location along the parking stall area east into the landscape island and landscape planter area. The remaining hydrant locations have been reviewed and are acceptable at this time. If you have any questions referencing the issues raised, please feel free to give me a call at the Elk River Fire Department 441-4919. 110 s:\offsite\sachmen.doc 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 Memorandum / To: Steve Ach, City Planner • :>., From: Michelle Masica/Cheryll Edinger Elk ; River Date: March 8, 1996 Police Department Subject: Menards Future Site Cheryll and I have a few questions regarding the site plan. We were wondering how high the chain link fence is going to be . We also checked one of our reference books on parking and the book recommended 600 parking stalls for the size of the retail store . We are not sure what the city codes require . We also were looking at the parking lot lighting. We would like to recommend that some changes be made. We feel that certain spots will not have adequate lighting due to the positions of light poles . Our last question is about the landscape planter. The plan shows it will be 5' high and have shrubs . With the barn display behind it, we feel this may obstruct natural surveillance . If you would like further explanations on any of our • recommendations, feel free to contact one of us . 13065 Orono Parkway • P.O. Box 723 • Elk River, MN 55330 • (612) 441-2324 • Fax (612) 441-8937 1y�ti�9 Cheryl Becker 11452 197th Avenue NW Elk River, MN. 55330 • Planning Department Elk River City Hall PO Box 490 Elk River, MN. 55330 Attention Debbie Kleckner and Planning Commission, I would like this information to be in the packet that goes to the Planning Commission prior to the March 26, 1996 meeting concerning the M.ennards Project P96-1 . Please address this at the meeting. I have to write this because with my business and other obligations with my children I cannot always make it to the meeting. I was at the public hearing with the Council on March 11th. My house is only 40 feet from where the East line of the project intersects my back property line. My home sits on the South side of 197th and only 30 feet from the back property line which is a common property line for the project. • At the Council meeting on March 11th it was decided: 1 . The "trail corridor" be removed because there shouldn' t be public walkways across backyards of residences and because of how close it was to my back door. 2 . The 75 foot no-cut strip on the North end of the project was then decreased to 50 feet without knowledge to me or the Council of how close this puts the parking lot to my house. 3 . The developer was able to decrease the footage of 25 feet to 10 feet from the no-cut strip to start his parking lot for this Outlot Kill:mut knowledge to the Council or me how much closer this put the parking to my house . Therefore, a parking lot with cars and public will be only 90 feet from my house and only 50 feet from my back property line. I am extremenly happy with the trail corridor being removed but decreasing the no-cut strip and increasing his parking • lot puts the public right back only 90 feet from my house and only 50 feet from my property line. The developer :ained 40 feet on the north side of his Outlot B, and I still have the public and now t e out o j .ui sing, an. .. s er TT-TV-house, property and daycare. I run a daycare and have done so for 10 years . I am very concerned about the children wandering off, following strangers , 411 or disappearing. The state will require me to put up a fence for the safety of the children. As for my home and privacy, I do not want the public so close with easy access to my property for vandalise , theft, and crime. Suggestions : 1 . Increase the North no-cut strip back to the 75 feet that it was origionally set for. This would help me with my privacy and by business and the parry for the safety of the children. I was established here first and the- developer agreed to this before. It was changed by the Council and developer without the Council or myself knowing how close the intersection of this project was to my home. 2 . As a neighborhood this 75 foot no-cut strip verses the 50 foot helps us as homeowners so we do not have to look at backs of buildings, parking lots , lights , parked cars and dumpsters . I feel we were here first and this re-zoning occured afterwards . If I knew this re-zoning was going to happen and this project was coming in, I wouldn' t have purchased this property nor built in this neighborhood. A. a single mom raising three children, maintaining my home and running my daycare business , I am asking for your help in this situation and with these issues . I do not have funds available to put up a fence for the safety of the children and for my privacy that is being taken away, and I feel I have been put in jeapardy for vandalism, and crime with the public having close access to my property, and my daycare business is being infinged upon. Thank you for your time in reading this and addressing these issues . Very concerned, (X/ty/e/ 42. i&C,1&(-) • 44/ -3 J9 ti. .. ,.t ..`"r,.r-.:*-,w—.tee...•....m.,-,.. ._ -.. - -"-=-�rrr K.....: .. -.;: : .- ,. .,. 1/ February 2, 1996 Mr. Steve Ach City of Elk River 13065 Orono Parkway P. 0. Box 490 Elk River,MN 55330 RE: Parking requirements for the proposed Menards store,Elk River,MN Dear Mr. Ach: Menards parking needs are not as high as most of the typical major retailers. Our use is somewhat different, our aisles tend to be wider,our products tend to be bulkier and our outdoor storage area is larger. I am providing you with an updated store list of Menards old and new prototype stores. The list indicates the number of available parking stalls at each location and the store opening date. As you can see from the list, the number of parking stalls we are proposing for Elk River is consistent with the • number of available parking stalls at our other locations. The total square footage of the new prototype store is 160,680 square feet. But, not all of that is actual sales area. Only 104,370 square feet is sales area with the remainder consisting of 42,900 square feet of unheated warehouse area and 13,410 square feet of receiving area. The old prototype store had about 60,000 square feet of sales area and about 50,000 square feet of warehouse and receiving area. It should be noted that at any one time, during business hours, we've found that approximately 25% of our customers are in the outdoor storage area with their vehicles picking up products they purchased in the store and not parked in the front parking lot. Finally, keep in mind that we do not receive the mad Christmas rush that most retailers count on. These retailers design their parking lots mainly around this one month of the year. Our busier times are a little more spread out,generally occurring in the spring and fall. • Thank you for your consideration in this matter. Sincerely, . • ary Colby Senior Project Manager Menard,Inc. GC/sw �< 2.00 1960 e t g SOD Mniyer • gal keV/W AmOCfr 4777 MENARD DRIVE EAU CLAIRE, WI 54703-9625 TELEPHONE (715) 876-5911 FAXit- 71 s-alr,Am1 411 Menards Home Improvement Centers Available Parking Prototype IIJL160,000 s.f.) Store Location #Parking Stalls Opening Date Appleton, WI 403 9-7-95 Batavia, IL 407 T.B.A. Bellevue, NE 411 12-21-95 Bellevue, WI 422 - T.B.A. Cottage Grove, MN 405 T.B.A. Dolton, IL 426 T.B.A. Eau Claire West, WI 415 2-08-96 Fox Lake, IL 397 T.B.A. Madison, WI 444 T.B.A. Minot, ND 401 T.B.A. Onalaska, WI 407 2-15-96 Sterling, IL 417 T.B.A. • Proto ype II (145,000 s.fj Ankeny, IA 298 8-11-94 Bradley, IL 343 12-15-94 Cedar Rapids, IA 356 8-10-95 Chicago, IL 249 T.B.A. Council Bluffs, IA 319 1-94 Elkhart, IN 319 12-22-95 Fond du Lac, WI 350 8-03-95 Goshen, IN 327 1-5-95 Grand Island, NE 335 3-16-95 Grand Rapids, MI 374 1-26-95 Gurnee, IL 317 3-94 Hudson, WI 317 6-30-94 Indianapolis North, IN 363 2-94 Indianapolis South, IN 311 3-94 Iowa City, IA 319 9-1-94 Machesney Park, IL 363 10-19-95 Mason City, IA 330 12-15-94 Matteson, IL 302 4-28-94 Mishawaka, IN 339 1-05-95 • Norfolk, NE 323 3-09-95 Norton Shores, MI 323 2-16-95 III Store Location # Parking Stalls Opening Date Sioux City, IA 256 1-91 Sioux Falls, SD 228 4-90 Springfield, IL 232 1-90 Urbandale, IA 211 1-86 Waterloo, IA 198 12-84 Waukesha, WI 248 12-83 Wausau, WI 221 10-78 West Allis, WI 236 8-87 West Burlington, IA 249 1-91 • • MAR- 6-1996 14:29 R I VERS I DE DEVELOPMENT 612 441 4575 P.03/03 ATTACHMENT "A" 0 MEwARDsa - r•f___ -.0 -44- _ _ _ ..• ••--__...... ____ _ • __ - / 1 , 1 • , t o i —sl\E-7P6.\-- CABO-IS:7' . 3 ---..., GAS STATION "6: ithrTEINALLY ?k.t...1.-rS.0 Cvz„E•f - --L- ".s — 1- - . - -I ILLUMI MAT Ea FACE St4M ' 1 MOTEL s —— .. ._ • RESTAURANT k------j , 1 :9 -+ .-.1 ci•--r-*-7. 'r••!'t""--- .1 ,•-•7'', -.1- •--•-•• . ) •-'7•I•• - . .*."-•••::- 1 . ,...., . ...----.C...v.-5.., ;')....c• 4 r",......, ..,'" ,: .... '-; ' I';': .; :... ( 12%>-31-11Z>=119 1 ,,, V. .. • ' . -....'lka.: ' • 1,51w. %....S143...A. •'t• 4'1' 1 I I JP _ __ i .• _ ._ ____ •• • zzi-o" ____ _ _ - _ ___ - - _ _____ ..-4 ,,...:: DEVELOPMENT SIGN (ALONG HWY 169) SCALE: 1/4" - r-0" ke.J. 16fr. -Rsv. /1.afcit RIVIR'.5101. Di VILLOPMENT 241 MAIN STREET, SUITE' ii ELK RIVER, I..4N 55330 pi-lOwE. b12. 2.41 1801 .... .. .. .. . . 111 341k 2.01 (43 TOTAL P.03 B € J3 LLI li ml 1_N y" wE w 0 • 3 Y N I- 5 Z w Q ,,9 0 ' Q a lig p%l/ 3 a !Iii os S W 3 c g201 . j +3, ►- Q1 1 h I i 'A "z,o?tliiT. IQ- w s ,11.,11 J a 1.110i i_cl , w c� Z q 6" Q z< § I 9 ?� V) xII J g i ! 1 3 9 A i z iY � ° (n a \. 0000 • cog 1 U 4 Q wed J M N N ii Zb � � ai � � .' 111111111 .. a I!I I • • ? •[I/ A d 8 ( F • = 0 ift �..-.b-on �i .:. -0 .00'00113.9f On S 01 ak .�._.. .Gm. wm„. :ice t��`���«��`���� 4117 k. N J £ W; gCM�`W' • al A ,`'� 1 : 4 4. I . . .1 ft- otao ” o Vi. ' � rros. I Z 8 Y € W„,41 'y < ® d z "'" a f Q C W 1 : 0 2n 2 : g F; II a" a e f M11 0 5 611 r., x. '0." .W.`.S.:=�aa,.o.. �I • " / � • @3XC8Y{�4,a:fAB}&'�4 Qui ac..<^--^— .� * Jj 4s+s eta c�oarrt n xxa 0_020 0 4�, 0� { 0 • a�,s CC .„*RSS ti p5P4°o' 33 M188 WWII SW aD *v."RIM 3H03 31Y11UtII SW I" • • • WALPAC INTERNHLV NGHTFD GREEN'CAP TRIM 1 P' LJg11ED'MENAADYASIGN 1 1 zPROWCT CATAGORV SICNS / • iiIIII iP D$ A e.r. °r' BNr9 , axis WA, �\ 'MACK" RN1.r • 151.. POI �+ IP ligraiiiiiill=4111111111116 111 I:.0 II II .. III - I_I DI N I - II —! �II7IIII—�' II II � ® ® ® ® � I I11I —I — \\_ \\\\ Y-a' PNNTE0 GREEN STRIPE N 19 GA,A1.7.1. `NirPIULLY LIGHTED'MELNME TD'SIGN BUILNGAT 12.AO6Yd FRONTif PNELS'GIEAY LL CD INSULATED FRONT ELEVATION SCALE: 1/16'-I'-0' n n n n WALPAC LXNTEO 1.-0 \ - _ �_ - - _ _ _ r y (a'-1/2'XS!Ak1'-0'1� 'BLAG('1RW . Hill 111111 =Iilllreuuf I I`'� _ A.ILeI._ A _ __-J [� R ° 141,1 2,9,s6./...6,,FEL .---' L-�J\ MOLE PLY ROOF NdBiANE RECESSED COMING DOCK / I Iill J WALL PANELS 6V FABCONNSNLATED RECESSED LOADING DOCK REAR ELEVATION 15 X IC OPENINGS INTO 804010USE SCALE: 1/16'-I'-0" MN 26 GA STEEL ' �GN EAE FLASH_ F � TOP CT BLDG.RNCLDK'ACE) l ELEV.12T-9 Sp'e MM 26 GA.5 ALEL ILII ® • • NM 26 GA STEEL PANEL 111111111 KRAITI _ _ 'GREEN' OHI/ —A R Ai ® 1 FINISHED fL00R e L NM 29 GA STEEL ELEV.100'-0' PANELS•GtAY �-REGE59ED LOAGNO DOCK SIGN LEGEND VO NE ttI 'LAS SIGNS MONT .FOOTAGE W)LL PNHfLS IX1 ROOMS 9•-0• SY-v Su WELC066 TT. 1,-11- 60' RIGHT ELEVATION 1111.1.166.6 T-0' W-A• MT 'GREEN'EAVE RASH Y-0' 66-2. 101 WAIPAC SCALE: 1/16'-1'-0" RANT TiN 04.1 Y-0' >-10' 1ST ICf-O' TIP CF MANSARD cNPEr Y-o' 7-4 In' INS 9 ' BEv.TCR-11/Y GANNETS 2N0• .6-V 20.0 \+ SN NN 2a CA.STEEL PELS 7-0' 6-91 193 . • . . • 1 PIR-COLORED'BAG(' 0u6.666 Y-O' V-A' 167 xAm Yb' a-10' :1--- 0. NANSMD ,WAE TOW 90.F.O1ACT-500.A SI R _ EI112 7 I NN 26 CA SIM PANELS >J a' NMZNCA STEEL PN{LS T reo r - Y RTAS_ �" �� LRECAST(YfYNQ21ENBAAIFD METAL CABINET la _ _ LEFT ELEVATION PANEL56 fIHCW IX X N'OPENING NFD WARENWY PAINTED GREY ■ — SCALE:1/16"•1'-0" 2'0 STEEL COLUMN -'TIL L'I��1UI411 1.I i� NYU'QII UOI „IC(4 io rtelS I I - ♦ 1 ♦ 1 1I; _ AD-C PAINTED GREEN III_ •s._'0, ! Pl�.-_g0 "I lit I1• STI - IE'71 N-,7[- I`� 1I 15.7 SQUARE FEET 18.7 SQUARE FEET 20.0 SQUARE FEET . �iEN� I >-s t/Y I I V-C I • _ 6"CAST-IN-PLACE _ 600��FEET CONCRETE CAP W//4 ppLL {� (�� �� }� 312 SQUARE FEET ' REBAR 24'O.C.8/W i � • •I1s�_� I�L �I`i C'11 I"�`` SII 2"OVERHANG TYPICAL +I 10.3 SQUARE FEET 10.8 SQUARE FEET 19.5 SQUARE FEET FRONT MENARDS SIGN WELCOME TO... SIGN ■ SCALE: 1/l'-1'-0" PRECAST PANEL BASE Y-�' SCALE: 1/8'-1'-0" nlo.Em TOLL 111TH1111111 IIIIIIIIIIIIIIIIIIIIIIIIIINII I I I,r H ARD INC. MENARDS i NIP111111ho11(I ''If�t<�11610710it _ ELK RIVER , MN. opRoe .N I. 24-0" .I 18.7 SQUARE FEET 19.7 SQUARE FEET EAU CARE.X41 'Q''"M BUILDING ELEVATIONS Wa9D� 200 SQUARE FEET r1�R PYLON SIGN PRODUCT SIGNS �G.RIN �'�' ' "• OAT 9Y GNA eAw 19LLT M6 SCALE: 1/8'-1'-0 SCALE: 1/4'-1'-0' 0.6 2 3 7-15-95 • March 22, 1996 Letter to City Council, Let me start this out by saying that I'm all for the Menards project. Just a couple of issues I need to get of my chest. #1-WOODLANDS. I hope the city council can come to a compromise with the developer and find a way to preserve some of the natural beauty this plot contains. We all know that the easiest way to build a development is to start from scratch. (NO TREES-FLAT LOT). Well the easiest way isn't always the best. I understand that there are some elevation concerns involved, but with all the timber in there I would think some trees match up with final grade; that aren't in the way of buildings. Also, why not save as many trees possible along Hwy. 169? With the signs that will be on the highway informing motorist of what is in the development, I don't believe knowing what is in there will be a problem. Let's add to it's beauty by preserving it's beauty. If we continue to destroy trees that have been around for 75 to 100 years, Elk River will have to hire a • forester to take care of all the small trees that take there place. #2-TRAFFIC. I live three houses east of Hwy. 169 and on the north side of 197th Ave. By adding 12,000 to 14,000 cars per day on this already busy residential street; you will be increasing the number of people that think my driveway is some kind of turn-around I suggest adding a right-in right-out off of 169. this would reduce traffic on 197th Ave. I am aware of a deal that was made with MN-DOT that hampers city in adding this option. but if city made that deal, why not make another one to allow this to happen? There are several right-in right-outs along Hwy. 10 at many businesses in Ramsey and Elk River. There will also definitely have to be stoplight installed at Hwy. 169 and 197th Ave. Just try and get across 169 sometime on a Friday afternoon in the summer time. This has to be one of the busiest highways for boats and campers I have seen. In my opinion we need to try and develop to the east & west on Hwy. 10 in the future. If this trend of building to the north on 169 continues; we will have to install a walkway over the highway just so our kids can cross safely. Jeff Meyer 11475 197th Ave. Elk River 1111