Loading...
3.6 ( *ITEM 3.6. flokRiver MEMORANDUM TO: Planning Commission FROM: Steven B. Ach, City Planner DATE: October 22, 1996 SUBJECT: Preliminary Plat Request by the City of Elk River, Public Hearing Case No. P 96-12 The City of Elk River is in the process of preparing a preliminary plat for the Cass property which was recently purchased for the development of athletic fields as well as the opportunity to subdivide some residential lots. The appropriate information has not been compiled yet to allow the Planning Commission a review of this application. Therefore, it is requested that the item be tabled until the November 26th Planning Commission meeting. Recommendation • It is recommended the Planning Commission postpone Case No. P 96-12 until the November 22, 1996, Planning Commission meeting. s:\planning\pc\p96-12.doc 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 &/ `\ ITEM 6.1. MEMORANDUM it of y � `} TO: PLANNING COMMISSION Ylk ' • River FROM: STEPHEN ROHLF, BUILDING AND ZONING ADMINISTRATOR DATE: OCTOBER 22, 1996 SUBJECT: CONDITIONAL USE PERMIT BY SHIELY COMPANY FOR CONCRETE PRODUCT PROCESSING/PH CU 96-24 REQUEST: The Shiely Company is proposing to construct a temporary ready mix-plant on property zoned I-2. Concrete product processing is a conditional use in the I-2 Zone. ATTACHMENTS: • Vicinity/zoning map • Plant diagram/picture • • Site plan • Review comments from City Engineer • Draft conditional use permit BACKGROUND: The property owners, Julius and Marian Nemeth, will be the Lessor. Shiely Company will be the Sublessor and Marshall Concrete Products, Inc. will be the Lessee. The ready-mix plant is proposed to be located in the southwest corner of the Nemeth property. There is a current conditional use permit on the property where the ready-mix plant is proposed that allows Elk River Bituminous to mine gravel. Mr. Jerry Hicks, owner of Elk River Bituminous, is aware of this current request. The ready-mix plant should not interfere with his operation. The Shiely Company has a conditional use permit that allows them to mine the portion of the Nemeth property not covered under Elk River Bituminous' permit. There is an existing temporary ready-mix plant on the north end of the Nemeth property. • 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 REVIEW: • Temporary: The word temporary refers more to the movable design of the plant than to its expected life at this site. However, this use should be compatible with this site and zoning for long term. Traffic: The proposed ingress and egress to the plant is 213th Ave. to and from US Highway 169. There are turnlanes both ways on Highway 169 and 213th Ave. is a county road appropriately designed for industrial traffic (see City Engineer's attached memo) Noise: As shown on the attached site plan the trucks using this plant will drive in a circle avoiding the noise of trucks backing-up. Hours: Staff is recommending normal operating hour from 7:00 AM to 7:00 PM Monday through Saturday with exceptions for special cases approved by staff, if due cause is demonstrated and extra hours do not intrude on adjacent residential uses. Dust: Approximately the last 100 feet of drive leaving this site is asphalt. This should help keep 213th Ave clean. Further, Marshall Concrete Products will have to water the site or contract with Shiely to water as needed to control dust. Because the plant is situated in a gravel mine that will someday undergo reclamation, staff is not proposing any additional • hardsurfacing. Drainage: All storm water is contained on site. Shop facilities: Shiely has made agreement arrangements for Marshall to use their shop facilities on the east side of Highway 169. Staff reviews this shop once a year as part of Shiely's gravel mining permit. All appropriate disposal arrangements for waste have been made for this shop and they have a hazardous waste generators license. Storage: Marshall is requesting to store 250 units of specialty blocks on premise for the convenience of their customers to finish a project when they run short. This site shall not be used as a retail outlet for this product. Environmental responsibility: According to the lease agreement for this plant, Marshall has responsibility for any environmental damage caused by their operation. Signage: Staff recommends the plant be allowed signage as per the I-2 zone and as a separate parcel. • s:\b&z\stever\marshall.doc Screening: Marshall and Shiely have met with the adjacent property owners (to the south) to address any concerns they may of had. It is mutually agreeable to all concerned to have the screening for this project placed south of 213th Ave. (on the residential properties). Having the screening close to these homes blocks out more height, which is a concern because of the plant's silo. Further, it is less likely that plantings on the south side of 213th Ave. will be disturbed due to future reclamation. Additional plantings to screen this operation from the Highway should not be necessary. The elevation of the plant site is quit a bit lower than the Highway and there is natural vegetation in place. RECOMMENDATION: Staff feels the proposed ready-mix plant meets the 7 standards setforth in Section 900.42 of the City Code of Ordinances by which a conditional use permit request. We are recommending approval of this request under the conditions outlined in the attached conditional use permit. • • s:\b&z\stever\marshall.doc A 4 it A� \ \ U ® x L1 0 ,„, i , . / ' y \ '-,,, ',,,, \s\\ \ \ . - x r ---_____> \` \ r, / i I \ \\ ;\ o I ! l' \ �.,�\ co i \\ \ -----'''-..,1 .. \-----, ,_____________________,-• I w pp ..\ \ ) c ---- 4/ I 1 \ 1\\ \ 1, I � /1�, }- yi \\ \\ , A\ /(714X '� ' \\ '4 ® I ;\ ill/ ! t s \\ ;; ?; !� - A. i / ' 1 O \\ ../ 'l, 1 )N� ' N \1 iliit ili:. •••• 4:1 \i, col 1 / I __.,.___ \-)\c',..; , v ti.:iff c, r,r-f--.• ', a I /8j xv 1 \ ;,'n 3 y 1. f o = 11 < , o ! I �\\1;-07/ o �.. 3 :.:______—___--- -- n ._ - -,-,---,-4---_,—_. • r-'---,-.. -7.----`,':.\,....-,---: I I \\I \ ei 1 1 , f ----\0I a / ao ,721 Win t !, O A, ' -11*** �.`-Y 1 r X Q X .� cco o :--I -0 J O iI � � 1 �� !. \ !/ ., , m 1I, ; 7 ' PC I X��� \JI sti 1 I x tip ' t---- s--�=�� �x5 x 1//r x �� l '••,, -.. L 2 x.67 x �I/ ! 1, ,\, x1 N III C2) .1. t w O �� pop. r` _:------,.?k.,1') o /// /� i - _----- --_ -- �` -r-= _ ' j - �� - _ '' i' j____________ " I `3`, Conditional Use Permit • .,---- �`\ 1-1 i GRAPHIC SCALE Concrete Ready-Mix Plant Q:$: cp p x J f '� 0 50 100 200 o ��� II 11 44 FILTER VENT ,,� (DUST COLLECTOR). CONTINUOUS READING OPTIONAL PROBE BIN SIGNAL OPTIONAL j I 1 A I'� Ij _ LADOE1t NANORaL I I k TOE BOARDS. ` -l Il _���.r_�;�, DP,TONAL , f HICM Bw SICNu 4.411. OPTIONAL if .i'",.1.4,.i:.:.'' Gil,. , tir 60'-1 1/4"800 BBL 1 Y uw.o 35'-7 1/4"800 BBL ,'�` ' ,.'1� 1 •`r Tr \ ' i r,`.F.. ,',l S i s c e J , , f�f ,,Ii:-tri,`r7"'''w•''.;irp%. 53'-1 1 t'600 BBL '+'?'' '.lq 4 1 •t I @3.rw...,-, " V.I„L'4 k'0 1,!:� . a... / � i � of, r h a, 1I1 $,, r ice' Y4 • E. . 28'-71/4"600 BBL AUXILIARY SILO Low BIN SIGNAL `. •'"' '., , ti � •k ,,,,..i.1`` 3 LOW ,___. 49'-1 1/4" 500 BBL 24'-7 1/4"500 BBL EMERGENCY AIDE CATE 44'-1 1/4'380 88L ,', I .... 25-0• -a 19"-7 1/4" 380 BBL ' / l LOAD CELS(3) 8.-4* 8.-4* 8•-4* BUTTERFLY CATS ' ' 11Vii_1,.-....11.,11----: FILTER VENT lir 12 YARD CELENT BATCNER 65 TON 11 di -L CPDGNA.. AGGREGATE BIN 2'-0' HEAP PLATES PI —....„7 i( / 24'-6" I ___I �\ ATCHER 41r2T•-9 i�Y1 L\AGGREGATE 65 TON III (STANDARD) f16'-0" STEEL CLEAR ;1"SHIN t GROUT i ---, ir -` • ���� I ' 4.-6• �I 11. !•C 1 1 1 I rJ L , L_ I 1 • ` J 0 0 g 0 r- 4 il ::,/ :, k • co i i. X , I \ I ' '' \'\ / , , , i ?..1 \0\\ -\. `,..,,,, ...• \ „ss 0, a l II \t; ® I\ f\V ' t o `t ' . 1 f..3 \ , 4 / 0,7 -,:n Lia cif"c'43 13) Ii:3 1 i i \ ; ' me 0/,------ yff J _ y XN \ i-131 N \ ml I =. -T 1 7 f ( \\A-...,.. \\� a r---'-- .► •',"----------''-7\<r-\ T'�r-" ter `_ 1 o m l i N , ) l \\ �_� • _�� \ • 03 `° Ill \'''..-\ \\_...., \\_x ! ` ' X 3 �� Q �`X� X .... ,,,,, ii, _, . , , \ c •I IN, '� m lIt II ,. X rI X \ \}}, LA m J I1 j1 G (fa--\te t o �l' y c° 1 °�° 2 - ° 11111 iI i•D 1 F V6f i C E4. I' ( ` A \ iff ,'Q, ‘‘f4' i r , N.:-...--„Li \,,__ „,,, 7 ,..,...2:2_7(;. /,,-// ../.., , li t , , .s. , _, , , / rx , • ____,.,_____ , , , . . .411. 3 1 t Xto .„--,x �x N . -C1-7:7"--78n\ i xoph co /•pOH i �\ i Conditional Use Permit 111, ___ I - ' " 1i \ GRAPHIC SCALE Concrete Ready-Mix Plant -r-u-1li_p X ,f 0 50 100 200 o i ' N i i 1NEEILS CONSULTING ENG 1326 Energy Park Drive St.Paul,MN 55108 October 16, 1996 File: 230-000-00 612-644-4389 1-800-888-2923 Fax:612-644-9446 Mr. Steve Rohlf Building and Zoning Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: SHIELY COMPANY'S CONDITIONAL USE PERMIT Dear Mr. Rohlf: CIVIL ENGINEERING: ENVIRONMENTAL As requested, I have reviewed the traffic flow situation on 213th Avenue (County Road MUNICIPAL 77) as it pertains to the Shiely Company's request for a Conditional Use Permit to install WNNING a concrete batch plant. It is my understanding that this operation is expected to generate O WASTE 100 trucks per day or, in other words, approximately 200 trips along County Road 77. STRUCTURAL From my review of the situation, the access point is located sufficiently west of the SURVEYING intersection with TH 169. The site distances at the access point appear to be adequate for TRAFFIC the trips expected. The intersection of County Road 77 with TH 169 has the appropriate TRANSPORTATION geometrics included in the design to handle this number of truck trips on a daily basis. Therefore, from a traffic consideration, I see no problem with this proposal. ELECTRICAL/MECHANICAL ENGINEERING: If you need any additional information or have questions, please call. HVAC POWER DISTRIBUTION Sincerely, SCADA SYSTEM CONTROLS MSA, CONSULTING ENGINEERS Terry J. aurer, P.E. TJM:tw 000-1602.oct OFFICES IN: NNEAPOLIS IOR LAKE ST.PAUL WASECA An Equal Opportunity Employer CITY OF ELK RIVER • AGREEMENT FOR ISSUANCE OF CONDITIONAL USE PERMIT FOR CONCRETE PRODUCT PROCESSING (READY-MIX PLANT) THIS AGREEMENT, made and entered into this day of , 1996, by and between the CITY OF ELK RIVER, a municipal corporation organized under the laws of the State of Minnesota (City), SHIELY COMPANY, a Minnesota corporation and Marshall Concrete Products Inc, a Minnesota corporation (Collectively hereafter referred to as the operators); WITNESSETH: WHEREAS, Operators have made application to City for approval of a conditional use permit to operate a ready-mix operation within the City on property legally described as follows: The South Half of the Southwest Quarter (S 1/2 of SW 1/4) lying west of U.S. Highway 169, except the west one thousand feet (1,000 ft.) of • the south seven hundred feet (700 ft.) lying west of U.S. highway 169, and except that part described as follows: Commencing at the south 1/4 corner of said Section 10: thence westerly along the south line of said Section 10 a distance of 360.00 feet, more or less, to the intersection of said line with the centerline of Trunk Highway No. 18; thence northwesterly along said centerline a distance of 618.00 feet; thence deflect 83 degrees 40 minutes to the left for a distance of 33.23 feet to the westerly right-of-way of said Trunk Highway No. 18, said point of being the point of beginning of the tract to be herein described; thence northerly along said westerly right-of- way line 732.5 feet; thence southwesterly at an angle to the left 83 degrees 40 minutes a distance of 170.00 feet; thence deflecting to the left at an angle of 96 degrees 20 minutes a distance of 732.5 feet; thence deflecting to the left an angle of 83 degrees 40 minutes a distance of 170.00 feet to the point of beginning. ALL IN SECTION 10, TOWNSHIP 33, RANGE 26, SHERBURNE COUNTY, MINNESOTA. (the Property); and • • WHEREAS, the City of Elk River Planning Commission and City Council have held hearings on Operators' request for a conditional use permit, at which hearings all citizens of the City of Elk River and other interested parties have had the opportunity to be heard on the application; and WHEREAS, the City Council by motion adopted November 18, 1996, approved a conditional use permit for the operation of a ready-mix plant (the Operation) on the Property, subject to certain conditions, including that Operators enter into a Conditional Use Permit Agreement with City so as to fully comply with the City's Zoning and other applicable Ordinances; and WHEREAS, the City's Zoning Ordinance requires that a Conditional Use Permit be issued and that a Conditional Use Permit Agreement for • concrete product processing be entered into. NOW, THEREFORE, in consideration of the premises and the mutual promises and conditions hereinafter contained, it is hereby agreed as follows: 1.) Entire Agreement- Except as otherwise provided herein, this Agreement shall constitute the Conditional Use Permit for the Property and shall govern the parties rights, responsibilities, and obligations with respect to the Operation, subject to the compliance by all parties with applicable city ordinances and state and federal laws. 2.) Warranty of Operators- Operators hereby warrant and represent to the City, as inducement to the City's entering into this agreement, that the Operators are the fee owners for the Operation. 3.) Conditions- The following general conditions shall apply to the Operation: (01) This Conditional Use Permit authorizes Concrete Product Processing (Ready-mix) on the Property. (02) All concrete product processing operations on the property shall • comply with the City's zoning and other applicable ordinances, s:\b&z\stever\marshcup.doc Page 2 with the terms of this Conditional Use Permit agreement to be • executed by the City and operators, and with the application materials and plans submitted by the operators, which plans and materials are the basis for the City's approval of the Conditional Use Permit. (03) The Operators shall orally notify the City of any violations of this permit within 24 hours and follow this with notification in writing within 4 working days of the violation. (04) Violations of this Conditional Use Permit may result in suspension or revocation. (05) The City Building and Zoning Administrator and/or his/her agents shall be permitted to inspect the operation for compliance with the conditions of this permit during normal hours of operation. (06) The City's approval of this Conditional Use Permit is subject to the approval of appropriate permits by other governmental agencies. • (07) Routine vehicle maintenance shall be performed in a shop or on a concrete slab. All waste fluids will be contained, cleaned up, and recycled or disposed of according to appropriate MPCA regulations. Leaks from emergency repairs down in the field will be considered a spill. (08)) Dust Control a. Water, but no chemical agents unless approved by city staff shall be used to control dust as necessary. b. The City reserves the right to require additional measures be taken if warranted by dust problems. (09) Traffic a. All traffic associated with the operation shall only use 213th Ave. back and forth to U.S. Highway 169, except for localized jobs. 411 s:\b&z\stever\marshcup.doc Page 3 (10) Noise • Noise levels from this operation shall adhere to State noise level standards at all times. Necessary measures to comply with these standards will be determined by staff. (11) Hours of Operation All activities shall normally be conducted between the hours of 7:00 a.m. and 7:00 p.m., Monday through Saturday. On occasion, increased hours may be allowed for specialized jobs as approved by the City Building and Zoning Administrator, however, if these hours create problems for adjacent property owners, staff may require adjustments to the operation. If problems still persist, review of this permit will be triggered back to the Planning Commission and City Council. (12) Lighting Lighting from the operation shall be directed away from public right-of-way and nearby or adjacent residential property. Glare, whether directed or reflected as different from general • illumination, shall not be visible from beyond the limits of the immediate site. All sources of artificial lights shall be so fixed, directed, designed, or sized, that the minimum subtotal of their illumination shall not increase the level of the illumination on any nearby residential property for more than .1 foot candles in or within 25 feet of a dwelling or more than .5 foot candles on any part of the property. (13) The piling, storing, or keeping of old machinery, junk, debris, or abandoned motor vehicles, shall be prohibited on the site. The storage of 250 units of specialty blocks shall be allowed on the property. (14) Signage for the operation shall be allowed as per the I-2 zone as a separate parcel. (15) The operation shall not interfere with future reclamation or other restrictions placed on this site according to the existing mineral excavation license on the property or the City's Environmental Impact Statement on mineral excavation. III (16) The operators shall be solely responsible for any adverse environmental affects due to the operation. s:\b&z\stover\marshcup.doc Page 4 General Provisions- ', (01) Permits- Operators agrees to comply with all of the provisions g pY hereof and agrees to save and hold the City harmless from any and all claims or actions arising from the operations of the Operator on the Property. (02) Binding Effect- The terms and provisions hereof shall be binding upon, and inure to the benefit of the heirs, representatives, successors, and assigns of the parties hereto and shall be binding upon all future owners of all or any part of the Operation and shall be deemed covenants running with the land. This Agreement shall be placed of record so as to give notice hereof to subsequent purchasers and encumbrances of all or any part of the Property, and all recording fees, if any, shall be paid by the Operators. (03) Severable- In the event that any portion of this Agreement shall be held invalid for any reason, the same shall not affect in any respect whatsoever the validity of the remainder of this Agreement. (04) Waiver- Any waiver, whether express or implied, by any party of a breach of any provision of this Agreement will not operate as or be • construed to be a waiver of any subsequent breach of this Agreement. (05) Notices- All notices and demands specified herein shall be deemed appropriately and timely given when delivered personally or deposited in the United States mail to the addresses hereinafter set forth by certified mail (return receipt requested). The addresses of the parties hereto are as follows until changed by written notice given as above: If to the City at: City of Elk River ATTN: Building and Zoning Administrator 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 If to the Operators at: Shiely Company ATTN: Robert Bieraugel 2915 Waters Road Egan, MN 55121 • s:\b&z\stever\marshcup.doc Page 5 Marshall Concrete Products, Inc. ID ATTN: Jay Miller 2610 Marshall Street Northeast Minneapolis, MN 55418 (06) Incorporation by Reference- All plans, special provisions, proposals and specifications, submitted pursuant to this Agreement shall be and hereby are made a part of this Agreement by reference as fully as if set forth herein in full. IN WITNESS WHEREOF, the City and Operators have caused this Agreement to be duly executed on the day and year first above written. CITY OF ELK RIVER By: Its: Mayor By: IIIIts: City Administrator OPERATORS: Shiely Company By: Marshall Concrete Products Inc. By: FEE OWNERS OF PROPERTY: By: Ill By: s:\b&z\stever\marshcup.doc Page 6 0 STATE OF MINNESOTA ss. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this day of , 1996, by Henry A. Duitsman, the Mayor of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA ss. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this day of , 1996, by Patrick D. Klaers, the City Administrator of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. • Notary Public STATE OF MINNESOTA ss. COUNTY OF The foregoing instrument was acknowledged before me this day of , 1996, by , the of Shiely Company, a Minnesota corporation, on behalf of the corporation. Notary Public • s:\b&z\stever\marshcup.doc Page 7 0 STATE OF MINNESOTA ss. • COUNTY OF The foregoing instrument was acknowledged before me this day of , 1996, by , the of Marshall Concrete Products Inc., a Minnesota corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA ss. COUNTY OF The foregoing instrument was acknowledged before me this clay of , 1996, by Marian Nemeth, the fee owner of subject property. • Notary Public STATE OF MINNESOTA ss. COUNTY OF The foregoing instrument was acknowledged before me this day of , 1996, by Julius Nemeth, the fee owner of the subject property. Notary Public This instrument was drafted by: City of Elk River Building and Zoning Department 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 • s:\b&z\stever\marshcup.doc Page 8