7.2B. SR 04-16-2018 EOty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 7.2b
Agenda Section Meeting Date Prepared by
Public Hearin s Aril 16, 2018 Chris Leeseber , Senior Planner
Item Description Reviewed by
Conditional Use Permit: Boat and RV Storage, Zack Carlton,Planning Manager
15585 Edison Street NW- Dennis Sharp, Sharp & Reviewed by
Associates for Cal Portner, City Administrator
Action Requested
Approve,by motion, the Conditional Use Permit with the following conditions:
1. The Conditional Use Permit (CUP) will not be recorded until all conditions have been satisfied.
2. A building permit will not be issued until the CUP is recorded.
3. If the proposed work described in the application and CUP has not been substantially completed
within two years after the date of issuance, the permit shall expire and become void.
4. If the authorized use ceases for more than six months, the CUP shall expire.
5. The applicant must apply for and receive approval for all required permits before any
construction may begin.
6. All driving lanes shall be marked "Fire Lane No Parking."
7. Any use or work within or affecting MnDOT right-of-way will require a MnDOT permit.
8. All comments in the Stormwater Coordinator Memo dated March 8, 2018, shall be addressed.
9. All comments in the Fire Marshal Memo dated March 8, 2018, shall be addressed.
10. All comments in the MnDOT Letter dated March 15, 2018, shall be addressed.
11. All sources of artificial lights shall be so fixed, directed, designed or sized that the minimum
subtotal of their illumination will not increase the level of illumination on any nearby residential
property by more than 0.1 foot-candle in or within 25 feet of a dwelling or by more than 0.5 foot-
candle on any part of the property.
12. The remaining three buildings shall receive site plan approval from city staff and,provided the
layout remains the same,will not need additional review by the City Council.
Background/Discussion
The applicant is seeking a CUP to construct two (eventually five) separate mini storage buildings and an
office on the subject property.
Planning Commission Meeting
No one spoke for or against the request. Since the Planning Commission meeting, staff received a
comment from the application regarding the 96-foot diameter cul-de-sac requirement from the Fire
Marshal. This was clarified and updated on the plans.
The Planning Commission unanimously recommended approval of the request.
The required number of trees was also discussed during the Planning Commission meeting. In working
with the applicant the tree requirement has been satisfied.
The Elk River Vision
A PehoMing community Pitb revolutionary and spirited resourcefulness, exceptional P,`01 W E H E 8 6 T
service, and community engagement that encourages and inspires prosperity INAWRE1
Statutory Review Period
Per State Statute 15.99 the required 60-day review period ends on April 7, 2018. A 60-day extension letter
was mailed and emailed to the applicant on March 30, 2018.
Attachments
■ Updated Site Plans/Architectural Plans/Elevations
■ Planning Commission Memo date March 27, 2018
■ 60-Day Letter
N:APublic Bodies\Agenda Packets\04-16-2018\Done\7.2b sr.docx
NW 'JOAIDV*d 113NOIS'MN IaOJIS UOSIP3 x
z
j, IR go
GNV IVOG NOSIC13
AM
�fo/ .
-77=1 11 11 11 1 IT
L--JL-JL-]L-JL-JL JL
uk
Nz�
0
I ISI
NORTH
II Im II
%
NabB
Ll
-------------------- -------- - --- !T--------------------- ------------
----- ---------
------- -----------------
U—I—
Q
NW 113 'MN laaJ)S UOSIP3
2,9 ut
, �f dg
% 3DVNOiS WS
0>
(INV IVOG NOSICII
—sl
F------� i,r---il Ir---il r---
1.
II II
mall
>L II a
H
qz-
II II' UIi fl
II Ili i II
i 1 it II
Aga i.' II�a IITaII
II
II II
II II
ob
ri
2p
bt
II II Ul
It
ts-W.1-9 Ak ONtl 11..—\I#
Z
z
NW 113 'MN lauJIS UOSIP3 N< 6
NVA?-
69-pef "K
cl
3DVNOIS WN
-On;
W*
alp
52B
CINV I V08 NOSIG3
-P NORTH
L_____J V____J L--- L----J L--- L---J L---JL__ J L___J L----J J L----J:-----JL-----J
6
F----- r---- 7 F----I r---I r--- IF-- 1I
-1 ---Ir---1r---1r----it-----1
as
0
a
g
j
JBAIN
NW ' N19 'MIN I98JIS UOSIPI
0a= fo - L
st ------- 0 0
<1
3DVAOiS WA
CINV iVOG NOSIM
o
L—J,
III zo
Q. 8, 1'2
H., '05 71
it
I I z
FC-1
o
I II 11 �� ` l1� - g� ��
T
Jill
II
II
Jfl
e� ea �d� L� I I i I i � 80
1——10 --1
rS 9 NW 'JIDAIS 113 'MN 19WIS UOSIP3
o S <
M 39VAOIS WN
z
It 0 R (INV iV09 NOSICII
OZ .
%
T,
-4L-JL-Jl-_jL_iL JLJLJL_JuL_JLJL_JL_ II
ft
-0
oF__1F_lF7F-lF1. X,
ui
ds
7
Q 3
M, jdm 0 7,lr#
i on,-, 5 Z
uj
I R Nlplsg,�
NORTH
�zl
3 Mq Fag=wo
P g,
IX
'.8
N Us
a <
3 's
-V;R
---------------- --------------- ------------
-------------—------- ----
Ll
AN I.l..10510IV—
T0—-466 �0N 3"3 C£491
NVId 31lS LO
owl"(694)W-tzozlp*(fq/j v divils
-Wvg�Yapvov;
OEM M.w
G" 'N' -4
.-!--d Am i,l SUA..IJP-n.2�18XVINO'24�—ISP-7 NW'H3AIN A13
Moil —I P-. -=I,9Kuoxq8uy T,WdaAjng-,aAllo VDVYOJS AW f_rVOff JVOSIag
A3a
05
Io +A
F— J,
---------- --------
Wa
m FRi
3
2
0
O H
84
Yd
HW6
0,
L9
N R z 80E
pg ,
h
N� H5--
------- ----------
o
-------- -------- - ---------
------------
---------------
£0-C.'L816 =0N 3lLi £C191'o! i3 glvZi 6/?'a}o9 LO
NVId JNIOVdO
- 1X31
,nu'S
Qva9 ,Leis :sM9 ogsS lo(£9L1'�+j-Z wlo(F9U 077`Bd)—KSY IR dJWS
ro
'o;oseuu 0&£fS.7.—W,-NvE'-v-V 798S E16f 03Eitld3bd �tl
{; yo smol ay1 rap 6 3
— W9 �AB P1MVa9 ;osoesueo��Sinp j yo �MdP�I.8+7+�w�44O1�H�K7�•���I�+Nfp�'7!1 r�y�{�{ T[Y NW'a3A123 rN1
y3
YlGOl ONOd JN-3-SIO'J Q351A3.`l Bir Z3i4 ON V9tl =A8 N`J 539 pAq pemtla tl°somo Yode p '.l •w'ul`�YL[88i1f`�lt'��yuu.mu-y.12Atty v1✓Y¢Q�LJ � Ja Y'��1Y.QxJl4lQ N
NOtLJiN9530 31N9 131FZ
819Zr 0,Z 3'd0_r oetle uold sY41 104}fif1 ao A9aaa4 �"
�z /// �rte$\ \ A� �• t
"moo \ / �` � •`��\ �k, \, �`�, ��� '�'�_
.s�
8 �p,l
I�
ooLa 33J
aa�ara91 ase tuaavaV Rm
« " dad e �ag
E Y z zmo"d ° zw N
€�€oS �q< o�H��a`w
Vi EF'9L8 333'i � 1
i
k a (%XRIIt�ffiIO.�f t�tV11tl'IIf78 /` ii �'
99'SL8 333 _______- i
3t:
�\
�
90'9L8 iii• w�-N
i 9 se8
g.9 <
it -- — _
r -
_t -
--
r a����}
8w'� QaMm �
o5,4
is
8sa�80 M2 ��>a
£0-01'L6i6 =-ON ilii £EL91'oy-An mz/lo/Z:e3op
_ i— 6spa , NVld Alnun
- -`1X31 anlou6s JG'f�ilU.
Mp v1n Amo � lsvrurf£vD' -rtor-rrs f£9U ".)77'saJUf-Sgv'R&"is
voa n[i G3YU3HU t} .... . "Ell;M---W`+-Rrw-Y-vvoof TW M.dlal
44p AB P1mtlN0 iouo�sselo�d lPas�a>il,S�np nunw�a'u36u} a (dW�'l W�wdR • 4P�+L'l _ .I11TJ1T/�>fr NPI}'N3]CAW TA11T3lter ♦>/ti'e>/�!{ i
L eJ-� Pk d V1 I 9 'ON loy ,la N91530 e 1. Pe�odaldnsona}.rode:aanaP ot)oc`OUj'8rgWaUj2Ug�'UldVA.r/{ JVAflo �i9VffOLu A Q J JVOS 11(os a
NOISdikY�534 31Va 1,3U 8102/IOaZ 31va_}(oatls'uold sl4)]04}F��axo R9a�a4 �'
/`--'/
ry `
oI 99 *�
a�
in
n
I.
m m
_ _ ----
99'4a
__99'GL8 333
a
00'LLH 333
Q�oR � � (�Xrbffi�8rRu6'JtdPIIrrE
m
cl'sca 3ij
_ faurrrns)xnaa�xramna
mg5 �� I a 99'949 333
� R
RSA mR R$m ( S
a x
dg "ooh I m ? S -•••• Gi*8lLL24)GO 949ae63•_--••••_
it
aw(mH
Ivo S„
RGw �m ( zo a - Rig s
soIg
a
—_ - -
o - ------------- -
^ : o --- -- ---- _ -
"d 8❑ sic --- aWi - - -
R
® ------- -
gs�, ��w �€��� M,-
2
cscsl oN-5.i 9,oz/,0/Z:aro'
�soa,a,o�oubs 'aa''so-�'71°. S�IH130
mp�13a of-cels 'oma �j�.{ s9?S-If8(E9L1'•'+�j'-tGdZ-tY6(E9G7 377`swppogsV T daV x
voa ae oa;a-e� oaosawiw!o am 'n^A w-vapvo8D Baca aaava3ad .�
NW'd3Ni3 Nl3 �
I i oa P l RI P 11 4o �f�idPm7.8�d+�hq 3U�S}•8upf�,unyP!�7
-- w�$-amt 5d Jr �$�I3E- ZO b tla23A8 P1.91530 d 1 P' F
you aosao aivo � aloz,to z �i a_nooaa Wold sup lou]4""'o Ava,eu';�uj'.4uttaattr8ttg�p.8ut n.ttts.t�ttjp ,YoF�1C3.LS t1'��8,LYOS RIO$7C73 �t
�a ni n
Iz
El
a, s "e.�mua.ezaa cE •g$ n�a�n m
9ft u� __«x«R
H ffi �a
-
,'$(�
- - T T T
s3,
lw
a
l m$ o
p o -
�i=LO
t o
q
Ido sw w 4 -
In
��nva w:s,reri e!azzrrvv�.�•rwii-,a.�.,-aiu,�n...st�naru!eJr.«-y.,!�.no
£D–DI G6i6 ON 31Li CSL91'oN'��'1 610Z�10/Z�atoa \
Ia9V o moa_ Sllt/130
�_ _________ __–_ my 3o ai=tris aMo �f S99SYOY(EFL1'�1-Z10tJ4t fE941 STI`sm.—ssr r tS
WND15 ONNoOd L1d133S3a 3 ��03M
YMJv3b4i3Oiouo°sRsaa3�P�"aG a ,,oPda kosa°�F_»o
�aO'E3EuSSuwao +ttif'+�•V�5i79
09
am
d; I'll QP iw43I (dF7-AWa�a -2W--SP-7 Z � 'Mxm'2Oa3AaIe2a3Aa1a3
JVS3QPQ 03SIAF "30 ul au8ug7wjaeilp V lVoir
OSAtOSIQ9
G z�
IR
1 IR
s aes aptl s ya toll!.y}ie�Rgata4 I
^ s�" l N
,aA
r o f
Ew
Oz
L2
a�
I
U
:41Yi945Ctt 'NixS'SW'tc9'f t:.'w'a:V1,lfiNxx _ 1 •.::_i:Cu
of
Er
El Request for Action
Rive
To Item Number
Planning Commission 6.11)
Agenda Section Meeting Date Prepared by
Public Hearings March 27, 2018 Chris Leeseber , Senior Planner
Item Description Reviewed by
Dennis Sharp—Sharp &Associates, 15585 Edison Zack Carlton,Planning Manager
Street NW Reviewed by
■ Boat& RV Storage CUP, CU 18-05
Action Requested
Recommend, by motion, approval of the Conditional Use Permit with the following conditions:
1. The authorized Conditional Use Permit (CUP) will not be recorded until all conditions have been
satisfied.
2. A building permit will not be issued until the CUP is recorded.
3. If the proposed work described in the application and Conditional Use Permit has not been
substantially completed within two years after the Conditional Use Permits date of issuance, the
permit shall expire and become void.
4. If the authorized use ceases for more than six months, the Conditional Use Permit shall expire.
5. The applicant must apply for and receive approval for all required permits before any
construction may begin.
6. All driving lanes shall be marked"Fire Lane No Parking".
7. The cul-de-sac shall meet the minimum 96 foot diameter as required in the MN State Fire code
Appendix D.
8. Any use or work within or affecting MnDOT right-of-way will require a MnDOT permit.
9. A landscape plan showing compliance with ordinance requirements,including credit for existing
trees, shall be submitted and approved.
10. All structures shall meet the architectural standards in Section 30-938
11. All comments in the Stormwater Coordinator Memo dated March 8, 2018 shall be addressed.
12. All comments in the Fire Marshall Memo dated March 8,2018 shall be addressed.
13. All comments in the MdDOT Letter dated March 15, 2018 shall be addressed.
14. All sources of artificial lights shall be so fixed, directed, designed or sized that the minimum
subtotal of their illumination will not increase the level of illumination on any nearby residential
property by more than 0.1 footcandle in or within 25 feet of a dwelling or by more than 0.5
footcandle on any part of the property.
Background/Discussion
The applicant is seeking a CUP to construct three (eventually five) separate mini storage buildings and an
office on the subject property.
The Elk River Vision
A nrelcoming community iritb vevolutionag and sP' ted vesouvicefulness, exc ptional P U u
service, and community engagement that eneouvager and inrpirerprorpe�zty / , ��
The property is zoned I3 (General Industrial). In order to comply with the Comprehensive Plan, the
applicant is also requesting a Zone Change (ZC 18-01) from I3 to C3 (Highway Commercial) where Mini
Storage facilities require a Conditional Use Permit (CUP).
Analysis
Comprehensive Plan
The Highway Business land use ranges from moderate to high intensity forms of commercial
development in Elk River and follows the Highway 169 and Highway 10 corridors. Businesses in this
category may be the largest both in terms of size and traffic generation while also providing services and
convenience types of business. Development orientation tends to be toward regional highways.
Buildings
The storage buildings are proposed to be constructed with prefinished metal panels with highlighted trim
and doors. Building#1, facing Highway 10,will have three sides composed of concrete and decorative
masonry. The office is proposed to be constructed with concrete masonry units and a metal prefinished
roof. The office and Building#1 meet the architectural requirements but Building #2 does not. The
three future buidlings will also need to meet the architectural requirements.
Section 30-938 (2) states the building finishes shall consist of at least two of the exterior building finishes,
at least two shall be used per wall. The materials listed are,face brick,natural stone, architectural glass
(i.e. curtain wall),wood, stucco, siding (metal, fiber-cement or vinyl),integrally colored split face (rock
face),burnished or glazed concrete masonry units (excluding smooth/plain or painted), and other city
approved architectural materials.
Parking/Circulation
NLinistorage or self-storage facilities require one parking stall for each 400 square feet of office space or
four stalls,whichever is greater. The proposed office space is 1,200 square feet, so four stalls are
required. The proposed site plan shows seven parking stalls.
The proposed building lengths surpass the allowed dead end access,but if all driving lanes are marked
"Fire Lane No Parking", the site layout can be allowed. The cul-de-sac shown does not meet the
minimum 96 foot diameter as required in the MN State Fire code Appendix D.
Landscaping
Per section 30-934, the number of trees required is 67. This will result in 33 overstory, 17 ornamental,
and 17 deciduous trees. The landscape plan shows four additional trees in the northwest corner of the
property. There are existing trees on site but no existing credit calculations were provided. Landscaping
on the subject property will need to comply with ordinance requirements,including credit for existing
trees.
Screening
The property slopes significantly downward away from Highway 10. Because of the topography and the
position of Building#1, the site will be screened from Highway 10. Further screening could be
accomplished along Edison Street with required landscaping.
N:ADepartments\Community Development\Planning\Case Files\CUP\CU 18-05 Dennis Sharp-Sharp&Associates(Edison Boat&RV
Storage\4Planning Commission\CU 18-05 sr PC 3-27-18.docx
Site Security
The facility will be surrounded by a seven foot high chain link fence,including approximately 360 feet of
seven foot high black iron clad picket fencing running along Edison Street. There will be a gated key pad
access and individual, secured codes for each customer.
Hours and Employees
During the spring and the fall, there will be one or two employees on site,with one part-time employee
the rest of the year. The part-time employee will be available on call during the operating hours of 8:00
a.m. - 4:30 p.m. Monday through Friday.
Signage
The applicant is proposing a wall sign on Building#1,facing Highway 10. Monument/freestanding signs
shall be setback 10 feet from all property lines and are not allowed in easements. Signage shall require a
building permit.
Stormwater
The Stormwater Coordinators comments, questions, and requirements are outlined on their attached
memo.
MnDOT
Any use or work within, or affecting,MnDOT right-of-way will require a MnDOT permit.
Streets
Building#1 sits adjacent to a potential future frontage road system. The site plan should be reviewed to
see if Building#1 can be moved to provide for proper setbacks and right-of-way for a future frontage
road. The frontage road is anticipated to be an essential public facility serving the surrounding properties.
Applicable Regulations
�. Vill not endanger, h jure or detrimentally affect the use and enjoyment of otbeT pvopeT y in the immediate vicinity or
the public bealtb, safety, moials, comfort, convenience or-geneval welfare of the neigbborbood or the city.
After the site is constructed, there will be limited activity on the site. The use will not endanger,injure or
detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public
health, safety,morals, comfort, convenience or general welfare of the neighborhood or the city.
2. WIWI be consistent witb the comprehensive plan.
The use is consistent with the comprehensive plan.
3. LVill not impede the normal and orderly development and improvement of surrounding vacantpropery.
Proposed Building#1 sits within a footprint of a future frontage road system. This could impede the
normal and orderly development and improvement of surrounding vacant property. If potential right-of-
way is protected for a future frontage road, this impediment would be avoided.
N:ADepartments\Community Development\Planning\Case Files\CUP\CU 18-05 Dennis Sharp-Sharp&Associates(Edison Boat&RV
Storage\4Planning Commission\CU 18-05 sr PC 3-27-18.docx
4. 1Y ill be seined adequately by and frill not adversely affect essential public facilities and services including streets,police
and fire protection, drainage, refuse disposal, crater and seiver ystem,parks and scbools;and twill not, in particular, create
traflic congestion or intetference ivitb tralc on adjacent and neigbboi* ublic tborougbfares.
Proposed Building#1 sits within a footprint of a future frontage road system which could adversely
affect services including streets,police and fire protection of neighboring properties. Again,if potential
right-of-way is protected for a future frontage road, this impediment would be avoided.
5. LVill not involve uses, activities,processes; materials; equ pment and conditions of operation that mill be detrimental to
any per ons orproper y because of excessive trac, noise, smoke,fume;glare, odors; dust or vibrations.
The use will not involve uses, activities,processes, materials, equipment and conditions of operation that
will be detrimental to any persons or property because of excessive traffic,noise, smoke,fumes,glare,
odors, dust or vibrations.
6. LVill not result in the destruction, loss or damage of a natural, scenic or bistolic feature of major importance.
There are no natural, scenic or historic features of major importance on the site. The use will not result
in the destruction,loss or damage of these.
7. LVill fully comply ivitb all other requirements of tbis Code, including arg applicable requirements and standards for the
issuance of a license orpermit to establisb and operate the proposed use in the city.
The use will fully comply with all other requirements of this Code,including any applicable requirements
and standards for the issuance of a license or permit to establish and operate the proposed use in the city.
If denial of such a permit should occur,it shall accompany recommendations or determinations by
findings or a report stating how the proposed use does not comply with the standards set forth in Section
30-654.
Financial Impact
None
Statutory Review Period
Per State Statute 15.99 the required 60 day review period ends on April 7, 2018. A 60 day extension letter
willn be send to the applicant to provide the time needed for Council review and the possibility of a delay.
Council Meeting
If acted on, this item will go to the April 16, 2018, City Council meeting.
Attachments
■ Location Map
■ Applicant's Narrative
■ Site Plans/Architectural Plans/Elevations
■ Landscape Plan
■ Grading and Drainage Plans
■ Stormwater Coordinator memo dated March 8,2018
■ Fire Marshal memo dated 3/8/18
■ MnDOT letter dated March 15, 2018
N:ADepartments\Community Development\Planning\Case Files\CUP\CU 18-05 Dennis Sharp-Sharp&Associates(Edison Boat&RV
Storage\4Planning Commission\CU 18-05 sr PC 3-27-18.docx
r
1
I
i00 00'
l rte.
.�� J � �+�,° , � �r �i0'�n ,��lrG / p� �✓ f, iii U � �`®
I
IIP
„rr✓ �' �l�� ��I m !! � ui III a ����
,,/�j/. V �! �. �.' li V I�q iiiiiiiilllllllllllllllllliilwvvvvvvvvvvulllVVVVIIi V!!��il
IIV
'Iii Illllum
ct
Uft~
/
" 01
11 75
1
{, I
SHARP & ASSOC 1ATEdZ,J`CE I VED
LEASING I CONTRACTING I STORAGE F'E[-,)' 0
500 Bunker Lake Blvd NW e Anoka, MN 55303
February 6, 2018
Elk River Planning Commission and City Council
Description of Project Narrative
The City of Elk River is a strong and ever-growing community that prides itself on
preserving its history, but also building its future. The neighborhoods, both old and new,
have a sense of character that speaks to the residents that live there and the officials that
maintain them. One thing that is becoming a growing problem within many suburban
areas, like Elk River, is the addition of recreational vehicles and water vessels that are
creating clutter and less appealing neighborhoods and streets., Demographically, Elk
River has a fairly high median house-hold income which would allow for most households
to be in the market for big purchases such as; boats, RVs, ATVs, Jet skis etc. With so
many households in the market for large-scale purchases it would be beneficial for the
city to think towards the future and provide its residents with a proper storage facility that
can house large-scale items.
That is why we propose to eventually construct five separate buildings on this
property for the purpose of storing recreational vehicles that tenants can access at their
convenience. This proposal intends to start with the construction of three separate
buildings on the north side of the property, two designated for semi-heated (climate-
controlled) storage of approximately 50 degrees during the cold season and the third
building intended for cold storage. Building number one will have three walls of concrete
and decorative masonry facing the side exposed to highway 10, the south facing wall and
the remaining buildings will be composed of color clad metal with highlighted trim and
doors.
This proposal will aim to please a majority of the themes in the City of Elk River's
Comprehensive Plan including; creating and maintaining strong neighborhoods, keeping
SHARP & ASSOCIATES
LEAWNG I CDNTRACTINSTORArt
www.,sharp-associates.com
Elk River a "safe" place, preserving and maintaining the environment and making Elk
River a "complete" place,
Create and Maintain Strong Neighborhoods
This proposals offers primarily Elk River residents the opportunity to store their
large, space consuming recreational vehicles/ boats/ cars etc. at our proposed facility
rather than in their driveways, lawns, streets etc. The removal of RVs and other various
motor vehicles from residential homes has the potential to improve residents overall
happiness within their neighborhoods and communities by freeing up their properties, but
still maintaining close and secure access to their recreational vehicles. This would also
create the opportunity for The City of Elk River to de-clutter neighborhoods that have
become less appealing due to the amount of outdoor storage that has accumulated over
time,
Keep Elk River a "Safe" Place
Our proposed facility focuses on the security and safety of our future customers
and their stored vehicles. Within this proposal we intend to construct a secured facility
with gated key pad access and individual, secured codes for each customer with a self-
storing unit. The facility will be surrounded by seven foot high chain link fence, including
+/- 360ft of seven foot high black iron clad picket fencing that runs along Edison Street
(this portion includes the key pad accessible gate). It is also our intention to have a fully
lit facility with outdoor lighting on each and every building to ensure the safety of our
customers. In addition, we intend to have 24/7 security cameras installed on the outside
of our buildings to eliminate theft and ensure safety.
Preserve and maintain the Environment
The site plan proposed takes into consideration the existing environmental make-
up of the property. It is our intention to save all of the Norway and White Pine along Edison
Street, as well as some of the better looking Jack Pine. It would be our proposal to remove
the Jack Pine on the Highway 10 right of way, with proper authorization, as the removal
of this Jack Pine would help in making our facility visible from the highway. With proper
�:ASHARP & ASSOCIATES
LEASPNa I CONTRACTING I STORAGE www.sharp-associates.com
authorization to remove the Jack Pine, we would then apply for a sign permit to be put on
the structure itself on the building constructed of decorative masonry, visible from highway
10/169.
Make Elk River a "Complete" Place
To make Elk River a more "complete" place, the addition of a recreational vehicle
self-storage facility would be an added benefit to the, City of Elk River and its residents.
Giving residents the option to store their large, often times expensive, RVs/Boats/Trailers
etc. close to home is an added perk if they are looking for a home in a neighborhood that
does not have the space to store large items. The City of Elk River wants to have it all
and be a one stop city that offers its residents everything they need within the city itself.
With the approval of this proposal you would be giving your residents the benefit of never
having to look elsewhere or outside of the city limits to store their most prized
possessions. You and your residents can feel good knowing that we will store them and
keep them safe.
Proposed Details
Sharp & Associates has similar facilities on the north side of Highway 10 that has
so far been very successful. We intend to have the proposed facility function as the
existing facility does to ensure success for the proposed facility.
The proposed facility would allow for approximately seven parking stalls,
estimating that only three to four will be used at a time. Our current location operates with
this trend. During the spring and the fall we will have one or two employees on site, the
rest of the year we will have one part time employee at the facility, but available on call
during the operating hours of 8:00am — 4.'30pm Monday through Friday. We currently
have an "emergency" call number in the event that we experience gate problems etc, on
the weekends at our existing facility and intend to offer the same after hour services at
this proposed location as well.
As mentioned previously, the proposed buildings would be constructed from color
clad metal with highlighted trim and doors, with one building that would have three sides
CASHARP & ASSOCIATES
LEASMG I CONTRACTMO I STORAGE www.sharp-associates.com
composed of concrete and decorative masonry. This building will be exposed to highway
10, and with the approval of removing the Jack Pine, it would be our proposal to apply for
a sign permit to put signage on the structure itself.
The proposed screening of the site is mostly accommodated by the lay of the
property which slopes rather drastically to the south. We have proposed the north building
floor level to be 10 feet below Highway 10 traffic and we are saving the trees along Edison.
CASHARP & ASSOCIATES
LEASING I CONTRACTING I S70RAGE www.sharp-associates.com
-4 N
ilia C'�
NW 'JDA!N 113 'MN
1a2u1s UOS!P3
rJ v, IDVNOiS WN
(I
NNV IVOB NOSIG3 o
01 .
VII
led
6 d1
(�,� SII '� j r�
y "j
__JL-JL..Jlii J1
iF-if
-if- ir i( -iF)r--ir-it I.
i4
NgRi
Z
H
a 8m
NW 'Jania X113 'MN ID@JIS UOS!P3
a s 3`)VNO1S WN Z <E
zo m aNb iVO8 NOSIQ3 e r
y \
1
/r
^_r Fr
L lI J3d
I I II
Z
c a fi4 3
1 1
a �K�s.ag� psae�
� o
flu z j t 'UNticrn
u 33
' qff 3� x'dR
m v
f
n
i; Y,r J_
�Id
II >
u.
I
I�r \\ _
ii—xnno�s nn ovv tvou rMSr,13V�vew.,nu ar,r�voo rvona3\mww xw u
'laA!d 113 'MN 19@4
fj 39V 1015 'A
5's.,1`
GNV I409 NOSlal
Mt.
----------- ............................. -- -------------
- —--------
I 6. NW
.......................--
H 1 iT
J)
PAN
z
NN '�aA!N 11] 'MN IDWI1 uosip3 i � z�
vCN
P. CIN`d ld m-a 'n.
OO NOSICA }p x
6�god
-9-- -- -— -.......__ ._. _.... -- -----
o a
o —
o_
1
c - Y
r~ Y
_..____
rr i
ki lib
k�
a
`
spm
ax�
F�
g:
l f/
z,
-10 --_
1
o �
Vg
s
NN 'iamb 113 `MN 3aaa1S UOSP3
ONb iVO9 NOSI0300
�x€
— —1� c
a.
IL
sNi
n ,
00
a�
a `
(L
a � o
A
Ea h: v'J�J Ca x J Pm
xv Wait 3>vwvis r.x axv tvoe uo5w3�3.iuo\bveois nu Oxv.doe vOsiPl :ow of
— nd�d ALIS
L � �IAh^I'd�a�w�4 MO•duY<6'P'nl ry LJ/.tl N13 \
a niTr 'auj'SuFraau}8u,��8innan.ms�an.F10 3:9i?IO,LS ii?I 3'.LY08 KOSIQ3 �—
v �
l � y
rel
17. Z 1 F ,
8
ji
e
i
g �
I
I 1 a s333
6LLAD fWRf)l) F V � ��
I fb b
P.
nP &
7
aa,.no�,o�nnr �s 1��5dN�4�
g Y .
I
T �
r3-s sr ��"rye...- (�i Nvid
.b 1 r�� `' ostrrarm Its tea`can-,.,tra0 _Y17'.,P—y V dMW n
.. mor-°ate'+r�rvms
ar -ss `.s+vl�vY78�FSwwmSs+t10 eHiDYNQLS i12INa'N.LYOEPIOS7PYc�\
l`
v
ON
FAfi
i
' a
t
R
N „ its
o c
t
Y I
@0
n
F
1
i
r
5 t ! 43 y
tl� b HQA
i M ins �a
,.a p
NMI Am
9 s
il
i"\y
o r
a
A. dr „3 ��y ashgR
w
WNP
do -
------------
7 i'S � L59f-(H(391/a'-L<OC Hfivtl .777 +TY�Y AWS 4
_ d— Vi'YSC+mP!'+41�+V NPVWS ea a
d _. ap.. Aimgd/oP x+P�N4Y*K11WM+8'PI Nn b-IniH Nl ':
v 2u)I– ^S+a'v1O 3'DVYCSS :IN 3'SZNO9 NOSTCr4
\\ a
/
0iZYV
i
C� 6 a
W � e
FITFI
iv
a ,
Hb
Y�
^
'• I � d A
R
Y oo ccR���
j�flA4 � f &YnNtl cwumu
S•��G6w�, Hh.
Ay
cc-3/e aee g
is
9
_�� "P .�,�� lrr and viJ arMIIna
+
°Fg
-m.
y apr W 2..
8 n H s g $ d
yy U y
x
a
r
_—
-...
a
a
E
F Y d LIG
{1 d-W
I
.� I �V�I�I�T•+c+w+v N^n�+w/+��c�M t u�J Y
18i�4W—',s—no 7DVffojs :f X�dYOS NOSI�3
3'8
n
._..._......_._....—_.— y____ _.__..._-----------__.._ ._..._..__
All
LZ
CQ
x
„
rc m
u K
oo�o
"
., 111 •.-� � »�� 7-- �
' no
v �
z
�—IF Iii I � lu ,
tni J ....
i5
z' 65
vi]a v>
77CZ. ..,
a'mr��7 —1'S-Y-0819 f 3 SS-410 30VUOSS 'd`U T.L i'08 XOSKr3
3,.a° u.��a,� aur u� c.,;�
d
3: eK
Q
y� E x ig
�sFFdo x; �se �
$ Qf E 4Y xa u
` flu
rr
fl
'0b
City of Memorandum
Elk
iffier
To: Planning Department
From: Brandon Wisner, Stormwater Coordinator
Date: March 8,2018
Subject: Site Plan Review - February 2018
The department listed above has reviewed the application listed below and has the following
comments:
Case #CU 18-05, Dennis Sharp— Sharp &Associates, 15585 Edison Street NW—
Edison Boat & RV Storage
1. Submit full SWPPP, HydroCAD and MIDS report.
2. Submit project description along with pre and post rate table.
3. Will the proposed `pond' basins be lined?
4. Has the groundwater elevation been determined?
5. Pre-treatment is required for infiltration basins, the two south basins treatment direction
may need to be switched.
6. Submit electronic plans, the current ones are difficult to read.
7. NPDES permit must be issued prior to construction starting.
Case #P 18-03, Royal Oaks Realty, Inc. —13707 185`''Ave NW—Preliminary Plat,
Riverplace Second Addition
1. Have soil borings been done to determine the groundwater elevation?
2. Lake Orono is impaired for nutrients, provide all specific NPDES requirements.
3. Submit full SWPPP and MIDS report.
4. How will pond#1 hold water at elevation 876'?If so,will it be lined?
5. How will pond #1 overflow to infiltration area#1?
6. Show 100 year flood elevation on plan.
7. Rip rap is not allowed at culvert ends, articulated block is to be used in accordance with
city specifications.
8. Redundant sediment control is required upland of all water resources and infiltration
basins during active construction,update accordingly.
9. Show limit of disturbance line along the entire North side of the site adjacent to Lake
Orono.
10. Show proposed driveway slope percentage for each lot.
PowE � � u � r
'0b
City of Memorandum
Elk
iffier
To: Planning Department
From: Cliff Anderson / Fire Marshal
Date: 3/8/18
Subject: Site Plan Review - February 2018
The department listed above has reviewed the application listed below and has the following
comments:
Case #CU 18-05, Dennis Sharp— Sharp &Associates, 15585 Edison Street NW—
Edison Boat & RV Storage
1. The site has several issues regarding Fire Lanes. The building lengths surpass the
allowed Dead End access,but with all driving lanes marked "Fire Lane No Parking"
we will allow the site layout.
2. The cul-de-sac shown does not meet the minimum diameter at 90ft. circle.
It needs to be increased to at least a 96ft. circle, as shown in the MN State Fire code
Appendix D.
Case #P 18-03, Royal Oaks Realty, Inc. —13707 185`h Ave NW—Preliminary Plat,
Riverplace Second Addition
1. No concerns or issues with the application as proposed.
Case #CU 18-06, Shannon Forsberg—920 Highway 10—Dog Daycare/Small
Boarding Facility
1. No concerns or issues with the application as proposed.
Case #OA 18-04, Ordinance Amendment - Beekeeping
1. No concerns or issues with the application as proposed.
Metropolitan District
M, ������ DEPARTMENT OF
1500 County Road B2 West
JI TRANSPORTATION Roseville, MN 55113
March 15th, 2018
Jennifer Green
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
SUBJECT: Edison Boat and.RV Storage
SW quad US 10 and Edison St
MnDOT Review S 18-019
Elk River, Sherburne County
Control Section 7101
Dear Ms. Green,
Thank you for the opportunity to review the proposed Edison Boat and RV Storage development in Elk River.
The Minnesota Department of Transportation(MnDOT)has reviewed the site pians and has the following
comments:
Permits:
Any use of or work within or affecting MnDOT right-of-way requires a permit. Permit forms are available from
MnDOT's utility website at: igp //v�rv�rvv (Iot sta�t�.i-ti us/;�;atilily/made fc trnl
Please include one 11 x 17 plan set and one full size pian set with each permit application. Please submit/send all
permit applications and 11X17plan sets to: rri tr err ai.1., ri a do ,A1112 uL, Please direct any questions
regarding permit requirements to Buck Craig(651-234-7911) of MnDOT's Metro Permits Section.
Review Submittal Options:
MnDOT's goal is to complete the review of plans within 30 days. Submittals sent in electronically can usually be
turned around faster. There are four submittal options. Please submit either:
1. One(1)electronic pdf version of the pians. MnDOT can accept the pians via e-mail at
�I� trodevra v' vys o G �ate ex a�u, .provided that each separate e-mail is under 20 megabytes.
2. Three(3)sets of full size pians. Although submitting seven sets of full size plans will expedite the
review process. Plans can be sent to:
MnDOT—Metro District Planning Section
Development Reviews Coordinator
1500 West County Road.B-2
Roseville, MN 55113
3. One(1)compact disc.
4. Plans can also be submitted to MnDOT's External FTP Site. Please send files to:
ti:: //iter a �icvt �a1 nnu /incorxburrn,g, m.c;IM ✓gat ,�-4LE ,/1"i;1!!2 .
Internet Explorer doesn't work using ftp so please use an FTP Client or your Windows Explorer(My
Computer). Also,please send a note to ant,tro(,icvrcv—iev_v_s_giQtLc),�tgmt . x jj._mjty indicating that the pians
have been submitted on the FTP site.
An equal opportunity employer
If you have any questions concerning this review please contact me at(651)234-7788.
Sincerely,
4-)-x '-64
Jennifer Wiltgen
Principal Planner
Copy sent via E-Mail:
Brian Kelly, Water Resources
Buck Craig,Permits
Ashley Roup, Right-of-Way
Gayle Gedstad, Traffic
Melissa Barnes,Area Engineer
Nancy Jacobson, Design
Cameron Muhic, Bike-Ped.
Russell Owen, Met Council
iver
March 30, 2018
Dennis Sharp
500 Bunker Lake Blvd NW
Anoka MN, 55303
Dear Mr. Sharp,
VIA EMAIL: dsharp@sharp-associates.com
On February 6, 2018, the City received your completed Conditional Use Application for a mini
storage facility located at 15585 Edison Street. As you know, State Statute requires a decision by the
City within 60 days of this application. The Statute also allows the City to extend the timeline an
additional 60 days if necessary.
Due to the date the City received your application and the City's Land Use Application
scheduling/review timeline, the City is extending the 60 day timeline to June 6, 2018. The City
expects the City Council to review the Conditional Use permit on April 16, 2018.
Please feel free to contact me if you have any questions.
Sincerely,
Chris Leeseberg, Senior Planner
Ph: 763.635.1033
cleesebergCt ElkRiverMN.g
13065 Orono Parkway
Elk River, MN 55330
Phone: 763.635.1000
www.ElkRiverNN.gov
rNATURE
Item #7.2 A&B
Edison Boat & RV StorageCU 18ZC18--0105
BackgroundCurrently I3 (General Industrial)Complying with Land Use Land Use designation Proposed C3 (Highway Commercial)does not match-Highway Business
Zone Change
No requestThe PC unanimously No comments received since one spoke for or against the request recommended approval of the the PC
Planning Commission Meeting
Adopt, by motion, an ordinance to rezone certain property from I-3 to C-3
Action Requested
Construct One officeEventually five on sitetwo mini-storage bldgs
Conditional Use Permit
No one spoke for or against the request PC unanimously recommended approvalbeen satisfiedNumber of trees was discussed. Tree requirements have Applicant has no issues with Since
PC, applicant questioned 96’ culconditions-de-sac
Planning Commission Meeting
Approve, by motion, the CUP with the conditions outlined 2.1.in the memoAdopt, by motion, an ordinance to rezone certain outlined in the Approve, by motion, the CUP with the conditions
property from Imemo-3 to C-3
Action Requested