Loading...
6.1 r 1 ITEM 6.1. ty of MEMORANDUM J1kRiver TO: Planning Commission FROM: Scott Harlicker, Planning Assistan �� DATE: March 25, 1997 SUBJECT: Discussion on Draft Ordinance Regarding Communication Towers Issue Discussion of a draft ordinance amendment regulating towers and antennas. After researching what other communities are doing, staff put together a draft amendment addressing the issues that came up during the review of APT's and AT&T's tower applications as well as those that were common in other communities. Attached is a copy of the draft amendment; staff is looking for your comments so that they can be incorporated into a proposed amendment. • Background On February 18 the City Council ordered public hearings be held on a proposed moratorium for the construction of new towers. They also directed staff that no permits or approvals be granted pending the public hearings. The public hearings for the Planing Commission will be scheduled for the Commission's April meeting and the City Council's third meeting in May. The proposed moratorium was initiated in order to allow time to research and amend the city's current ordinance regarding the construction of antenna towers within the city. Currently Sherburne County and the City of Zimmerman have moratoriums in place and are working on amending their codes to address antenna towers. APT is currently investigating several sites in the Zimmerman area for another tower location. The City of Ramsey currently has a moratorium in place and the Planning Commission is considering a proposed ordinance amendment regulating antenna towers on their April 11 meeting. Proposed Ordinance Staff is suggesting that the revised ordinance work within the existing framework, that being a rezoning to Antenna Tower Overlay District (AT) • and a conditional use permit for the actual tower. That process would stay 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 Memo To Planning Commission Page 2 March 25, 1997 • the same; however, performance standards would be added to address the issues that have come up during the review of APT's and AT&T's requests for cellular towers and antennas. Antenna Tower Overlay District The AT would allow the construction of towers anywhere in the city. The criteria for rezoning would be the following: • The compatibility of the rezoning request with surrounding land uses • That the proposed rezoning is necessary in order to provide effective wireless telecommunication coverage for the City This will allow some flexibility in located towers based on adjacent land uses and service area requirements. Co-Location To encourage co-location, all commercial wireless telecommunication towers would be required to provide for co-location for additional users based on the proposed height of the tower. Towers 100 feet and higher would be required • to provide for 2 additional users and towers 60 to 100 feet would be required to provide for one additional user. Applicants would have to prove that the proposed antennas can not be accommodated on an existing or approved tower within a one mile search radius (1/2 mile for towers under 120 feet and 1/4 mile for towers under 80 feet). In addition to the above requirements, requests to locate on existing or approved structures could be approved administratively without requiring a conditional use permit or a rezoning to AT. The request would require site plan review and a building permit and would still have to comply with all applicable sections of the code. Construction and Design Requirements Towers and antennas would be required to meet certain construction and design standards. Construction requirements include compliance with building and electrical codes, security measures, and one tower per parcel with a minimum lot size of one acre. Design requirements include designing the tower to blend in with the surrounding environment and requiring a mono pole design. No signs or advertising would be allowed and illumination would be limited to what was required by federal or state statute. S Memo To Planning Commission Page 3 March 25, 1997 • Tower Setbacks and Height It is recommended that the towers be setback a distance equal to the height of the tower and the height should not exceed 150 feet. Height of the tower could be increased in order to accommodate additional users. Engineer's Report A report from a qualified licensed engineer would be required. In this report information regarding structural integrity, co-location positions, steps taken to avoid interference and compliance with federal regulations will be provided. Abandoned and Unused Towers All abandoned or unused towers will have to be removed within 12 months of cessation of operation. If the tower is not removed, the tower and associated facilities may be removed by the city and assessed against the facility. • • • Antenna Tower Overlay District Purpose The purpose of the Antenna Tower Overlay District is to protect the public health, safety, general welfare, and to accommodate the telecommunication needs of residents and businesses by providing a specific zoning district for the use of land for the establishment and operation of wireless telecommunication towers. Since this use is unique, a special zoning district is appropriate, and the City of Elk River reserves the right to determine the suitabliity of a rezoning request to Antenna Overlay District based on the following: 1. The compatibility of the rezoning request with surrounding land uses 2. That the proposed rezoning is necessary in order to provide effective wireless telecommunication coverage for the City Wireless telecommunication towers shall not be permitted nor conditional uses in any other zoning district. This section shall apply to all towers over • 60 feet in height. Findings In order to accommodate the communication needs of residents and business while protecting the public health, safety, and general welfare, the Council finds these regulations necessary in order to: 1. Establish standards which permit a reasonable and equitable opportunity for the establishment of wireless telecommunication service in the City; 2. Avoid potential damage to adjacent properties from tower failure through structural standards and setback requirements; 3. Minimize adverse visual effects of towers through careful design and siting standards which attempt to screen and/or camouflage towers and antennas from adjacent private and public property; 4. Maximize the use of existing and approved towers, buildings and other structures to accommodate new wireless telecommunication antennas in order to reduce the number of towers needed to serve the 4IPcommunity. Antenna Tower Overlay District Page 2 March 25, 1997 • Uses The Antenna Tower Overlay District (AT) is an overlay zoning district; land zoned into the AT will also maintain its original zoning classification. All permitted, accessory, and conditional uses allowed in the underlying zoning district will continued to be allowed on land rezoned to AT, subject to all restrictions and requirements applicable in the underlying district. In addition to the uses allowed in the underlying district, the following uses shall be allowed in the AT: Antenna arrays, including radio, television, commercial wireless telecommunication, and microwave transmitting and receiving equipment, supporting towers, buildings and enclosures accessory to the tower and antennas. Co-Location Requirements All commercial wireless telecommunication towers erected, constructed, or located within the City shall comply with the following requirements: 1. A proposal for a new commercial wireless communication service tower • shall not be approved unless the City finds that the telecommunications equipment planned for the proposed tower cannot be accommodated on an existing or approved tower, building or other structure within a one mile search radius (one half mile search radius for towers under 120 feet in height, one quarter mile search radius for towers under 80 feet in height) of the proposed tower due to one or more of the following reasons: a. The planned equipment would exceed the structural capacity of the existing or approved tower, building or structure, as documented by a qualified and licensed professional engineer, and the existing or approved tower or structure cannot be modified, reinforced or replaced to accommodate planned or equivalent equipment at a reasonable cost. b. The planned equipment would cause interference materially impacting the usability of other existing or planned equipment at the tower, building or structure as documented by a qualified and licensed professional engineer and the interference cannot be prevented at a ID reasonable cost. Antenna Tower Overlay District Page 3 March 25, 1997 III c. Existing or approved towers, buildings or structures within the search radius cannot accommodate the planned equipment at a height necessary to function reasonably as documented by a qualified and licensed professional engineer. d. Other unforeseen reasons that make it infeasible to locate the planned telecommunications equipment upon an existing or approved tower, building or structure. 2. Any proposed wireless telecommunication service tower shall be designed , structurally, electrically and in all respects constructed, to accommodate both the applicant's antennas and comparable antennas for at least two additional users if the tower is over 100 feet in height or for at least one additional user if the tower is more over 60 feet in height. Towers must be designed to allow for future arrangement of antennas upon the tower and to accept antennas mounted at varying heights. Construction Requirements All antennas erected, constructed, or located within the City shall comply III with the following requirements: 1. All applicable provisions of this code. 2. Towers and their antennas shall be certified by a qualified and licensed professional engineer to conform to the latest structural standards and wind loading requirements of the Uniform Building Code and the Electronics Industry Association and all other applicable reviewing agencies. 3. With the exception of necessary electric and telephone service and connection lines approved by the City, no part of any antenna or tower nor any lines, cable, equipment or wire or braces in connection with either shall at any time extend across or over any part of any right-of- way, public street, highway, sidewalk, or property line. 4. Towers and their antennas shall be designed to conform with accepted electrical engineering methods and practices and comply with the provisions of the National Electrical Code. 5. All signal and remote control conductors of low energy extending IIIsubstantially horizontally above the ground between a tower or Antenna Tower Overlay District Page 4 March 25, 1997 • antenna and a structure, or between towers, shall be at least eight feet above the ground at all points, unless buried underground. 6. All towers shall be protected against unauthorized climbing. The bottom of the tower (measured from ground level to 12 feet above ground level) shall be constructed in such a manner to preclude unauthorized climbing. The tower, antenna and supporting equipment shall be enclosed by an eight foot high chain link fence with a locked gate. 7. Metal towers shall be constructed of, or treated with, corrosive resistant material. 8. Only one tower shall exist at any one time on any lot or parcel. The minimum lot size requirement shall be one acre, unless the underlying zoning is more restrictive. Design Standards All antennas erected, constructed, or located within the City shall comply with the following requirements: • 1. Towers and antennas shall be designed to blend into the surrounding environment through the use of building materials, color, textures, camouflaging architectural treatment, screening and landscaping, except in instances where the color is dictated by federal or state authorities such as the Federal Aviation Administration. 2. Commercial wireless telecommunication service towers shall be of a monopole design unless the City Council determines that an alternative design is preferred. Signs and Advertising No advertising, logos or identification of any kind is permitted, except as may be required by Federal and State authorities. Accessory Structures and Equipment 1. All accessory equipment related to towers and antennas must be housed within a structure. Existing structures shall be used whenever possible. Any new accessory buildings or structures shall be architecturally designed to blend in with the surrounding • environment. Antenna Tower Overlay District Page 5 March 25, 1997 III 2. The use of compatible materials such as wood, brick, or stucco is required for associated support buildings. Equipment located on the roof of an existing building shall be screened from public view with building materials identical to or compatible with existing materials. In no case shall wooden fencing be used as a rooftop equipment screen. 3. Ground mounted structures shall be screened from view by suitable vegetation, except where a design of non-vegetative screening better reflects and compliments the architectural character of the surrounding area. Removal of existing vegetation shall be minimized through careful site selection and design. Illumination Towers and antennas shall not be illuminated or display strobe lights unless specifically required by the Federal Aviation Administration or other Federal or State authority. When incorporated into the approved design of the tower, light fixtures used to eliminate ball fields, parking lots, or similar areas may be attached to the tower. Tower Setbacks 0 Towers shall conform with each of the following requirements: 1. Towers shall not be located between a principal structure and a public street. 2. Towers shall meet setback requirements, equal to the height of the tower, from all property lines. Tower Height 1. The maximum height of any tower, including antennas and other attachments, shall not exceed 150 feet. 2. The height of a tower may be increased by 25 feet to accommodate each additional user above those required by co-location. Time Limit on Tower Completion Once a tower is approved by the City, the tower must be substantially completed within one year, including any structures accompanying the tower, following the date of tower approval. • Antenna Tower Overlay District Page 6 March 25, 1997 • Interference with Public Safety Telecommunications No new or existing telecommunication service shall interfere with public safety telecommunication. All applications for new service shall be accompanied by an intermodulation study which provides a technical evaluation of existing and proposed transmissions and indicates all potential interference problems. Before the introduction of new service or changes in existing service, telecommunication providers shall notify the City at least 10 calendar days in advance of such changes and allow the City to monitor interference levels during the testing process. Support of Public Warning Systems Telecommunication providers that utilize antennas erected after the effective date of this ordinance shall participate in the Emergency Alert System (EAS), as defined by FCC Rules and Regulations, Part 11, by broadcasting warnings of severe weather and other life threatening emergencies to users of personal communications equipment served by the antennas. Telecommunication providers may be exempt from the requirements of this section under the following circumstances: 1. The telecommunication provider demonstrates that • participation in EAS is not technologically feasible; 2. The telecommunication provider is unable to acquire any FCC waiver or exemption from licensing or other regulations that would prohibit participation in EAS; or 3. The state or regional EAS planning committee determine that participation by the telecommunication provider is not necessary. Additional Submittal Requirements In addition to the information required elsewhere in this code, development applications for towers and/or antennas shall include the following supplemental information: 1. A report from a qualified and licensed professional engineer that provides the following: a. Describes the tower and/or antenna height and design including a cross section and elevation; b. Documents the height above grade for all potential • mounting positions for co-located antennas and the minimum separation distances between antennas; Antenna Tower Overlay District Page 7 March 25, 1997 • c. Describe the tower's capacity, including number and type of antennas that can be accommodated; d. Documents what steps the applicant will take to avoid interference with established public safety telecommunications; e. Proof that the proposed tower complies with regulations administered by the Federal Aviation Administration and the FCC; and f. Demonstrates the tower's and/or antennas compliance with all applicable structural and electrical standards, and includes an engineers stamp and registration number. 2. For all commercial wireless telecommunication towers, a letter of intent committing the tower owner and his or her successors to allow the shared use of the tower if an additional user agrees in writing to meet reasonable terms and conditions for shared use. • Antennas Mounted on Roofs,Walls, and Existing Towers 1. The placement of wireless telecommunication antennas on roofs, walls, and existing towers may be approved administratively, without requiring rezoning to Antenna Tower Overlay District, provided the antennas meet all applicable requirements of this code and the following: a. The maximum height of an antenna shall not exceed 15 feet above the roof and shall be set back at least 10 feet from the roof edge. b. Wall or facade mounted antennas may not extend 5 feet above the cornice line and must be constructed of a material which matches the exterior of the building or structure. 2. In addition to the submittal requirements found elsewhere in this code, an application for antennas mounted on roofs, walls and existing towers shall be accompanied by the following information: • a. A site plan application which includes the location of the proposed antennas on the structure and elevations; Antenna Tower Overlay District Page 8 March 25, 1997 • b. An application for a building permit, and c. A report prepared by a qualified and licensed professional engineer indicating the structure or tower's suitability to accept the antenna, and the proposed method of affixing antenna to the structure. Complete details of all fixtures and couplings, and the precise point of attachment shall be indicated. Abandoned or unused Portions of Towers Abandoned or unused towers or portions of towers and accompanying accessory facilities shall be removed as follows: 1. All abandoned or unused towers and associated facilities shall be removed within 12 months of the cessation of operations at the site unless a time extension is approved by the City Council. In the event that tower is not removed within 12 months of the cessation of operations at the site, the tower and associated facilities may be removed by the City and the costs of removal assessed against the property. 2. Unused portions of towers above a manufactured connection shall be • removed within 6 months of the time of antenna relocation. The replacement of portions of a tower previously removed requires the issuance of a new conditional use permit. Definitions Antenna - Any structure or devise used for the purpose of collecting or transmitting electromagnetic waves, including but not limited to directional antennas, such as panels, microwave dishes, and satellite dishes, and omni- directional antennas, such as whip antennas. Commercial Wireless Telecommunication Service - Licensed commercial wireless telecommunication services including cellular, personal communication services (PCS), specialized mobilized radio (SMR), enhanced specialized mobilized radio (ESMR), paging and similar services that are marketed to the general public. Public Utility - Persons, corporations or governments supplying gas, electric, transportation, water, sewer, or land line telephone service to the general public. For the purpose of this ordinance, commercial wireless telecommunication service facilities shall not be considered public utility • uses, and are defined separately. Antenna Tower Overlay District Page 9 March 25, 1997 IP° Tower - Any ground or roof mounted pole, spire, structure, or combination thereof taller than 15 feet, including supporting lines, cables, wires, braces, and masts intended primarily for the purpose of mounting an antenna, meteorological device, or similar apparatus above grade. •