5.6 Item# 5.6 • of MEMORANDUM Elk • Rlver TO: Planning Commission FROM: Steve Ach, City Planned, DATE: May 27, 1997 . SUBJECT: Preliminary Plat Request by Good Value Homes (Cherrywood Hills), Public Hearing Case No. P 96-13 Request Good Value Homes is requesting preliminary plat approval to subdivide approximately 38 acres into 68 single family lots. • Location Subject property is located in the northwest corner of Proctor Road and 193rd Avenue. Zoning/Land Use Rlc (Single Family Residential) /MR (Medium Density Residential) Attachments • Memo from City Engineer dated May , 1997 • Zoning map • Proposed development plans • Pedestrian plan for the area • Original plat Bach round Earlier this year, the Planning Commission reviewed a preliminary plat request by Good Value Homes to subdivide the same piece of property before • the Planning Commission this evening. The previous application was a 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 •TDD & Phone: (612) 441-7420 • Fax: (612) 441-7425 Memo to the Planning Commission/P96-13 May 27, 1997 Page 2 request to subdivide the 38 acres into 79 single family lots. The Planning • Commission and City Council denied the preliminary plat request based on the following: • The plan's proposal to remove all of the existing trees on site • Lots within the proposed plans that did not have adequate depth. • Internal drainage concerns that were not adequately addressed • The proposed plan was inconsistent with the adjacent development and may have had adverse impacts on the reasonable development . of the project. • The plan was inconsistent with the comprehensive plans and goals to encourage subdivision design which protects wooded areas and natural contours. Attached are the minutes from both the Planning Commission and City Council meetings regarding this previous application, along with the resolution denying the preliminary plat. Overview of Proposed Plat The proposed preliminary plat has been revised from the original drawing by reducing the number of lots to 68, redesigning the roadway, increasing the • depth of proposed lots within the plat and giving some consideration to the natural characteristics of the site. Project Design The proposed plat still includes a roadway system that ties into Lafayette Woods to the north, and has a street connection to Proctor Avenue which is aligned with Highland Road immediately to the east. The plat also has a street that ties into the Lafayette Woods project immediately to the west. A cul-de-sac in the northeast corner has been included to access four new lots and the existing home. The proposed plat has more of a "rectangular or grid" design, as opposed to the previous plat that included curvilinear streets. Staff would recommend that the developer look at the possibility of including minor curves in the street to break up the long, straight blocks that are proposed. Lot Sizes The proposed lots in the plat range in size from 53,000 square feet down to the 11,000 square foot range. All of the lots do have a minimum depth of 135 feet and a minimum frontage of at least 80 feet. This is consistent with the • Planning Commission's and Council's recent adoption of the ordinance, f:\shrdoc\planning\pc\cherrywd.doc Memo to the Planning Commission/P96-13 • May 27, 1997 Page 3 increasing the minimum lot size in the Ric district. The overall density of 110 the project has decreased from 2.36 units per acre down to 1.8. This is a little more consistent with the development of Lafayette Woods immediately to the north and west. Natural Characteristics As mentioned earlier the lots along the north part of the plat adjacent to Lafayette Woods have been increased in depth by 20 feet. The plat has also been redesigned slightly to shift the east end of the cul-de-sac further to the south allowing some lots to be increased in depth from approximately 164 feet up to 220 feet. Although there is an increase in depth in the lots, the number of trees that will actually be saved along the north portion of the property will not be known until the preliminary grading of the site is actually completed. Pedestrian System Attached is a map illustrating the pedestrian system for this area. As previously presented to the Planning Commission a sidewalk has been constructed along the west side of the street entering this site from Lafayette Woods directly from the north. This sidewalk will continue south along the • west side and ultimately along the south side of the road through the plat to Proctor Road. As part of the Park and Recreation recommendation, there is also a trail corridor extending south of the cul-de-sac adjacent to 193rd Avenue which will provide the opportunity for a trail connection to the 193rd Avenue corridor. Eventually there is anticipated to be a detached trail along the west side of Proctor when that road is upgraded at some point in the future. This improvement along Proctor Avenue will tie the sidewalk from Lafayette Woods into a system that will then carry the pedestrians south along Proctor Road the various destination points. The wetland in Outlot A will need to be partially filled in order to construct the proposed road and sidewalk. It appears a retaining wall of 12-14 feet will be necessary along the street's south edge. Since a sidewalk is planned for this side of the road, the developer will need to include a fence or guardrail along the retaining wall and sidewalk. 193rd Avenue Once again the issue of 193rd Avenue should be discussed by the Planning Commission as it relates to this preliminary plat. As staff has presented to the Commission at previous meetings, it is recommended 193rd be eliminated 4111 for vehicle traffic and converted to a non-motorized trail corridor connecting f:\shrdoc\planning\pc\cherrywd.doc Memo to the Planning Commission/P96-13 May 27, 1997 Page 4 • Proctor Avenue and the City trail (along the former railroad corridor). This will channel the traffic along Proctor Avenue down to County Road 1 at a point where there is a future signalized intersection planned. The residents within the proposed plat as well as Lafayette Woods will still have an opportunity to use the local streets from those developments and gain access to County Road 1 near the City trail crossing of County Road 1. The future of 193rd Avenue is somewhat critical in terms of approving the proposed plat as well as future additions of Lafayette Woods. If 193rd was to remain in place the funding to upgrade this street would have to be considered along with whether the proposed plats design of having no access onto the street is appropriate. Outlot A Outlot A is a wetland area at the intersection of Proctor Avenue and the proposed road entering the plat. Staff will recommend this outlot will be combined with lot 11 and not be left as an outlot as the City does not want to own this smaller wetland complex. The wetland would however have a drainage utility easement over the wetland area protecting it for drainage and utility purposes. • Outlot B Originally outlot B included four single family lots with the upgrading of 193rd Avenue for approximately 300 feet west of Proctor Avenue. The developer is proposing to deed outlot B to the City and develop a small detention pond upon a portion of that property. This ponding area has the opportunity to be more of a "regional nature"; therefore, accepting the outlot is warranted. Outlot C As mentioned earlier this is a 20 foot corridor that will be deeded to the City to accommodate the extension of a trail from the end of the cul-de-sac to 193rd Avenue. The land associated with this outlot will be credited towards the developers park dedication fee. Outlot D This outlot should also be combined with either lot six or lot five and not be left as an outlot. This area was probably made as an outlot as it is the location of a lift station to serve a portion of this plat. The lift station will be built either within the right-of-way or within a easement on the property. • f:\shrdoc\planning\pc\cherrywd.doc Memo to the Planning Commission/P96-13 May 27, 1997 Page 5 Therefore the outlot is not necessary and should just be made part of the • adjacent lots. Landscaping In addition to the required front yard trees, it is recommended boulevard trees be installed along the roadway where the sidewalk is located. Furthermore, the plan should also include a combination of conifer and overstory trees along Proctor to provide some buffering to the homes along this county road. Finally, along the park corridor to 193rd, overstory trees should be installed along both sides of the trail every 30 feet. Recommendation It is recommended the Planning Commission recommend approval of the preliminary plat request by Good Value Homes to subdivide approximately 30 acres into 68 single family lots with the following conditions: 1. A Developers Agreement be prepared and executed outlining the terms and conditions of the plat approval. 2. All comments from the City Engineers memo dated May 21, 1997 be incorporated into the plat for approval. 3. Recommendations from the Park & Recreation Commission be incorporated into the plat. These recommendations include: • Payment of cash in the amount required by the City at the time of final plat. • A $10 per lineal foot of trail credit be given to the cash dedication for constructing the park trail. • Dedicating a 30 foot trail corridor in the southwest corner of the development to accommodate the extension of a trail. 4. The developer shall construct a trail within Outlot C prior to homes being constructed on the adjacent lots. 5. A water availability charge in the amount of$300.00 per lot be paid to Elk River Utilities prior to releasing the final plat for recording. The developer should check with Elk River Municipal Utilities for any additional charges related to water connection fees and electrical hook- • ups. • f:\shrdoc\planning\pc\cherrywd.doc Memo to the Planning Commission/P96-13 May 27, 1997 Page 6 • 6. A surface water management fee be paid prior to releasing the final plat for recording as required by the City of Elk River at the time of the final plat. 7. Appropriate approvals from the Corps of Engineers, DNR, and local agencies for filling of any wetlands on site. These approvals must be obtained prior to final plat approval. 8. A tree preservation plan be submitted along with the grading plan identifying those areas which will be saved during the grading of the site. 9. A NPDES permit be obtained from MPCA prior to beginning grading on site. 10. A grading plan be submitted, reviewed and approved by the City Engineer prior to the beginning of any grading on site. This grading plan shall identify erosion control measures that will be used during the grading process. 11. Sherburne County Highway Department will need to approve the • proposed streets from the plat accessing Proctor Avenue. The preliminary plat will be conditioned on these permits being obtained from Sherburne County. 12. Prior to issuance of any billing permits a development plan will need to be submitted outlining the style of homes and finished floor elevations. This plan will need to be approved by the City Engineer prior to issuance of any building permits. 13. The developer shall reimburse the City for costs associated with reviewing this plat prior to releasing the plat for recording at Sherburne County. 14. The developer will need to provide a letter of credit to the City of Elk River in the amount of 100% of the costs of the associated improvements within the development. 15. Street lights will need to be provided throughout the development in locations as recommended by the Elk River Municipal Utilities. 16. A cluster mailbox design must be utilized throughout the development. • f:\shrdoc\planning\pc\cherrywd.doc Memo to the Planning Commission/P96-13 May 27, 1997 Page 7 17. A complete landscaping plan must be submitted for approval prior to • recording the plat with the county. This plat shall include yard trees as required by ordinance, landscaping along Proctor Avenue as well as the planting of boulevard trees along that segment of street that will have a sidewalk and along the trail corridor. • • • f:\shrdoc\planning\pc\cherrywd.doc tddid Howard R. Green Comoanv J i1L CONSULTING ENGINEERS Formerly MSA Consulting Engineers May 21, 1997 File: 230-348-11 Mr. Steve Ach City Planner City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: CHERRYWOOD HILLS PRELIMINARY PLAT Dear Mr. Ach: As you requested, we have reviewed the revised submittal for the Cherrywood Hills development. The submittal was prepared by Passe Engineering, Inc., and consisted of a • preliminary plat, preliminary utility plan, preliminary grading plan, and storm drainage calculations. Based upon our review and comments received at the staff review meeting, we would offer the following comments: A. Preliminary Plat 1. The preliminary plat now consists of 68 single-family lots. This is down from the original submittal which contained 79 lots. The lots along the northern portion of the property, which contains the wooded area, have been made larger in an attempt to save as many trees as possible. The double frontage lots that were shown on the first submittal along Proctor Avenue have been redesigned so that they no longer exist. 2. Outlot D shown in the middle of Block 3 we assume is shown for the lift station that will be needed by this development. If that is the case, the City does not need Outlot D. The lift station can be placed in the right-of-way or a small easement can be taken adjacent to the right-of-way in one of the lots. There is no need to plat a 3,300 square foot outlot which the City will be asked to maintain. 3. Several items are missing from the preliminary plat such as street names, the width of the right-of-way on Proctor Avenue, and a detail showing the typical easement widths around each lot. 1326 Energy Park Drive • St.Paul, MN 55108 • 612/644-4389 fax 612/644-9446 toll free 800/888-2923 230/348-2102.may Mr. Steve Ach • May 21, 1997 Page Two 4. Outlot B in the southeast corner of the development will be used for storm drainage purposes. In the previous submittal, this area contained additional lots which have been deleted. Outlot B will likely be dedicated to the City for drainage purposes. 5. The new road coming out to Proctor Avenue that lines up with Highland Avenue does not quite line up with the existing road on the east side of Proctor Avenue. There should be an angle point put into the plat to make the road on the west side line up with Highland Avenue on the east side. B. Preliminary Utility Plan 1. The entire plat is served by gravity sanitary sewer to a lift station located near Outlot D in Block 3. The sewage flow is then pumped through a forcemain northerly to the existing sanitary sewer in Lafayette Woods. 2. There is one location in Block 2 where sanitary sewer crosses side yards. We would suggest that these lot lines that the sewer traverses be replatted to line up such that it is not necessary to put a manhole in the rear yards of any IDof these lots. This will keep the City maintenance crews off of private lots when the sanitary sewer lines are maintained. If manholes are located in the rear yards, it will be necessary for the sanitary sewer crews to get to these manholes with trucks and equipment to maintain the sanitary sewer lines. 3. The watermain from the cul-de-sacs needs to be looped. This can easily be accomplished along lot lines. In the northerly case, the lot lines to the south from the cul-de-sacs do not appear to be wooded and it should be easy to loop watermain. In the southwest corner of the plat, the watermain could be looped along the same alignment as the storm sewer or sanitary sewer. C. Preliminary Grading Plan 1. Generally, the grading and house elevations shown on the grading plan work very well. General comments we would make about the plan are as follows: • In several locations, the grading plan should be changed to reflect rear yard drainage along lot lines. • In several locations, the overland drainage across lots is not kept on the lot line by the contours shown on the grading plan. The contours should be revised to reflect drainage along lot lines or the plat needs • to be changed to show larger easements in these areas. Howarc R. Green Company CONSULTING ENGINEERS 230/348-2102 may Mr. Steve Ach May 21, 1997 • Page Three • The proposed elevations at the north and west sides where the plat abuts Lafayette Woods should be verified to ensure that they meet the • elevations proposed with the Lafayette Woods plat. • In critical drainage areas, especially in rear yard situations, a spot elevation with arrows depicting the drainage around the house should be shown. 2. A detail should be added to this drawing to indicate what the elevations in the typical house pads indicate. Also, the type of house on each lot should be shown. 3. The trees on the site that will be saved should be shown on the drawings. 4. There is a retaining wall proposed along the wetland located in Outlot A. As best we can tell, this retaining wall would be approximately 14 feet high. A detail should be shown as to how this would be constructed. 5. Slopes on the ponds to be constructed are at 3:1. City policy would indicate that a minimum of 4:1 slopes are required, or the pond must be fenced. • D. Drainage Plan 1. The calculations we reviewed were developed assuming only that existing conditions runoff would be allowed to leave the site through the 15-inch culvert under 193rd Avenue. We find that these calculations do accomplish this and are acceptable. One comment we would make is that the proposed pond located in Outlot A does not have an outlet. Currently, if this pond were to overtop its banks, it would flow onto private property to the south. An emergency overflow should be shown for this pond which would keep the drainage on the Cherrywood Hills property. Perhaps it would be possible for any overtopping of this pond to be routed through the existing wetlands. E. Miscellaneous 1. There should be a sidewalk shown on the west side of the street leading from Lafayette Woods at the north and on the south side of the street connecting with Highland Avenue at Proctor Avenue. 2. The plat should include street lights according to the Elk River Municipal Utilities' new street lighting policy. • Howard R. Green Company CONSULTING ENGINEERS 230/348-2102 may Mr. Steve Ach • May 21, 1997 Page Four 3. The plat should be required to utilize clustered mailboxes for ease of snow plowing. 4. When the final plat is approved, an electronic copy of the plat needs to be submitted for use in upgrading City maps. If you have any questions regarding these comments, please call. Sincerely, HOWARD R. GREEN CONSULTING ENGINEERS alb Terry J. aurer, P.E. TJM:tw 111 • Howard R. Green Company CONSULTING ENGINEERS 230/348-2102 may srUINIMIIIMMINNE ../ • ,: ' t• ) r-,-;-7 / Li / '' 2 71 (.. i • . l, 7 r .../41, 0 !"` --"-- , .. Ira 4 , n c f fro L 07F?' " i' W. ,. pc. 4-4 LIYAMIN Y ' .. ' ' . .sa—.. P.lk:1v4, Fiil ,.1 . .1te. _..,.•,-- m,a/ ,-.',...4i07 LOCATION 1► Ric / • . �' '� • /,�IN .0. .,,1%2J -43 :\ • Or• rl I 1 1 6 I I Igil al li VET , , mmigpmft. Awry is gip 72 ii !Ivy 1 A 1 AU riall1L.ACSIIMItt.WAtrir- 111 . memlia �1 nw.�\ _= _�... ,-- �== -"-- • �� � ` _— _:g J o• af �o iript. 0 IrksorN44 .H111111MaiirAMOR; . ,bro fir' . Q 41111 i . EU .poraLm•aiw'` IT& I. , Zfi3riri=s-3.: glefrialli 3��■► SND modem ,....:! ' a 11 t X1+:^'1 ;.:::71 . iiil Illi j,I!!RT:4111.'� __ ■tD • oN ��' golisp ' .Wrogiii— , ••., iteimAr - ,.i... 1 OM ��-i ADD •.Aprol 1111166. R A '/y",,4 l aim :AIWA ?jos ''''.144 .\. .. II: • gtillah I. Jarzititia' a� aic>,I e,nl cats �f4 � �� �- - AO -t� �� '.~any� jT V' , .,....: .1_ wr 1 4, UM - prerall4.4-... Ai orm .4._. .1 ..:::.::.:.-::, re, vim ..,..„,:, a siRcE, or .ki.„.....,,, ,_ iir lu •i ---7 ..,t11Z 1 ) I . .\.( / ZONING • '' City of I lviAP E1k River 13065 Orono Parkway • P.O. Box 490 CASE: P 96- 13 m OWNER/DEVELOPER SURVEYOR/ENGINEER GOOD VALUE HOMES, INC. PASSE ENGINEERING, INC. e, i • A.F AY '• _� a .` 9445 EAST RIVER ROAD 9445 EAST RIVER ROAD i *• i SUITE 201 SUITE 203 22 _ Y 8 MN. 55433 COON RAPIDS, MN. 55433 ► : :,,,i;,"," COON RAPIDS, ---' :a'� r' "ill PHONE: 755-9793 PHONE: 755-6240 e W 0 JA ;v.14 ---'T--- n _may , N i I I :i i- io h Y i 10 1 1 1- I; 1�__________ 8 \\d 8 0 60 11.ION IWO ZOO110% evq ---- ! _ b `:, w- ;ruw fu•+1 Y I Imo-I y,r ;,�1 4 3`, 4 el NE I/._ iy -- ti , - ------•"i--o-- Fad /' �_ ' ,�: p i"; / SITE DATA tiZI, Q o -•'a -..—__� `�– -• `�i1, ` . i'., DETAIL V W i i , n 48 ww.-I i__1.._uw.-10,-11----.;:1, 111 ...., 1 :wp.., _,.' _ if - O i1; 2 h 4 ( " 8 .f• _; /— GROSS AREA OF SITE 37.77 AC W w n i --' ;;j' AREA OF R.O.W. (PROCTORROAD) 1.18 AC C y tz 1 I I uw..pK 12 r« f__ '_ 3 _ _ PARK AREA .39 AC 41 3 O ! , f6 u+w-; k ' 1 I uw- i; wr.. w+^- is w•'•- WETLAND AREA 2.88 AC ti O ' I____-______.;';' -H''''' i f '- u,.- {1�; •_•,•, ,,,,• UPLAND AREA 3354 "_- _ " °r_ I 9 I•( IT Cl) 6' l :.--1.---44 8 i 80 lY UNITS 792 Li 1 I uw. 85 r18 10 '----1 t` ' ____.__ DENSITY 2.36 UNI /AC , a p , pAw- Y k iw.- � _ TS ` � AC 4 wr_k ? rc i, I � I7`j 14 IOL 16j; 17 �, IS_ -'14_,__I- EXISTING ZONING R 1c -I } I fr I "+•'.40i 14 ur t I �pN-Ilk g"r• p"'• "'-,I°"'- 3M I-�_____ PROPOSED ZONING R-lc �,:, .< ur �s___,i _ { L_____ __ __ —__ __ ___ ___ 3 MIN. LOT WIDTH INTERIOR 80' !� ''. �-� `' rc '._.v_ __y__1..a__r_J._„_, v __,p__ MIN. LOT AREA CORNER 10,800 S.F. N 111 k 1•+••cLe; 15 _ i 1 " uu,- 1510 �w r__�.,.__ _—_ __�__ _— .___ _ __ _ --------___________. SIDE FRONT ARD SETBACK l5' O - `�--___ir =--- 6-C 3 REAR YARD SETBACK 5 1 , _ - .....,„1. w "A" a — /J it �'. I wp .oe.. 4 1 3 1" q �., `L.i -.L.., 7 8 ;3 8- 10 ll UTLOT A/ 14 O -. �* ''-"'-�,";-_; ,•; si. 'sc.; ss. =,R LEGAL DESCRIPTION• Q p ,p "" `` .•.•' 'I`A , �• 3' d •' THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER, z J ,\p y—" SECTION 28, TOWNSHIP 33,RANCE 26. SHERBURNE COUNTY. .� ,._ ,/ ------ --- - v 8 4/519 ;:7:777, - / - - /� ...'..'':,,,,,,,• w- ' j `,�I MINNESOTA. LT,' � SAVE AND EXCEPTrL1 44 '0- ., j F I ,','v'%ice a / � '`•_' C7, THE EAST 330 FEET OF THE NORTH 330 FEET OF THE SOUTH R. C) 8 ;i `` ;% '•"' / 1 =`=`�- _ - :z.- - 515 FEET.AND THAT PORTION OF THE EAST PART FOR RIGHT ' -e%:.- OF NAY PURPOSES OF COUNTY ROAD NO. 77(PROCTOR ROAD). / L.--.,"--�J a��ry it ' `\='„' ,'4' ILL 1 r� � "4 — ® • LOCATION MAP • F S C1 0 'N ` ''-„ . .__ iy i ;i ' , r:' I ii > • ( . -W - b . .\ ' s --: 211:1 hi4 , -a,- -61tIciif-alitr--- ;-----/z.'"-- -'-‘'t----.'---------- , ,,, . , , ,:- \ - 11:,10\, pi, pi ; ...,t ;;t. ,----_---- . ,,,, ;, . .1 ; N‘;‘,„, \ $, .,,,1„,,,,,,,,___L_),___.,_____Ni....._\%\\\\ V 1r�a r� �fVV/ v l' /,`.°I cv \N.441::*,:---4.1 ----,•---44iiigiiiii.9 Z.7 / 44,- t*,,,Nit.LeONT4114\- 1 (iIP �.! � k, ' ��' tili I�'' ��- ILL_ I ',1);.:,,,,I, ay +.',r 4 ,i1 - '..., tb"! trilam ++ galffil , ,__.,J ,Y l .+. it, ,,,,if___,..._,,,..,,,..„ .., 31 I • iA,111,....::7,--'1..'',;'1I.\,('.1.14l,‘‘i,:.jj_I_iitij,l) -,-_t:_-',1,:_,,:_:-,,_--,1_,,'—•.',.•1,•s,_.s,,11, 1MiI,.L7:f' m:1___ ,. ta..w ll� , t/ ,r:: , ') ''' 'i. :.,: • . N',, r II r r P . a P y 4 1. Pip 0 P P 10+ �- y P P •+ iiiip ‘11110-��Illjlll � Ori ' s re r+ I r , 4§", r---- I f. ,::::4. ---„..1. —//:' -----:—.. e , 1- -., V. ..C `---- �h., , . � s � P � 1 l_ ,,,.: //: t, - , , ,,,,,,,,,,,,,,,,,,,,,,,,,..,,,,,, `,, e ...: , • � � j a P ♦r 1 y > < . \_____,. s s y Z. as b771 1f N d., Y ._`� _F�. • yo 4, il �ti£ I ,,' .e b� 44.4s;q o.ghro°.c",4r*",-- 8 1. d 8 41.----Z 8 d I • �" PRELIMINARY UTILITY PLAN PASSE ENGINEERING, INC DATE• REVISIONS a. N "^ 44I" — CHERRYWOOD HILLS 9445 EAST RIVER ROAD SUITE 203 1 - �{p MINNEAPOLIS, MINNESOTA 55433 o Hu J"^ amu— t of Elk Plver,MN Y PHONE'(612) 755-6240 FAX (612) 7,55-7362 I--q---------- _ .. RECORD DRAMA, c). , ^` -^�- . (41.31.1tro," ' NaliESE Ilt i [nli MI I I 1 ' II...:- .., !!!in i ••••••••:>7.1.0.04-00::'''' . -*17,%?:'::).".'Cit.'1 ;;;:;6?-;1;1,;CH-::...: tit filo. r . ...---.., _.....„--4::::..--,„,......--.. ... .6:_.,„&.4 1. i .,,, ,. .. J L' ,..;01s17-. 1f-'-'"i.lg'—....-•aY M_7071Villi ,•-...,fa4,417ffq/Pr' it, •••• i/ ---- ,.. 1 1 - '''' ,,.,.:...r.,'"._..e..iii..•-..i*10,1 t le 1....''' ..,!4 kV',. _...aL,-...m.); --.%.-0-,,, ---....7:-,_ Wific... ,a‘...",....„•-,t•. ..1,\\s.\ -,•,:,V, .,. 1.----- .„......,-. riolt. 3.1%-lf,%,,,,. ..;.;:-,:roizZirts,,, is.. .....,..tr,07-„ 4,14,,arkl.kkjytzts,,,,:k 474,4 i„...,,...:,. . -...„. ... ,,,, ,,,,,..?,i.,..; ...., . . ,,.. •-....,:..,'-•...,4-1:-,I..40*.t..1 ..-_....<-4-f,,..141t..r. ., .3firlr At.„.......„...Arico. 0 ....v,isl\alp.:;-...... .:.,,, , -.---..1„,,.- ) i‘.! 16.-r4 - ''''''"" %:/ti.1‘44kfra."(14-111:0,- 4,W4Y-N .M.;*,,+07 --110 16"-- itt,.44;W:' '..'i''- ittk?, -- 1 liliV.I .,,,,,-, 4,4 " _ . klig___,F1-7(ir.iii, c.:A .N.‘„,;..- * ,-..-a.zier 1,1~-_,*,..,,, ,, __- .. r. . 00:44.104/,,,,.. '..tv•vfr.14....„.4,..,.. .6041,.. ,:-....iik.,e4t*,.,..... -,-4, ., =Wear.,''-. - ''-'- ' :: 1- 4,1tittip S,14,1110WfaCj VII..;1'1,111M- .444r••;'.-ItrN15.1±,;;T'<4.!::.,M,.1 .1CNV:wilm ' ----4!) ii411b_1". ' 54 44,.%111*'''44.--****--4-•:41‘."'Ai 1144r44,41)1\t?'''' reELIM 4,r-rwai-a- ti:;t :st..11.--,-,4711,0------iipk....,,, ..1...„:-. ,. ef- ly:0 ' ‘ ---11.-=-ix g„-xim,-: r, ....... ., ,..?......„.. :, .., „...,„,.... . , ,, la?„116, -,_ , . ,„il ,..,7. 4. -%1.0 _,, • -•-.- ,10k1t4y. `'-'(°41---AV• - 41"444611/41--V4.e2.4740 AMI-=,-Ptilat?,11.R.072' ii-' ,•-,! 1°L)—.--1 •• --•-, : Ttsir, (3'IVO ,,,,..__, ...-...r.,,,,,,-----=.1-1,101-catt.4-,z---_is...% .irreg,,,- . c. ,,, ...:,-- , ..„40.1v,, -i,,,,.,,, ,,,,.,...j.4.t...... . ,/,;,,,,i at , . .,.. .____, N...*- ..___Aostii,,.._.;--wriktrio_ . .....-11 iiiIi......,..6„ _ ..40,,4b0,51,\\!..41 ,.._ZW.r„,,,it..„, ..-„..... ,..,.•,.z.. ..........:::- AlAtifi$'34kliffikz,-....----.4011,34• ;I',/ i .\40‘ tk.m.ilt,„ Vr ...i:67(.;:..ie *. 45406 ,..t...4•Vil r1.4•'1 C...,ArIre,i?t;‘4.•00- .4VV‘ • I . 1.11141W4P141711 '' • 10.‘i,..11.17 a IS --., iffisr- 6 ,'4 • 40,:atiL\ ••••z4.4! 70 .' . ‘'-')..a#:.' " - 4-5.1-mownw,-"...."- "•-7.7.-.- .:74:0/4"•••• ' e .`.r.,..ly dAir-777-----x---%A. ---wit.. .,1.1 (01;),,, r7 : 4:.,- -...‘,\:., -,04\11. - -410-o.09/... - ...- - --<.."---4,16,./!.‘,;-., ti .4„„oloi-,:„..,,..-g, ..,,w'rli,,.;..,::-.;v4 ...:.:ii 6 ' .. is, -.::•••27-:"7.• .:',7:-.:'-q-f","',. .,)//11...fly ..••--::. '4=Nle. ,Wslew .wew*Ib*v°11- ' --.'* . fi riY; *1:•• • :if ( •';',..1.. •:-. i.... ...".••\..N.,:.::,•\ (••--.1--•••• •- ,:' 110....;.. 4 io. ....4--,.....p. ii.•,.;.,.*_.......774-.,--_: .•.1-;;Ima. • .',.,is .',..,- •k:-.f.''!!'.' 5- :).1.••••••••k:------..-1--:::• : -..)*-1'..:'•? /IX' - '''• ; 'il•f>:.:•: . ‘,....a ,,,.t .-.,.,..„..,...„,, ...,,,,,,,...,.....,:„.„,,,",,,,,-„,‘„,„,....i, .• . ,........_:. ,,, ..• ...,:......„.,.; .,........ , . • • • .,...,,,, i........... ,_....... . ,, 4.,,,.,44..„...,,T. .,,,,, ,„,?.,........ i !.,-,--. .\ ..----. , . .„....,:. :)„,...:.....,..... - ...... Nvi I;::://:-•:.:'.4' -.— .„••...- A It', '• .•'''', ' ti 1":',•ikitiit'• ••-•-•-- 0 .1 I . '',..,•:-'1—, ' ..,;1,-:14:•/ •j!,':,... • . .j', iiIII''''.....,,A„.z„,.. rg.4L \-.•141 ' .'\..:".‘k•'':.:'' ALith'Z',.'....4d ''''''41'/41&.:•1,1 lt 0 it, mi :;.; ..,,_. ..• ‘ - Is, ••.• . s•• - -.. - -—..•7....%., • .-- ., •.• - -.m/4 \. xp,t, .---, ...-.1 ,,i,4••• --..... i ;.,........4 rTi tp. . -.1,-' ,_ .. .', -*,, ' .'• • • ' • ') 11!:••.- 11'"' 41 '• \. • 1 .- .• ‘,1 ..,';+,,••414 'i:,/:,',1:11.11) ,...,;"•:,.A.,. ,);I...!j4Y:*));:••••', -1 10, .._ • ..,.. 1 L , • •W::4,i,Mii-!,,it. Sir •'', .::?.'".1:::-..• •'0';L.t . '- .2 i 1 i -•''t.:1%IL. 1 . ..'' '..' '�-'-_ __'_____-____-_____-_________________'___-_'__-.. � _ .. ' ' - ' _ --- - -- RECOMMENDED SIDEWALK LOCATION m OWNER/DEVELOPER SURVEYOR/ENGINEER 6 I GOOD VALUE HOMES. INC. PASSE ENGINEERING, INC. i 0 , ''' """"'"'" , ` 9445 EAST RIVER ROAD 9445 EAST R/VER ROAD c ,, 8. ...e,, e.41.�°4. SUITE 203 S o .:;, a t't 1__ t � 55433 55433 "-"'---- ` PHONE 755-9793 PHONE. 755-6240 � e• •a.1 COON RAP/DS MN COON RAPIDS, MN. � s\ W �, T N li" 5 „ -ti o i I r , 1 ' . I! I t r I V! i y ` 9 r 10 9 j a - r...- „w '4 ll ' I F' 1,\, rxw rww F' I x%ii%aw ,y q. lyyu 1 ftiV 01 ri)N 4 t s ... — — —i o� �� J� ri:\J SITE DATA W y o . ,_____________,:.:,,,,...J , i :- I__ ::w` _ • DETAIL O2 '. , s, , i, v 1 u6 rrwl h-....._I...f._wr lY; ll • s warty 1.1 t1""'' 6+' �'a_ 2 h i , ( _, I 6 ] 1- I GROSS AREA OF SITE 37.77 AC [1 p n I r w-- ---nr ;r .r ____w 1 r- ,;�' I AREA OF RO.W. (PROCTOR ROAD) 1.18 AC a ui -. 1”' r I ew, I u.., I ` I- I PARK AREA .39 AC 3 I t �9K' 1 6 w..w; k r --____„ _� AREA 33.5 ' I (_---x �r 7-, j � 6 t ``(� � UPLANDD 2.84/AC CO O b ti - �, f �. 1 r 4K;r m7 Ww � . t •"rw 6St� ....wl ,j 165K 1a DENSITY 236 UNITS AC "1 0 1 t k AREA "+I , (1-' 13 4 , t t '� I 19 ,._'_) I .-�--v �; a--1-, I {r 12 1I 16-'1 14 16 16 i 17 16 I EXISTING ZONING R-lc _ r .7•'�ta wl ' I t',w t t PROPOSED ZONING R-1c I � .11�ser IPu Iil°" ;le"" �"" e wlr WIDTH ,, t I-__q v""_ L____,`-_ __ __ ___ __ __ ___ I MIN. LOT INTERIOR : ,.__,_J ,a : �L JL L ,'. CORNER ` ) tt t tt tt tt 1� 100' 1 ';� ,5 }—" I I u 264'16 „�", I MIN. LOT AREA 10,800 S.F. N v w ZviI s—_—_—_—_—_—_—_—_—_—_—_—_—p_ :'' ( 1 ___w___ __w__ __..__ _w__ __w_ _ _ LOT DEPTH 35 t t, s ;. I _ N E.MN --. 1r. w..6 I r16 wn..', ' FRO SETBACK 0' d' I �T �j. SIDE YARD SETBACK 5' 1-1 tl. I. '' --�� --'"a- 3'^----"`__'„ � ��'�' a. , REARYARDSETBACK 35' 0.. t S1 417 1 ,-, 7J y� . . ^L wooer _ 7 sty1! 9Y'8 10 11! UTL A/ `N _;j' =�' �'.�.! ,�.. '-'�R LEGAL DESCRIPTION g p CI - � 3 R t �Y` THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER z '�' � i 19 K•, /_ —~' i SECTION 28• TOWNSHIP 33.RANGE 26, SHERBURNE COUNTY, - '' „51, uv % :,7,71-g MINNESOTA. ICl RI' 2'5- ,;\ I, r.w 6, 1,,� '/ `^ �' _ SAVE AND EXCEPT W • / IJ I- I' 1 `.'.;- II v '' / 40 _ THE£AST 330 FEET OP THE NORTH 330 FEET OF THE SOUTH Pty U 5 515 FEET,AND THAT PORTION OF THE EAST PART FOR RICHT '/� r`• _ �J•:%^‘,_,` , - - -_ OF WAY PURPOSES OF COUNTY ROAD N0. 77(PROCTOR ROAD). ( R , E�r ! ri issy•• ' j ' mw IOW. B �/ 1 • E'#Oil1 ---�'--'' wear oas f --' .....• .E r�S 3 i Ii ' .a..w . ! 6 n gC ® fa i9 4rr• iS. LOCATION MAP 0 1 ..... tr, :i 1 ORIGINAL PROPOSED PLAT F s'••• \\ .. _.,. „ ,......„ ,„ . • .\ \ \ F / • + O to q C} T TQ lD CD V • O7 / N -I^t-.�,=+ •r-s • f6 . .. ""un .fes'•�. ii,.' I ,1' . CV. '4y• .•Z'"4'.. . s -• ...••‘.. .,.,,r �`•\ � (•, . t...". �?. ., . +. 31,1I 1 +. t' • !I ,,,, .- N -0 mill SCI • r a - r N V ,r • l-' ' .1.: 7C o t, ra:: ; ..r' .`".. '•.\ % Q ...j,,\\ 'N :; s f r 3. r I• '' ' ., I' ' •'•\ _ 7 4 Qf , r...__,,,.,..-----..\ T I. i F \ N • I ,.i..r.,6 V t�3 --••••,4"6 0 -, . ,El .. ..' ..A. /.',,,.0 \.,- % •,-V tea_ ,•_ s:,: ` ''''••••• i 1 Z i O7 \ r _ __ ____ ( _�___.-"-tom____----i-_:e.. 1i I -— -- —— -— — — a\ " \ i • i Oa y Y�= - VI b n O A Y h n :-,,• .,` 2 2 N CR-, 'Zi i y o O L 9. v N i i. \ i roti O y N O :a c• 2 . ` `t C h [.."+\- •�,•'� -.i i i1^Ir i1-1'- D. i n 20 C'7 - z z z x'>''v w z k r, -- - '•_ � .SII I. x �Zi ti x _ C.11 + ; . f.:._...„-_W I ate-'' F. °,x en x .�_ —s--z •` y ^�--"Y--=:',;;.- �t!T-..- • o > 1. i.i is A '[ _ �./•.II_�e ^•• (T ri�'.ti V~q m co Z - �- N O`y • `fir-�•• , L..) 7^.-•' �/' O 4 : 4 300 _ 1. h ti �•�Kr� ---I4• I xis 2N 7-� -o=�:; - r n ,_ -, x rl'I` + C '"'-� -_,_ _,. CHE.RRYVDOD HILLS :PASSE ENGINEERING, INC _W'___ _. v, _a -.-.T • jx.--- PRELIMINARY PLAT I s++s WT Rlt'CP. H0A0 a'r.7re' =U3 ---'-_---- 'L:"”- • • •-, i MINS EA X_4NCSCT: .SJL73 "---'-•-'-__.._._-.- J,..".-..-•-... Coir.=.2+'... - (-Rs. o! Ea R.vrr. 4.s' ?HOVE 1672: )53-6240 Ir- 67:1 .•1:17 .•-;.-___-- -.._._.._- -_-