Loading...
6.3 Item# 6.3. fry ofMEMORANDUM lk • River TO: Planning Commission FROM: Stephen Wensman, Planner DATE: January 26, 1999 SUBJECT: Request by Tony Emmerich of Country Ridge Inc. for Preliminary Plat approval for Country Crossing Business Center Third Addition, Public Hearing Case No. P 99-2 Request Consider a request by Tony Emmerich of Country Ridge Inc. for Preliminary Plat approval of Country Crossing Business Center Third Addition. Location The northwest corner of Joplin Street NW and 183rd Avenue NW. Country Crossing Business Center Second Addition, Outlot A Zoning/Land Use BP (Business Park) / LI (Light Industrial) Attachments • Location map • Preliminary Plat • Memo from City Engineer Background In 1997, the applicant platted Country Crossing Business Center Second creating one industrial lot and Outlot A. The applicant is now proposing to plat Outlot A as Country Crossing Business Center Third Addition creating two lots, lot 1 (6 acres) and lot 2 (7.97 acres). The proposed lots exceed the 1.5 acre minimum lot size requirement in the business park zone. • 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD &Phone: (612)441-7420 • Fax: (612)441-7425 Memo to Planning Commission/p99-2pc January 26, 1999 Page 2 • The proposed lots are adjacent to business park zoning on the northeast, and single family residential zoning on the south and southwest of the plat. A condition of the platting of Country Crossing Business Center Second Addition was a buffer strip consisting of earth berming and planting to be installed along 183rd Avenue (adjacent the residential property) at the time the parcels are developed. The condition would be a requirement of any development in the Third Addition as well. Access to the proposed lots is off of Business Center Drive which will minimize the impact on the neighboring residential properties. Development proposals of a permitted use for the proposed lots will be subject to staff site plan review. Conditional uses for the proposed lots will require a conditional use permit and additional reviews by the Planning Commission and City Council. Drainage and Utilities Utilities are currently available to serve the proposed properties off of 183rd Avenue. The preliminary plat shows the required drainage and utility easements. • Park and Recreation Commission On January 13, 1998 the Park and Recreation Commission reviewed the preliminary plat. The comments were limited to questions regarding location of sidewalks and agreement with staff recommendations. Recommendation It is recommended that the Planning Commission recommend approval of the Preliminary Plat of Country Crossing Business Center Third Addition with the following conditions: 1. THAT A BUFFER STRIP CONSISTING OF EARTH BERMING AND PLANTING BE INSTALLED ALONG 183RD AVENUE (ADJACENT THE RESIDENTIAL PROPERTY)AT THE TIME THE PARCELS ARE DEVELOPED. 2. THAT VEHICULAR ACCESS BE LIMITED TO BUSINESS CENTER DRIVE • f:\shrdoc\planning\stevewen\pcmmo\p99-2pc.doc • R1bOritELXL;AKE t. y O o INI: p RIVER1 L9411ON `` eiir....-Ai ORONO ■ ., �� ��/ ` PARK W_ it ; R , - ice a t rk IJ:._grt' ¢ I i _• U.S: HID-IN/AI' -NO -52 = __ . -114 1 `,' N , .01 NTI / oR o •oAo cO • COUNTY I ♦• COUNTY -,- .4.4 •41-:.-4,,-1SOFTBALL UG FAR O,F.. 1w &** COURT crrr3P ' - • : CROfJHDS HAIL 111E111 �; �.. HOUSE �.�.�.�.��9'9�U.r ,� �9�f. ....v...! ._ �- ® ;Nftftwir nw n PA- WAY • 11111 , w• • :2 , a. ,„,,,,,,,„ . _, , .„„ . W _� c �. ate. rw AA 9.:8 � f�0 �:6Y �Y AB �e:aE fr ( 31 aPP* El 37 di NE III 1K IC N "L'' Malligillninill 1611e PEel" t I t.. 6 - IPEI&I1 . r►Ea=pw: : P 'taIAi-44 ., 4%. nu:ow :ytiritli�• En ra > VIii IIS L.........riivisiaPto_a _4&iL :L- Illiiii kiwi ilifiE " aiiiiiiihmiti*Iritg m,ssis„, iii el MVP . ...;-7 -1.4. 4,._. .. .. 111111/ gi ItigalAppozo R 4 m . ; • ; !Pill R1d,1kkjverZONINGMAPtl 13065 Orono Parkway • P.O.Box 490 CASE: P 99-2 Elk River, MN 55330 COUNTRY CROSSING BUSINESS CE • N.W. Corner of N.W. 1/4 of S.W. I/4.A Sherburne �— — — — — --- -- County Cast Iron Monument.-- --North line of the N.W. 1/4 of the S.W. 1/4. Sec. .7 — — — — _ _ — _ � _ — _ — _ _ �. #1.I � L+``i: ,r . E' — — — — I ` .. gi) .r / • 46.86 —_ ( � QDJd` N /• ; ��'r ( 3? \ r. / r NN \ \ •r,a�•I \ 4 \ •r 04N`'9,412;113:Wd° •.7i. eye%a.1• 96 _ mN8V41' W:�.:N875743"W 86.16'556 — 232.40 5 — — 3 ../�•.,„ 1 3 1 /' • tD N • /rN LI O r `i, •e; O W 4• 00 _ a�i • i° -� %1 i N89°41 r▪ 's)i �/ I _e64.7 m °a. •� a li' I 3 �' :•. �r— 2 N. 7 \ ; 1 b ''‘., 1 s 1 BLOCK 1 1.1 I 1 zLUJ ;,j 1 1 1 1 \ 320.74 J L 354.70 _ — — — — — —' 1."s --- 589°24'09°W 675.44 --- o _aa3J? - - —— — — t — - : :.,... COUNTRY . — .-,. CROSSING e�9\ i T, ;:1 I I_ 1 c / AL :„ ,/ 1 -I /_c:i -' \ \;:� \ •'; f.% \ / --7.,,'`,.. �\ st.00K 1 �/ \ tL'Jct', 7 /ii i„ //'. • / 0..) COUNTRY CROSSING TOWNHOHESCOUNTRY CROSSING TOWNHO THIRD ADDITION SECOND ADDITION 6 CITY OF ELK RIVER, ,WTER THIRD ADDITION SHERBURNE COUNTY, MN. VICINITY MAP t„ o :er,N W •I,_• 111 -01 :• :” illal 2, T. 33, R. 26. -_ - I 44.:::•♦•14:•4J i ♦% e ...... . .7 ---,_ 7— ---_ H I \ \ \ \ , I N / -- d . '' 1 1,....., ,,,,,_____ . _ c • I GRAPHIC SCALE , I 3 100 0 50 100 200 ') I ( SCALE IN FEET ) `- I 801 1 inch = 100 feet 3 76 " W __ __ x, For the purposes of this plat. the West "' line of the N.W. 1/4 of S.W. 1/4, Sec. 32, T. 33, R. 26, is assumed to bear South 0' 35' 51" East. 0 Denotes 1/2 inch x 14 inch iron pipe set '` � • I with a plastic plug stomped R.I.S. 21729. `+'i/�i Denotes iron monument found. xV i�,.� I ti Drainage and Utility Easements are shown 4'5�i�, ill thus: —41-10 („i,, _= io � ( f I O1__- L---LIO I I I _ Being 10 feet in width and adjoining right- of-way lines, also being 10 feet in width and adjoining lot lines. unless otherwise indicated, as shown on the plat. • `...,....... -� — r - - - ADDITION :.:1:11`: ; I. ! / > 1 :, :::' 1 nN`: � j � /,,/ ..< F_ I 'ES COUNTRY CROSSING TOWNHOHES John Oliver & Associates SHEET 2 OF 2 SHEETS el O • rf-411. F M St -t� Howard Re Green Company EMI LTING ENGINEERS CONSULTING ENGINEERS Formerly MSA Consulting Engineers January 20, 1999 File: 806240J-0240 Mr. Scott Harlicker Assistant City Planner City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: COUNTRY CROSSING BUSINESS CENTER 3RD ADDITION Dear Mr. Harlicker: As requested, we have reviewed the preliminary plat for Country Crossing Business Center 3rd Addition. The plat takes the largest remaining undivided piece of that development and divides • it into two lots, which run north and south from Business Center Drive to 183rd Avenue. Lot 1 on the west appears to be just less than six acres and Lot 2 on the east side appearing to be approximately eight acres. We find that the plat meets the City requirements according to the ordinance. We would, however, make one comment regarding public utilities to service these two Lots. When this preliminary plat was originally laid out, it was anticipated that this area would be serviced by a cul-de-sac extending from Business Center Drive to the south. When the utilities where put into Business Center Drive they were laid out with this cul-de-sac plan in mind. The original plan called for the centerline of the cul-de-sac at Business Center Drive to be approximately 85 feet east of the new proposed lot line between Lots 1 and 2. Therefore, this is the location that sanitary sewer and water are stubbed to the south for service. When development occurs on both of these two Lots, provisions will need to be made and potentially additional easements granted to extend the utilities into Lots 1 and 2. If you have any questions regarding this information, please call. Sincerely, HOWARD R. GREEN COMPANY /lam ace-cot„) Terry J. Maurer, P.E. • o./p roj./240-0121.j a n 1326 Energy Park Drive • St. Paul, MN 55108 • 612/644-4389 fax 612/644-9446 toll free 888/368-4389