Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
6.10-6.12
c \;4Item#'s 6.10. - 6.12. ity of / MEMORANDUM Elk Ri• ver TO: Planning Commission FROM: Scott Harlicker, Planning Assistant DATE: February 23, 1999 SUBJECT: Request by Phoenix Enterprises for Rezoning, Preliminary Plat (Hillside Estates 9th), and a Conditional Use Permit, Public Hearing Case No.'s ZC 98-7, P 98-5 and CU 98-21 Request Consider a request by Phoenix Enterprises for a rezoning to PUD (Planned Unit Development), a preliminary plat for 61 single family lots and a conditional use permit for a planned unit development for Hillside Estates 9th • Addition. Location 193rd Avenue and Zane Street, north of Deerfield 3rd Addition Zoning/Land Use Rle (Single Family Residential) /MR (Medium Density Residential) Attachments • Location map • Preliminary plat • Minutes from Park and Recreation Commission meeting • Memo from City Engineer Overview The proposed planned unit development and preliminary plat is an extension of the Hillside Estates development along 193rd. The proposed plan includes • plating 43 acres into 61 single family lots and the extension of 193rd to the eastern limits of the plat. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD &Phone: (612)441-7420 • Fax: (612)441-7425 Memo to Planning Commission/P 98-5 February 23, 1999 Page 2 • Since the Commission reviewed this plat on January 26th the applicant has submitted revised grading, drainage and utility plans which the City Engineer is currently reviewing. The layout of the plat has not been changed. Wetlands The applicant is working with the City on resolving wetland issues. There is a wetland that will impact the development of Lots 17 and 18, Block 4. Options to address that issue include adjusting the lot lines or filling the wetland. There is also a wetland located in the proposed right-of-way for 193rd Avenue that will have to be filled. Streets At the last meeting the Commission discussed the proposed median on 193rd and the islands in the eyebrow cul de sac. The applicant will be working with staff on appropriate landscaping. At the public hearing residents on Auburn Street expressed concerns about existing traffic on Auburn Street and increases generated by this proposed development. Increases in traffic on Auburn Street generated by this development is likely to be minimal. Most • traffic generated by this plat would go directly to 193rd . Some traffic generated by the lots on the northern cul de sac may go out to Auburn. Lots The lots in this plat range in size from about 14,000 square feet to 49,000 square feet with an average lot size of 20,779 square feet. Some of the lot lines should be adjusted so they better line up and eliminate odd corners. The property within the NSP easement will be platted as outlots and will contain a drainage pond and trail corridor. Most of the gas line easement on the east boundary of the plat will also be an outlot and will contain a trail corridor. Three of the lots fronting 193rd will actually have direct access from 193rd. The remaining 7 lots will have access from the eyebrow cul de sacs. Lot 11, Block 1 should be oriented so that access is from the side street and not 193rd. Lot 5, Block 1 will need it's west lot line adjusted so it can have access from the cul de sac. There are 6 lots with double frontage and 3 lots with triple frontage. A landscaped easement on 193rd should be provided for those double and triple frontage lots. It appears from the grading plan that a 50' to 120' wide strip of • existing trees will be maintained along the north side of 193rd except for a small area at the northeast corner of the cul de sac and 193rd. This small area s:\planning\scott\p98-5fpc.doc Memo to Planning Commission/P 98-5 February 23, 1999 Page 3 Swill have to be reforested. A similar situation exists on the south side of 193rd. Park and Recreation Corridors for trails be maintained within the within the NSP easement and the Northern Natural Gas easement on the east boundary of the plat. The applicant will be responsible for construction of the trails. A sidewalk is proposed for the north side of 193rd Grading, Drainage and Utilities The City Engineer will address grading, drainage and utility issues in his memo. I would like to point out the developer is proposing an unusual location for a drainage pond; he is proposing to construct a drainage pond in the right-of-way for 193rd at the east boundary of the plat. It might become an issue when the time comes to put in a street and the residents loose what they thought was a pond. An alternative, as presented by Commissioner Kuester, would be to locate the pond in a place where future lots are proposed. When the pond is no longer needed it could be filled and houses constructed. 0 Rezoning For this project to proceed as proposed, the applicant is also requesting a rezoning from Rle (Single Family Residential) to a PUD (Planned Unit Development). The PUD allows for more flexibility is design of streets and lots. All the lots will meet the minimum dimensional requirements of the original zoning district (Rle). The PUD also allows for a comprehensive review of the project. Recommendation It is recommended the Planning Commission recommend approval of the rezoning request from Rle (Single Family Residential) to a PUD (Planned Unit Development) based on the following findings: 1. A PLANNED UNIT DEVELOPMENT ALLOWS A COMPREHENSIVE REVIEW OF DEVELOPING THE PROPERTY. 2. THE PROPOSED REZONING WILL BE CONSISTENT WITH THE CITY'S COMPREHENSIVE PLAN. III 3. A PLANNED UNIT DEVELOPMENT ALLOWS FOR FLEXIBILITY IN SUBDIVISION DESIGN. s:\planning\scott\p98-5fpc.doc Memo to Planning Commission/P 98-5 February 23, 1999 Page 4 • Staff has unresolved issues relating to grading, drainage and utilities. Should the Commission recommend approval of the conditional use permit and the preliminary plat, the following conditions are suggested: 1. A DEVELOPERS AGREEMENT BE PREPARED OUTLINING THE TERMS AND CONDITIONS OF THE PLAT APPROVAL AND INSTALLATION OF IMPROVEMENTS BE PREPARED AND EXECUTERD PRIOR TO RELEASING THE PLAT FOR RECORDING. 2. A PLANNED UNIT DEVELOPMENT AGREEMENT IS PREPARED AND EXECUTED PRIOR TO RELEASING THE PLAT FOR RECORDING. 3. A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100%o OF THE COSTS OF PUBLIC IMPROVEMENTS. 4. UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25%OF THE IMPROVEMENT COSTS SHALL BE SUBMITTED TO THE CITY FOR A ONE YEAR PERIOD. 5. SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING WITH SHERBURNE COUNTY. 6. A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY ENGINEER BE PAID TO THE CITY PRIOR TO RELEASING THE PLAT FOR RECORDING WITH SHERBURNE COUNTY. • 7. A GRADING AND EROSION CONTROL PLAN AND DEVELOPMENT PLAN BE SUBMITTED AND APPROVED BY THE CITY ENGINEER PRIOR TO THE ISSUANCE OF BUILDING PERMITS. 8. ALL GRADING WILL NEED TO BE CERTIFIED PRIOR TO ISSUANCE OF BUILDING PERMITS. 9. STREET LIGHTS SHALL BE INSTALLED AS RECOMMENDED BY ELK RIVER MUNICIPAL UTILITIES. 10. A LANDSCAPE PLAN, CLEARING AND TREE PROTECTION PLAN SHALL BE PROVIDED PRIOR TO FINAL PLAT. THE LANDSCAPE PLAN WILL INCLUDE LANDSCAPING ON THE CUL DE SAC ISLANDS AND THE MEDIAN ON 193RD AND REFORESTATION ALONG 193RD WHERE NEEDED. 11. AN EASEMENT BE DEDICATED FOR THE TEMPORARY CUL DE SAC. 12. ALL WETLANDS ON THE SITE SHALL BE IDENTIFIED AND DELINEATED AND ALL WETLAND PERMITS SHALL BE RECEIVED PRIOR TO COMMENCING ANY WORK IN A WETLAND. 13. A REALISTIC TREE PRESERVATION PLAN BE PROVIDED SHOWING WHICH TREES WILL BE PRESERVED. 14. ALL COMMENTS OF THE CITY ENGINEER SHALL BE ADDRESSED. • 15. MINIMUM SETBACK REQUIREMENTS FOR THE PRINCIPLE STRUCTURE SHALL BE AS FOLLOWS: s:\planning\scott\p98-5fpc.doc Memo to Planning Commission/P 98-5 February 23, 1999 Page 5 • FRONT YARD 30 FEET SIDE YARD 10 FEET REAR YARD 30 FEET GARAGE SIDE 5 FEET 16. ACCESSORY STRUCTURE SETBACKS SHALL BE: FRONT YARD 30 FEET SIDE YARD 5 FEET REAR YARD 5 FEET 17. ALL MAILBOXES SHALL BE CLUSTERED. 18. WATER AVAILABILITY CHARGES TO BE PAID TO ELK RIVER UTILITIES PRIOR TO RELEASING THE PLAT FOR RECORDING. 19. SIDEWALK SHALL BE INSTALLED ON THE NORTH SIDE OF 193RD EXTENDING THROUGH THE PLAT. 20. TRAIL SHALL BE INSTALLED ALONG THE EAST BOUNDARY OF THE PLAT CONNECTING WITH THE TRAIL INSTALLED AS PART OF HILLSIDE ESTATES 5TH ADDITION AND EXTENDING TO THE SOUTHERN BOUNDARY OF THE PLAT. 21. THE TRAIL PROPOSED ALONG THE NSP EASEMENT BE INSTALLED AS PART OF THIS PLAT. • 22. THE LOTS LINES BETWEEN LOTS 24 AND 23, BLOCK 4 AND LOTS 13 AND 14, BLOCK 4 BE ADJUSTED TO ELIMINATE ODD LOT LINE ALIGNMENTS. 23. LOT 5, BLOCK 1 BE ADJUSTED SO IT WILL HAVE ACCESS FROM THE CUL DE SAC. 24. LOT LINES ON LOT 3, BLOCK 4 BE ADJUSTED SO THEY ARE MORE PERPENDICULAR TO THE STREET. • s:\planning\scott\p98-5fpc.doc PE ffIL \\ O ( lam (R/a) 9 .i.:. \:\ / /\:/' .IN. I 11PIII / :;;: . el . • . / ,, ,),-. :''II MN hill: • Ilii - 1;�.: - :1141re1 jt,1� F ''':\s/ • '� ff. f'' PORI) DARK w `\\ 'v.,,,,,., .,..- . st-tp7 .iiiimAt mpg ,,, , 6 IP low. . . Illi , \ . 1 :::q 4y'` ja3 --‘.. :-. ... agninfalMft*asill"1 ii7b....g. * " O&M"- arlO'► LOCATION '`.\ .. . ' .-- . V W 1 14T4v111 pm • **7"str--": 'A mzir i- ----.-H - -. • • a. X1°4 2AIi 1111IF AM lable', iz j4 ; _aili -T its .miswoulpgraiiimi,mew gr. . ..,...........:.,.:.::,:,:,:,:::,:„.. reg • S-- . >......::.,.:..:.0i:;:..:::::. .. lAi ;Se :""PA:01.44,113igillibeiSiiiiiiil: 77; h\_, .T...t0„,,Eiti tiVe 4P im". 2 '..." t./ iii6.2111112 . ft, ,40: 110114-.), ill 0111E.P.iiii.rAgiri. *sr Li:::i,i:,ipmi:iimi ::::pmi',.,E 1 I i ;11.1111111111rt-it.-6. . 441kilirAN IIIC-:,tf: 1.2 igii ny'r.111,;,,, =i, g. . . pè* i.. viol R3 0111..---V-----tealliii i ,. 4:P. _14* it , ._..._ ----r . Rio '.. V_„„, ame - 0 tra * €240.70 . .yl:.;,r- 41. mown m- Ain_ ),, \ - i . . 7 . , __att., . .... . ... .,--1 1 ' \ 2, H E - T^� La: • . 12 — ''01111•011111E51 .rig gig 1 cas__,... r. __ ___,_ . ,.„.c.. : 1161 i L,D• —••••4 : \` x+571 z:,,, .` •* 0 166, ' -FY--(_____., .1 sm......J.ii-- • 1 4". '. t, ' ' ' .,.. -• "V-Mr - -';--- - ' . a LOCATION :\,__ . . „ "1-1 ' , ..t MAP i - , Re. aver _ 4N( , s•D '.3065 Orono 'Par K•.vav ?O. ?cx -9O CASE: _.. ...ver.k ver. N,L'•4- ='O du 9, 2. ff ; d1' .Al sw- - --•' el) 1 umov."24 . 0 SCALE D4 FEET ; a 100 100 >< •?BO aO ,2° 4.16**\ . ! .1b, .. AbN - : )) t-hi'L., ,, s 1 ( . ,,,,,,, 0M14°A'N \\4 \\.\\ \-., "Nik"wv11/4v4 ... ., ,e., \Th\\ 1\ I i / 4.,,,AliN 400 , ( .4 t '''- v.- ,-.-.,-, -.....,.,,..,a 1...,„11.14,11'4,1 ,,,,,,,,, ,,., ,,H, 4'.**.NT i I 7 /** Ritir-tb._ * ',„.--...7 / ,______011/#0.1. ,l ,„ . . _.,: W.." -----#.1 _ ....... .."4-rm----7- &;, , 'r f/Oik viS k.0 40,01 v'W-410/11" 4.14.71 ft. r) /11•1010; ‘v _id"- ,, .VP- 1,0,70-,...17.:-*-v..„, 14.44,1* , trillifigiallio sli". Z.,•' --.4, Aolr"' sie0- --Iiiitia N ,.,. kik.OfroOlpiikt .4,11:46•, 401.- 44a*%\ i.n.iik 8V\ -., . . 1 vtiliontit, 4 - --m,41 ekvisiap—iwili 40.0. , )17/ • taski,... .,MIP� ! IIIA t.kg • ` , • to, .i. . X411 4 f . .- 2 Ur 8 �� � ' - '. • 2 ,WitAl'- __' _‘ 1M is c i liffek. I.: a, %.,, tgrd • filWiti . b. ,Ali fir..laatAr.-.o . VIA. 0A40016 ..‘ \ '')\ fr ...-va..* ------- 111,1 ., 4. -sittarmx. - i ,iarAreAlt.....,01.4., Val`.-'-'!---=----- :7-AA Vorairi „Ot niorivx ,. *tvotios., :, •: ` ihVitititpr#, Ak....41*-40n. ft - Vartge f• c.�), i`i.�y ,�/ p�19 �.� �, �.�a+���, �psem-- 6-� �=. � 4'L ` 01,54ir%%-t,,,,Qp4lo,�� `�`, Vie,, 40 ,;.\11 it#3"14# �'�% ,, 40farimat.:-:, )1.411„::_ .„,,,,,,...i....,.,,,... „,, jp,:::,:::,, ,o ,, ..,,,..,‘„,:vi - 64.111 , 'CI 1. ‘‘..11 (110;15-441 . 0 Y;':-- .-- -'01r7°1-7; ,.ftm qf .„---- •\. oilts-‘ ,.....,,Avoriatk.r. .--,a0":--744,...„„e-,;.; --,-:.,__-,,, i /f 1 .'” 1 It _, .nk' i\, .1410v \'NNE. ,:-.4----N,\r ' 1,5( i tu. irr V 911 la 74 . •7 toq/, e yy7�y it-U1414.. . ., y( r �� ' '; ♦ ?4.• t ,`T'V t n. s +it .' c Y"6;, :v V Legal Descriptions . . r,,,.._-_ �� That part of the West Half of the Northwest Quarter Section 26, Township 33, ��' Range 26, lying southwesterly, southeasterly, northeasterly and southerly of the plats of HILLSIDE ESTATES FOURTH ADDITION and HILLSIDE ESTATES FIFTH ipia 111111plats all In Sherburne County, Minnesota. beat 40011 and 41111166.. "11111!,,, That part of the Northeast Quarter of Section 27, Township 33, Range 26 lying • southwesterly, southeasterly, southerly, westerly and northerly of the plats / //, of HILLSIDE ESTATES SECOND ADDITION and HILLSIDE ESTATES THIRD ADDITION ..--I I '\ all in Sherburne County, Minnesota. illand ! Bill 'a Dutlot C. HILLSIDE ESTATES FOURTH ADDITION. Sherburne County, Minnesota. 16b+- - • X � The above described legal descriptions are incomplete. full legal descriptions ;�"� to be provided at a future date. lei 1 /� t _ i r �/ Title opinion rot provided as of this date. j{l „{ Property sublect to easements of record. f' �� All distances approximate subject to a final survey. \' ) ''‘., Topography provided by Howard R. Green and Associates. Design information and lot layouts for Rick Harrison Site design .it // •44, 1\ .--.441\ 0 t Owner and Developer: LP /'� Riverside Development Corporation :7j ' f � 1?230 Evans Street k' � J Elk River, Mn. 55330 1'. iit /7.--)) / i612) 241-1801 `)••T F' 1 /( Plat Area = 1.379,8`,3 Sq. Ft.+i- (43.16 Ac=res) ,3,/ l: } -` 4 Lot Areas it , \ \ �� / Block 1 Block 4 , I �k \ �" Iir 1 ,� Lot 1 = 17,578 Sq. F+„+;- Lot 1 = 14,011 Sq. Ft.+/- Lot 31 = 22,420 Sq.•Ft.+/- Lot 2 = 49,310 Sq. Ft.+/- Lot 2 = 16,007 ,q. Ft.+'- Lot 32 = 26,331 Sq. Ft.+/ •Lot 3 = 35,245 Sq. Ft. Lot 3 = 16,998 sq. Ft.+!- Lot 33 = 18,558 SQ. Ft.+/- I Lot 4 = 14,359 Sq. Ft. '- Lot 4 = 16,887 Sq. Ft.+,'- Lot 34 = 36,963 Sq. Ft.+/- I I / Lot 5 = 17,022 Sq. Ft.+'- Lot 5 = 20.200 Sq. Ft.,- Lot 35 = 20,319 Sq. Ft.+/- (! ! ! Lot 6 = 16.146 Sq. Ft.+; Lot 6 = 16,389 Sq. Ft.:- Lot Lot 36 = 18,341 Sq. Ft.+/- J3•��tr� Lot 7 = 17,798 Sq. Ft.+,- Lot 7 = 222,427 Sq. F+,+•- (� ��' y .. 1 Lot 8 = 15.955 Sq. Ft.+i- Lot 3 = 24,193 Sq. Ft.+!- �� f % Lot 9 = 17,644 Sq. Ft.+!- Lo+. 9 = 15,605 Sq. Ft.+.'- �, qLot 10 = 22,863 Sq. Ft.+/- Lot 10 = 17,726 Sq. Ft.+i- Outlot A = 12,698 Sq. Ft.+/- ?.I f� • lig / / Lot 11 = 21,426 Sq. Ft.+/- Lot I1 = 22,872 Sq. Ft.,- Outlot B = 35,735 Sq. Ft.+/- ,II ' ----, Lot 12 = 18,979 Sq. Ft.+/- Lot 12 = 17,421 Sq. F+,,+/- Outlot C = 76,448 Sq. Ft.+/- / 1 Lot 13 = 19,107 Sq. Ft.+/- Lot 13 = 20,381 Sq. Ft.+/- Ou+.lot D = 41.737 Sq. Ft.+/ / > Lot 14 = 18.291 Sq. Ft.+/- Outlot E = 80,459 Sq. Ft.+/- / , ,-4' ( '\ ` Block 2 Lot 15 = 15,928 Sq, Ft....- Lot 1 = 26,981 Sq. Ft.+/- Lot 16 = 16,099 Ft.+/- i ' Lot 2 = 20,494 Sq. Ft.+/- Lot 17 = 16,185 Sq. Ft.+!- / 0 r0\ \�'�� Lot 3 = 31,850 Sq. Ft.+/- Lot 18 = 14,467 Sq. Ft.+/- • Lot 4 = 27,135 Sq. Ft.+/- Lot 19 = 24,938 Sq. Ft.+i- \= /o N�� Lot 5 =317,572 Sq. Ft.+/- Lot 20 = 22,581 Sq. Ft.+/- (/ Lot 21 = 17,077 Sq. Ft.+/- `�4`_ `i Block Lot 22 = 26,250 Sq. Ft.+/- =e�.� Lot 1 = 20,706 Sq. Ft.+! Lot 23 = 34,487 Sq. Ft.+/- 'L w Lot 2 = 21,377 Sq. Ft.+/- � fir, Lot. 24 = 21,503 Sq. Ft,+/ ' Lat 3 = Ni F• ot 25 = 20,494 Sq.18245 . Ft - Lot 26 = 16,786 Sq13854 . Ft - Lot 27 = 16,786 S15858 . Ft.+/- Lot 28 = 17,667 Sq. Ft.+/- � 1,.." Lot 7 = 25,743 Sq. Ft.+/- Lot 29 = 15,473 Sq. Ft.+/- , I_ TYPICAL LOT 2, ` \� Lot 30 = 15,166 Sq. F+,.+/- SI "1111 ' ` \ 5„660,, ` I a\\\� Total number of lots ;! �� I 1 3 I i . N.,` -, Nunker or bots between 11:1K:0 :Jr,,.. !c')U, -1 i1 ' :co�cc I- i _ I ,--72.\\„\\,'•:.--- -7.:� ` l2.D01 ar:d 14,000 Sq. Ft 0 W / --i;-',,',.:"-----`` ,' 14,001 and 16.000 Sq. Ft.. 11 iw` W IIIIi t} I 16.001 and 20,000 Sq. Ft 22 1 i It �' /%�'� '• 20,001 and over 28 VI �� ► n j j 'j i' Average area of lots 2A.7.7..9...Sq. Ft. 5 ,,\n 1/7 l i i ! Minimium front building setback........_.__.__.....__ __ ..30 �� ..rte /5,,,---' 1!! pop,MA..KN,. A,,. I, ;�/� 1/�))� R - .'.,;,,.4, -..", /7'tc ./,//I STREET ----/ 1 )4! 1 0 P Py 2-`9V. ORIGINAL SATE:6-26-98 PROPOSED PLANNED UNIT I NEREBY CERTIFY THAT THIS PLA I.PLAN, 1 DESIGNED IY:RN. SPECIF[CATION,a REPORT VAS PREPARED LOT SURVEYS COMPANY, INC.,,,..:„..>" ` " , DEVELOPMENT OF: /�� I DRAWN D DA !Y ME DR UNDER MY DIRECT SUPERVISION / CHECKED BY.CA. AND THA THE LA REGISTERED T LAND LAND SURVEYORS HILLSIDE ESTATES STATE OF MINNESOTA. 7601 73RD AVENUE NQ REVISIONS: 29 8-182-98 612)560-3093OOKL IN 8 FAX(6 2)560-3522 NINTH ADDITION CITY OF ELK PIVER, MINNESOTA SIGNED: ----- I r B 00 11 INV ,II. -e • / il/ j----./.,,,,„„______/„/" ." #0.,ie,"7,:„., - .. , ,,. . ) , . . .,A.A •.., / / /` 4....._a01.-----...... / i, , / \ IX 101 TOKR \ el 9"1)44/ 4 . ''.--1."' • '' '/ . -......001111111111 Alid0' L-,/ ' .2--:..0. : s ' ''de --...--:--- - • - 1--v441111 I I r, ► /' •a.- ° ,III..\. ti , ,. ., a4 AI , /�� " *Andik:4,a,41 z , „,,......./74,044r, 01111"- ..:::-----___., 7.11M4PW11101-&-illr- '' •• . pA,.\/ \.s tailliallk ft (4 vik .. ,. 111W‘ 0 N, _ `.•=et% if i ,.../.'''' r \ --- '1 •1 L' " ilk, 1 r 3 -.. .,.- , ,,, ,:. ,7 \ i‘EN ______ N'Ilktinn., •„ --3/..doiP' iie ,,,A / •40,016.;....74ii....-.0.11,7-, i hike -1.-\------s\ik I ... • ,, ' // A.;•.> 96 i-ii- -aro- . 1 ..,4,S .,_\ ,.. / , __./ ,.. 1 i III -----/„.---N‘ \ if- ,.,' // /.1)<,:tilii: 14 0 •IN Lz_ ' i.‘. .:444/ ; 't -_ -- -,_,1 . -..riall 11 ill I 5 ', 4i: 1:4•-•7714 -----::: ' ,..„..-- , . ,.‘, \ 1 , ki./- , --,..: ,,j\ ,00 4 .11:,-'------..,: --. '. \ .',. ' ii::: . ••- '',:--, \ \ '?'N. . • -ilA111 vit*'l c-r--'-y---T. 'N \ Ao, P\ ;,,/' \ , .., . , ,,,,,,s..A iv., . .., ..,„. 't \ Al \\`-. 111 11M. .. 5 --I . '‘Iert0 14 /:- ./ 00. ‘--17- !meq.i,....., 4-144 \ ,, � , v .„ „ .. ,;,==--tit” k' \ :n )k N 11 Vaal% ;It . ,,, , „ . ,,, , -"411,14. ...wia ,, ' 4 nt, ),. - /4). ,,,>,, ,.1,1ki. - j ' ,,,,,,,, heti -1.1%‘1Taaffi - t---1 A ( 14 Wilr1SO4 ": t !..stir,6/k .,..!goillmdi Xr", ' 1`tb • ,• --14 ''. :PIAMV • ,. . Ilihr,Akirt Il \ \ 1 1.....,, \ ...,.., , N ,, ., /. / , --_-- ..... . ., ,,,,,,,,.,,,,,..„,,,,A. ,,,,,, ,,, a il ISIMP :I) /7-- . villi\wV,,,,,„, ptev: N\AilitigiNot, ,- g -,. _ //7 ."- ; . , ` k, ,...446, . , i psi t L,,,i . I4, -,..'-- .4 '4: ° -.NNZI141441ba%As'ioklitjalliti :.. ••-. . - -- •n....___;.,<, 't... '-'%, WWI - i , , --4'___4 --------:__- _- , . ',r-r-I,• • . Nr. \...,1,. .. .k ---_,.. :;, ,,---iz.L., , 1 \''' ..4" . /____ 10...„ ,..-<.+ _,,v imiewo4rk4:, .., .•----- . 70,....., „,..,,,,,,rwIllillo.„-.7 4.,. -?„: 2";, - ,t .--,,,,dilmsr_______, /4,- _ __, sto .0.4= :•.--- ---------------- ''''44-0611Ird"--41."`"---Asiswitunimmar ....- ------iht • <I: ', 1. \ \S(11111111" , ..d 014 ���I�.�_� 9690 ',41.........r4 ,i,o‘ } '>\,, 4, • 1\ IV` ♦ ,fj 1 9:1 W iris_ I . ' __J ~,,, 9 `� '300 A l I CNIiIER 069.0—��,`\ /''� / �\ X '\\u\ i )a, %V0 •-• 96do �� , / \./ \ 6 rw-.o,.;..,._�.... .^.....!,,.. ..:s-,,v-.-cr:,.;.•.,v:-:•-.csv;^...,.;:::v..,...,•.ar., .... .... . .. :r. .,r.<.vi'Ts. ..qct � \ -J R �� \, -_ ��= �/jJ / ,c GRADING & DRAINAGE PLAN M,o /,�__ `�� •HILLSIDE ESTATES 9TH ADDITION =�--` �`^`� �`\\ Elk River, Minnesota • / /4VT ` ' I. \'' \ ' GARAGE FLOOR LOWERED w/ ADDITIONAL STEPS TO FRR:ST t- --..,1 b„... ,••,-....._ , , Iv) ... ,_,„. ____,,,,„... A ) i kik \ .'414tai....:-ati;-0..--- --- 41‘,c ( V NW\'‘‘.\.. 'N 1 1„/ \`,...3 ''- , 40 *Ap,N 7, / fr'\'N y.c.\ 1 ' \ Ai° 11:-.;-53\ \\ ' 'NZ* 1 / J ii \___‘ Itr ...., Nili'ilot /,1_ / \ \ ) • Al NP, 1 i >\ RE TAMING 1 0. .f` VNI1101 rit ,�:�, A - „: , /� �.. 21 t.:r:..• 4111,` ...,,,,,. ....v, „.. „:,„.„,,:...:. ..„..„4„..:,:::,.,..„., ..,„...„ , , , , , ,i, , , �1 / , u - ,� i 1 c S0� ` ir _::m;,yye I.:i!•-. t 4 s r I &'fes `�°'° {• *'./r.: \�, , EDA"., ROCK CONSTRUCTION ENTRANCE ili 10 1111111111, " a.��I� -'11 mac- • �..0 ,i,7I 1 GENERAL NOTES • dP! • ��'� i r 1 7 \\�� ` ! 71:., 4N f,:3NTTStXNQ(EMf"..EML4;AP.GTtSCNEO�Jf:. ,;0 �._, t , I r RIOR TO RCI.?I+R ADIN( IN.TALL SILT S'MFEN:ESINt•iCA flC-NSaTQMv�� /vo `� vrciANAITILT ST!ypiE4i,ES'A'.LBE FEtF.R'EDhHERE L:CAL WA77.CN PE :RE P` 1141(41:.'-*. ,9ef i t .�d vA'E PONOS. if I �`•°i,� t,. �' N,i :31 Rou,.CRADINC•SHALL PPLCEEU•llr AN AREA R'r ARE BADS ,,,Wawa ���` � \- i ,r', ,4 r•. UNCOMPLETED AREAS P .� ' \t, y! , v\ // 7 ) ( )PR0410E N4TI4E TOF$OIL,SEED, GNU MVL!'M Albl/CFED MAIM A iAl4•"icT ' // `\ / �r / /4' ''./ ;5A WITHIN 14 DAYS OF ROUGH GRADINN. \ �,��[ / I {S)MAINTAIN AND REPAIR SILT STOP FENCES INCLUDE ME REMOtAL OF A^CVuc:1F_D J // �� �; ��I ?� \\\\ i J/ ;/ 'RIP UNTIL TREATMENT AT IS EDISCH SHED jp'.� `�' �// /X i61 kIPRAF TkEA1MEN7 AT ALL DISCHARGE.APRONS SHALL BE GRb::TED. A:L 4'PkAP =� �� /' ,/ 31.ALL BE CLASS III. - 0 ) AT ` :'�se/ �•,\/.---:,,</ / /. / '� /' EA TRAM ESROCK TO EXISTING ACCESS ROAD FA SN ALL BES. INSTALLED01ETI AND MAINTAINED N \/.-1.0" / �1�/I t� �crii.,..-..„,,,„: / ENTRAN;ES TO EAISTINO HARD SI/RFACE RuA05. P.^CK ERTkANCE SNAt1 dE rNO �t ,� / LESS MAN S^'IN LENGTH AND AS WIDE.A5 NECESSAPI FOR TRAFFIC. USE I- ,��' , � _ ,..„ , Tn?'WAaNEO ROCk. 1 ,.i0 � N4 I LEGEND Iv �yIral I)k 901.40 Proposed Spot ElewUa.• r ^)—t- Donors Diredfan of Surface Drainage 1110111C.' "� ��,1, 3) Denote:vrpT,osad{:moor 1<rde09:411100001r N7J�J(a\ /i', Deletes Silt FenContour,4,k(06; , 1 1 _. 5)�� Orore. Silt Fence �/al� 1 iZy11 p„,,,,,,,k '� `, \"�� 4`\ ` • Ail spot deretions ate Gitumtmus surface or /'y ` 11 �,`, /l \ \ \ \'l,``` gutter unless otherwise nntvD. ,;g 1 I 4�\'` , 1 `� ' ' �`.. GRAPHIC SCALE • 40e i A4 ! i; ti " 9?c•' I l IN FEET 1 I each A GO ft. /`` \ } ` 1 '� i ` RGl iSTATS \ r twat..ce-:%l M.,t(s Non gas Prer!aB4 G)' .^•..:r amic' o P , .^ \ ��� ` � , .��,` ` ' .-- - y onolt g,ne ,i:aa ao-i Me:a+, o Cu•: rop7,.,44 pro- //„ii„__ 5• /assionor engneer.,»Jeo Mee :crs et!e Silt,* or Ar,-nrs!•to. . 0111 , ..'- . 1-,I'9*g , `i=' 3I 1 -- — ----__ �vAs_rte: .�� ._ I 7 ' jr{ I : I N _ I.iJ�'�9 ' .�� t# a :o , t 1•I t O4rEr _ aFQ NO ` `i 1 _ Sir or,WNttrr' E,:,,. \ �/ _^ ENC%'.f._ 4,�-� ,� _ �� dI2t; � CHARLES W. PLOWCONENG/NEEP/ iii1\ .id i wl EA7.N,aOh AtLE N F.�/ ' .. � ►.i' `•� Prepared�W Gll For DATE:2.04,iy 1 - � 1 _ ate, orf h� y� ��� Riverside Development Corp. ----41;11111..1/4 ----*- ' 19230 Evans Street AP, \ -�'r"' / iElk River,MN 55330 C3 A I A I I �_� /i,...-- � , t / / Tel:(612)241-1801 I I „'/ ( ( 1 f't---7 1 4 I ,„e" ., / ii //7 - 1 I I „ i \\ \\\ \„ 1:, . . : / / t / - - 67( / \ \ I \1 i 1\ , ''''''t .-- __ r- • \ „ , \ \\\\ _„--„----- •: ..4 Iii •-- \ , .\. '1 ( lit • ‘,.... k . . " ,e 1 kr st ‘!, At i )Orm ,\.. ., 18; g , A\ \\.\ ' '' N 1 ilf •-• _______ i • - I ______Ns ,,,\.. --/57 fk,-;:;#111 \, ,a1 111 , \ -, . „ .;)-i:• tS5'' --"13- ' -.V --- '' iftk. ;/ Ati, -0 'IWN ii C.• />Cx-/ Nall. / - • ., • \\,, \ / // 1// f \ )\ ., / tr. i / 1 b,klb ) $ 'k! • -- / ild LiWilin N---(enr ' ,--,//- / 7 1 / r I r 8 i'i i f• ‘ 4 \ -."-- :',,Zr4f-N\\\\:, 11110116 „,•,, //' / IIIPP0P- 1 .. .. ''t['' kb*t,•1.,, -: 4 n // / 11 ',--e- s- 1,1 I40li 1 4„ NINViO ,‘dk ' l'”• - . r,,:'°4* l./nib/sr- - • • I ' , - 1 , _.1„ *,, \ . N ,,,/ '- It ‘40 I ._ _194... C , o _ti.v ,_, ( ) pi. , 7 - ,-,,,. \ ki . ._....1.,......=..,.._=_„......_....,, .....24"7-1.-41...a-mmisamitimpu.,410- ---- .tirar 4 t- - • / - • ,-, is _/ • N,K , t 0.467 ', . ' 111110,Nork,,Tagprdsingsuirau , •,,,:, N.,„titksV,., 7 A / / . \-• / asi4,111.101111116w417* ok .44(A i .1 -• id - ------____I\ _/ - -7, L_ ' IMO 6.-, - 7 SlipaYSViri fr s A.. .divti,„,Slar.er; ,,, \ ---, .,:,/ / -- osiiii/ ____„ ii //A .-''--l '--_..---7/ . / ;.. ' iFiti '7 ('‘il / NeN co 8 1....-----,--- . •-1.,-. 411111111011111.16, /111.....--0.1...'- --,,----- -/- , 1 ‘t 'IMMIP111111111001P"'"--'glii...____,1,-------- qr. -41°C;411: , :gOalIllr ;1•7:- 4ei? 4 401,- ._ _ .,-,,-,, - If 1/ / r/ ., . ilia. y t,I3 •S Via: 2 r ri, , .,,, c VIIL a( ei . „es. , iAra I NltgrUMIFIIIIFPAEApi.-IIPF/" FirardllIl • -4':% -...-\ 1,11/ji lo to...-""01111.1MIIIMMINWAIWAMMIKEIMIffeigh' \ 44b' ' -4401.02M§WirwiWAIWAGAMIVANWO*041.2 Mailk. t gi ( SiriliarAramirmiiirasiammillrear,,,vi 4ftisiummormaffistrasmussistiblawir \\\ ,. _______ . , , .., _______ 7; zz. r 1/ f II • . S >x-- ..:. • -,..) •4:-. :5ta y T, 4-- _� �. :',IT" .- a ,h,. :,..ve _ � •7. r 1. .41 +r V)I Wi. '(:` v X.•'-.re.. - ' -- '`S &':BOULEVARD `0/MA �—� - SITE GRADING PLAN _ ��-\, HILLSIDE ESTATES 9TH ADDITION ���� `��� \ \ Elk River. Minnesota // E',(, p_z`��.i.I` \ \\ \ s, / /'vi, `( `\j0/..i..0 ,(_ \\ NOTE: LOT GRADING IN HOUSE PAD AREAS NOT COMPLETED GUNPK.,INITIAL SITE • \ ` L• `]((' \ GRADIIJG. INOINWAL LOIS ARE PROPOSED TO BE CUSTOM ADED • 114.4414‘. ,OTL-,1 / .$4 , ,,,i_ «'amu M ::.A. ill)!/ ..._„......,....„....,... ,.... \ \, ------.-:\ ..'... :--.--.‹,,.,,--`,...... ''',..„,,,,, Aill)X.,. 1111%), / , \ ..,, ,. At*\ \‘\1\41% •./:,:,...0.7777:"... \ let‘ N AN.. , / i 'N\ . *. ,/Ilk * eN„..\_, i • ,:.. , , , ., . , . i , ,...eln,AM,,,r \ j d.6....---, . � • ��� � ..,.mom , ,,. Lt..I...n Ow 1.... J i Ni.. %i j )./ 1/ \ , ,11 j SILT FENCE ,� I , i _ y / „ c_. - /A, ,. iii.14111111,, 111 „, , ..-- ,,:,. / -if 1 ...,,,,F_________ , ....,_________ I eP/.1' ....40.74,,:nris4..: -•-., --- ,_...„ /ye. ..mi.,. ..„. ...,.:44,,L...„..,..,..4..,....... ...... ... g,....,,,„,,...:-. ' --4 ----\----.9--,..... ----3..-9/, ;,,,,, ------„,____„/ i , ,......., ,.,.,.„:.„:„,,,,t,,,,,,:„..,...„:„...7__._,..„.,,,.-:_, :„.4„,,,::........... .....„..,,,...,.„..,..„... ,,,:. .104.2.''' '''":l'i'..ttnr':''..44'''''4-*.- '''''.. ., r / . 8 7.„,,,„\, 1, (, ,,,., . , .1„ , , .....,,,,,„„:,,,,:,:. .. .:„.„...,:.......„... t 3 teal • \ . /� 0I �� a \ Nx7,-;------7r ; ROCK CONSTRUCTION ENTRANCE 1 =�= —7• ►�� \,,,,,,---1-/' i I ~ GENERAL NOTES :I :\7....\\.. \ \ / / / I fad.,.211 COIJTRGL NOTES&IMP)EMENTATISTJ SCHFOIS F • .Or \ N 1 / (I) PRIOR Tfl RfAIC+1:RADINC-.IN_7ALL SILT STOP FENCES IN IOCATIC-NS 910WN / C1\ j ADDITIONAL SILT STuP FENCES WILL eE REWIRED MyEP.E LOCAL 0.YOITIONS REQUIRE / I E'.:CAVA7E PbI4D5- (P, l-1 ROUGH ETEDING SHALL PPCCEED o1J A.N ANSA RV AREA 9ASt5 TO MRJIMRE �/`y/ UNCOMPLETED AF.EAS ItI � i \ i'_ \� / j (4)PROv10E NATIVE TOPSOIL,SEED, AND MULCH AN H PEO MTH A STRAIGHT SET ' .. `p,` _ `-\^ �/ UIS::WITHIN 14 DAYS OF ROUGH�)RADING. / \�y C�•� ,...........,\ � '----/ (5)MAINTARJ AND REPAIR SILT STOP FENCES(INCLUDE THE REMOVAL OF ACCUMULATED / I "4110---- 0 SILT]UNTIL'VEGETATION IS ESTABLISHED. 1303141 `/ / (nl kIPRAF TREATMENT A7 ALL DISCHAkGE APRONS SHALL BE GROUTED ALL kIPRAP II \s y 4AL BE cuss III. "Wer-Itillerill'ille-lkt. A ROU'(CO145TRUC110N ACCESS ROAD SHALL BE RJSTAIIED AND YNNTAINED AT J1 ' by ENTRANCES TO EXISTING HARD SURFACE ROADS. POCK ENTRANCE SHALL BE NO /l 4 1I ��`t♦ LESS THAN SP'IN LENGTH AND AS NIDE AS NECESSARY FOR TRAFFIC. USE 1" 7 �, 4 TO 2-WASHED ROCA. �` LEGEND AS� , ly1„1113 �m ,/ ,.1��i, ��� i)X 907.40 Proposed Spot Elevation• r �eI�-i—_�r4 2)- Driot/A Direction of Surface Drainage / , �1, % �� ` 3) Denotes EAistiProposed Contour r 1 +) Denotes Existing Contour firelppice' , gig �_ �`w • ` 5). .S. Denotes Silt Fence `'4w., G� A ` ^�` .. ` ` • All spot Ntwtions ore bituminous surface or ►4, \ •\- \,. ;`.�_ gutter unless otherwiee noted. �4,, 1 ` �,„ f . GRAPHIC SCALE ...' r oc t \ r1 \.,., '\ ,S ir• ' �,� ,. n- ao n Df FEET) / \ \\ \ ` /, REI-I5"; 1 I Aererp cervi y that Nis pian ens prepared LO'n:c ar under �\ \ \ \ -A i � �� Z-44'YTJnls10-x,4 .-44., my direct supenes:on and that i am a deA re;istered pro- \! \ / 11110,4111h- � /.�. \Mk e'�� 5 - /essionol engmser under the Taws u7!ne 571,1 o/uirntsuro. SI- i' • , I s ' , • r 1 l o4r,. 2/0'079 R£G. NO. 78227 _ Y ll \.sl, \ ' l/�..., �,�t�, 1 1 / SITE PL 4NN/NG ENGINEERING 6 N. I/7 `�/ CHARLES W. PLOWS COl16SUL TWG EMGIVEEH — r -- 9120 LEXINGTON AVENUE ATE ''�N i�� \ PIN ATV 550/4 2, 795- Opp, 5- 7■ 1 I, . i ��4 i 1 111 -� .� Prepared For. DATE:1/13/s9 �� �� ._ Riverside Development Corp. /� �\ 19230 Evens Street C" J .4 \ 3... `�� Elk River,MN 55330 `././ 4 l / ,I ------:-. 1:---;....-a------------,„ / Tel:(612)241-1801 ff ;7 ; - -..........".9999.9 $ • . -.,-`41:a•natti'CoV!"" "-:'r • --. • -.: • • - ' ' .'' ''... ' '' '':. - -'00,•ir-'.-.4,: ':':..- •-. , , • . . .-. _AILA — ,- . S (..... .„,„ ..... ,-.. 1 i P` ........ / 0 5 - - % I 1 \ t. • 0P- ,.,..wt. • -• - , It E.ZI.27 0 r--------, %----- , (. ‘ E. '2 '4000, 7.. , ..•••?! :.ii-1110.0 ...••-•-•\ ‘'. '''\ . Cis \ \ •• /1], '/ • / \ 1--'' _.v".";. C. OLE 1009.4 RE 1004 iF•I '• E . '''.: 11.990.9 IL 9910 _./.... S ' III't io 7/,.. il LI La imil< \Z ..' '-• n.0 ------1",--__, •.< / ,,, Ns., '4,-,— .-------..., . .---- ,_ -,..,, -...... 2 .,-- -''c •... . . , Al? " ' ° vi—'------% .....- / \ r C /ii ..... ..../ \s/ f 1 7------.---- l' / r ‘ ---------1 \ \ 12 11 AA liiius . I (.. 3 \NJ, •,..., ..7,5-„,./.< i , . < , .... III 1,1 < • // Z 197 . i N......., 3 ,..,........,.... sx /7.,,,,,, /„,..., „_,..,.., „...., 13 \ 10 , ....----....../ 7 , ,,7.&u-4 '1;f:, 1 I ---4-2r --77(//::://' ,1--;; ;'-'-‘,i1. 14 26 ,_ 27 • liii 1 . , .,. .30 \ . 0 III ... ......_ 15 '' 25 . '• '?\--7---- \ \ \ „. . I . "\ • .., , 1 wr,. -in \ 7 _ ___ ill . \ . 30 30 • / \ r ... __,..----- \ /7/ ''\ 17 .. . .., I •••,.„. _— , .\.... .„ 24 1 .,-. s•\-, ...• -,t„„ / , ..- ...s. I.E 900' .--- 7 2 • ' / \ \ •\\, ,.,,... •\ / I 1 I.s. , V.,: (- IE 979• \ 18 1 .E.I001.1 ..,..\\:E.9910 ' ....../X \ ../ / .E:4.71 . ' aitiliallit. GIV.1:7 / L.--------A 21' 7 RE 901 -------. .7,.. '.E SU • LC 970. Aft ,....,„.....,.. E.47S \ ••/ -. , o Nx/N,--/ _________\ tR.VOW- .- 441/44%4 0 IE.9OE 0 , 22•---/ // --- I 1...........] / 1-..„2,S.2.,_ ; r ir— N •-, ,.....„.. .• ,., . ,...,,,, . i sL •,......,,,, CP 3 '''- .517°.,ri---... ----- --1---- e \ . .>i lip if '..... 1 7: — / I 'N 2 • .... All I ' / 1: // ! /.......... 7 • • ..___ 1 / • .E... , •\,...c,:.. 1 -\ , '''----------1- i \ \ ; r \ 5 I 9 6 7 \ (..., „, 1--- /1/1 •./ , 4 8 , . / 6 \ \ ' /, \----. A,4.1LEY4 }IG'dT."u .'_f,.tiyBC :1-.:.i,., , :i";a t'rt+rc, y'ti'?; 'p'"'k"aK§'ti ..*r4.:AR°'r ,S�, ', ;•;' •)it',47. it r:i•.Lhi•.;htr.CC'"ie?e"d - -4-,?------... .. . PRELIMINARY UTILITY PLAN • f i< eJMe I HILLSIDE ESTATES 9TH ADDITION Elk River. Minnesota. Fps —,``I VICINITY MAP �� • lT ` �<OT ` 11111 I 1 \\ / 1 w '' I1 • js c / 7f b y \ 5, er E WS 4 -'4', ',.., ` ▪ e� ye1 Z,e 9.02-0\,� 1 r ` ;\ \ 8 \�\ \` `y;I' LE.942.0 ♦� >\ 31 3�., J 1 LEGEND i 7. �\ O� ! \ / ^ I it= EeiaGng Storm Sewer 1\ / • \I 4)»—Propasrd Stam Sewer ,moi \\ C' , `�. I I .S;_i._..-Existing Sanitary Sewer 7 \ > l > .,./ `) \ wso i)-›—Proposed Sanitary Sewer I/ ' \✓/ 30 \ s+'1 aE sess 5;-I---E,latirry Walermain (J] i i E P.O.', 6)-I—Propised Vhltermain l \ \\'`� N'- ?) o Denotes Catch Basin C fl..,3....,..%'"P'---- /,'"--71,-- B cS Denotes Sanitary Manhole �� �'f .L 9'2Q• 19 '0 Dervotes lei ro Manhole // 1J, o Denotes Storm Inlet/Outlet �\\---'''' ( II Cx1 Denotes Cate Valve 2^ \\ ` ! B���P ,°E 29014- 1 GD 1'' 'CI Denotes Rip ant e: Valve 28 9 i U� , yDenoles Rip Rap ►' I ' NOM: onlra.acr Shoo notify engineer and the City of Elk krver J /-'',\\ ,,\\ /'c4 <v-//� 3 a minimum at[i hours prior to any interruptiun of e� • �C' Cz. ! y y sonars!sewer ar corer ser.¢e to t.istk,g+:.tined. s. \ .'sr I EtiI5T7NC=Ui1LI TIE'.: \•� 't / N M I' 1)Tile information shown on these drawings concerning type and t3 1 7 /�- eta, \ \.`\ 0 for titian of existing utilities is not guaranteed to be accurate „ .../. j _ /r J or all inclusive. The contro:tor is responsible for making his awn (j)` '-.-b--.. / ^`•\ N. 1 determination as to the type end Ixayion or ulP1iea os rnop ad aped ......w".....1.E Vele - \"' J 1 n I be necessary to avoid damage to these utilities. • \�t `�♦/ a \ \ ...• t., CI 1 '2+ The Contractor shod be respmable for existing Coity locations. Y.�: �s� �.`J � ` '1,\_ 1 i Carl Gopher Slot*Ott of 15.1-0.762 for 1o.otions. t /� SANITAR7:EWER �-' Sanitary'ewer shall be PVC SDP 35 unless otherwise noted. • i `� 34 y R_E99t. �♦ .w,a i \' 35 I 2.polo 4.S2A%' \ 2) Sewer Servis Locations shall be Ce.Mel in the Geld prior to ♦, `� w6 is • E%: •• \\ - \ \ ,i I xirUCti(•n. .E 1 \ 36 ,\ i IIII 1. WATERktA1N ▪ \ , \♦ \ 1 I 1)Water Services shall be 1 inch copper type K. \ ,E,w,lrw.were«[ I StORM Iran SEWER 20 t -— \ �.�. l;Storm Steer lengths include laying length of the apron. I r �! qua tawng length of aprons oP be deducted fro payment+ength ((�� or pipe. t e ,=i tif a� ! CUk65Rf.9360 _ '2 1)Ba:k611ing of Curbs oriLh an-site material is inddenrel to ox,``e•' /.• rE 909. E - Al construction. lr 4C.a 2) Curb ends shall terminate with a two taxi Bea'•er Tail section. ' 1E en.'c7 ��: '7 "'7�T111 `/ �. ♦\ /((iff" .---- ' ;1 STREETS `// �/ /v \\ :'illIllit)) ` q Sow wt existing Bituminous and Concrete Curb to pra.ide fff L` • serer ` butt faint. • • ✓ 2)Removal and disposal of existing street materials us required it / /// -ti \4L A ` ^� tar'construction i>incidental. Ij ♦ J 9 /l \\ \ --� LE.ails .. ''./.. /, �/\t„,......"\ 1 . GRAPHIC SCALE 11 \ . \ ,-!' ,.J ,i�''v..,. .,--- ' i,ash- W f[ w e 4.r ped �i`'.``\\ •• -+ ',, ' 4E;�J,!\.{ E e Rt-o5,-Ns , I Adret 5)' Uwe( this C•On ass t-e o ed DY are 5, -•t t• \\ • reV rPr•w. ,:cw 101x5 my d e t ,-erlisi•.lrl and,'hot. am o da rt;sten d r - \. i'�l ♦ / r• 1 i 50 ----- 7essionol engineer.order the •nws at tee State at ar. .e c+_. t \•'. 3.e.41.' a ees r- 1/73/W 1822: 10 `` _ ,—[ ,--+ , �:e• I• ` O't c' REC. N0. Q \ '.....\.....,---`... •..\/`\ SITE FY.WNiAk: £N'G!':£ER/Ni: \\ /-Y" / l /�/�� \ �/ { '�. CHARLES W. PLOWS CONSUL 77NG ENGINEER /:/ H-_-(- /� 9780 iECfONANUEN.E.CfRaE FYNES• my 550,4 (612) 785-•. J (c—,..........,./ y+ \ 13 i /. 4 ` C Prepared tor. DATE:I/IC/.9 • a.nn.01 5 Riverside Development Corp. '\ .I r. IL Cl C:162��• —� _ 19230 Evans Sweet` I Elk River,MN 55330 [ Tel:(612)241-1801 , Park&Recreation Commission Minutes September 9, 1998 Page 2 • 7.a. Neighborhood Meeting to Discuss Meadow Park-7:00-7:30 p.m. Steve Wensman reviewed the concept plan endorsed by the Park & Recreation Commission for Meadow Park which is located on 2nd Street, east of Evans Avenue. The plan includes a sliding hill, swing set, area for skating, planting of overstory trees on the boulevard, and ornamental trees and shrubs within the park. The residents to the south of the park expressed concern that the play structure would be too close to their home and asked if the property line could be fenced. They also expressed concern that the trees be saved. Steve indicated that tight hedging has been proposed as a natural buffer. It was the consensus of the Commissioners that if the play area became heavily used and created a problem, fencing could be considered. The residents in attendance expressed their support for the concept. Chair Anderson noted that there are no funds to develop the park at this time. 7.b. Hillside Estates 8th and 9th Addition Park Dedication Steve Wensman indicated that he and Scott Harlicker met with Rick Foster regarding the park dedication requirements recommended by the Commission for Hillside Estates 8th and 9th Additions. He stated that Mr. Foster's revised plans for Hillside 9th have included the recommendations, but he was not able to • incorporate a flat, 4-5 acre park site in the Hillside 8th plans requested by the • Commission. Rick Foster, developer, indicated that when he purchased the property 7 years ago, the Master Park Plan did not identify any large parks for this area. When the plan was updated, there were no changes for the area. A year ago when he began moving forward with his plans,Steve Ach asked him to meet with the Park & Rec Commission,which he did. At that time, the Commission recommended a park area the size of 1-2 lots, a trail corridor to go through the NSP power line, extending to the north side of Menards and over to the south side of 197th and tie into the sidewalk. At that time, he stated he would provide whatever easements were needed to weave the trail through the trees so it would not be necessary to cut down any trees. Mr. Foster stated that it is not possible to meet Commission's recent request for a 4-5 acre flat piece of property for park adjacent to the powerline and a road because the property is densely wooded and hilly. Mr. Foster explained it would cost approximately$250,000 to cut down trees and level out a 4-5 acre park area. He reviewed the trail corridors, connections and areas where the ponds would impact the trail routes. Commissioner Huberty questioned whether or not the ponds would freeze over in the winter for skating. Mr. Foster stated that they would, but he felt the pond south of Menards parking lot would be better for skating. He noted that if it were used for skating, it should be included under the city's insurance liability. The Park & Recreation Commissioners concurred that size of the recommended IDopen space area is needed to serve the density of the Hillside Estates area. Chair Anderson reviewed the recommendations of the Commission for the 8th addition. Park& Recreation Commission Minutes September 9. 1998 Page 3 Mr. Foster agreed to provide the power line easement for a trail but he requested that he be allowed to infringe into the easement where necessary to obtain the required lot depths. Mr. Foster indicated that he would provide the necessary easements to run the trail around the pond in the Zane Court area. Discussion followed regarding different areas within the 8Th Addition plat where a 4-5 acre park site -night be created. Co-- missioners Huberty and Kuester expressed suppc `or obtaining a site, leg,ing it wooded for now, with it's future use to be deters d at a later date. Mr. Foster suggested that the Commission use the lark dedic:ltion fees to purchase property to the southeast for the type of park they are looking for. Discussion followed regarding a park site in the northwest portion of the plat (Lots 1-13, Block 3, and Lots 18 & 19, Block 1 area). Chair Anderson indicated that the goal is to serve the entire Hillside Estates area. Commissioner Kuester noted that they would like the 75' powerline corridor preserved. COMMISSIONER WESTRUM MOVED TO RECOMMEND THE FOLLOWING PARK DEDICATION REQUIREMENTS FOR HILLSIDE 8TH ADDITION: - THE DEVELOPER WORK WITH STAFF TO LOCATE A 4-5 ACRE PARK SITE IN THE NORTHWEST PORTION OF THE PLAT. - THE DEVELOPER ALLOW A MINIMUM 75' WIDE EASEMENT FOR A TRAIL (WITH AN 8 PERCENT MAXIMUM SLOPE) TO WIND THROUGH THE NSF POWERLINE CORRIDOR AND AROUND THE PONDS. COMMISSIONER ANDERSON SECONDED THE MOTION. THE MOTION CARRIED 6-0.*, • CHAIR ANDERSON MOVED TO RECOMMEND THE FOLLOWING PARK DEDICATION REQUIREMENTS FOR HILLSIDE 9TH ADDITION: - A 50' GAS LINE TRAIL CORRIDOR EXTENDING FROM THE NSF CORRIDOR TO 193RD; THEN A 50' CORRIDOR FROM 193RD, TAPERING DOWN TO 20' AT THE SOUTH OF THE PLAT TO PRESERVE THE INTGRITY OF THE PROPOSED LOTS. - CONTINUE A MINIMUM 75' CORRIDOR ADJACENT TO HilISIDE 5TH PARK, WIDE ENOUGH TO ACCOMMODATE A PAVED TRAIL WITH AN 8 PERCENT MAXIMUM SLOPE, WHICH MAY NEED TO SWITCH BACK. COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 6-0. 8. BMX Committee Presentation Steve Wensman indicated that the BMX Committee would not be making a presentation this month. 9, Mountain Biking Trails Progress a. Update on Trail Building Seminar-Steve Wensman Steve Wensman stated that the information he learned at the trail building • seminar will be very helpful for mountain biking trails in Hillside Park. He explained ;.., • ; �. - Howard R. Green Company L CONSULTING ENG!NEERS February 19, 1999 File: 804410J-0240 Mr. Scott Harlicker Assistant City Planner City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: HILLSIDE ESTATE 9th ADDITION Dear Mr. Harlicker: As requested, we have reviewed the information submitted for the Hillside Estates 9� i Addition. • The three plan sheets consisted of a street and boulevard site grading plan, grading and drainage plan, and preliminary utility plan. All three plans were prepared by Charles W. Plowe Consulting Engineer and were dated February 4, 1999. Based on our review, we iuuould offer the following comments: A. GRADING PLAN • The developer indicated by submitting a street and boulevard-grading plan, that it would be his desire to only grade these areas and to leave the actual lot gr-ading until the time of house construction to preserve trees on the lots. The developer has indicated custom homes will be built in this area and it is difficult to anticipate the specific trees to be removed for each specific house. However, the overall-grading plan would indicate that nearly all of the lots would have grading through the house pad and some even beyond the house pad. This will not allow much opportunity, if any, to preserve trees from the street to the rear of the house pad. Because there is anticipated to be significant grading on many of the lots, we would recommend that the developer would be required to at least grade a small pad into each of he lots. It has been our experience that when the house pads require significant grading and the developer does not do this, it is very difficult to get the home builder 7o do this work. Most homebuilders attempt to balance the dirt on the lot when constructing a home and do not want to export or import additional fill material. If the lots are not graded properly before the home construction, the builders typically want to adjust the development plan grades. This approach to home construction leads to many difficulties for the building department. • There are numerous homes along the northern tier of the development that appear to • have garage elevations below the street grade. We would recommend that .311 of Mr. these lots be adjusted to raise the garage elevation above the street grade. 0.1PROJ,1410-0218.FE B 1326 Enemy Park nrive. . ct RAM [Cann _.,_. . .. . b©iZ©'d 6b2Z bb9 IS9 'OJ t•13310H1H OZ:It 6665-6T-30� • Scott Harlicker February 19, 1999 Page Two • The small cul-de-sac in the southeast corner of the plat has several house pads that will have very steep driveways. We would recommend that these be reviewed and either the street raised or the house pads lower to lessen the grade of the Driveways. • There are a significant number of areas in this grading plan where drainage: from one lot to another will not follow the lot lines and it will, therefore, not be within the normal drainage and utility easements. This is often the case where trees are tc be saved and existing topography is not to be disturbed. We would recommend, however, wherever there is proposed grading, attempts be made to keep rear and side yard drainage within the described easements. Where this is not possible, additional drainage and utility easements will be necessary to provide for drainage not along lot lines. • Along the south plat line, there are a couple of low areas and additional drainage issues that need to have more information provided to determine the effects on Deerfield Third Addition located immediately to the south. • A number of the intersecting streets and cul-de-sacs along 193fd Avenue. which is the southerly east-west street, have relatively steep approach grades with little or no landing area provided. Ultimately, 193` Avenue will carry a significant amount of traffic. All intersecting streets should be provided with some type of landing for vehicles coming to a stop condition. • B. DRAINAGE ISSUES • The drainage calculations that were submitted seem to be somewhat in adequate. The drainage area that flows to the northeast pond in Outlot C needs to be modeled as if there is no outlet. There is a 12-inch pipe shown as an outlet to the north but that leads to another land locked pond. it is unclear whether or not there is an opportunity for water to flow from the north to the south. This drainage area and pond need to be modeled based on 100-year 24-hour storm verses a 10-day snow melt. The pond in the southeast corner of the plat is shown to be constructed within the City right-of-way. The first question here is this allowable? The reason the • developer has shown it this way is it is a temporary pond and the only ether option would be to dedicate two or three lots for a temporary pond and make them buildible when the pond can be eliminated. This, however, would require the clearing of all trees on those lots. The thought being that building the pond in the right-of-way does no damage to trees that could be saved because the right-of-way will need to be cleared anyhow. This pond also needs to modeled as a no outlet pond. There is a 10-inch outlet shown heading to the east. it is unclear where this flow would go to and how frequently this pond would discharge. We believe the pond should be modeled with no outlet. The drainage in the southwest corner of the plat flows to an existing wetlanc, partially on this property, but the majority falls within the Deerfield Third Additim. The • Deerfield Third Addition constructed over 10 years ago discharges directly to this wetland, however, wetland laws have changed since that time. Hillside Estates 9th Howard R. Green Company 0./PROJ./410-0218.FEB CONSULTING ENGINEERS 17©/73'd 672E 1779 TS9 'OD N93�i9 SIH 8 :TT 666T-6T-Sed b©'d 10101 Addition will be required to apply for an NPDES permit given the size of the • development, It is likely that a requirement of that permit may be to have a sedimentation pond prior to discharging to the wetland. • There is no erosion protection shown on the grading plan. The grading olan should be modified to show provisions that will be utilized during the grading and turf establishment phases of the project to prevent erosion. C. UTILITIES • The utility plan does not show looping of the water main in the cul-de-sac areas. According to Elk River Municipal Utility policy, all cul-de-sac water mains need to be looped. It appears that it will be relatively easy to loop the cul-de-sac in Phase Four to the street in Phase One along the storm sewer alignment and to loop the cul-de- sac in Phase Two with the easterly cul-de-sac in Phase Four, again, along the storm sewer alignment and through Outlot C where the pond is proposed. The cul-de-sac in the southeast corner in Phase Three could also be looped along the storm sewer alignment to 193`0 Avenue. Using the same route as the proposed sters, sewer for looping will minimize, if not totally eliminate, any tree removal due to water main looping. • Each of the sanitary sewer manholes in the cul-de-sacs could be pulled back slightly and terminated much closer to the center of the cul-de-sac. • The street design on 193`' Avenue proposes a median down the center of the street. We have discussed this issue with Phil Hals, Street Superintendent, and he has indicated a willingness to be responsible for maintenance of these island areas. The City would not maintain the two island areas in the "eyebrow" cul-de- ;.acs along 193rd Avenue. The design of these should consider low maintenance type of construction. • The developer should be made to escrow monies for the utility extensions ;and street construction at the east end of 193't Avenue where the temporary ponding area is proposed. in the future, this pond can be eliminated and the storm sewer -un to the east ultimately outletting to the ditch system located east of the plat. If you have any questions regarding any of these issues, please call me. • Sincerely, HOWARD R. GREEN COMPANY Terry / c���� -. aurer, P.E. • Howard R. Green Company O.IPROJ./410.0218,FEB CONSULTING ENGINEERS 173ib0'd 6b2z bb9 TS9 00 N3a19 elH 6E:T T 666T-6T-33d