6.6 ( Item# 6.6. Ity of / MEMORANDUM 1kRiverTO: Planning Commission FROM: Stephen Wensman, Planner DATE: March 23, 1999 SUBJECT: Request by Gopher State Mini Storage for a Conditional Use Permit, Public Hearing Case No. CU 99-10 Request Please consider a request by the applicant for a conditional use permit to construct additional mini-storage buildings in the I1 zoning district. Location Lot 5, Block 1, McChesney Industrial Park • Zoning/Land Use I1 (Light Industrial) / LI (Light Industrial) Attachments • Location/zoning map • Site/landscape plan • Grading plan • Elevations • Howard R. Green memorandum Overview The applicant is applying for a conditional use permit to construct additional mini-storage buildings in the I1 zoning district. The site is located at the end of a cul-de-sac and adjacent the Burlington Northern Railroad. Presently, there are 3 storage buildings on the site. The applicant is proposing to join two of the existing buildings, expand one, and construct one entirely new structure. The proposal will require a slight variance of the building setback • 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD&Phone: (612)441-7420 • Fax: (612)441-7425 Memo to Planning Commission/CU99-10 March 23, 1999 Page 2 • in the direction of the railroad property and a larger parking setback variance. Curb and Gutter The Elk River City Ordinance requires curb and gutter adjacent the public right-of-way extending back to the building wall as indicated on the site plan. Parking The Elk River City Ordinance requires a minimum of 4 on-site parking stalls as indicated on the site plan. Emergency Vehicle Access and Driveway Widths In several places, the pavement widths are too narrow for two-way traffic on site. The applicant will be required to post the site with one way traffic signs in these areas. Furthermore, the single storage stall addition near the center of the site will restrict emergency vehicles from turning between the buildings. The . proposed western most drive lane is too narrow to permit emergency vehicle turns. Lighting The police department was concerned about security lighting. The applicant has provided a lighting scheme for security. Drainage and Utility Easements The proposal necessitates the moving of an existing utility pole guy-wires. A 5 foot easement is required under the relocated guy-wire across the site as indicated on the site plan. Also, a ten foot drainage easement is required to be granted to the City along the north line of the site as indicated on the site plan. Site Drainage The applicant proposes to construct a small sedimentation pond adjacent the parking stalls (See attached Howard R. Green memorandum). • \\elkriver\sys\shrdoc\planning\stevewen\pcmmo\cu9910pc.doc Memo to Planning Commission/CU99-10 March 23, 1999 Page 3 • Sign The police department and Fire Department have requested that the driveway extend around the proposed building addition near the entrance of the site to facilitate emergency vehicle access. This paving conflicts with the location of the existing pole sign. A new location has been shown. The new sign will be required to conform the Sign Ordinance and will require a sign permit prior to construction. Grading The grading plan shows grading on the Railroad property and the DNK property to the east. The approval shall be contingent on written approvals from the adjacent property owners. Landscaping According to the Elk River Landscape Ordinance, the applicant is required to plant 28 trees. As proposed, the site is mostly paved leaving little area for landscaping. The applicant has indicated (9) conifers and (12) deciduous trees planted roughly 30 feet on center. The tree species, sizes and planting • details have not been indicated on the site plan. Recommendation Staff recommends that the Planning Commission recommend approval a request by the applicant for a conditional use permit to construct additional mini-storage buildings in the I1 zoning district with the following conditions: 1. THAT THERE BE NO OUTSIDE STORAGE. 2. THAT A VARIANCE BE GRANTED FOR THE BUILDING AND PARKING SETBACKS. 3. THE DRIVEWAYS LESS THAN 24 FEET WIDE BE POSTED ONE-WAY. 4. THAT ANY NEW SIGNS CONFORM TO THE ELK RIVER SIGN ORDINANCE AND WILL REQUIRE A SIGN PERMIT. 5. THAT A TEN FOOT DRAINAGE AND UTILITY EASEMENT BE GRANTED TO THE CITY ALONG THE NORTH PROPERTY LINE. 6. THAT A FIVE FOOT EASEMENT BE GRANTED TO THE CITY ACROSS THE SITE UNDER THE RELOCATED UTILITY GUY WIRE. • 7. THAT WRITTEN PERMISSION FROM ADJACENT PROPERTY OWNERS IS PROVIDED PRIOR TO CONSTRUCTION OR GRADING OFF-SITE. \\elkriver\sys\shrdoc\planning\stevewen\pcmmo\cu9910pc.doc Memo to Planning Commission/CU99-10 March 23, 1999 Page 4 • 8. THAT THE DRAINAGE, GRADING AND SNOW STORAGE ISSUES BE ADDRESSED WITH THE CITY ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION OR GRADING. 9. THAT A MINIMUM SIZE OF 6 FOOT CONIFERS, 2"BB DECIDOUS OVERSTORY TREES AND 1.5"BB ORNAMENTAL TREES BE PLANTED ON SITE AS REQUIRED BY CITY ORDINANCE. • • \\el kriver\sys\shrdoc\planning\stevewen\pcmmo\cu9910pc.doc Si y • . i 1 I .d 'v pay , .. .o. 3 7 q TOP OF THE WORLD PAR•K I, 11Po g► tfr dY .i , ,,„ ,. Ts , _ 0 �.jaf O • 's r �p,,o,,►. ipaggi vi gym.. :� , i.`""" ADDITION 1` t if1itai y_ RicMVP A At, all/ ri,irer: % :ice onm av: /ode v .4U . "`.rs �••. `�os'Cs VD=,' "Sit." MO �����. 'wa t. •., O Isql kg* (iii i CITY PARK ? LOCATION IlitiOlillIttlik `^ firjrilw.n // 111 '�,,,.ria NMI VMS' n\ 1 latiiii L... 464 gill MOO. All all 6/4"62‘ AIM Illtappil" :4".".ft...MI eye Milkiiii '',. . 111 ',.i!..it R3 • Eli iimill: .rdwg .,�� �itor iopoi , 111. :�itiip ?i:.3,;',.... pp � i Ric %. �`.. rfI:�: 1Q, w,z,tom.,..z, ...51 N., ,- Q'� i Y oRONo — j l `s'i ■ riri 1'' 'az QM r1 en 4.011 __ _ ..'iiil:�1'�, \ : ' 11 a n �r..�... 1111'� ■r 12 p� ,- . i�l�,:41�' z" J*�f AUDITORS ,d:a� U • LOT 9 I —, .a - _ . r *( / ZONING • 4ct1! River i /"s. • MAP 13065 Orono Parkway • P.O. Box 490 CASE NO. V 99-2, CU 99-10 Elk River, MN 55330 I SCALE 1.-2,1 'aft"ftimesessionaftia. eisaationia„ RaNanow TBN..• . °�'��G >�yAt BLOCK • ►►•• — nor s ••►••• a z • 52 it � __ °AEgERy ise•••'••►••• Fir, 1 O PROP. EqE� ^ , g ► /::,, 1./1 @ lil OE ,m BLp --_ . , ». €./1 I Q L� r`,�A�R. 1g L f � /te • f► � ', �� 8 L 5 _�^ " —- °�-a RO•OSED BLp e P , �.. "_. �. � tea.,.,` I �. / S G T LC.fATIG /Ia �11- , s � /so f d { iiiiii YORK - `Jy -`.� �. STRUT NW. n`a m'o"ua°.w c / (111.DM LDES) '} n"'^4,tiL``_,. Ro'nC sr- A+ID..o .. n'0c e °�° u <�,�� / A nRTR O.."'..40(.40i3.• • nill vy,,,, 4aq �' rf I vii Ri Pi p`—`\ O ,E ]14 _4R O i tEl DLEsnuelLN 1011/O Ott r ,l IEIU�OQf.MWOIf N ANUS IOCHEE mi q 10®M1OOn. {IRS „, 1 MOW= E MOM. ¢¢ I1 M>TTEIL LRE lAl .COMAS L' I1' I-11; �,- 0 1 ARE IEa-uu ADE ,wow pam. scat MUMMY/Ifo P'ay__ re,.. ..., J b F F ]If MOAT t1MO( MO YORL RYN La A/IT ORY Id OE.,I tM OaV t"m SDI) M p Rwiw >ea twEuortAE llm,i r III T i,1.c h."t ONO M...."50)( YN Y 441,1% NaD.a awaua IIAc->e unEEo aD1aAa Arm= aD IIRE sw m Aar !off r av.Aw.:r:lel tam mn Z z EAi 0 !LE fO/ENIS TRD(r M Iwo) d CONCRETE VALLEY GUTTER = w1rou.N, i7 p a MEGrt Au nm.NR.aER7".....- VEAmort a we M[Y NIIC Nnroa■rn,m...,L- NO aavE wva�AYOENf soar NO= �j F (T l Au mllo ELARAo aIWAcar wnaq —.1.— flu C CREAM.DM. NqF a Obi AIID` tnuinEA•.GSYATAK vNn.Rro°b°"`[;•; F C a l m U1RR MOWED E!'CANER IONR E....,I I PAVEMENT RECTION o • W N 1 Da n�i w.00110 ar 110€SET S COT COMAS. V NIEY nE CR.S1RUCnR1 571 0 R to LE SINFD. C TMB SET Or UOR,Q.3 HAS LE o O t1®AMM UNDER ME OIRECTON a A IERROIED OK EMRNEL,1 pppEOl IID N�NEAs �I OF 2 J • • i Thu Mar 04 07:43:42 1999 1 i'0' • / it ` \`\ „ - / 4^ I'' Awa i. / /\, • ,....,--0-0'_ '— _ - / • Ys �a f•;. // Al n n F II. T.___,___ -- \wi/,n, \:,,,,:),,.. . .7,11 ; '1 ' tl 9� El i 747 117 "" 1 411 4 _ ;'g i� I gin N 11 1 ,i �■ . , ni• / 1 1 I - 11 1 1 _ • / j 1 I e { ' f' o hfb I 1,: e ,,' , al pq -3; 3 J j / %---I- 1.- I•• /it, C 1 el I frva�i N t 1 I` ii illI:li I.;I./I;Rip;um:Ili... • • kl- I'I1��i�i19�E O �� SE I n I I� I I! I I o� as hilt! 1,t II ►�EIt { II 1'! ', , 9 i ,. r v ja, _ "l; II 11 lii: . ,i - I I ,I}lit 1 i II I. / r-n ,, 1 JIM b / ' o0 0 ,,% 1, 1 47 1 • I/ =. y o / b. I i ti is - ------ 1: - ----- -1 oi a _ �I s k III � N � ATE GOPHER STATE MINI STORAGE plumy 9 !mice. km. 000 m 3.... ...a,.,,,, REASONS ELK RIVER,MINNESOTA 625 Lake Drive IX mLa,IX aM u .a...m...`"'":2,.."12-7,127.....,r...":". .�..s.. Annandale,MN 55302 Nti.GRADING&EROSION T� Annandale,w...�affirm 9.'ate'�@ CONTROL PLAN nim. ROT DATE DATE am as 12.11 I. • • • 12 41— . 12 4f 12"CABLE O.H. 12" 12" 29ON go. STEEL 3'X2' WINDOW RIGHT ELEVATION SCALE 1/8"= 1'-0" 16'-0" 16'—0" k I 1 DONN FACING FLOOD(SAME ON OPPOSITE SIDE) I �' 00M FACNG ao(0 DAVE ON OFP09IF 90E2 EXISTING BUILDING -2/IA- .�//IA CONT. RIDGF VENT / /I \ \\ // / I \ \ -.. / 1 I \ \ / I \ \ / I I NN(ACING 8000 / I \ / l I \ \ 12" VENTED SOFFIT 12" / \ I \ 11'X12'O.H. DOOR 12'X12'O.H. DOOR 11'X12'O.H. DOOR J // /l i \\ \i'n ••1111.11 / / 1 \ 3',2'SLIDER- Pnm. ✓ / I \ \ i / I \ \ / I \ INSTALL O.H. DOOR IN EXISTING BLDG. aNE DOOR W//NNINE LITE TIE ONTO EXIST. BUILDING W/ TWO NEW BAYS TIE ONTO EXIST. BLDG. W/ NEW OFFICE FRONT ELEVATION SCALE 1/8"= 1'-0" • l' .A-,09 '1 -0-.9 _..0-.13 _ �0-.9 T• i,;- II —_ •;/ 0001414.ZXf 0000 1W35 I W 73315.,B-.9X,t V b I I Z. i:1 I I �-1 Wim;. b b I 1 Ii oQ~0,. R OuiQW t✓ w�Qu I a�NtiOL. I III L..1._1 _I J • J J rte+ I I I 14 'I 9078 19103 X3 943133 01 031411 73315 ONY'3'0.9f 5100 ID/M'30.01 O 13041 ONS 000 000 I t, _ I 14 I o I "W I E 3 I '0018 30141 .9f ONIISIX3 OlNO 311 -,' 7f N 1 4----I=A- I 3 "1 10 -I I I § I I b I I I _I.7 b !\ i-%a 1 X300 01 1110111101 73310 0140'3'0.17f 51019*04/M'3'0.09•SONS 009 1'' 3 .� 1 na I -I^ • / t• I § I I 1 _ I I b g m II I .I\ I 443 -LW l . .eifi .f3. i fi ',I... i 14__-- s I 1- ^D 1 .A-35 • Howard R. Green Comcany CONSULTING ENGINEERS March 15, 1999 File: 806510J-0240 The Honorable Chairman and Planning Commission City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: GOPHER STATE MINI STORAGE EXPANSION Dear Planning Commission Members: As requested, we have reviewed the plan for the proposed expansion of the Gopher State Mini Storage facility. This site is located in the McChensey Industrial Park. The plan we reviewed was prepared by D'Heilly Engineering & Associates, Inc. It consisted of two sheets, a site plan • and a grading and erosion control plan. Based on our review and comments received at the staff review meeting, we would offer the following comments. 1. Currently the site has three free standing mini storage buildings. The proposal is to connect two of the buildings together, put small expansions of the third building and construct a new fourth building on the site. 2. The grading and erosion control plan shows a significant amount of grading north of the site on the Burlington Northern/Santa Fe Railroad property. It also shows some grading and the installation of silt fence east of the site on adjacent property. A permit will be needed from the Railroad Company to allow the grading in their right-of-way. Without the grading it will be difficult to build the proposed new building. Permission will also be needed from the property owner to the east to install the silt fence and do the small amount of grading shown on their property. 3. A small pond has been shown along the southerly property line. It takes drainage from about a quarter of the site. There have been no calculations submitted for this pond. One problem we see is that the only emergency overflow from this pond would be to the south on to the adjacent property into a currently existing pond there. There is an existing storm sewer system which flows along the western line of this property to the ditch system north of the property along the railroad. We questions whether it would be better to either tie into this storm sewer system and eliminate the pond or possibly build and independent storm sewer system on the site which would drain to the north. We believe that a land locked pond that can only overflow onto the neighboring property should not be allowed. 4. Glen Sundeen from the Elk River Municipal Utilities indicated at the staff review meeting that he needs a 10-foot utility easement running north and south through the center of the site for guy wires from an existing power pole shown along the north property line. o./p roj./806510J/0240/510-0312 m a rch 99 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 • The Honorable Chairman and Planning Commission March 15, 1999 Page Two 5. The bituminous along the north site of the proposed new building does not meet the City set back requirement of 10 feet from the property line. 6. It will be difficult if not impossible for a fire truck to move around all buildings on this site. We will be reviewing this issue with the fire chief prior to the planning commission meeting and can report on it at that time. 7. At the staff review meeting the Police Department representative requested that security lights be placed throughout the site. 8. There appears to be little or no room on the site after the proposed expansion for snow storage. We question where the owner will pile snow. Part of the drainage system through the center of site consists of a concrete valley gutter with a half of percent slope which drains both westerly and then northerly to the railroad property and a portion of it drains east to the neighboring property. If the eastern part of the site is used for snow storage the drainage system will not work in the spring when it may be need most. Also, even if there is no snow stored at this end, off of the end of the concrete valley gutter, there is approximately 80 feet, which is at a grade of just over one percent. We question whether this will adequately drain the site. After the proposed expansion, this site will be nearly all impervious. A great portion of this site is expected to runoff to the east. We also question whether the owner even has the right to send a concentrated flow greater than existing conditions to the east onto a neighboring property. If you have any questions regarding any of these comments, please call. Sincerely, HOWARD R. GREEN COMPANY Terry . aurer, P.E. • o./proj./806510)/0240/510-0312march98 warc R. Green Corncany CONSULTING ENGINEERS