Loading...
6.2. HPSR 04-26-2018 = Architectural Group Ltd. 15 Groveland Terrace - Minneapolis, MN 55403-1 1 54 Telephone 612.377.2737 • Facsimile 612.377.1 331 E-Mail archcmkodet.com • Website www.kodet.com March 26,2018 Mr.Zack Carlton City of Elk River-Planning Manager 13065 Orono Parkway Elk River, MN 55330 Re: Elk River Jackson Street Historic Water Tower- Renovation Dear Mr.Carlton: We have evaluated the existing water tower and generated budgeting numbers to help assist you in the grant submission. The existing water tower was scanned by a UAV(Unmanned Aerial Vehicle)on February 81h,2018. We have taken the data from the scan and converted it into a scaled drawing which was used for cost estimating by two painting contractors. Both painting contractors have separated out their cost estimate into three options as noted below. Each of the three options give you different levels of restoration to choose from: 1. Option 1 (short term)-pressure wash water tower and repaint. Fix structural items as noted in report dated August 3,2015. 2. Option 2(medium term)-pressure wash and sand blast only problem areas as identified in report and repaint. Fix structural items as noted in report dated August 3,2015. 3. Option 3 (Long term)-remove all the lead base paint by sand blasting the entire water tower and repaint. Fix structural items as noted in report dated August 3,2015. The two attached cost estimates from the painting contractors did not include the following mark-ups-25%Soft Costs,20%for contingency and 10%per year for inflation-see cost breakouts below. Estimate / Soft Costs(25%) / Contingency(20%) / 2018 cost / 2019 cost(10%) /2020 cost(10%) 1.Slack Painting: a.Option 1 - $92,000 + $23,000 + $18,400 =$133,400 $146,740 $161,414 b.Option 2- $130,000 + $32,500 + $26,000 =$188,500 $207,350 $228,085 c.Option 3 - $390,000 + $97,500 + $78,000 = $565,500 $622,050 $684,255 2.TMI Coating: a.Option 1 - $153,000 + $38,250 + $30,600 =$221,850 $244,035 $268,439 b.Option 2- $193,000 + $48,250 + $38,600 =$279,850 $307,835 $338,619 c.Option 3 - $385,000 + $96,250 + $77,000 =$558,250 $614,075 $675.483 Mr. Carlton,we again appreciate the opportunity to work with you and everyone with the City of Elk River on this project. Let us know if you need additional information for the grant submission. If you have any questions,please contact me. Sincerely, K ET AR HITECTURAL GROUP, LTD. dward J. Kc et,Jr., FAIR, ED AP BD+C Attachments: Existing Drawing TMI and Slack painting proposals Architecture • Interiors - Planning mw�w�aea=w�nmawmwe=� � ���e� pie n cia�y���w IEEl'LLE"Z19 allwl i�Lf L2'LLE'Z 19 aVOVtlala�m��a�e p�ea�» �����'y�m••p�®-Wla)�ffi 9 ,I lapaa lex.n allSgaM•w 1aPoy®4�ae IIeW�3 KES NW'—H Vl3 11\ 8f xHpma4 Zfffe w'wo 5 5 1puelano•751 MN is 4148 MN--V-"--r to uoyo9slal9l �PEzrool-a P�� pas NW' —.. w "P1i yodaa luawssaooy 8L/9Z/E aIWPlll tlnoa•J leanl>al!y>ay ■ ZMR Jannol�a;eAA IGOAg uos3joe�-�an!a�II3 to A8� � z h s U C' o O U a MN 3Atl ONIAM U o U b b O L b LL m m S s p ; 0 4 apo app _ Z z "so w xs. zz0 0 oa ZO i> y iMooio ++ M . ool�o�S MN 3A�Nosmovr n.. oy�3oi � o =ZF'WE Y aramorw p i c� m o u 3 a o Ol. 11 11 zz S C � wrc a � g` g` zo U w; C CL d o d o Y n N� N� Im c� O= `a a 03� `� uf. $o T A Q7� Q7� A7 9 M w oA 'zal`" su rcjl^ RM vl� p V1m I$ 8 VIS S VI b c§ Nil -7�7�7���7 O� )o c.i s $ lI28 m 2f� 1.; 3I_ y ay 3 xH8 11 111-111- 91-, IIIIIIIIIIIIIII a III=III=1_I IIIIIIIIIIIIIIII I 1=1 II=1 11= III—IIIA IIIIIIIIIIIIIIII I II I II I 11111111 s f11111111 11III=III= o III—III—II :. 11=1II=III= > IIIIIII I "' 1=1 1=1 1=W 4 o� _ pw WN III—III—II —III—I I— a W10-1r8186 Mod laMo1JMW-1H413 8 Lz68Lw9aw1MM1au91A—M3 WV9E6068L vE Q c U 0 %"N SLACK TOM SLACK Painting PROPOSAL/QUOTE Tel 612-991 -6493 15886 SVEND LANE NW EMAIL: Fax 218-948-2328 EVANSVILLE, MN 56326 Slackpainting@gmail.com Q DATE: February, 26 2018 Elk River, MN, Legged water tank Option 1: Water Blast entire tank, Coat high rusted areas with Sherwin Williams 920 Pre Prime, followed by a coat of Macro 646, A final top coat of Aluminum Spray-Lastic, Final top coat of Flourokem on the roof, Logo Elk River Flourokem, Fix concrete inside legs, Structural repair. Reinforced poly will be laid out covering the ground underneath the tank and around the perimeter to contain any chips that may come off in the Water blasting process. Chips that are collected will be properly disposed of including paperwork to track disposal. $92,000 Option 2: Water Blast Entire Tank, Sand Blast SSPC-SP6 Wet Blast on extremely rusted areas only, estimated surface area Wet blasted < %10, two coats Sherwin Williams Macro 646, A final top coat of Aluminum Spray-Lastic, Final top coat of Flourokem on the roof, Logo Elk River Flourokem, Fix concrete inside legs, Structural repair. Disposal and containment would be the same as Option 1 $130,000 Option 3: Sandblast Entire Tank SSPC-SP6, 2 coats Macro, 1 coat Sherwin Williams Hi- solid poly. Fix concrete inside legs, Structural repair. Full tarp containment system would be utilized. Ground cover would be laid out around the perimeter of the containment system. Dust collector would be used inside the containment system. A wash station, PPE, Lead training, TCLP test would be included. Spent abrasive would be disposed of at the proper landfill with all the attached paperwork. $390,000 Thank you for allowing Slack Painting, LLC the opportunity to bid this project for you. The total bid price is based on the work reviewed; any alterations or unforeseen circumstances may result in an adjustment to the proposal total. Slack Painting is not responsible for moving or removing any materials or objects that interfere with the proposed work. If you have any additional questions or concerns please contact me directly. Thank you. Tom Slack PROPOSAL TMI Coatings, Inc. 3291 Terminal Drive,St.Paul,Minnesota 55121-1610 Phone:651-452-6100 Fax:651-452-0598 Painting&Restoration Contractors Kodet Architectural Group,LTD. NOTE: This proposal may be withdrawn by TMI if Attention: John Brandel not accepted within 30 days. 15 Groveland Terrace Minneapolis, MN 55403 Date: February 23,2018 Phone 612-377-2737 E-mail ibrandel@kodet.com TMI Coatings, Inc.hereby provides budget pricing to repaint the 100,000-gallon lattice leg tower on Jackson Street in Elk River, MN. Scope: • Option 1—Wash and Paint o Power wash at 3,500 psi. o Spot clean and prime rusted areas. Includes up to 5%of surfaces only. o Apply two full top coats. • Option 2—Wash,Spot Repair,and Overcoat o Power wash at 3,500 psi. o Spot abrasive blast and prime rusted areas. Includes up to 20%of surfaces only. o Apply two full top coats. o Containment is priced as an option. • Option 3—Full Abrasive Blast and Recoat with Containment o Abrasive blast per SSPC-SP6 all exterior surfaces. o Apply a three-coat system. o Containment is priced as an option. • All options above include installing steel reinforcement at one leg where bowed and at one base plate foundation for additional reinforcement. • All options include the re-application of the tank logos. Pricing: A. Option 1-$153,000 B. Option 2-$193,000 C. Option 3-$385,000 NOTES: 1. Includes lead testing and abatement as required. 2. Prevailing wages are not included. 3. Bonds are not included. 4. Work to be scheduled during average temperature of 50°F and up. P:\Shared\Bid Package\FEBRUARY 2018\Elk River,MN 2-22-18\Elk River PROPOSAL.Doc ACCEPTANCE The undersigned hereby accepts TMI's proposal and authorizes TMI to furnish all materials and labor required to complete the work set forth in the proposal pursuant to the proposal terms and conditions set forth on the reverse side hereof,for which we agree to pay you the amount set forth in the proposal. If the proposal terms and conditions set forth on the reverse side hereof were not provided with transmission of TMI's proposal by facsimile, mail or email,the undersigned agrees to request a copy of the proposal terms and conditions before signing below. The undersigned agrees to be bound by the proposal terms and conditions set forth on the reverse side hereof regardless of whether the undersigned requested a copy or read them before signing below. Accepted: Date Respectfully, TMI Coatings,Inc. By By Title Title Ben Nicholson,Senior Estimator Customer: Sign and return copy. Retain original for your files.