Loading...
3 PCSR 05-25-1995 -17 ity of 1k River MEMORANDUM TO: Steering Committee FROM: Steven B. Ach, City Planner DATE: May 25, 1995 SUBJECT: Agenda Items Review Committee's Decision on Industrial Development Attached is a map illustrating the Steering Committee's recommendation to expand the industrial opportunities along the East Highway 10 corridor. If this map accurately illustrates the Committee's intent for the East Highway 10 corridor, staff asks that this be confirmed at Thursday night's meeting. Commercial Development • Included in the Steering Committee's packet is a copy of minutes (Exhibit B) from the July 14, 1994 Steering Committee meeting where commercial development was first discussed. In addition, backup information previously distributed at Steering Committee meetings has been included for discussion purposes. (Exhibit C) The following is a brief description of the existing commercial areas and where they are generally located throughout the community: • Highway 169 Corridor - The Highway 169 corridor is obviously the most intense and heavily developed commercial within the City. The primary zoning found along this corridor is either C-3 (Highway Business) or a PUD which has been developed with more control, however, maintaining the characteristics of a highway business development. A couple of issues that may be discussed in regards to this corridor are: (1) how far north should commercial extend? (2) are there any particular areas that should be considered for rezoning to accommodate highway commercial development? • West Highway 10 Corridor - Highway 10 as it extends west out of the • downtown area does not currently have a significant amount of 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 Memo to Steering Committee Page2 May 25, 1995 • commercial development. The current zoning along this corridor indicates that West Highway 10 will not be developed as a regional type commercial as Highway 169; rather, the commercial will be more community and neighborhood-oriented. Examples of this is at the intersection of Highway 10 and Proctor where there is a convenience/gas facility as well as another at the intersection of Orono Road and Highway 10. As it has been discussed before, the Business Park allows for commercial development; however, the purpose of this commercial is to serve the businesses and residents within that area. • East Highway 10 Corridor - The East Highway 10 corridor presently does not have City water and sewer, which may be one reason the development activity is not as intense as Highway 169. The present zoning of C-3 would allow for similar development activity as Highway 169 once City water and sewer is extended. One of the issues along this corridor that has been discussed is the image and appearance of development. With the proper zoning and development standards, the City will be able to guide development and maintain an attractive corridor. • The Downtown - Also attached to the Committee's packet is information compiled by the Economic Development Coordinator, Bill Rubin, regarding issues facing the downtown. Much discussion has taken place in • the past regarding this area of the City and I think we all recognize the importance of the downtown and the opportunities that it presents for the City and its residents. A lot of attention has been given to the downtown recently and with the formulation of various groups to look at various issues, a new course can be charted for the downtown. The Riverfront Corridor Committee is one example that is exploring the development of a riverfront pathway and to begin opening up the downtown to the river. Projects such as this river pathway serve as springboards to additional studies and projects to enhance the downtown area. One issue the Steering Committee may want to make a recommendation on is identifying the boundaries of the downtown. Attached is a map illustrating one concept of the boundaries based on various conversations and ideas from several individuals that may be considered as the limits for the "core downtown". (Exhibit D) From this core area certain design standards and common themes can be extended along East Main Street, Jackson Road and 3rd Street. Other Issues • The Committee may wish to identify certain areas that should be • considered for commercial development. s:planning:sc:5-25memo Memo to Steering Committee Page3 May 25, 1995 • • Design standards within commercial areas have been an issue from previous meatiness that may require additional attention. • Establishing new commercial zoning districts such as neighborhood or community commercial. These districts would be located in areas where regional commercial may not be appropriate. Schedule of Upcoming Meetings Attached is a list of issues left to discuss. (Exhibit E) The dates that were tentatively scheduled are no longer valid; therefore, dates for future meetings need to be updated. I would ask that the Committee bring their calendars Thursday night to schedule future meetings. • • s:planning:sc:5-25memo r . • r• , ,,1 , k 15. It li !I. b li ‘..46.” _t1.1!... ..._ \ -- (-,%,i..ic:,!: ,• 1, , 0 .. I , . ..,s roll •• : ,r, • _,,,.. °9 A - I/ -•-• /.,r 01,14 ,;„0; _..,„...,. 4.4•AI _TV" -ivi —\ ' ...-.. , ,. .4. -...."....!.! t I I 1 IL I „,.„., ,,,, .. ... ,.f . 0 MO , ,.. — f4,43-rehr:logi , ..--• 1 7 V ' :" !I ,ItrZ RI __ 0,...., ",.." 1 I ,, _.„,,,,, ,. -, _pool lii I.l•CO1 -.jrn ..... i..1 -2.....r. 7. j•,:0741 i rit;. =•-•L'-- •'-. k,\ .. . . i 1 1 -.. - i- t ! ' t. . 1 -- _ . i ., ai,,. r : • . o o4nol 'I, I ,, I '') 1 741,\4 4 Y.- •'/ Nth 1:1 ' ." "Al', • .. i •, , 0 21•0, _.._....k..0_.. .' •1 '.4 00 mo• I , e., , „,, -0, •1..f.'' ._...2_,±16' r'• Ap . , . 44. v ,,. I•, • .,,, , ,7,...,..... / .../ if ! _IA^.4', I 1 .it!•'' . ..-- 1721 I I ti le -.t.--: F4. 0. . /'Al Fli#i .• 11,ill. ' Mil 0:}1.41 ....,,,,,..em. .--OXPP li 4) 111.0) W.ellt . , II P I I 1 9 1%.....•........-1/:.:E:.:1111.A:. ' Fr 0 \ 1 .1f, ..' (1 II ::I _.9,2 01. \s„.........._ .III. I li I In •''' i7,-,,-,,,..'sr _tow., ---,T.% -------IlAtip I: i 10'1/1;11 6. ‘11111101'''. 7.,.? 1111 't,' •' ,,.i AI ) i7R.0 .)..go...11.11i111 •:, I • ' , .r i!..o:.-iiiii AI .. 1'4. 1 i M ! —..AM I I 1 111 ' ../.....11,"11:51 i t.'•tak 4.... •If .• A 1 . 11f/PYI :Wm) 1 li 611"...a11.151..1/1*1 i i,''1.t.4* • ---;-.' .1; . :, ; 1 L 1:. I ,, •-:,_ 77 4 -4 'A 1111111110114 --2`' ,..ir.: - •-• -ItittE:wig AM)-4414 . 1 ii ' ' . ____, , riot:, I ': .„....,1,...t.t. _- _ ----- WI jr.04L .."-- -77:: aid iiiii. , '''' ) ___,, i ii riorp-foO•Mir I 1,21: 111 --- -jE,-' IllpipAho / I /-',/ .! 1 ___!•,'FA I.; /7 •I , :1 6 . S4\ .41611 ./ --V .,.. Il 1.- - go .?. ,i., i .......,.. ; ..- -1.---- L....... : , ,, .. „.,. ., .., — -4-x.5 11 „ ..1 _ _ • :il , q ... ,-.5,- ., i 1 .° 4( -----.. --r i __.. _ ...: hl ' 1---s-'k7,--..k,1-------... ,,e A •- -- Tr ____ t._____ 1 1 o 11.- .---,•:.• 1 i ---I.,: .,r. 1— -1 . :1 • —— _ —- -'',.... I 1.41. .1.,, '' ;. AMP , I / I ."-- ____ _ • ',, .....t. I( ....40, 1 4e " 1 ..., ii , , , ,..,,-;.,--- i ,. dp ,- . °., :. . .--7. ---4--aiaV= -- — ''''''.. . • •_ , -„:4 \ .......•"-- --- ---, ..- , ----„ ...1,,,-, ,4 ."' ' '' 4, i 1 I I 1., _ ._. I Ifr " i'''' ,14 if'.:....;',' I 1 r---f ---1 rl 1 „ 1 ; JJj - _ _ii.,1,2.•L''',44.-_-11,-L11 1 1. _I ;' t':-. - i _ . ,. __ ..I I- i r ; I ii 1 1 11 1 II ii q 111 1 I.. if If P ii 11 li r li iA li - li 1) li li 11 1,-. pt, lg it i 0 I I' 11 1 i I I , i I I 1 I I 1 1 1 1 1 li li [i li It 11 I, li It 11 ly, Ig If ll II i 13 13 :. 13 13 13 13 3 13 II I/ I 1,3 II II I! 1. • , I' j ..„ . -"s- ll 1_ • womallik• --T.------wait IIIIII .... , .3r-" 7----Z 1 I ... t _ - 4111111111 . I . - .__ NMI ,....., ) . 0, ,, • „__ -.-..-. _ ,...H., - m _ ,. to 1 0= gl1 - III m _ IF r, kv_. i.j-,t' --_....-_-_i I - 1 _ tirJa I q ' . --NI ' I- 1 1 m , 1 , , z 1 _ i I N, 1 1 ,li ___F __ _ 11:11_ iv .it iridior __ ?. ..1 ,.. ..._ -J- ot.. ; L____ i • , , ., ma , i ,Paii- 1 1611P111,R, < 1 ..... , . 41114 Itmer•P- $4- P.. g i. 44•41,414t.iw. , 4 ._ .• : " . . -----4 ' - , I 1 I- - - , . ' .Aetitlrel r 1 . , .„ ... hill . . ,,t 1> IL lmi.•• -:, .__._1_. . ... ______ z : ..._ 1 , • . lo.. ,. 1 4 A II :pi ' ri•Wi 1 1 i 1 liqmi i All LII41 "7' I pit\-4,1 ;Jo. 1 il II' 0 Imo . r(71 -- ' 1444 Mill .-11-441 ------ __ 11111 "r 1 lawitirliwg r r'-‘-wa - - -.‘.0-41111 4°1 ark 4164 AN esp,_A pli solilas i .ii.,. • 0..." ' 0 ,111111 i " I- •^ , t . I " IIIIIIL _ ' - 1, 6341 ' ki 4•0'!_:NlifAip 11.k1 1 X illikIntik v 1 w Iliii li 'ma. 111 , ii Ja4.. a; tiPF • . -- • titi- ,...%.6., rari , itiAii- ---- <-'7. N7 i• ,......-INViermodniiM Z klif•Vrialmlwall_ILO 1 1V .SW2 0 4 I 1 hk.. al MN IiiitimM, killf . .. 711:-; -11 1- _.: N. Jo : .....: i ' .1191.11 milt., .im III. 1111iii 'S ur-mi _ -iiii ili I • !'... • -PA- a ii: -pc - - fi_ 11- fai,,,,pilipui im 0 0 .. ,--_. I - I.*"MI '- -1_ - .111 An -"wa .:__ , _ or .4 ,& oil I E _ • -,-;-- - r-- zit *4 Lir, il g mil ,, 1 \.\ Ill AS— — MIA ..._ ' ,-:S..f•i- Vi.------ . M IN 0 16 'A4 1111 x, , _ .0.• . TIP-_1 ---_ \I 1_ „__ _ _____, r- li _______,.•s,;._,,.._=,ti 4_..1. , { ..,11,. Ill .. , ---. , ... . , L ,.-I t ----- ----, .,_ i___, i___. ,.. t\i-_.__I I - -' __ ___ . ---„,, ) 1 , ..1 \ -. ..1 - • -...-r,_-,..T, . .-, 11 Ii31 riPIIPIIPPRPOPP0130111j11. 11FirifilillfililiPliN135 5 5 N 'Ir i •. . V k i 1, ,, th t tyld g li ,. • prie. x I d ; , bt' ia FREI er ..i •••I ? (1100) (VANS '. :•1, r • 'I, i ; ; ; ,. (11400) AR J i 0 ,. • ; %:1 (11300) 0 ___,..----- ,: ) j AUBURN ii ....:. • ::::::•!..;.:.;.:. . ..:•:•:•:•: : :•:•:•:•:;.;.;..:.: ' • 1 (11200) ZANE • •-••••:•:•:•:::::::::• : . :: : : :. ! ! • ...:•:•:• : , ;*Ii;.; 1 ; ; N f•,6 3 ; •':::::i:i:i::::::::E:i:i:ii. '::: I :: : : : .- • _ , . . Yu" i." 1 * - " " ••••••• 1 • (woo) 1 ;:i:•.::::: :::::::::::::.:.;...• • 00 1..1 latiMilli •, , • XAVIER .r,..i::,4:::::::::. -:.:.•.• • fio, A - ..::•?::::•:.- • a., VALSON .f ,I . (11000) - ,:::, • 400 4 r g • VANCE ...:,•i'.: 1 ,,----- -----:-..i. 0 0 ' ' ' I ;.;, PI . (10900) ULYSSES •:• '• . 0 . . „ I i 10 .7„......,...........„„/"..- ---- •::?:::,:" 0 , I TYLER •:::_;•• .•:•:,;Y (10800) SW TH - :•:•:, 1: "1 •:. iii;/ i',-, / 0..:41. -- 1 7/ •::::11 ...:::::•:.:N .i ROCGEVELT ..:•:•/: e(i. pj 4011....S.•?:...::::•:-...: (10700) .::: fi ......16 .-:::::::.: ,.-...0) QUINCY - •::::ii1 1 /•••••••••'•••••••• = • .. ..... K 1‘1) ..._... .....-1. , / ••:iv..:::::::::•:•:•:•:. ii)i••:" 4 ... ...... ... . 10600) POLK / :le: if -4.;$4.•:::::::::•:•:•::::::::::1 • "•• T .,--,_, -Ny 1 .00 ... •.'..:............-................. i ' ,, ••••• •:.:•:•:•::•:•:.:•:•:.:-:•:;.:: .,• • i OLSON 2 ',... '.., ,,'.•*:::.......::.:::::::::::::::::::::::::::•:.: ' •%,- .. ............................ ;0500)I i •,..4% I ..r..::::::••::::*::::::::::::::•:•:::::::::::::::: I 1 ! NIXON • / NZ4...1 , ado ..:•:.....::::.:•:•::::::::::::::::::•:•:•:•:::::::: r. r ' i P • :. -Nk..! ...:.:.:.....::::•:::::•:•:•:•:•::::::::::::::::.:.:.:: 'i . ..::.:./...:.:::.:.:::::1::::::::::•:•:•::::::::::::::::. ' MONROE r : , , ( .; f U4COLN : *•*:','i'•:••••••••••••••••••••••••••••:•:•:••••••••••.'••••••••••••:•:•:•:•••••.1••••••••.•:•:•:•:•:••••••••••••••:•;•:•:•:•:•:•...•••••,.;•;•;•;•;•:. •: •••••••• •••••••••••••••••••••••••••••••••••••••••:•••••••••••••••••••••••••••••••:•:•••••••••••••••••••••••:•:•:•:•:•:•:•:•:•...;.;.;.;.;.;.;.;•;•.............•,. • i: Kr-r*DY ... ••••• •••••••--•----•'•••••••••••••••••••••• ''• '''••••••••••••••••••••••••••••••••••••••••••,... •.,7• •• ••••••••••'•••••••••••••••••••••.•. •.. .........•.............,,„,„.................. . ..1 :.:.;;;_,.,.*'::./ii. ••••••••••••••• ••••••••••:..•••••;:;••••.....;.:.'........:.•.:.:::::::::::::::::::::-:•••••••i?.•:::::-::::::::::•:•:::::::::::::::::.::................::::::::::::',...',......................:.... /, JOHN SdX4 Z :%."-:.-1.:•-:::::':• •••••••••••••••••••••-•••-•••••••••••':::::::::::./....i•••:::::•.•:•ir6..:: ::•:-..::::•::: ::.::::.•:.::........:.::.............................................."........................... ° , ./ ' . :4.i•.:;i:. i:,•••••••:.:••••••;-••:::::::::::::::::::::::•:::::••••••••:::::•....c.i:..........:::::::::::::;',.............,...........,...................•...:.:..........:•.....................I....."............"‘....................... r: ni,...04CE • .: :• ......:..........:.:::.:.:::.:::•:::•••••••::.....'•••••...••••••:-.•-:•••••••••••••:::::.•••:-..:::::::::::::::::-:::.::,::;::::::::•:•:.:::•:•:,/,.•:::::::::: /-..--,0* .:;::,.;:i:i::i:::Z:•••••••:::::::::::::::::.:.::::::::::::::::::.:....:......:::::::::::::„:::::::::::::::::„.::::::::::.........:::::::.::::::...........::::::::::::::::::: 4 HOOAR ' 1 , 1 '-'•••••:-.:;(:.• •::::::ii'til•.:•.;1 ....r- :.::::::::::::::::::.::::::::::.....::::,:............:::::::::::::::::::::.::::::::::::::::::.:.:::::::::::::::.......:::::::::::::.:::....:::.::: cc_ •::::;i1,.....,i,-...i::i:::.::„.:v ..............:.:....:........:....:.:.:.:.„.:.:....:.::.:.:.:.:.:.:.:.:.:.:....................../................................................ , •:i:::::::::•:•::::• •.‘ 'RAN T• I -•.'-'.....•'•''...........:•:•....i••••••••••:•:.......•::::••••••••••••••••••••••••••••••2.......':":•••-•••••••••.................................................: .09• ;:ii:i:t‘: :•:•:;'• '-, , ,...-''-'- '',, - ',.& '•••••••••:•:::::•:::::::::::::••••...............................'.:.:•'....‘..............:.:.;•./.................................:.:., .el...iiI.S.::::' • . 0 . 'i!..:•, * ill . ':S. , ..)...............................:.........,..........'....'•'.........................' .' ..'•)•••••• •.........................:..•:.....: ....- ^ ' .---.... „•...1:•.• i : •''C 7k •: :•••/ f.g. • i ,--_ :r -7 /' ... ........••:.••:.:..............................K:. .•I ' -.i.ii ii*--- . ,T; " . . :::::::::::::::::::::::•:•::::: ,, ....1•.' . Li Mo.. VI1.0 rs . .•.•....•••••••••••••,•.•...... ,, .:) •••:t I. , .•- — -- — ,7A' ?....5 •:•:•••••.................. ?DAVIS, 1 • - - - - I:•:•:•••.•:•:•:•........................ ., .•. .-. , i •:::el --- ru.,.... VP., - [ IN/D4N \ .1Sl4P A ki. 'i ::E •.•.•.•.•.•.•................. g - , ;.;[ ••••/...............................................I i ! :•..g , --- .1..PdPel •••• --- ,40p lyifjk,, 1 11\.) ::::::::::::::::::::::•:•:•:•:•:1 •.•. ••• ,4" 4/1-..,;*4#10*. , .---," -- *:::!::•::::::•:•:•.%.*:*:%.*•.%.: ••: .•:::: ,-.Q.±..1,... .1 1- 1, / iiii . -.-'' '' '''' '''ri_k_ .., Atb 47-, ,, 4 .........:...:.:.:.....:.:::.:....:., , : •.:•••:::::::::::••::::,•:::::::: ,..,,,, , , .•:•• • ........ , 4:.* /"Nty ' .::::.: •:•:•:•:•:•:•:•:•:•:•: , ,....-- ;:i:i::,: ii:::i::: .....,....,„ , •- --- .. - 0 ; — 0 _ 0 — ... , . 1 1 : , . KING _-- -: ;. A V `J L d r ,••' • , („�, JACKSON if:;!; � ir�i :l �•111111111 a J L__.., ',r���r, !'r mit 1s1r.: t: `in q:,:L, -�% IR'1NG if'„71„..ILr11AiI::N:Ic:a. •''i f' 1 st1..Zil Jam, _ ''-'r� (11700) HOLT P = �^ �t Z�igi ` A _ - '' �_ 7;7 Sari Il P11 1s 'NO .E Nit 9 jr `. ,i.:44e;min arg.00 PORT •: �Gj ;:j' • 11 • s)`�' S' :� �/•.�'.•��11 7 {+ ,. ' V id it a : ,I, c, nee* 'r. 7 - 11";11•17.ii ..' • 'f;V' fiii itilVi •-•i vi, 0 • .•'. .2?:•:•1•:•:•' ' 1 oN' h ir„itiar.-1,103 . .• .4..•:•:::•. .... ; As .-er'' •• il” eillitii atti • • : .!. : ` l Ge. •+ -- .:.x:1ofc$ a•. vH f eco --> or Q � ' - Idp i� • 5 f r� r,rs� • , 410 '{ \ '" � ` � �t f' ;: I !4 gl,144207 1 Al 0 fr.t 0. 1 htbr.y 4 1/4 I (/PAAeldiblibb---/ ,�, ,� 4ii 1 i .1.10/Ippr. AI - ,:f>sassaiiii.:::::::::::...1!::::::::: ::::::::::::;...........t..:..1111 ,s ii _ 1\ x I ; a •••••• II I f ri t Jol/,���` 7. I' `---- -,3 x p "4(\N .v.n7\� O m I 1 \\ { ___ pr :•:-:•:,%:.:•:•:::: .•:.:•:•:•: ..:•::::.:....:. .. .::::•?!Ili.li.i.:: i.:i:***:':!!)•1:.;',::.::.! —__—,_ -- __ ___..___—_-- —_,_ _. C;: •••••-'-••1•••:-1-1-:-:-.:-:v-:' ' .�,. -••r�•-ji;-:;c- ..L.j.t•1•• •t,'t•1 � �t N. II i tf,-- .•.•.•..:. :::::. ••...iiii1::::•:::::•:•:•:•:•:•:•:• i ii...1 •::.,•::: ... • ., i= U -,1 I. i::: :!i.::-- X - • c r ia *I: :II! _ el i MOM -- wilip ;_ ._-... _ :.::-::i ::• EX) -4. 0 , 00, VI Pr,4 - : 1111111.11 , : • :• •: :• / i..: 1,341 -.'r t ell x f / ,Iv t :.::::.,--•i:::!:::•:::::::!:!:i::::. , > ii •::,„,...::,::::::•::::•:•:•,: , ,....:::.::•.•• ••::::::,, ,.._____ . _ :,:,: ; .:• r , „,- f, c`c au •:::: 1:::•:•:•: :•.• . . / lea N.-„,s, ::::•::::: Ui N ♦yy Uyy P J Py Oyy 8y 6 N (i byy 61 i OJ $ p z N-1 O O I Z Z S 3 �� O O Z Z Z i Z , s • 5 / v J} EXHIBIT B fif/rope • ite& MEETING OF THE ELK RIVER STEERING COMMITTEE HELD AT ELK RIVER CITY HALL THURSDAY, JULY 14, 1994 Members Present: Chairman Minton, Committee Members: Hank Duitsman, Pat Dwyer, Dick Hinkle, Merry Sipe, Marly Glines, Mary Eberley, Mary McDevitt, Lloyd Barthel, Arnie Engstrom, Bill Birrenkott, and Keith Holme Members Absent: Committee Members Chris Kreger, Dave Anderson, Mark Lucas Staff Present: Steve Ach, City Planner; Bill Rubin, Economic Development Coordinator 1. Call Meeting To Order Pursuant to due call and notice thereof, the meeting of the Elk River Steering Committee was called to order at 7:02 p.m. by Chairman Minton. 2. Consider Steering Committee Agenda ARNE ENGSTROM MOVED TO APPROVE THE JULY 14, 1994 STEERING COMMITTEE • AGENDA. DICK HINKLE SECONDED THE MOTION. THE MOTION CARRIED 12-0. 3. Consider Steering Committee Minutes PAT DWYER MOVED TO APPROVE THE APRIL 27, 1994, STEERING COMMITTEE MINUTES. MARY EBERLEY SECONDED THE MOTION. THE MOTION CARRIED 12-0. The following corrections to the May 25, 1994 Steering Committee Minutes were noted: 3. Paragraph 4, should read "Chairman Minton emphasized the importance of the industrial sector because it gives us the biggest tax base for the community." 4. Change the word "Conclusion" to "Summary"; and, add the word, "acres" after "25" in the first line after "Summary" MARY EBERLEY MOVED TO APPROVE THE MAY 25, 1994, STEERING COMMITTEE MINUTES AS AMENDED. PAT DWYER SECONDED THE MOTION. THE MOTION CARRIED 12-0. 4. Response to Letter from Tony Emmerich Chairman Minton asked that the letter from Jay Johnson of Tony Emmerich . Homes be entered into the Steering Committee record, along with the staff's response prepared by Steve Ach. Steering Committee Minutes Page 2 July 14, 1994 dPpzispet ..)5. Introduction of Commercial Development 5.1. General Information 0 on Commercial Retail Sales, Construction, and Tax Impacts 5.2 Evaluation of Existing Commercial Districts Steve Ach reviewed the following exhibits: Exhibit A - Retail Sales and Effective Buying Income for Sherburne County (1988-1992) Medium household income, retail sales and buying power has increased over the years. Exhibit B - Elk River Retailers 1992 Retail Sales Gross retail sales broken down by Standard Industrial Classification (S.I.C.) codes Exhibit C - 1988-1992 Retail Sales in Sherburne County/Elk River/Percent of County Sales Discrepancies can occur due to reporting factors (i.e., mailing address/business address). Exhibit D- 1992 Retail Sales Estimate Summary memo of Exhibits A, B, and C, prepared by Bill Rubin Exhibit E- Residential/Commercial/Industrial Construction Value 1988-1993 1994 expected to increase significantly, due to Elk Park Center, Hillside Crossings, and surrounding commercial activity. Exhibit F- Commercial and Industrial Contribution to City's Tax Capacity Commercial and Industrial contribute $3.85 million in taxes, representing 44.5% of tax capacity. Importance of both industrial and commercial for a community should not be under estimated. Exhibit G -Taken from Growth Management Study for City of Lakeville This study illustrates how industrial and commercial property positively benefit a community's tax base. Net result would be similar in Elk River. Industrial and commercial generate a majority of revenue for cities and school districts. Single family development demands more services (expenditures) and contributes less tax revenue. Chairman Minton noted that the net impact of commercial in the Lakeville study was nearly twice as much as industrial, indicating commercial was more important. Gary Santwire stated that he felt that it would be true in considering tax dollars only, but if you are considering places for people to work who live here, that would a different category. Dick Hinkle stated that this information does not mention the value of industrial in creating new jobs. Steering Committee Minutes .e 3 July 14, 1994 pp 5.3 Inventory of Commercial Property- Exhibit H • Steve Ach explained the following breakdown of commercial property in Elk River: Total acres zoned Commercial: 873 acres Cl/Central Commercial- 55 acres C2/Office District- 56 acres C3/Highway Commercial - 662 acres Planned Unit Development 140 acres Total Acres Developed 469 acres Total Acres Vacant 404 acres - Restrictive Areas -27 acres TOTAL NET ACRES AVAILABLE FOR DEVELOPMENT- 377 ACRES Cecilia Scheel questioned what "restrictive areas of development" meant. Steve Ach explained that these areas were wetlands, floodplain areas, or properties that would not meet minimum setback requirements and could not be developed. Gary Santwire asked how many restricted and developed acres were in each of the four commercial areas. Steve Ach stated that those numbers have been calculated but he did not have them available, but indicated most of the available commercial area is C-3/Highway Commercial. He explained that the C-1/Central Commercial area is located in the 40. downtown and is fairly limited. C-2 is in the corridor on Main Street between Highways 10 and 169, and north along Jackson. C-3 is located along east Highway 10 and up Highway 169. Steve explained that using a high absorption rate of 14 acres per year, the City would have approximately 27 years worth of commercial property. Using a low rate of 2 acres per year, there would be approximately 188 years worth of commercial property. He noted that these numbers could change dramatically when big projects such as Elk Park Center are developed. Pat Dwyer indicated that a large portion of undeveloped commercial land located along the Highway 10 east corridor would be used if sewer and water were available. He stated that if a large user wanted to locate there, they would be unable to because of the lack of utilities. Gary Santwire questioned whether or not Elk Park Center is considered developed. Steve Ach stated that the majority is considered developed with the exception of the free-standing lots between Freeport Avenue and Highway 169 and the 3 lots at the north end of the development. Steve Ach explained the graph attachment to Exhibit H, which shows the new commercial development from 1988 to 1993. He estimated there will be approximately 75 to 100 acres of new commercial development in 1994. • 6. Overview of Commercial Districts Steering Committee Minutes Page 4 Jule 14, 1994 Appooriii • Steve Ach reviewed the four commercial zoning designations in effect as follows: 6.1. Central Commercial Cl district, basically the downtown area, approximately 55 acres of property 6.2. Office District C2 district, primarily the East Main Street corridor, some along the west side of Jackson extending north from the downtown area, also the courthouse property, all totaling approximately 56 acres. 6.3. Highway Commercial C3 district, the most intensive commercial district, has a broader category of permitted and conditional uses, 622 acres. 6.4. Planned Unit Development PUD district, primarily consisting of Elk Park Center, Hillside Crossing, Barrington, and Elk River Mall. Chairman Minton questioned whether the PUD at Highway 10 and Waco was industrial or commercial. Steve Ach stated that the land use plan map suggests approximately 2 acres are Highway Business while the balance is Light Industrial. Mike Boelter asked what is the current zoning of Custom Motors and Wapiti Park. Steve explained that Custom Motors property is zoned I-1, Light Industrial, and Wapiti Park is currently zoned residential. Chairman Minton noted that Wapiti was grandfathered into the current zoning. • 7. Downtown Commercial Area 7.1. Inventory of Existing Land Use Bill Rubin provided a map (see exhibit J) and explained uses currently operating in the downtown area. 7.2. Challenges and Opportunities in the Central Business District Bill Rubin explained information in Exhibit J and K, emphasizing the value of a vibrant Central Business District (CBD) and the importance of reinvesting in the CBD. He discussed some of the challenges and obstacles encountered in redevelopment, and the City's/HRA's/EDA's role. He stated that revenue sources must be identified to provide assistance and/or incentives in order for redevelopment to occur. 8. Discussion of Goals and Policies for Commercial Development Steve Ach reviewed the current Growth Management Plans goals and policies, as outlined in his memo to the Steering Committee dated July 14, 1994. He stated the Steering Committee needs to determine if these goals and policies are still valid, and to make the necessary deletions or additions, based on the group's findings. In conclusion, Steve indicated he feels the City of Elk River is in a good position to attract quality development. As Elk River's residential base continues to expand • commercial development will naturally follow. The City's challenge will be to manage this commercial growth. Steering Committee Minutes Page 5 July 14, 1994 FAN WEI • Steve Ach suggested that the Steering Committee may wish to consider the following issues in evaluating the current goals: • Establish a neighborhood commercial zoning district • Establish an intermediate type commercial district somewhere between the office district and highway commercial • Planning and redevelopment efforts for the downtown area Chairman Minton posed the following questions for Steering Committee: • Is there enough commercial property in the City? • What characteristics should it have? • Are the current commercially zoned areas in the right place? • If not, where should they be? Jim Mulroy, representative of the Downtown Development Corporation, stated that if the people in the position to do something about the downtown are interested, something could be accomplished. Bill Rubin noted some of the challenges to the downtown area are the highway, the river, limited access to the river, and the railroad tracks. Arne Engstrom commented on the restrictions in redevelopment, including costs, working with old buildings and limited parking. Bud Houlton commented that Kraus-Anderson previously presented some very interesting plans for the downtown area, but they were found to be cost prohibitive. Further, he felt the plans for the "hole in the ground" will be helpful. Gary Santwire stated that a redevelopment proposal for the vacant site downtown was denied by the Council. Pat Dwyer explained that was partially due to changes in the T.I.F. laws. Mary Eberley questioned the availability of funds for historical redevelopment. Pat Dwyer replied there is a very high demand and very little money available. Chairman Minton said that a historic theme has been suggested for the downtown, using the river and older buildings. Discussion followed regarding this concept. Opinions varied as to historic value of existing buildings. Jim Mulroy informed the Committee that he has received many positive comments on the downtown from customers since the street lights and sidewalks were added. Denny Gorman, resident, remarked that he was strongly in favor of using the semi- rural flavor idea in the downtown area. This idea has been successful in communities with a natural resource such as a river or lake, and Elk River has that. . Stan Chase, business owner, commented that the railroad tracks were definitely a barrier in developing the downtown. He suggested building a tunnel for the Steering Committee Minutes Pa e 6 July 14, 1994 O T1 U vt • railroad, or walls with walking bridges over the tracks. Robert Dare, business U owner, felt the railroad may be an asset in the future for providing mass transit opportunities to Minneapolis and St. Paul. Pat Dwyer noted the downtown area has been studied over and over, but the same problems remain, such as cost of redevelopment and parking. Service- oriented businesses will likely locate in downtown, but some type of redevelopment project will be required. Steve Johnson, business owner, commented that it has been past practice to reinvest commercial tax dollars in residential projects. He suggested that a portion of the City's taxes be set aside to reinvest in its downtown. Discussion followed regarding the T.I.F. program. Bill Rubin informed the Committee that there are many positive attributes in the downtown area. There are no boarded up buildings downtown, it is clean, and the recent landscaping and expansion projects in the downtown are attracting attention. Also, Elk River is unique in that it has an actual "Main Street" . Discussion followed regarding boundaries of the downtown. Don Heinzman explained that business owners north of the railroad tracks do not seem to feel they are a part of the downtown and questioned the definition of "downtown". Bill Rubin referred to the map outlining the central business district, including the C l, Central Business District, the core downtown area, and areas complimenting the downtown such as the East Main Street corridor. Bill stated that the defining the downtown would likely be an internal issue. Hank Duitsman stated that some commercial tax dollars do go back into the downtown by providing police and fire protection, and other services, indicating that he hopes a plan for the downtown can be agreed upon so that some type of funding can be provided in the future. Arne Engstrom emphasized if money is not available to invest now, the City can create a theme by using the mechanics of the ordinance to regulate construction and remodeling in the downtown area. Margo Foster expressed her concern that retail in the downtown area not be limited to a service district that would coexist with retail. Pat Dwyer agreed there are retail uses that would be compatible. The concept of entrances to the downtown businesses and shops facing the river was discussed. Mr. Dare expressed his concern for the deteriorating riverbank, noting that 12 to 15 feet have eroded away since his business located there. Marlon Glines indicated he did not feel either of his businesses were part of the downtown, one being north of the railroad tracks and the other on East Main Street. He agreed that the downtown area is appropriate for service-oriented businesses and specialty retail, and that people would be more likely to spend time walking around in the downtown area. Steering Committee Minutes Pai92 7 July 14, 1994 1011.1.7i7EFT • Chairman Minton asked for a consensus of the Steering Committee to continue this discussion at a meeting with the downtown group. Chairman Minton feels that people move to the Elk River area because of the semi-rural atmosphere, "where city and country flow together". He also discussed negative comments from local residents made at Planning Commission meetings regarding the large scale development that is occurring in Elk River. Gary Santwire asked whether or not it would be in the best interest of the City to force existing commercial areas to be absorbed, rather than create another spot of commercial north on Highway 169. Mr. Santwire suggested the Committee consider deleting some of the commercial zoning in the Comprehensive Plan and adjust/fine tune what we have. Hank Duitsman stated that it is the intention of the Committee to first inventory the land uses and then identify areas where zoning may be inappropriate and to adjust it accordingly. Another area of concern is to identify arterial roads, and where they should be since there is a close relationship between transportation and land use decisions. Chairman Minton noted that design standards in commercial areas can be used to keep the semi-rural atmosphere. The PUD (Planned Unit Development) concept was discussed. Steve Ach Ana explained that a similar result can be accomplished by setting a high level of development standards in the City's existing zoning ordinance. Steve Ach and Bill Rubin agreed that PUD's can become administratively cumbersome, citing the Elk River Mall as an example. Marlon Glines stated that PUD's can offer special amenities that make it unique when use correctly. The neighborhood commercial zoning district concept was discussed. A resident expressed his opinion that the City should use extreme caution in proposing such a district; there are areas where it would be strongly opposed. Steve Ach explained the value of small convenience center in a residential district, providing such services as gas and groceries, dry-cleaning, hair styling, etc. Marlon Glines suggested the Committee provide more categories limiting the types of uses within a specific commercial zoning district. Chairman Minton reported that Don Strei had contacted him regarding the idea of a business/office district near the Courthouse. Steve Ach replied the proposed business park zoning would provide opportunities around the Courthouse for clean industrial, office and limited retail; all of which comprise the business/office district. Chairman Minton stated that a letter was received from Franklin Outdoor Advertising which offered ideas for a uniform sign ordinance for commercial and industrial zones. He also noted that each member of the Committee has been given a copy of the Surface Water Management Plan and Comprehensive 111 Transportation Plan. Steering Committee Minutes Page 8 July 14, 1994 1713 rL1 PIFi t)IU A consensus was reached to table the Commercial Development Discussion to a later date. Don Heinzman announced that the Promotion Committee of the Downtown Development Corporation will be launching a focus group study for making the downtown more attractive. The following upcoming meeting dates were noted: July 28, 1994, 4:45 p.m., Community Room at the First National Bank - Next meeting of the Downtown Development Corporation. August 8, 1994, after the regularly scheduled EDA meeting (approx. 8 p.m.) will be a workshop session for the EDA, City staff, and the Utilities Commission, to discuss business park issues. A second workshop will be used to discuss downtown redevelopment issues. Downtown Development Corporation and Promotion Committee representatives are invited to participate. August 25, 1994, 7:00 p.m., Steering Committee Meeting Next Topic of Discussion: Northern Residential/ Agricultural Area of the City The meeting adjourned at approximately 9:40 p.m. Resp ctfully submitted, Z y/"-"(„c (�j� -cam Debbie Kleckner Recording Secretary • EXHIBIT C ELK RIVER CENTRAL BUSINESS DISTRICT (CBD) , � REVIEW/DEFINE CBD BOUNDARIES Elk River's CBD is perhaps best defined as a core area at, say, Main Street and Jackson Avenue. The core area has multiple extensions from it. These extensions include: • The East Main Street office corridor which connects the CBD with the highway commercial uses at U.S. Highway 169; • The Railroad Drive/3rd Street NW area; and, • The Jackson Avenue corridor - which runs north/south from U.S. Highway 10 to School Street. Each corridor has its own unique characteristics. For example, the East Main corridor is primarily single family residential that is currently undergoing a transformation into office uses. This has required the displacement or demolition of the single family uses prior to the construction of the offices. The city/HRA has played an active role by way or redevelopment grants to ensure that this corridor emerges as planned. The Railroad Drive/3rd Street area is characterized by existing commercial/governmental/medical uses. Redevelopment opportunities exist in this area to connect it with Gates Avenue. The Jackson Avenue corridor perhaps represents an emerging zone which may connect the CBD to the Elk Park Value Center and other Highway 169 users. The east side of Jackson is a mix of commercial and residential uses. The west side has some vacant commercial sites as well as a potential redevelopment site where Morrell Transfer exists. Barriers or constraints to development in the Elk River CBD include: • The Mississippi River; • A river crossing (Otsego bridge); • U.S. Highway 10; and, • The railroad tracks. While these features present challenges to the CBD, Elk River is in an enviable position when compared to other "suburban" communities that are currently exploring initiatives to establish a central focus or an identity. Capitalizing on the CBD's strengths will be a key to • ensure the long-term success of this critical area. II. EXISTING USES IN THE CBD Existing uses were identified at a previous Steering Committee meeting. Please refer to a handout on this topic in the agenda packet. In addition, a color coded map identifying the various uses in the CBD will be available at Thursday's Steering Committee meeting. The Elk River CBD is anchored by financial institutions, drug stores, automotive, professional, hospitality, medical providers, and a wide array of service providers. While the retail base of the community has clearly shifted toward Highway 169, the CBD remains an excellent area for the previously-identified uses. Preserving the CBD's existing base and expanding on it represent both challenges and opportunities in Elk River. III. PRESERVATION OF CBD'S CHARACTER 111 A fundamental role of a city is to preserve its character - be it historical, cultural, recreational, etc. Elk River's CBD stands in contrast with other CBD's relative to its historical perspectives. Given the lack of true historical buildings in the CBD, the city and the respective property owners should not overlook the other characteristics which help create a sense of place in the CBD. These characteristics include signage, lighting, sidewalks, streetscapes, landscaping, etc. IV. PARKING ISSUES Municipal lots are maintained in Jackson Square, the former railroad property running parallel with U.S. Highway 10, the lot behind Kemper Drug and Champion Auto, and the lot along Railroad Drive. Two of these lots were improved in recent years by the HRA. The lot behind Kemper Drug is scheduled for improvements this year. It is likely that the Railroad Drive lot will be improved in 1996. It is not practical to expect existing businesses at the CBD core (Main and Jackson) to provide off-street parking. However, as one moves out from the core, some minimal parking standards should be required for each use. Moving out even further, perhaps commercial users are • required to meet or exceed the city's off-street parking standards. As future opportunities are presented, the city/HRA should consider adding to its inventory of off-street parking lots in the CBD. V. RIVERFRONT INITIATIVES The Mississippi River in Elk River's CBD is an overlooked asset. Work is currently underway to explore and plan for the construction of a pathway along the river in the downtown area. If successful, this pathway may serve many purposes, including: • Adding to the CBD's character; • Reinforcing the community's sense of place; • Creating a place for activity in the CBD; and, • Establishing the basis for a showpiece in the city's multi-use trail system. Issues such as design, cost, phasing, and sources of funding are unresolved with this proposed riverfront trail. However, in order to reinforce the CBD's sense of place for the community and its residents, a high priority should be placed on this project. VI. REDEVELOPMENT OPPORTUNITIES Numerous sites in the CBD and the surrounding area present themselves as redevelopment opportunities. These sites include: • Northwest corner of King and Main; • Southeast corner of Lowell and Main; • Highway 10 corridor from the Main Street/10 intersection to the Proctor Avenue and 10 intersection; • Jackson Avenue - Railroad Drive - 4th Street triangle; • Southwest corner of Jackson Avenue and School Street; • Railroad Drive/3rd Street towards Gates Avenue; and, • East Main Street. • c � Oiry of L' ik Rive' MEMORANDUM TO: STEERING COMMITTEE FROM: STEVEN B. ACH, CITY PLANNER,,e61.— DATE: JULY 14, 1994 This next meeting will focus on commercial development in Elk River. Over the past few years commercial activity has been brisk. With the addition of road improvements to Highway 10 and Highway 101/169, Elk River has become more accessible and attractive to prospective home builders and future residents which in turn fuels the commercial growth. Unlike industrial development, commercial activity follows growing markets that occur along with residential growth. Elk River is in a fortunate position to have the opportunity to take advantage of the strong commercial interest in this area. The challenge will be to manage this activity and maintain a high level of quality, project a positive image of the City, and enhance the City's tax base. The following is a brief description of agenda topics for the scheduled meeting: ITEM 5: RETAIL SALES ACTIVITY Exhibits A through Exhibit G illustrate general information regarding commercial activity. Exhibit A should not be a surprise because of the growth in Sherburne County. Basically, since the median household income has increased over the years, total retail sales and effective buying income has followed a similar curve. Exhibit B provides a breakdown of retailers within Elk River according to their standard industrial classification (S.I.C.) code and associated gross sales for 1992. Food stores ($ 35,890,525) followed by auto dealers/service stations ($ 27,870,304) and general merchandising ($ 12,420,013) lead the list according to gross sales. With the development of Elk Park Center and other proposed general merchandising stores, this category should experience and increase in upcoming years. • Exhibit C gives a comparison of retail sales within Sherburne County as well as Elk River's share of the County activity. The City's percentage of sales P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-742 Agenda Review Memo Page 2 Steering Committee Meeting July 14, 1994 1110: has decreased over the past five (5) years, however, with the development of Elk Park Center, Hillside Crossing Commercial, and possibly the property at Highway 169 and Main Street, Elk River's share is likely to increase in the future years. Exhibit D is a memo from Bill Rubin to the Economic Development Authority explaining in more detail the preceding two exhibits and the overall retail sales activity from 1992. CONSTRUCTION ACTIVITY Exhibit E illustrates commercial/industrial construction valuations since 1988. Last year, 9.5 million dollars worth of commercial/industrial construction occurred in the community. 1994 is expected to be another banner year for commercial construction. Elk Park Center, Hillside Crossings, and surrounding commercial activity should certainly surpass last year's numbers. FISCAL IMPACT • Exhibit F gives a perspective of commercial and industrial contribution to the City's tax capacity. In total, $3.85 million in taxes representing 44.5% of the City's tax capacity is generated by commercial and industrial development. As discussed at the last Steering Committee meeting, both industrial and commercial development provide a majority of taxes and job opportunities for a community. The importance of these two land uses for a community should not be under estimated. The next exhibit was taken from a Growth Management study for the City of Lakeville. The analysis illustrates how industrial and commercial positively benefited a community's tax base. Even though these numbers reflect Lakeville's situation, the net result would be similar in Elk River. Generally speaking, commercial and industrial development are "gainers" for cities and school districts. These two land uses generate a majority of revenue for the cities and school districts. On the other hand, single family development demands a considerable amount of services (expenditures) and contributes less tax revenues. INVENTORY OF COMMERCIAL PROPERTY • Exhibit H gives a breakdown of commercial property within the City. Acreage for each zoning district has been calculated along with a calculation memo.steering Agenda Review Memo Page 3 Steering Committee Meeting July 14, 1994 • of total developed and vacant property. The last chart highlights commercial activity over the past five (5) years whereby an absorption rate can be calculated and projections for future commercial development needs can be made. ITEM 6: OVERVIEW OF COMMERCIAL DISTRICTS The City has four (4) commercial zoning designations in affect. The designations are as follows: A. Central Commercial (C1) B. Office District (C2) C. Highway Commercial (C3) D. Planned Unit Development (PUD) CENTRAL COMMERCIAL DISTRICT The downtown commercial area is a very important and vital part of the community. Because of the issues associated with the downtown, this area •{ will be discussed separately under Agenda Item 7. OFFICE DISTRICT The Office District is basically set up to accommodate governmental, business and professional offices, and other financial related businesses. The two identifiable office corridors extend east and north out of the downtown area. The first is along Main Street between Highway 10 and Highway 169. Recently, development activity has included removing single family homes and constructing new low profile office space along the Main Street corridor. This corridor has a considerable amount of potential to become a high quality corridor, both visually and in terms of its location. East Main Street also provides the link between downtown and the Highway 169 commercial corridor. The second office corridor is along the west side of Jackson extending north from the downtown area. This area has a few office buildings on the south end, however, is primarily undeveloped at this time. Some issues that may be associated with both of these identified office corridors include: • • Development standards memo.steering Agenda Review Memo Page 4 Steering Committee Meeting July 14, 1994 • • The conversion of land use from existing single family residential to commercial uses. • Providing adequate off-street parking to serve the development of office space. • Maintaining the integrity of these office corridors without allowing office uses to escape to the Highway 169 corridor. HIGHWAY COMMERCIAL The Highway Commercial zoning district is the most intensive commercial district. This zoning district is primarily found along the Highway 10 and Highway 169 corridors. The purpose of this zoning district is to provide high impact commercial uses that typically require access onto the highway system and may provide commercial opportunities for a broader area than the City of Elk River. Issues associated with this district include the following: • Development standards. • Avoiding the appearance of strip commercial along the major corridors. • How far north along Highway 169 and east and west along Highway 10 should the Highway Commercial district extend. • Re-evaluating some of the uses that are currently allowed within the C3 district that may be more appropriate in other zoning districts (i.e., light industrial). PLANNED UNIT DEVELOPMENT The Planned Unit Development zoning district should be established at the time a development proposal is made. Because of the permits required, the City has greater control reviewing PUD projects. Elk Park Center is one example of a commercial PUD development. Under the right conditions, a Planned Unit Development can be used to benefit both the developer and the City in achieving a quality project. Issues associated with PUD's: • Use Planned Unit Development where appropriate. • Establish Planned Unit Development's that can be administered effectively. • Planned Unit Development's should provide flexible standards while at • the same time creating a project that has overall qualities greater than a typical development. memo.steering Agenda Review Memo Page 5 Steering Committee Meeting • July 14, 1994 AGENDA ITEM 7 Please refer to Exhibits I-L for additional information. ITEM 8: GOALS & POLICIES FOR COMMERCIAL DEVELOPMENT The current Growth Management Plan lists the following goals and policies: 1. Goal: Encourage the development of a quality community which retains a semi-rural atmosphere while providing necessary commercial development to serve a growing residential population. Policies: • Guide the type and location of development to achieve an IIorderly development pattern consistent with the semi-rural character of the community. • Provide for a Planned Unit Development approach which, through the use of site design standards, allows for a mix of compatible commercial and residential development in appropriate areas. 2. Goal: Maintain and encourage the continuation of a well designed employment and business opportunity in close proximity to the community. Policies: • Direct future commercial development to those sites which support and strengthen the existing downtown area. • Limit development of strip or scattered site commercial and industrial operations along the City's major roadways. • Allow commercial expansion only in close proximity to existing services. • memo.steering Agenda Review Memo Page 6 Steering Committee Meeting July 14, 1994 • To evaluate all proposals for commercial and industrial development to determine impact on municipal and natural systems. 3. Goal: Preserve, maintain and/or strengthen the physical and visual qualities unique to the community. Policies: • Adhere to controls as to the size and placement of signage and landscaping for commercial and industrial applications within the City limits. While evaluating the current goals, the Steering Committee may want to consider some of the following issues: • Consider establishing a neighborhood commercial zoning district which • allows uses that are convenience oriented and compatible with the residential areas. • Consider establishing a commercial zoning district that would fall between the office district and highway commercial zone. This district would allow an intermediate type commercial district in locations where the most intensive highway commercial zones are not appropriate yet provide exceptional retailing opportunities for uses other than office. • Consider what planning or redevelopment efforts could occur to maintain vitality in the downtown area. • memo.steering ITEM NO. 4 • INVENTORY QP.CQMMERCIAL PROPERTY ................................................................................................................................................................................................................................. .................................................................................................................................................................................................................................. 0 C1/ Central Commercial - 55 Acres 0 C2/ Office District - 56 Acres 0 C3/ Highway Commercial - 622 Acres 0 Planned Unit Development (Business Park) - 140 Acres TOTAL ACRES DEVELOPED • 469 ACRES • TOTAL''ACRES VACANT 404 ACRESIiigg 0 Restrictive Areas for Development - 27 Acres • TOTAL 27 ACRES TOTAL NET ACRESAVAILABLEFOR.DEVELOPMENT 377 ACRES ..:HIGH.ABSORPT10iN RATE • 377 ACRES .. 14 AC/YR Years Worth of Commercial Property 26.9 Years 'LOW>ABSORPTION RATE 377 ACRES =- 2 AC/YR Years Worth of Commercial Property 188.5 Years Page 1 of 2 • TOTAL ACRES WITHIN CURRENT URBAN SERVICE AREA 375 ACRES 0 Developed - 227 Acres 0 Vacant - 148 Acres 0 Restricted - 10 Acres 0 NET AVAILABLE ACRES - 138 ACRES TOTAL ACRES OUTSIDE CURRENT URBAN SERVICE AREA 499 ACRES 0 Developed - 242 Acres 0 Vacant - 257 Acres 0 Restricted - 17 Acres i 0 NET AVAILABLE ACRES - 240 ACRES Page 2 of 2 • N. 1/2 S.A . 1/L SEE. 37 T. 33 • ., - AUDITOR'S SU3D!VIciON %/ i_____[ i ; _ ,� 4T.1 STREET N.W. sso q„ ,,,„„.1 Sr hW 1441: 144 VILLAGE a '°Y "IL,67‘ ri; 0 /'14t ( :[ / ii, I ftfteaw i illkilkb a - 1 1 ! -it r R,.../ 1 L Atuv aft TO 1 I lae al J • --- -.11111-5 i7 1 1 ......Srq I (' 13i T . !Ma" g1 7-7-7-1-Th T':1 -\I >> "CORE DOWNTOWN '_[k); £Ci visio V Puck- -'---------LL IJ � �. R E'2viE'lV AVE 2, - • / ADDiTILThi / _ EXHIBITD .' ' .,:'. \ -:--- . NUMBED7 i ' 3 < AUDITUR'S W 0 .1\ , 4TH STREET NW EXTEND COMMON DESIGN ELEMENTS TO CONNECT WITH DOWNTOWN-- , IP ---_,..,, I — --- -- IP r 321 STREET MW. 3F+J— �Tl c_ET `� F�i7LT — = j APO ITrl. L ._ ! SiNsiSof. 4,,,c, lib. VAIN MAN SIPEET ' MAIN lili t. . LI_F.c �, VILLAGE 4.\'' r, NN ' \ __, .` !PiC INc, N. \ ' .. \ •" \\\\,, IJ EXHIBIT E • TENTATIVE SCHEDULE FOR UPCOMING STEERING COMMITTEE MEETINGS March 9 URBAN SERVICE AREA (completed) -East Highway 10 -Service District East -Possible Modification to the North (Conclude Urban Service Area) March 23 TRANSPORTATION & April 6 -North East-West Route (completed) -Hwy. 169 & 10 Corridor -Future Collectors/Arterials April 20, May 4 COMMERCIAL/INDUSTRIAL & May 25 -Location • (Industrial completed) -Redevelopment Opportunities HOUSING -Mix of Housing/ Land Use -Housing Maintenance -10 Acre Minimum Lot Size PARKS & RECREATION LAND USE PLAN/ZONING MAP REVIEW GOALS & POLICIES OF COMP PLAN PLANNING COMMISSION PUBLIC HEARING 411 CITY COUNCIL PUBLIC HEARING s:planning:sc:schedule