4.6. SR 05-07-2018
Request for Action
To Item Number
Mayor and City Council 4.6
Agenda Section Meeting Date Prepared by
Consent May 7, 2018 Justin Femrite P.E., City Engineer
Item Description Reviewed by
Pay Estimates Lori Ziemer, Finance Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Approve, by motion, the pay estimates detailed below.
Background/Discussion
The following pay estimates have been reviewed and found to be accurate and in accordance with the
approved contracts.
Financial Impact
P ROJECT P AY E ST. # C ONTRACTOR A MOUNT
2017 Street Improvements 8 North Valley, Inc. $182,066.33
2017 Trail Improvements Final North Valley, Inc. $17,390.38
Attachments
Pay Estimates
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity
Contractor's Application for Payment No.
8
To City of Elk River
Application 11/2/2017
Application Date: April 11, 2018
(Owner):
Period: 4/11/2018
Project: 2017 Street Improvements
From (Contractor):
Via (Engineer): Hakanson Anderson
North Valley, Inc.
Application For Payment
Change Order Summary
Approved Change Orders
Number
Additions Deductions
1
101,722.24
2
83,206.98
TOTALS
NET CHANGE BY
CHANGE ORDERS
$184,929.22 $0.00
$184,929.22
1. ORIGINAL CONTRACT PRICE ................................. $ $3,777,635.22
2. Net change by Change Orders ....................................... $ $184,929.22
3. Current Contract Price (Line 1 f 2) .............................. $ $3,962,564.44
4. TOTAL COMPLETED AND STORED TO DATE $ $4,350,670.81
5. RETAINAGE:
a. 1% X Work Completed ........................... $ $43,506.71
b. 0% X Stored Material .............................. $ $0.00
c. Total Retainage (Line 5.a + Line 5.b) ................. $ $43,506.71
6. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5.c).. $ $4,307,164.10
7. LESS PREVIOUS PAYMENTS .................................... $ $4,125,097.77
8. AMOUNT DUE THIS APPLICATION ........................ $ $182,066.33
Contractor's Certification
The undersigned Contractor certifies, to the best of its knowledge, the following:
(1) All previous progress payments received from Owner on account of Work done under the
Contract have been applied on account to discharge Contractor's legitimate obligations
incurred in connection with the Work covered by prior Applications for Payment;
(2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed
in or covered by this Application for Payment, will pass to Owner at time of payment free and
clear of all Liens, security interests, and encumbrances (except such as are covered by a bond
acceptable to Owner indemnifying Owner against any such Liens, security interest, or
encumbrances); and
(3) All the Work covered by this Application for Payment is in accordance with the Contract
Documents and is not defective.
Contractor Signature
By: Date:
ENGINEER: HAKANSON ANDERSON
Certification: We recommend payment for work and quantites shown.
(Engineer) (Date)
OWNER: CITY OF ELK RIVER
(Owner) (Date)
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
ain crucni u c ,-A., _ a e a 7nA-4i v-na - nanun aearwev
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.13
LUMP SUM
$80,250.77 S
10432.60
0.13
5
10432.60
2
CLEARING
1
TREE
51564.72 S
1,564.72
3
S
4694.16
3
GRUBBING
1
TREE
$586.78 S
566.78
3
$
1,760.34
4
REMOVE CURB AND GUTTER
4,730
LIN FT
S3.23 $
15,27290
4,816
S
15 562.14
5
REMOVE CONCRETE PAVEMENT
990
SO FT
52.61 S
2.583.90
1,168
5
3048.48
6
REMOVE CONCRETE WALK
750
SO FT
$2.09 5
1,567.50
947
$
1,979.23
7
SAWING CONCRETE PAVEMENT FULL DEPTH
90
LIN FT
53.16 S
284.40
94
S
297.04
8
SAWING BITUMINOUS PAVEMENT FULL DEPTH
103
LIN FT
$1.98 S
203.94
103
S
203.94
9
ISALVAGE CHAIN LINK FENCE
50
LIN FT
S16.05 S
802.50
70
S
1,123.50
10
SALVAGE SIGN SUPPORT
3
EACH
$26.75 S
80.25
2
S
53.50
11
SALVAGE CASTING
13
EACH
5110.48 S
1,436.24
13
S
1,436.24
12
SUBGRADE EXCAVATION EV
160
CU YD
S11.73 S
1,876.60
248
S
2,909.04
13
WATER
100
MGAL
S27.82 S
2,782.00
66
S
1,836.12
14
FULL DEPTH RECLAMATION
17,388
SO YD
$1.35 S
23 473.80
17,368
S
23 473.80
15
HAUL FULL DEPTH RECLAMATION LV
2,801
CU YD
$7.14 S
19,999.14
3.391
$
24 211.74
16
HAUL FULL DEPTH RECLAMATION LV
416
CU YD
57.14 S
2,970.24
344
S
2,456J6
17
MILL BITUMINOUS SURFACE 2"
19
SQ YD
$26.75 $
508.25
19
$
506.25
18
BITUMINOUS MATERIAL FOR TACK COAT
807
GALLON
$2.51 S
2.025.57
700
$
1,757.00
19
TYPE SP 9.5 WEARING COURSE MIXTURE 2.8
513
TON
$50.06 S
25 660.78
468
S
23,428.08
20
TYPE SP 12.5 WEARING COURSE MIXTURE (3,C)
1,756
TON
547.02 S
82,567.12
1,822.62
$
85699.59
21
TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B)
2 194
TON
$41.31 S
90,634.14
2,106.48
S
87,018.69
22
15" RC PIPE SEWER DESIGN 3006 CLASS V
103
LIN FT
$53.03 S
5,46Z09
94
$
4,984.62
23
CONNECT TO EXISTING STORM SEWER
6
EACH
$1,988.64 S
15 909.12
8
S
15 909.12
24
ADJUST VALVE BOX
5
EACH
$303,821 S
1,519.10
6
S
1,622,92
25
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
6
LIN FT
$441.92 $
2651.52
10
$
4419.20
26
CONSTRUCT DRAINAGE STRUCTURE DESIGN 46 - 4020
38
LIN FT
$419.82 S
15,911 . 18
44
S
18 472.08
27
CASTING ASSEMBLY
10
EACH
$524.78 5
5,247.80
13
S
6822.14
28
ADJUST FRAME AND RING CASTING
17
EACH
5740.22 $
12.583.74
23
S
17 025.06
29
SEAL CATCH BASIN
13
EACH
S155.15 S
2016.95
24
S
3,723.60
30
4" CONCRETE WALK
380
SO FT
$6.371 $
2.420.60
515
S
3,280.55
31
6" CONCRETE WALK
705
SQ FT
$7.44 S
5,245.20
536
S
3,987.84
32
CONCRETE CURB AND GUTTER DESIGN 8618
4,730
LIN FT
$12.79 $
60 496.70
4,818
$
61,622.22
33
8" CONCRETE DRIVEWAY PAVEMENT
177
SO YD
$57.78 S
10,227.06
142.5
S
8233.65
34
TRUNCATED DOMES
100
SQ FT
S48.15 S
4,615.00
75
S
3611.25
35
INSTALL SALVAGED FENCE
50
LIN FT
526.75 S
1,33T50
70
S
1,872.50
36
TRAFFIC CONTROL
0.13
LUMP SUM
$79,859.23 S
10 381.70
0.13
$
10 381.70
37
INSTALL SIGN SUPPORT
3
EACH
580.25 S
240.75
2
S
160.50
38
STABILIZED CONSTRUCTION EXIT
0.13
LUMP SUM
S5.200.23 S
676.03
0.13
$
676.03
39
FERTILIZER TYPE 1
228
POUND
$1.02 S
232.56
228
S
232.56
40
COMMON TOPSOIL BORROW LV
270
CU YD
$32.12 5
8,672.40
249
S
7,997.88
41
SEEDING
1.25
ACRE
S374.50 S
468.13
1.25
S
468.13
42
SEED MIXTURE 25-131
126
POUND
S3.20 S
403.20
126
$
403.20
43
HYDRAULIC NATURAL TACKIFIER
2,760
SQ YD
$0.75 S
2.070.00
2,760
S
2,070.00
44
EROSION CONTROL
0.13
LUMP SUM
S3,210.00 S
417.30
0.13
S
417.30
45
PAVEMENT MESSAGE EPDXY
30
SQ FT
S5.73 $
171.90
30
1 5
171.90
46
4" SOLID LINE EPDXY
5,535
LIN FT
$0.31 S
1,715.65
5,550
$
7 720.50
47
24" SOLID LINE EPDXY
42
LIN FT
$6.88 S
288.96
40
S
275.20
48
4" DOUBLE SOLID LINE EPDXY
345
LIN FT
$0.62 S
213.90
345
S
213.90
49
CROSSWALK EPDXY
432
SQ FT
$3.67 $
1,565.44
432
S
1,585.44
Total Bid Schedule "A" S 460,720.25 $ 476,450.83
SAMunicip0AelkrveAER303\PAY ESTIMATES\ER303 PE.xisx PE - 1
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "B" - S.A.P. 204-129-001 - JOPLIN STREET
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.17
LUMP SUM
S80,250.80 S
12.037.62
0.17
S
13 642.64
2
REMOVE CURB AND GUTTER
5215
LIN FT
$3.23 S
16.844.45
5,202
S
16 802.46
3
REMOVE CONCRETE PAVEMENT
505
SQ FT
52.61 S
1,318.05
793
5
2,069.73
4
REMOVE CONCRETE WALK
2,927
SQ FT
$2.09 $
6,117.43
4,595
1 S
9,603.55
5
REMOVE BITUMINOUS PAVEMENT
36
SO YD
$26.75 S
963.00
187
$
5,002.25
6
SAWING CONCRETE PAVEMENT FULL DEPTH
58
LIN FT
$3.16 S
183.28
130
S
410.80
7
SAWING BITUMINOUS PAVEMENT FULL DEPTH
311
LIN FT
$1.98 S
615.78
311
S
615.76
B
SALVAGE SIGN SUPPORT
12
EACH
$26.75 $
321.00
18
$
481.50
9
SALVAGE CASTING
9
EACH
$110.481 $
994.32
12
S
1.325.76
10
SUBGRADE EXCAVATION EV
870
CUYD
519.56 S
17017.20
1,105
S
21.613.80
11
WATER
150
MGAL
$27.82 S
4173.00
36
5
1001.52
12
FULL DEPTH RECLAMATION
18,008
SQ YD
$1.39 S
25 031.12
18,008
S
25,031.12
13
HAUL FULL DEPTH RECLAMATION LV
4121
CU YD
56.49 S
26 745.29
5,302
$
34,409.98
14
HAUL FULL DEPTH RECLAMATION LV
2608
CU YD
$6.49 S
16 925.92
2,328
$
15,108.72
15
MILL BITUMINOUS SURFACE 2"
64
SQ YD
$9.63 $
616.32
64
S
616.32
16
MILL BITUMINOUS SURFACE 2.5"
45
SQ YD
$9.63 $
433.35
45
5
433.35
17
BITUMINOUS MATERIAL FOR TACK COAT
829
GALLON
$2.51 S
2,080.79
610
S
1,531.10
10
TYPE SP 9.5 WEARING COURSE MIXTURE 2,6
465
TON
$49.85 S
23180.25
436.86
S
21 778.47
19
TYPE SP 12.5 WEARING COURSE MIXTURE 3,C
2051
TON
$46.04 $
94 428.04
2.161.55
S
99,517.76
20
TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B)
2,250
TON
$40.72 S
91 620.00
2,320.24
S
94 480.17
21
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
10
TON
$197.95 S
1,979.50
103.13
$
20,414.58
22
ADJUST VALVE BOX
6
EACH
$513.54 S
3,081.24
6
S
3,081.24
23
INSTALL CASTING
12
EACH
$110.48 $
1.325.76
12
S
1,325.76
24
ADJUST FRAME AND RING CASTING
5
EACH
$740.22 S
3,701.10
8
$
5,921.76
25
SEAL CATCH BASIN
12
EACH
$155.15 S
1,861.80
12
S
1,861.80
26
4" CONCRETE WALK
1,752
SQ FT
$6.37 $
11 160.24
2.201
S
14 020.37
27
6" CONCRETE WALK
1,175
SQ FT
S7.44 S
8,742.00
2,379
S
17699.76
26
CONCRETE CURB AND GUTTER DESIGN 8618
5,215
LIN FT
S12.79 S
66 699.65
5,177
S
66 213.83
29
7" CONCRETE DRIVEWAY PAVEMENT
58
SQ YD
S77.04 S
4,468.32
103.7
$
7,989.05
30
TRUNCATED DOMES
220.0
SQ FT
S48A5 S
10,593.00
292
S
14,059.80
31
TRAFFIC CONTROL
0.15
LUMP SUM
$79,859.20 S
11,978.8B
0.15
S
11,978.88
32
INSTALL SIGN SUPPORT
9
EACH
580.25 S
722.25
18
S
1,444.50
33
ADJUST HANDHOLE
2
EACH
5428.00 $
856.00
1
S
428.00
34
RIGID PVC LOOP DETECTOR 6'x6'
4
EACH
$909.51 $
3,638.04
1
S
909.51
35
STORM DRAIN INLET PROTECTION
13
EACH
$90.95 S
1,182.35
14
S
1,273.30
36
STABILIZED CONSTRUCTION EXIT
0.15
LUMP SUM
$5,200.27 $
780.04
0.15
$
780.04
37
FERTILIZER TYPE 1
300
POUND
$1.02 S
306.00
300
$
306.00
38
COMMON TOPSOIL BORROW LV
330
CU YD
$34.25 S
11,302.50
354
S
12124.50
39
SEEDING
1
ACRE
$374.51 S
374.51
1
S
374.51
40
SEED MIXTURE 25-131
165
POUND
$3.20 S
528.00
165
5
528.00
41
HYDRAULIC NATURAL TACKIFIER
3,630
SQ YD
$0.75 S
2,722.50
3,630
$
2,722.50
42
EROSION CONTROL
0.15
LUMP SUM
$3,210.07 S
481.51
0.15
$
481.51
43
PAVEMENT MESSAGE EPDXY
99
SQ FT
$5.73 $
567.27
99
$
567.27
44
4" SOLID LINE EPDXY
770
LIN FT
$0.31 $
238.70
770
$
238.70
45
24" SOLID LINE EPDXY
118
LIN FT
S6.88 $
811.84
156
$
1,073.28
46
4" BROKEN LINE EPDXY
960
LIN FT
$0.31 S
297.60
880
S
272.80
47
4" DOUBLE SOLID LINE EPDXY
2210
LIN FT
$0.62 S
1,370.20
2,183
$
1,353.46
48
CROSSWALK EPDXY
1872
SQ FT
$3.67 S
6,870.24
1.602
S
5,879.34
Total Bid Schedule "B" $ 500,287.45 I S 560,800.83
S:\Municipal\Aelknver1ER303\PAY ESTIMATES\ER303 PE.xlsx PE - 2
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
R1n Cr:HFnlll F ^r"' _CAP InA_111-nni _ RI ICINFCC r:FNTFR nRNF
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.17
LUMP SUM
$80,250.82 S
13,642.64
0.17
$
13,642.64
2
REMOVE CURB AND GUTTER
3490
LIN FT
$323 S
11 272.70
3,579
$
11,560.17
3
REMOVE CONCRETE PAVEMENT
1,016
SQ FT
S2.61 S
2,651.76
1,318
S
3,439.98
4
IREMOVE CONCRETE WALK
2,468
SO FT
$2.09 $
5.158.12
3,951
1 S
8257.59
5
SAWING CONCRETE PAVEMENT FULL DEPTH
84
LIN FT
$3.16 $
265.44
170
S
537.20
6
SAWING BITUMINOUS PAVEMENT FULL DEPTH
125
LIN FT
$1.96 S
247.50
125
$
247.50
7
SALVAGE SIGN SUPPORT
5
EACH
537.45 S
187.25
14
$
524.30
8
SALVAGE CASTING
15
EACH
$107.00 $
1,605.00
16
$
1,712.00
9
SUBGRADE EXCAVATION EV
2,167
CU YD
518.54 S
40.176.18
3,673
S
68,097.42
10
WATER
150
MGAL
S27.82 S
4,173.00
92
$
2,559.44
11
FULL DEPTH RECLAMATION
21,725
SQ YD
51.21 $
26 287.25
22,095
S
26 734.95
12
HAUL FULL DEPTH RECLAMATION LV
7,409
CU YD
$6.26 S
46,380.34
7,846
$
49 115.96
13
HAUL FULL DEPTH RECLAMATION LV
7024
CU YD
S6.25 S
43 900.00
7,894
5
49 337.50
14
MILL BITUMINOUS SURFACE 2"
44
SO YD
$9.63 S
423.72
44
S
423.72
15
BITUMINOUS MATERIAL FOR TACK COAT
1,200
GALLON
$2.51 $
3,012.00
1,025
5
2,572.75
16
TYPE SP 12.5 WEARING COURSE MIXTURE 3,C
2,613
TON
$45.99 $
120,171.87
2,651.43
S
121,939.27
17
TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B)
3,264
TON
541.24 5
134 607.36
3,085.55
S
127,248.08
18
ADJUST VALVE BOX
15
EACH
$513.54 S
7,703.10
16
S
8.216.64
19
INSTALL CASTING
15
EACH
$324.48 S
4,867.20
28
S
9.085.44
20
ADJUST FRAME AND RING CASTING
11
EACH
$740.22 S
8,142.42
14
S
10,363.08
21
SEAL CATCH BASIN
15
EACH
S155.15 $
2,327.25
16
1 S
2,482.40
22
4" CONCRETE WALK
2,238
SQ FT
$6.37 $
14,256.06
3,195
$
20 352.15
23
6" CONCRETE WALK
230
SQ FT
$7.44 S
1,711.20
756
S
5,624.64
24
CONCRETE CURB AND GUTTER DESIGN 8618
3490
LIN FT
$12.79 $
44 637.10
3,609
$
46,159.11
25
7" CONCRETE DRIVEWAY PAVEMENT
114
SO YD
S77.04 S
8,782.56
150
S
11,556.00
26
8" CONCRETE DRIVEWAY PAVEMENT
40
SO YD
557.78 S
2,311.20
50.4
S
2,912.11
27
TRUNCATED DOMES
56
SO FT
$48.15 S
2,696.40
34
$
1,637.10
28
TRAFFIC CONTROL
0.17
LUMP SUM
579 859.18 S
13 576.06
0.17
5
13,576.06
29
INSTALL SIGN SUPPORT
5
EACH
580.25 S
401.25
14
S
1,123.50
30
STORM DRAIN INLET PROTECTION
17
EACH
$90.95 S
1,546.15
46
S
4,365.60
31
STABILIZED CONSTRUCTION ENTRANCE
0.17
LUMP SUM
$5 .200.29 S
884.05
0.17
S
864.05
32
FERTILIZER TYPE 1
72
POUND
$1.02 S
73.44
72
S
73.44
33
COMMON TOPSOIL BORROW LV
130
CU YD
$34.25 $
4,452.50
163
S
5,582.75
34
SEEDING
0.25
ACRE
$374.46 S
93.62
0.25
$
93.62
35
SEED MIXTURE 25-131
40
POUND
$3.20 $
128.00
40
$
128.00
36
HYDRAULIC NATURAL TACKIFIER
871
SO YD
50.75 S
653.25
871
S
653.25
37
EROSION CONTROL
0.17
LUMP SUM
$3,210.00 $
545.70
0.17
$
545.70
38
PAVEMENT MESSAGE EPDXY
192
SO FT
S5.73 S
1.100.16
192
$
1,100.16
39
4" SOLID LINE EPDXY
5.912
LIN FT
S0.31 S
1,832.72
6,150
S
1,906.50
40
24" SOLID LINE EPDXY
82
LIN FT
$6.88 $
564.16
76
S
522.68
41
4" BROKEN LINE EPDXY
649
LIN FT
$0.31 $
201.19
560
S
173.60
42
4" DOUBLE SOLID LINE EPDXY
3,170
LIN FT
$0.62 $
1,965.40
4,203
$
2,605.86
43
CROSSWALK EPDXY
537
SO FT
I 53.67 S
1,970.791
612
S
2,246.04
Total Bid Schedule "C" $ 581,585.06 $ 641,920.15
S:\MunicipaMelkriver\ER303\PAY ESTIMATES\ER303 PE.xlsx PE - 3
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
Rin SCNFnIII F •'n" - S A P. ?nd.4d9-nn1 . 193Rn AVFNIIF
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.05
LUMP SUM
$80,250.80 S
4,012.54
0.05
$
4,012.54
2
REMOVE CURB AND GUTTER
16
LIN FT
$21.40 S
342.40
16
S
342.40
3
REMOVE SEWER PIPE STORM
133
LIN FT
$11.05 S
1,469.65
133
S
1,469.65
4
1 REMOVE CONCRETE PAVEMENT
102
SQ FT
$2.61 S
266.22
102
S
266.22
5
REMOVE BITUMINOUS PAVEMENT
450
SQ YD
$3.69 $
1,660.50
467
$
1,723.23
6
REMOVE MANHOLES OR CATCH BASINS
3
EACH
$441.92 S
1,325.76
3
$
1,325.76
7
SAWING CONCRETE PAVEMENT FULL DEPTH
17
LIN FT
$3.16 S
53.72
17
$
53.72
8
SAWING BITUMINOUS PAVEMENT FULL DEPTH
298
LIN FT
$1.98 $
590.04
424
$
839.52
9
SALVAGE MAILBOX SUPPORT
14
EACH
S37.451 S
524.30
14
S
524.30
10
ISUBGRADE EXCAVATION EV
676
CUYD
512.53 S
8470.28
922
S
11552.66
11
WATER
70
MGAL
527.82 S
1,947.40
0
5
12
FULL DEPTH RECLAMATION
6,007
SQ YD
51.33 $
7,989.31
6,007
$
7,989.31
13
HAUL FULL DEPTH RECLAMATION LV
1736
CU YD
56.18 S
10 728.48
2,114
S
13 064.52
14
HAUL FULL DEPTH RECLAMATION LV
1.736
CU YD
$6.16 S
10 728.48
2,012
$
12 434.16
15
MILL BITUMINOUS SURFACE 1.5"
24
SO YD
$26.75 $
642.00
24
S
642.00
16
BITUMINOUS MATERIAL FOR TACK COAT
350
GALLON
$2.51 S
878.50
320
S
803.20
17
TYPE SP 9.5 WEARING COURSE MIXTURE (2,C)
529
TON
547.87 S
25,323.23
502.5
$
24,054.68
18
TYPE SP 12.5 NON WEARING COURSE MIXTURE 2,B
882
TON
S40.23 S
35 482.66
908.2
$
36 536.89
19
TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 2.5" THICK
323
SQ YD
$11.74 $
3,792.02
340.7
S
3,999.82
20
15" RC PIPE APRON
1
EACH
$828.60 S
828.60
1
S
628.60
21
12" RC PIPE SEWER DESIGN 3006 CLASS V
6
LIN FT
552.48 S
314.88
6
S
314.88
22
15" RC PIPE SEWER DESIGN 3006 CLASS V
91
LIN FT
$53.03 S
4.825.73
91
S
4,825.73
23
ADJUST VALVE BOX
2
EACH
$303.82 S
607.64
$
24
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
3
LIN FT
$441.92 S
1,325.76
3
$
1,325.76
25
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020
15
LIN FT
$524.78 S
7,661.79
14.6
S
7.661.79
26
CASTING ASSEMBLY
4
EACH
S524.78 S
2,099.12
4
$
2,099.12
27
1ADJUST FRAME AND RING CASTING
2
EACH
S110.48 S
220.96
2
S
220.96
28
SEAL CATCH BASIN
4
EACH
$155.15 S
620.60
4
S
620.60
29
CONCRETE CURB AND GUTTER DESIGN 6412
3,511
LIN FT
$11.72 S
41 148.92
3.520
$
41,254.40
30
6" CONCRETE DRIVEWAY PAVEMENT
144
SQ YD
S52.971 S
7627.68
147.5
S
7,813.08
31
INSTALL MAILBOX SUPPORT
14
EACH
$42.80 S
599.20
14
S
599.20
32
TRAFFIC CONTROL
0.05
LUMP SUM
S79,859.20 S
3,992.96
0.05
S
3,992.96
33
STORM DRAIN INLET PROTECTION
6
EACH
$90.95 S
545.70
6
S
545.70
34
SEDIMENT CONTROL LOG TYPE COMPOST
320
LIN FT
51.87 S
598.40
0.0
$
35
STABILIZED CONSTRUCTION EXIT
0.05
LUMP SUM
$5,200.20 $
260.01
0.05
S
260.01
36
CULVERT END CONTROLS
1
EACH
$240.75 S
240.75
1
$
240.75
37
FERTILIZER TYPE 1
261
POUND
51.02 S
266.22
261
S
266.22
38
COMMON TOPSOIL BORROW LV
150
CY
$34.25 $
5,137.50
150
5
5,137.50
39
SEEDING
1
ACRE
S374.51 S
370.76
1
$
374.51
40
SEED MIXTURE 25-131
191
POUND
$3.20 $
611.20
191
S
611.20
41
HYDRAULIC NATURAL TACKIFIER
4,206
SQ YD
50.75 $
3,154.50
4,206
$
3,154.50
42
EROSION CONTROL
0.05
1 LUMP SUM
$3,210.00 $
160.50
0.05
$
160.50
Total Bid Schedule "D" $ 199,447.07 $ 203,942.55
S:\MunicipalVAelkriver\ER303\PAY ESTIMATES\ER303 PE.xlsx PE -4
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
Rin SCHFnIII F"r" _ C A P. 9nd.154.nn1 . FVANS CTRFFT
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.06
LUMP SUM
580,250.83 S
4,815.05
0.06
$ 4,815.05
2
REMOVE CURB AND GUTTER
2160
LIN FT
S5.20 $
11,232.00
1.859
$ 9666.80
3
REMOVE CONCRETE PAVEMENT
1,412
SO FT
$1.46 S
2.061.52
2,778.2
S 4,056.17
4
1 REMOVE CONCRETE WALK
2,230
SO FT
$1,091 $
2,430.70
4,612
S 5.027.08
5
REMOVE BITUMINOUS PAVEMENT
774
SQ YD
$4.84 S
3,746.16
1,619
S 7,835.96
6
SAWING CONCRETE PAVEMENT FULL DEPTH
230
LIN FT
S3.16 S
726.80
282
S 691.12
7
SAWING BITUMINOUS PAVEMENT FULL DEPTH
360
LIN FT
S2.09 S
752.40
2,550
S 5,329.50
8
SALVAGE SIGN SUPPORT
6
EACH
$37.45 $
224.70
3
$ 112.35
9
SALVAGE CASTING
11
EACH
5107.00 S
1,177.00
13
S 1.391.00
10
MILL BITUMINOUS SURFACE 1.5"
1,544
SO YD
S1.95 $
3,010.80
1,949
S 3,800.55
11
MILL BITUMINOUS SURFACE
8,330
SO YD
SO.59 S
4.914.70
8,063
$ 4,75T 17
12
BITUMINOUS MATERIAL FOR TACK COAT
883
GALLON
$2.51 S
2,216.33
870
$ 2,183.70
13
TYPE SP 9.5 WEARING COURSE MIXTURE (3,C)
1530
TON
$47.87 S
73,241 A0
1,540.76
S 73,756.18
14
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
185
TON
$59.82 S
11 066.70
264.54
$ 15,824.78
15
IADJUST VALVE BOX
5
EACH
$441.92 S
2,209.60
6
S 2.651.52
16
INSTALL CASTING
11
EACH
$110.48 $
1,215.28
13
S 1,436.24
17
ADJUST FRAME AND RING CASTING
2
EACH
5994.32 5
1,988.64
1
S 994.32
18
SEAL CATCH BASIN
11
EACH
$155.15 S
1706.65
13
$ 2016.95
19
4" CONCRETE WALK
1.400
SQ FT
56.37 S
8,918.00
991
S 6.312.67
20
6" CONCRETE WALK
870
SQ FT
$7.44 S
6,472.80
3621.38
S 26,943.07
21
CONCRETE CURB AND GUTTER DESIGN 8618
2,160
LIN FT
$12.79 $
27 626.40
1,966
S 25 145.14
22
7" CONCRETE DRIVEWAY PAVEMENT
157
SQ YD
577.04 S
12 095.28
309.8
S 23 866.99
23
TRUNCATED DOMES
294
SQ FT
$48.15 $
14156.10
100
$ 4,815.00
24
TRAFFIC CONTROL
0.06
LUMP SUM
$79,859.171 S
4,791.55
0.06
$ 4,791.55
25
INSTALL SIGN SUPPORT
6
EACH
$80.25 $
481.50
3
S 240.75
26
STORM DRAIN INLET PROTECTION
11
EACH
590.95 S
1,000.45
12
S 1,091.40
27
STABILIZED CONSTRUCTION EXIT
0.06
LUMP SUM
S5,200.33 S
312.02
0.06
1 S 312.02
28
COMMON TOPSOIL BORROW LV
30
CU YD
$47.06 S
1,411.80
60
$ 2,823.60
29
SEEDING
OAS
ACRE
5374.47 $
56.17
0.15
S 56.17
30
SEED MIXTURE 25-131
25
POUND
$3.20 $
60.00
25
$ 80.00
31
IHYDRAULIC NATURAL TACKIFIER
533
SO YD
$0.75 S
399.75
533
S 399.75
32
EROSION CONTROL
0.06
LUMP SUM
S3,210.00 S
192.60
0.06
$ 192.60
33
PAVEMENT MESSAGE EPDXY
71
SQ FT
$5.73 S
406.83
71
S 406.83
34
4" SOLID LINE EPDXY
240
LIN FT
$0.31 S
74.40
280
$ 86.80
35
24" SOLID LINE EPDXY
70
LIN FT
$6.88 S
481.60
29
$ 199.52
4" BROKEN LINE EPDXY
1,150
LIN FT
$0.31 S
356.50
1,100
$ 341.00
ft3736
4" DOUBLE SOLID LINE EPDXY
2,250
LIN FT
$0.62 S
1,395.00
1 2044
S 1 267.28
38
CROSSWALK EPDXY
324
SQ FT
$3.67 $
11189.08
324
S 1 789.08
Total Bid Schedule "E" $ 210,633.96 S 247,107.66
S:\Municipal\Aelkdver\ER303\PAY ESTIMATES\ER303 PE.xlsx PE - 5
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
BID SCHEDULE "F" - LOCAL FUNDING
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
0.44
LUMP SUM
$80,250.00 S
35310.00
0.44
S
35,310.00
2
CLEARING
0.1
ACRE
$21,698.20 S
2169.82
0.1
$
2169.82
3
CLEARING
2
TREE
$183.37 $
366.74
5
$
916.65
4
GRUBBING
0.1
ACRE
$14,363.70 S
1,436.37
0.1
1 S
1,436.37
5
GRUBBING
3
TREE
$103.911 S
311.73
5
$
519.55
6
REMOVE CURB AND GUTTER
2,629
LIN FT
S3.23 S
8,491.67
2,527
S
8,162.21
7
REMOVE SEWER PIPE STORM
166
LIN FT
$11.05 $
1 834.30
166
$
1,834.30
8
REMOVE CONCRETE PAVEMENT
6,942
SO FT
$2.61 S
18 118.62
6,834
$
17 836.74
9
REMOVE CONCRETE WALK
990
SO FT
$2.09 S
2,069.10
757
S
1,582.13
10
REMOVE BITUMINOUS PAVEMENT
5,348
SO YD
54.43 S
23691.64
6,207.5
S
27,499.23
11
REMOVE RIPRAP
27
CU YD
$38.67 $
1.044.09
27
S
1.044.09
12
SAWING CONCRETE PAVEMENT FULL DEPTH
726
LIN FT
$3.16 5
2,300.48
795
$
2 512.20
13
SAWING BITUMINOUS PAVEMENT FULL DEPTH
4767
LIN FT
51.98 S
9.438.66
8,257
$
16,348.86
14
SALVAGE SIGN SUPPORT
17
EACH
537.45 S
636.65
12
S
449.40
15
SALVAGE CASTING
22
EACH
$110.48 S
2,430.56
16
$
11767.68
16
SALVAGE MAILBOX SUPPORT
104
EACH
537.45 S
3,894.80
114
S
4269.30
17
LANDSCAPE ALLOWANCE
1
ALLOWANCE
$20000.00 S
20000.00
0.38
S
7600.00
18
REMOVE MISCELLANEOUS STRUCTURES
1
LUMP SUM
S1.070.011 S
1,070.01
1
S
1,070.01
19
SALVAGE MISCELLANEOUS STRUCTURES
1
LUMP SUM
$1,070.01 $
1,070.01
1
$
1,070.01
20
COMMON EXCAVATION EV
3,707
CU YD
515.07 S
55 864.49
3,161
5
47,636.27
21
SUBGRADE EXCAVATION EV
6,113
CU YD
$16.60 S
101,475.80
9.636
$
159 957.60
22
WATER
250
MGAL
S2T82 S
6.955.00
97
$
2,698.54
23
AGGREGATE BASE CLASS 5
33
TON
$26.75 S
682.75
10
S
267.50
24
FULL DEPTH RECLAMATION
44993
SO YD
S1.50 S
67,489.50
45,449
$
68 173.50
25
HAUL FULL DEPTH RECLAMATION LV
10,492
CU YD
$9,00 5
94,428.00
11,698
$
105,282.00
26
HAUL FULL DEPTH RECLAMATION LV
10,492
CU YD
$9.00 S
94 426.00
14,358
S
129 222.00
27
SHOULDER BASE AGGREGATE CLASS 2
50
TON
$44.94 S
2,247.00
74.36
$
3,341.74
28
MILL BITUMINOUS SURFACE 1.5"
2.818
SO YD
51.84 S
5,185.12
3,490
$
6,421.60
29
MILL BITUMINOUS SURFACE
5.964
51,03 S
6142.92
5,774
S
5947.22
30
BITUMINOUS MATERIAL FOR TACK COAT
3,988
GALLON
$2.51 S
10 009.88
4,045
S
10 152.95
31
TYPE SP 9.5 WEARING COURSE MIXTURE 2,C
5,114
TON
$48.75 $
249 307.50
5,074.5
S
247,381.88
32
TYPE SP 9.5 WEARING COURSE MIXTURE (3,C)
1,117
TON
$50.35 S
56 240.95
1,100.82
S
55 426.29
33
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B)
6,618
TON
540.56 $
268 558.44
6,713.71
S
272 442.35
34
TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 2.5" THICK
1,241
SO YD
$13.14 S
16 306.74
1,295.1
$
17,017.61
35
TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING
695
TON
567.92 $
47,204.40
966.93
S
67032.29
36
15" CS PIPE CULVERT
64
LIN FT
550.82 S
3,252.46
70
S
3,557.40
37
12" GS PIPE APRON
1
EACH
$248.58 S
248.58
1
S
248.58
38
15" GS PIPE APRON
6
EACH
$276.20 $
1,657.20
6
S
1,657.20
39
15" RC PIPE APRON
3
EACH
$828.60 $
2,485.80
3
S
2,485.80
40
18" RC PIPE APRON
i
EACH
$883.84 S
883.84
3
S
2T651.52
41
24" RC PIPE APRON
2
EACH
$1,436.25 $
2,872.50
0
$
42
15" RC PIPE CULVERT DESIGN 3006 CLASS V
32
LIN FT
$66.29 $
2,12t28
32
$
2,121.28
43
12" RC PIPE SEWER DESIGN 3006 CLASS V
12
LIN FT
$52.48 S
629.76
12
S
629.76
44
15" RC PIPE SEWER DESIGN 3006 CLASS V
73
LIN FT
S53.03 S
3,871 . 19
88
S
4666.64
45
16" RC PIPE SEWER DESIGN 3006 CLASS 111
158
LIN FT
556.34 S
8,901.72
240
S
13,521.60
46
24" RC PIPE SEWER DESIGN 3006 CLASS 111
74
LIN FT
$62.97 S
4,659.78
$
47
12" HDPE PIPE SEWER - DIRECTIONAL DRILLED
137
LIN FT
$154.67 S
21 189.79
137
$
21 189.79
48
ADJUST VALVE BOX
7
EACH
$303.82 $
2,126.74
9
$
2,734.38
49
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
9
LIN FT
$441.92 $
4,012.63
9.08
S
4,012.63
50
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020
30
LIN FT
$386.68 $
11 739.60
30.36
S
11,739.60
51
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020
4
LIN FT
5718.12 S
3,095.10
4.31
$
3,095.10
52
CASTING ASSEMBLY
9
EACH
$524,78 S
4,723.02
10
$
5247.8
53
INSTALL CASTING
22
EACH
$110.48 $
2430.56
14
S
1,546.72
54
ADJUST FRAME AND RING CASTING
7
EACH
$740.22 S
5,181.54
5
S
3,701.10
55
SEAL CATCH BASIN
31
EACH
$155.15 $
4,809.65
26
$
4,033.90
56
RANDOM RIPRAP CLASS III
25
CU YD
$121.53 $
2,989.64
42.7
$
5,189.331
57
GE TEXTILE FILTER TYPE IV
86
SO YD
$5.52 S
474.72
108
$
596.16
58
4" CONCRETE WALK
25
SO FT
$6.37 $
159.25
88
5
560.56
59
6" CONCRETE WALK
990
SO FT
57.44 S
7,365.60
583
5
4 337.52
60
CONCRETE CURB AND GUTTER DESIGN 8412
18,806
1 LIN FT
1 $11.72 $
220,40&32
1 18,897
5
221 472.84
SAMunicipalWelkriver\ER303\PAY ESTIMATES\ER303 PE.xlsx PE - 6
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
RID SCHFIV II F "F" . I OCAI FI INDING - CDNTINI IFD
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
61
CONCRETE CURB AND GUTTER DESIGN 8618
2559
LIN FT
$12.79 S
32,729,61
2.401
S 30,708.79
62
6" CONCRETE DRIVEWAY PAVEMENT
1 397
SO YD
S52.97 S
73,999.09
1,802.6
S 95,483.72
63
7" CONCRETE DRIVEWAY PAVEMENT
106
SO YD
$77.04 S
8,166.24
94
$ 7,241.76
64
8" CONCRETE DRIVEWAY PAVEMENT
73
SQ YD
$57.78 S
4,217.94
0
$
65
CONCRETE DRAINAGE FLUME
61
SO YD
$115.56 S
7,049.16
50
$ 5778.00
66
TRUNCATED DOMES
170
SO FT
$48.15 S
8,185.50
88
S 4,237.20
67
BITUMINOUS CURB
1,710
LIN FT
S2.14 S
3,659.40
2,461
$ 5,266.54
66
MAILBOX SUPPORT
15
EACH
$101.65 S
1,524.75
10
S 1,016.50
69
INSTALL MAILBOX SUPPORT
104
EACH
S42.80 S
4,451.20
114
$ 4,879.20
70
TRAFFIC CONTROL
0.44
LUMP SUM
$79,859A8 S
35,138.04
0.44
S 35,138.04
71
INSTALL SIGN SUPPORT
17
EACH
$80.25 S
1,364.25
12
$ 963.00
72
ADJUST HANDHOLE
2
EACH
$428.00 $
856.00
0
$
73
RIGID PVC LOOP DETECTOR 6'x6'
4
EACH
$909.51 S
3,638.04
0
$
74
SILT FENCE, TYPE MS
2,260
LIN FT
S1.87 S
4,263.60
477
S 891.99
75
STORM DRAIN INLET PROTECTION
44
EACH
$90.95 $
4,001.80
51
$ 4,638.45
76
SEDIMENT CONTROL LOG TYPE COMPOST
3450
LIN FT
S1.07 S
6,451.50
2,606
$ 4,873.22
77
STABILIZED CONSTRUCTION EXIT
0.44
LUMP SUM
S5,200,25 S
2,288.11
0.44
S 2,288.11
78
CULVERT END CONTROLS
2
EACH
$240.76 $
481.52
2
S 481.52
79
IFERTILIZER TYPE 1
2,173
POUND
51.02 S
2216.46
1,436
$ 1,464.72
80
COMMON TOPSOIL BORROW LV
1,092
CU YD
$35.85 S
39 148.20
1,807
$ 64 700.95
81
SEEDING
7
ACRE
5374.50 $
2.640.23
7.05
S 2,640.23
82
SEED MIXTURE 25-131
1,549
POUND
$3.20 S
4,956.80
1 549
$ 4,956.80
83
EROSION CONTROL BLANKETS CATEGORY 3
3,125
SO YD
S1.55 S
4,843.75
604
S 936.20
84
HYDRAULIC NATURAL TACKIFIER
30,922
SO YD
$0.75 S
23,191.50
30,922
$ 23,191.50
85
EROSION CONTROL
0.44
LUMP SUM
$3,210.02 S
1,412.41
0.44
$ 1,412.41
86
PAVEMENT MESSAGE EPDXY
45
SO FT
S5.73 S
257.85
45
$ 257.85
87
4" SOLID LINE EPDXY
2959
LIN FT
50.31 $
917.29
5,018
$ 1,555.58
80
24" SOLID LINE EPDXY
43
LIN FT
$6.88 $
295.84
44
$ 302.72
89
4" BROKEN LINE EPDXY
622
LIN FT
50.31 S
192.82
600
$ 186.00
90
4" DOUBLE SOLID LINE EPDXY
1,180
LIN FT
$0,62 S
731.60
0
$
91
CROSSWALK EPDXY
270
SO FT
$3.67 S
990,90
0
S
Total Bid Schedule "F" $ 1,824,961.43 $ 1,958,368.30
SCHEDULE G - LOCAL FUNDING FIELD CHANGE DIRECTIVE
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
COMMON EXCAVATION
CU YD
527.35
623
S 17,039.05
2
STABILIZING AGGREGATE 1.5" CLEAR ROCK
TON
$36.52
327.78
S 11 970.53
3
4" DRAIN TILE
LIN FT
513.13
513
$ 6,735.69
4
GEOTEXTILE FABRIC
SO YD
$2.74
5,244
$ 14,366.56
5
GRANULAR BORROW
CU YD
$17.70
994
5
RECYCLE CLASS 5
TON
$18.31
202.22
�1736
5
7
ADDITIONAL TREE CLEARING NORFOLK STREET
LS
S3080.00
1.00
$
$ 74,490.28
SAMunicipaN+elknver\ER303\PAY ESTIMATES\ER303 PE.xlsx PE - 7
PAY ESTIMATE #8
CITY OF ELK RIVER
2017 Street Improvements
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
MOBILIZATION
1
LUMP SUM
S2,396.86
S 2,396.86
1
$ 2.396.86
2
REMOVE CONCRETE CURB AND GUTTER
70
LIN FT
$17.83
S 1,248.10
173
S 3,084.59
3
MILL BITUMINOUS SURFACE
7800
SQ YD
$1.98
$ 15,444.00
7,803
S 15449.94
4
TYPE SP 9.5 WEARING COURSE MIXTURE (2,C)
1320
TON
$52.38
S 69 141.60
1,227.22
S 64 261.78
5
BITUMINOUS MATERIAL FOR TACK COAT
750
GAL
$3.07
$ 2,302.50
630
S 1 934.10
6
ADJUST VALVE BOX
12
EACH
576.46
S 917.52
8
$ 611.66
7
ADJUST MANHOLE
6
EACH
5195.49
$ 1,172.94
14
$ 2.736.86
8
CONCRETE CURB AND GUTTER
70
LIN FT
$31.28
S 2,189.60
173
5 5411.44
9
STORM DRAIN INLET PROTECTION
20
EACH
5740.23
S 2,804.60
19
5 2,664.37
10
TRAFFIC CONTROL
1
LUMP SUM
$1,348.36
S 1,348.36
1
5 1,348.36
11
COMMON TOPSOIL BORROW LV
30
CU YD
S52.32
S 1,569.60
20.5
S 1,072.56
12
TURF ESTABLISHMENT
1
LUMP SUM
$1,186.56
5 1 186.56
1
$ 1,186.56
S 102,179.10
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
CONTRACT
UNIT PRICE CONTRACT AMOUNT
USED TO
DATE
EXTENSION
1
1.5" MILL FULL WIDTH
13 156.00
SO YD
$1.12
$ 14 734.72
13,156
S 14.734.72
2
1.5" 12.5 WEAR 2408
1140
TON
$51.30
S 58,482.00
1,178
$ 60,431A0
3
TACK COAT
1105
GAL
53.08
S 3.403.40
620
5 1,909.60
4
4" DOUBLE SOLID LINE YELLOW EPDXY
3448
LIN FT
50.85
S 2,930.60
3.798.00
S 3,226.30
5
4" SOLID LINE WHITE EPDXY
530
LIN FT
50.43
227.90
455
S 195.65
6
STOP BARS
78
LIN FT
511.30
881.40
FS
947
CROSSWALK BLOCKS EPDXY
288
SQ FT
$6.03
1 736.64
504
S 3 039.12
8
TRAFFIC CONTROL
1
LUMP SUM
$810.12
810.12
1
S 610.12
SUMMARY OF WORK COMPLETED TO DATE
Bid Schedule "A"
Bid Schedule "B"
Bid Schedule "C"
Bid Schedule "D"
Bid Schedule "E"
Bid Schedule "F"
Schedule "G"
Schedule "H"
Schedule "I"
TOTAL WORK COMPLETED TO DATE
S:\Municipal\Aelkriver\ER303\PAY ESTIMATES\ER303 PE.xlsx PE - 8
$ 85,411.11
$
460,720.25
$
476,450.83
$
500,287.45
$
560,800.83
$
581,585.06
$
641,920.15
$
199,447.07
$
203,942.55
$
210,633.96
$
247,107.66
$
1,824,961.43
$
1,958,368.30
$
74,490.28
$
102,179.10
$
85,411.11
$
4,350,670.81
CITY OF ELK RIVER
13065 Orono Parkway
Elk River, MN 55330
Elk River Trails Project
April 17th, 2018
PAY ESTIMATE NO. 3 (FINAL)
FROM: September 1, 2017
TO: November 15, 2017
CONTRACTOR: North Valley Inc.
20015 Iguana St.
Nowthen, MN 55330
ITEM
NO.
DESCRIPTION
CONTRACT ITEMS
UNIT OTY. UNIT
PRICE
USED TO DATE
OTY. AMOUNT
1
MOBILIZATION
LS
1
$1,604.11
1
$1,604.11
2
REMOVE CURB AND GUTTER
LIN FT
135
$3.85
163
$627.55
3
REMOVE BIT. PAVEMENT
SY
155
$0.01
47
$0.47
4
COMMON EXCAVATION (P)
CY
461
$20.30
503
$10,210.90
5 1
JAGGREGATE BASE, CLASS 5
TON
736
$17.47
770
$13,451.90
6
BITUMINOUS PATCH
SY
26
$58.61
42
$2,461.62
7
FOG SEAL
GAL
1760
$3.74
1500
$5,610.00
8
BIT. WEARING COURSE 2.5" THICK
SY
1792
$11.35
1650
$18,727.50
9
4" CONCRETE WALK
SF 1
1150 1
$6.36
2822
$17,947.92
10
CONCRETE PEDESTRIAN RAMP
EACH
7
$2,031.86
7
$14,223.02
11
CONCRETE CURB AND GUTTER
LIN FT
13.5
$21.33
120
$2,559.60
12
TRAFFIC CONTROL
LS
1
$802.05
1
$802.05
13
W11-2 WITH W16-71? SIGN
EACH
4
$374.29
2
$748.58
14
W 11-2 WITH W 16-91' SIGN
EACH
4
$374.29
2
$748.58
15
SILT FENCE, TYPE HEAVY DUTY
LIN FT
1300
$2.09
1357
$2,836.13
16
TOPSOIL BORROW(CV)
CY
100
$41.44
49
$2,030.56
17
SEED, FERTILIZER, AND BLANKET
SY
2200
$1.91
1604
$3,063.64
19
CROSSWALK MARKING
SF 1
180
$12.05
180
$2,169.00
Total
AMOUNT EARNED
AWARDED CONTRACT AMOUNT
AMOUNT RETAINED (056)
PREVIOUS PAYMENTS
AMOUNT DUE
TOTAL THIS PERIOD
99,823.13
94,232.03
82,432.75
17,390.38
I hereby certify that all items and amounts shown by this pay estimate are correct for the work completed to date.
CONTRACTOR:
North Valley, In
Approved by Owner/Commission
CITY OF ELK RIVER, MINNESOTA
ENGINEER:
Justin Femrite,
BY:
`1-23/-1 V
$99,823.13