10.3. SR 05-07-2018Request for Action To Item Number Mayor and City Council 10.3 Agenda Section Meeting Date Prepared by Work Session May 7, 2018 Zack Carlton, Planning Manager Item Description Reviewed by Jackson Street Water Tower Grant Opportunity and Cal Portner, City Administrator Future Planning Reviewed by Action Requested Provide direction on the restoration of the Jackson Street Water Tower and discuss future plans for the tower and site. Background/Discussion Earlier this year the city worked with Kodet Architectural Group to prepare architectural plans and restoration estimates for the Jackson Street Water Tower. We received estimates for three different restoration options: 1. Option 1 (Short -Term) — Pressure wash water tower, fix structural items noted in conditions assessment from August 2015, and repaint the tower. 2. Option 2 (Medium -Term) — Pressure wash water tower, sand blast and repair only the problem areas identified in the conditions assessment from August 2015, and repaint the tower. 3. Option 3 (Long -Term) — Remove all lead based paint by sand blasting the entire tower, fix structural items noted in conditions assessment from August 2015, and repaint the tower. The consultant contacted two firms and their estimates for each option are attached. The HPC reviewed these recommendations during their April 26, 2018, meeting and recommended Option 1. Staff is seeking direction from Council on the preferred restoration option. Grant applications are due May 25, 2018, and staff will prepare the grant based on Council's recommendation. Additionally, staff is seeking input on long-term plans for the Jackson Street Water Tower and site. Elk River Municipal Utilities (ERMU) has agreed to contribute to the match for the restoration grant, but that comes with the requirement that the city takes ownership of the tower and responsibilities for future maintenance obligations. Financial Impact Long-term maintenance obligations for the Jackson Street Water Tower Attachments Elk River Water Tower Conditions Assessment dated August 3, 2015 Architectural Plans dated February 13, 2018 Restoration Cost Estimates dated March 26, 2018 The Elk River Vision A PehoMing community Pitb revolutionary and spirited resourcefulness, exceptional P,` 01 W E H E 8 6 T service, and community engagement that encourages and inspires prosperity INAMIRE1 Jackson Street Water Tower City of Elk River Condition Assessment Prepared By ice COLLABORATIVE DesignGroup,»Zc. 100 PORTLAND AVENUE SOUTH, SUITE 100 MINNEAPOLIS, MINNESOTA 55401 PHONE: 612.332.3654 FAX: 612.332.3626 Project Number 15010.00 August 3, 2015 COLLABORATIVE DesignGroup, Inc. ro Architecture Engineering Interiors Planning August 3, 2015 Zack Carlton City of Elk River 13065 Orono Parkway Elk River, MN 55330 Re: City of Elk River Jackson Street Water Tower Condition Assessment CDG Project # 15010 Dear Zack, We have completed the Condition Assessment for the Jackson Street Water Tower as proposed. This report summarizes our evaluation procedures, along with our observations, conclusions regarding the current condition of the water tower, and recommendations for repairs. The services performed in evaluating this assessment and in preparing this report have been in accordance with the level of skill and care normally used for this type of project. The conclusions and recommendations discussed in this report are our best professional opinions based on our knowledge of current design and repair of this type of building. No warranties are expressed or implied. It has been a pleasure to perform this service for you. If you have any questions, or if we can be of further assistance, please feel free to call. Very truly yours, Collaborati Design Group I 11�� -1 U3 CMilkert, PE iE Principal Affirmative Action. Equal Opportunity Employer 160 Portland Avenue South, Suite 100 Minneapolis, Minnesota 55401 t 612.332/3654 f 332.3626 www.collabcrativedesigngroup.com City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 TABLE OF CONTENTS EXECUTIVE SUMMARY....................................................................................... 1 INTRODUCTION.................................................................................................. 2 SCOPEOF REPORT............................................................................................. 2 Review of Documents................................................................................. 2 Discussions with City of Elk River Personnel ............................................. 2 Observations................................................................................................. 3 DISCUSSION AND CONCLUSIONS................................................................. 28 Introduction................................................................................................. 28 General Discussion.................................................................................... 28 RECOMMENDATIONS...................................................................................... 30 PRIORITIES AND ESTIMATE OF PROBABLE COSTS ........................................ 30 C COLLABORATIVE Design Group, ii.. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 EXECUTIVE SUMMARY From a structural standpoint, all components of the Water Tower appear to be performing well. Besides some more superficial issues, such as the presence of chipped paint, rust, and lichen, all steel components are in average condition, especially for their age. The legs are securely bolted to the concrete footings. There are no noticeable problems with any of the tie rods, horizontal girders, or lattice work on the legs. Two issues were observed, both located on the legs, which will need further maintenance beyond the obvious painting. The first issue relates to some corrosion of the steel at the base of the legs. This condition is hidden by the concrete that was installed to drain water from the legs. It would be important to investigate the condition of the steel behind the concrete further during the painting project by removing a portion of the concrete infill and inspecting the steel. If the corrosion is worse than what is observed presently, some remedial action may need to be done to strengthen the base, such as the addition of steel plates to replace the loss of cross sectional area due to corrosion. The second potential concern involves the steel splice plates connecting the leg sections. Some of the plates are bowing as result of rust jacking, which occurs when the backside of the metal rusts and expands, causing the front of the panel to move outward. Further investigation and testing is recommended to confirm the severity of the corrosion and determine the proper remedial action. Paint is chipping on the Water Tower's legs, tie rods, and horizontal girders; the surface of much of the exposed steel is covered in rust. The condition of the underside of the tank and its surrounding walkway platform was observed to be similar to that of the legs, tie rods, and girders, with a significant amount of weathered paint and rust. The sides of the tank appeared to be in good condition relative to the rest of the Tower, but the roof and cap are weathered with rust stains present from seams in the roof panels. Considering that the Water Tower structure is no longer supporting the weight of water in a full tank, maintenance and periodic observation will be all that is required in the future, and no major structural modifications will be necessary. Some minor modifications may be necessary as identified above. All of the Tower's surfaces should be painted, including areas that may not be easily visible from the ground, such as any exposed areas of steel angles, the inside of legs, and the walkway platform. A new coat of paint will not only return it to its original appearance, but it will also protect the steel from further rusting and deterioration. The two potential structural issues should be further investigated with a more in depth study of the areas in question. We recommend that a portion of concrete from one of the leg bases be removed to get a better understanding of the condition of the steel. The bowing steel splice panels should also be closely observed and tested to determine the extent of damage. Co COLLABORATIVE DesignGroup,,nc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 INTRODUCTION The Jackson Street Water Tower was built in 1920 by the Minneapolis Steel & Machinery Company as part of a water works project that developed a fire protection program for the City of Elk River. The Water Tower consists of a 100,000 gallon tank on a four leg, lattice -girder trestle tower and stands approximately 129 feet tall. The Tower is currently coated with paint that is assumed to be lead-based, and displays a non -historic City of Elk River logo, which differs from the original silver tank and red conical roof. The structure was added to the National Register of Historic Places on May 23, 2012. The City of Elk River and the Elk River Heritage Preservation Commission have plans to restore this structure. The intent of this Condition Assessment is to provide an understanding of the required restoration work, along with the associated costs. SCOPE OF REPORT Review of Documents Available documents regarding the Jackson Street Water Tower were limited, but the National Register of Historic Places Registration Form was reviewed to gain an understanding of the structure's construction and history. This paperwork informed us that, besides cleaning and painting of the Water Tower, no alterations had been made to the structure since its construction. Discussions with City of Elk River Personnel The Jackson Street Water Tower is an iconic landmark, and provides an important piece of the identity and heritage of the City of Elk River. The historic paint colors were silver for the main structure and tank, and red for the sloped roof. Simple black lettering spelled out "Elk River' on the side of the tank. The water tank structure was constructed in 1920 by the Minneapolis Steel and Machinery Company. The tank was constructed initially as a response to the many fires that occurred in the downtown area. These fires were difficult to fight since the railroad line created a barrier between the downtown and the river. After the construction of newer water tanks in other locations, the Jackson Street Water Tower was de -commissioned in 1960. ELN C COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 Observations Initial, ground -level observations were made on January 30, 2015. A more thorough site visit was made on March 12, 2015 to further document the structure from both the ground and the top of the Tower. The following rating system was used in assessing the condition of the structure components: • Good: The component is new, with no apparent defects. • Average: The component is able to perform its originally intended function in its current condition. Any defects are minor and do not affect the performance of the component. • Poor: The component is unable to perform its originally intended function in its current condition. The component has major defects, but is repairable. • Unacceptable: The component is unable to perform its originally intended function in its current condition, and cannot be economically repaired. Replacement of the component is required. Visual observations of the building are recorded below. OBSERVATIONS Each of the Water Tower's legs consists of two parallel steel channels, which are bracketed on the outside with a flat steel plate, and on the inside with small latticed bars. REFERENCE PHOTO WCMN 3 C COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 2. The Water Tower was constructed in 1920. 3. The Water Tower has four concrete footings with varying amounts of exposure due to the surrounding landscape. All footings appear to be in average condition, with no significant deficiencies noted. REFERENCE PHOTO '!1-,kiii 4 6 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Wafer Tower Condition Assessment Auqusf 3, 2015 CDG Project # 15010.00 OBSERVATIONS 4. The legs are connected onto a steel base plate at each footing with steel angles, all of which appear fo be in average condition. 5. The steel base plate at the bottom of each leg is bolted info the concrete footings. These bolts show no significant deterioration, and are in average condition. REFERENCE PHOTO C COLLABORATIVE DesignGroup,,lw. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 6. The inside of the base of each leg has been filled with concrete. 7. The sloped surface of the concrete allows water to drain from the base of the legs, but water that flows to sides of the legs has begun to rust and deteriorate the steel. REFERENCE PHOTO I s COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 8. Water flows out of the legs along the steel at the edge of the concrete, which has caused the steel to corrode. Loss of cross- sectional area of the steel is occurring on the steel channels due to corrosion. 9. Loss of cross- sectional area of the steel is occurring on the steel channels due to corrosion. REFERENCE PHOTO .4 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 10. Steel tie rods are connected to the base of each leg. Steel legs and tie rods are covered With a significant amount of rust and chipped paint. Ill. Rust and chipped paint are prevalent on all steel tie rods and legs. REFERENCE PHOTO COLLABORATIVE DesignGroup Ong. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 12. Diagonal tie rods are in overall average condition and are performing well, but are showing a significant amount of chipped paint and rust. 13. Diagonal tie rods are in overall average condition and are performing well, but are showing a significant amount of chipped paint and rust. REFERENCE PHOTO COLLABORATIVE DesignGroup,blw. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 14. Tie rods are connected with steel turnbuckles. Like the tie rods, these turnbuckles are covered with rust and chipping paint, but their performance is unaffected. 15. A ladder extends up the northwest leg of the Water Tower. Surface rust and peeling paint are visible in some areas, but no functional concerns regarding the ladder were observed. REFERENCE PHOTO 10 (1 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 16. Lichen (organic growth) is growing on the legs in some areas. 17. The lattice girder legs appear to be in average condition, With no structural deficiencies observed. Lattice surfaces generally seem to be in better condition than the flat sides of the legs, with considerably less chipped paint, rust, and lichen. REFERENCE PHOTO —11111.plw _ - .. .'t 11 66, COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 18. The paint on the flat sides of the legs is weathered; lichen and corrosion was observed in some areas. 19. Each of the Water Tower's legs is essentially made up of three sections, with the longest at the bottom and the shortest at the top. The leg sections are connected with steel splice plates on all four sides, with some plates inside the legs and some outside. Note the two exterior plates indicated in the photo. REFERENCE PHOTO 12 Co COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Wafer Tower Condition Assessment Auqusf 3, 2015 CDG Project # 15010.00 OBSERVATIONS 20. The presence of bolts and rivets wifhin the leg channels indicates that there is a steel plate inside the leg, the condition of which could not be ascertained from ground level. The steel bracket connecting the horizontal girder is rusting and the bottom of the exterior plate is expanding outward slightly. 21. A steel plate is attached fo the legs just above the connection fo the horizontal girders. Each of these plates (eight total) appear fo be in average condition. lra .t REFERENCE PHOTO 13 COLLABORATIVE DesignGroup,blw. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 22. The plates on the outside of the Water Tower are in average to poor condition, with some showing significant rust and expansion. 23. Close up of one of the outside steel plates. It appears as though water has corroded the backside of the plate, causing the steel to expand and bow outward, a condition known as rust jacking. REFERENCE PHOTO 1� W'Y 14 `S COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 24. Another instance of rust jacking. While this plate is in better condition than others, it can be expected to continue to degrade. 25. A horn sits on a platform perched atop two horizontal steel girders, requiring an electrical conduit running up the northwest leg from the ground. The horn and platform contain surface rust and weathered paint, but no major deficiencies. It is unknown if the horn is functional. REFERENCE PHOTO • • • • • 4h 15 C COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 26. Horizontal girders are connected to the legs with steel angles and rivets. There are eight total girders, connected just below the seams between leg sections. All girders appear to be in average condition, with just some rust, weathered paint, and lichen noted on their surfaces. 27. Lichen is growing on horizontal girders. REFERENCE PHOTO 16 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 28. Rust and chipped paint is evident on the surface of horizontal girders. 29. At the epicenter of the four Tower legs is vertical steel tube that encloses an eight inch stand pipe connecting the tank to the water system. Eight tie rods connect the center tube to the Tower's legs. REFERENCE PHOTO 17 Co COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 30. An access hatch leads underground underneath the Water Tower. 31. A small hatch allows access to the enclosed stand pipe. REFERENCE PHOTO 18 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Wafer Tower Condition Assessment Auqusf 3, 2015 CDG Project # 15010.00 OBSERVATIONS 32. Some minor rusting and weathered paint were observed on the vertical tube. 33. The vertical tube is bolted info a concrete pad. The surfaces of the bolts are covered with rust and dirt, but are performing well. REFERENCE PHOTO 19 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 34. The standpipe enclosure extends from the ground to the underside of the tank. 35. The underside of the tank is in average condition, with some rusting and weathered paint. REFERENCE PHOTO 20 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Wafer Tower Condition Assessment Auqusf 3, 2015 CDG Project # 15010.00 OBSERVATIONS 36. The walkway platform surrounding the tank is in average condition, with weathered paint. 37. Sections of the steel plate walkway are riveted fo steel splice plates beneath the platform. REFERENCE PHOTO F 1 21 C COLLABORATIVE DesignGroupol c. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 38. Steel plates and Civets beneath the walkway platform connect the sections of steel walkway plates. The walkway has a latticed steel guardrail, which - like the platform - is weathered but in average condition. 39. The latticed handrail around the tank is in average condition overall, but features many areas of chipped paint and rust. REFERENCE PHOTO 22 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 40. The latticed handrail around the tank is in average condition overall, but features many areas of chipped paint and rust. 41. The four legs extend inside the walkway platform and are connected with steel angles and Civets to the vertical surface of the tank. REFERENCE PHOTO 23 Co COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 42. View looking down the inside of one of the Water Tower's legs. 43. The side of the tank is in average condition. REFERENCE PHOTO A 24 Ca COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 44. The side of the tank is in average condition. 45. A second ladder rises along the side of the tank. Like the ladder along the northwest leg, this ladder features surface rust and chipped paint, but is performing well and has a good connection to the Water Tower. REFERENCE PHOTO t_ 25 `COLLABORATIVE DesignGroup,,lw. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 46. A third ladder allows access to the conical roof of the tank and the cap on the very top of the Water Tower. This ladder can dis- connect from the second ladder, and pivot around the cap at the top to provide access around the entire circumference of the roof. 47. Some minor rusting and water staining was observed at seams and the edge of the tank on the underside of the roof eave. REFERENCE PHOTO 26 Co COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS 48. The conical roof is rusting at panel seams. 49. The conical roof is rusting at panel seams. REFERENCE PHOTO --y 27 COLLABORATIVE DesignGroup,inc. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 OBSERVATIONS I REFERENCE PHOTO 50. The cap atop the roof appears to be in average condition. DISCUSSION AND CONCLUSIONS Introduction This condition assessment focuses on two main points concerning the Jackson Street Water Tower: the overall structural condition of the Tower, and the requirements to preserve the Tower to maintain its integrity and value. Part of the preservation plan is to restore the water tower to its original appearance, which will require extensive work to clean and remove old paint, rust, and growing lichen. A few rusting areas, such as at connecting splice plates on the outside of the legs and deteriorating areas within leg bases also present a concern from a structural standpoint. General Discussion From a structural standpoint, all components of the Water Tower appear to be performing well. Besides some more superficial issues, such as the presence of chipped paint, rust, and lichen, all steel components are in average condition, especially for their age. The legs are securely bolted to the concrete footings. There are no noticeable problems with any of the tie rods, horizontal girders, or lattice work on the legs. The Water Tower's legs consist of two steel channels sitting parallel to each other and riveted to a long, flat steel plate on the edges on the outside perimeter of the Tower and small is COLLABORATIVE DesignGroup,,lw. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 latticed bars on the inside edges. Put together, these pieces form a square leg that rises to the tank in three sections. Each section is connected with four steel splice plates, two of which are bolted and riveted inside the legs, and two that are bolted on the legs' exterior surfaces. Two issues were observed, both located on the legs, which will need further maintenance beyond the obvious painting. First, the base of each leg is filled with concrete that promotes the drainage of water out of the leg assembly. It appears that water naturally flows to the sides of this concrete and along the edge of the inside of the legs, which has resulted in some deterioration and loss of cross sectional area of the steel. The thickness of the steel channels is important, as this is what transfers the load of the water tower to the foundation. At this time, the condition of the steel is behind the concrete is unknown. It would be important to investigate the condition of the steel behind the concrete further during the painting project by removing a portion of the concrete infill and inspecting the steel. If the corrosion is worse than what is observed presently, some remedial action may need to be done to strengthen the base, such as the addition of steel plates to replace the loss of cross sectional area due to corrosion. If it is determined that additional steel needs to be added, a sample of the steel should be taken and tested to determine its physical properties. Steel produced during the time of the construction of this water tower did not have the same physical properties of modern day steel, and may not be able to be welded. This testing information will inform the design of the connection of any additional steel members, if needed. The second potential concern involves the steel splice plates connecting the leg sections. Some of the plates are bowing as result of rust jacking, which occurs when the backside of the metal rusts and expands, causing the front of the panel to move outward. This appears to be happening exclusively on the eight plates on the outside perimeter of the Tower, which is not surprising since the slope of these surfaces allows water to travel down the legs and flow behind the connection plates. Since these plates hold the legs together, they are integral to the structural integrity of the Tower. If the plates continue to corrode, the connection between each section will weaken and the structural capacity of the legs will diminish. Paint is chipping on the Water Tower's legs, tie rods, and horizontal girders; the surface of much of the exposed steel is covered in rust. A significant amount of lichen is also growing on some of these surfaces. The condition of the underside of the tank and its surrounding walkway platform was observed to be similar to that of the legs, tie rods, and girders, with a significant amount of weathered paint and rust. The sides of the tank appeared to be in good condition relative to the rest of the Tower, but the roof and cap are weathered with rust stains present from seams in the roof panels. Considering that the Water Tower structure is no longer supporting the weight of water in a full tank, maintenance and periodic observation will be all that is required, and no major structural modifications will be necessary. Some minor modifications may be necessary as identified above. 29 Co COLLABORATIVE DesignGroup,,lw. City of Elk River Jackson Street Water Tower Condition Assessment August 3, 2015 CDG Project # 15010.00 RECOMMENDATIONS It is the City of Elk River's intent to restore the Water Tower to its original appearance, which consisted of mostly silver painted steel except for black lettering and a red roof. In order to do so, chipped paint, lichen, and rust will need to be removed to provide for the adhesion of the new paint. Because the paint is likely to contain lead, all removed paint will need to be captured by qualified workers and properly disposed of. It will not be necessary to strip all of the paint off of the water tower down to bare steel. Any lead based paint that is adhered well can be encapsulated with the new paint. Proper cleaning and preparation of all surfaces will need to be performed prior to cleaning. All of the Tower's surfaces should be painted, including areas that may not be easily visible from the ground, such as any exposed areas of steel angles, the inside of legs, and the walkway platform. A new coat of paint will not only return it to its original appearance, but it will also protect the steel from further rusting and deterioration. The two potential structural issues should be further investigated with a more in depth study of the areas in question. We recommend that a portion of concrete from one of the leg bases be removed to get a better understanding of the condition of the steel. Areas of rust and deterioration are present on the exposed steel just above the concrete, and the possibility exists that water has been able to seep between the metal and concrete and cause unseen damage to the steel. The bowing steel splice panels should also be tested to determine the extent of damage. PRIORITIES AND ESTIMATE OF PROBABLE COSTS Description Estimated Cost Additional Testing $ 4,000 Steel repair (if required) $ 5,000 Painting $60,000 Sub Total $69,000 Contingency, 15% $10,350 Design Fees, 8% 5,525 Total $84,875 30 `COLLABORATIVE DesignGroup,,lw. Ln M N EE 'GCE 219 E GLE 9 Vdal at BIQL� PI�'� PSI wok laPay mm 5p M ® II.w 3 0££SS NW' 9f rte Zff. —ou 45 E0455 NW-s3lPdeau Plw eual PPe ano�� ; I MN 1S 41b a MN enb uosh of )o uo pes�e]ul eLzooL oN jjodaa;uauassaooy wdSLO£ Mt/£L/z��ale 'W7 ano.p dei na�ai�y�•y annol a;eM;aaU;S uoSoer - JOAia �JZ];0 Allo z U � O (6 MN 3AV ONIA2l V U 00 10 O 0 — 0 Z Wri d MN 3Atl NOSNOtlf o1.F�M. z w L d O w ;.. I0 mo o� U z EE ro � (6 d C ®41 N � o m lul- Qia Sur r i pl,7 o ��- �I �o��'r 4n la uuizFO L OZ L00 d 11101 1141M 11 nib hj 39 LZto L\soua w m opVau uizf\s,as0\o Nd SLO££OLN Q m U 0 o� U ro � i I �8-LL ��- �I �o��'r 4n la uuizFO L OZ L00 d 11101 1141M 11 nib hj 39 LZto L\soua w m opVau uizf\s,as0\o Nd SLO££OLN Q m U 0 = Architectural Group Ltd. 15 Groveland Terrace • Minneapolis. MN 55403-1 154 Telephone 612.377.2737 • Facsimile 61 2:377.1 331 E -Mail arehODkodet.com • Website www.kodet.com March 26, 2018 Mr. Zack Carlton City of Elk River - Planning Manager 13065 Orono Parkway Elk River, MN 55330 Re: Elk River Jackson Street Historic Water Tower - Renovation Dear Mr. Carlton: We have evaluated the existing water tower and generated budgeting numbers to help assist you in the grant submission. The existing water tower was scanned by a UAV (Unmanned Aerial Vehicle) on February 81h, 2018. We have taken the data from the scan and converted it into a scaled drawing which was used for cost estimating by two painting contractors. Both painting contractors have separated out their cost estimate into three options as noted below. Each of the three options give you different levels of restoration to choose from: I . Option 1 (short term) - pressure wash water tower and repaint. Fix structural items as noted in report dated August 3, 2015. 2. Option 2 (medium term) - pressure wash and sand blast only problem areas as identified in report and repaint. Fix structural items as noted in report dated August 3, 2015. 3. Option 3 (Long term) - remove all the lead base paint by sand blasting the entire water tower and repaint. Fix structural items as noted in report dated August 3, 2015. The two attached cost estimates from the painting contractors did not include the following mark-ups - 25% Soft Costs, 20% for contingency and 10% per year for inflation - see cost breakouts below. Estimate / Soft Costs (25%Z / Contingency (20%) / 2018 cost / 2019 cost (10%) / 2020 cost (10%) 1. Slack Painting: a. Option I - $92,000 + $23,000 + $18,400 = $133,400 $146,740 $161,414 b. Option 2 - $130,000 + $32,500 + $26,000 = $188,500 $207,350 $228,085 c. Option 3 - $390,000 + $97,500 + $78,000 = $565,500 $622,050 $684,255 2. TMI Coating: a. Option 1 - $153,000 + $38,250 + $30,.600 =$221,850 $244,035 $268,439 b. Option 2 - $193,000 + $48,250 + $38,600 = $279,850 $307,835 $338,619 c. Option 3 - $385,000 + $96,250 + $77,000 = $558,250 $614,075 $675,483 Mr. Carlton, we again appreciate the opportunity to work with you and everyone with the City of Elk River on this project. Let us know if you need additional information for the grant submission. If you have any questions, please contact me. Sincerely, K ET AR HITECTURAL GROUP, LTD. dward J. K et, Jr., FAIA, ED AP BD+C Attachments: Existing Drawing TMI and Slack painting proposals Architecture - Interior5 • Planning Ln V N ES L. ell Ile 119 ... 4-laam„a S �a RolmPy aye vW 3 O££SS NW' 21 4U 11`\ gf £e Zf`f` yy i 60055 ry ea asr d2 SG MN 4S 41b a MN enb uo >p of �o uo awe s�eaul eLztOL -N W �� uodaa;uawss000V 8L/Oz/£ares 'Pil ano,9 Leim"a 714”" Jannol Ja;eM;aaJ;g uos>oer - Jan!a �I3 30 A310 Him W U MN 3Atl ONIA211 oNlo U _ — w3� w 53� wn ozoo LL o- 'za rc a=. aJ zwmpzo om w w �W o¢000 z_; z� ur z I MN 3Atl NOSNOtlf O yy OW WONFFOQ �W.z WN ol o a aFQmoIw Z `mom Uz �i po o.o Z o � Ali 0 LU Lnrleu UIZFGLOZ LOGd e morel MIIAIJhI3 OLZtOLAS]Oe W1103leuuizk11SR3 NV W& O69LOUt Q m U 0 4 �\ SLACK Painting /'� Tel 612-991-6493 15886 SVEND LANE NW Fax 218-948-2328 EVANSVILLE, MN 56326 �- DATE: February, 26 2018 Elk River, MN, Legged water tank TOM SLACK PROPOSAL/QUOTE EMAIL: Slackpainting@gmail.com Option 1: Water Blast entire tank, Coat high rusted areas with Sherwin Williams 920 Pre Prime, followed by a coat of Macro 646, A final top coat of Aluminum Spray-Lastic, Final top coat of Flourokem on the roof, Logo Elk River Flourokem, Fix concrete inside legs, Structural repair. Reinforced poly will be laid out covering the ground underneath the tank and around the perimeter to contain any chips that may come off in the Water blasting process. Chips that are collected will be properly disposed of including paperwork to track disposal. $92,000 Option 2: Water Blast Entire Tank, Sand Blast SSPC-SP6 Wet Blast on extremely rusted areas only, estimated surface area Wet blasted < %10, two coats Sherwin Williams Macro 646, A final top coat of Aluminum Spray-Lastic, Final top coat of Flourokem on the roof, Logo Elk River Flourokem, Fix concrete inside legs, Structural repair. Disposal and containment would be the same as Option 1 $130,000 Option 3: Sandblast Entire Tank SSPC-SP6, 2 coats Macro, 1 coat Sherwin Williams Hi - solid poly. Fix concrete inside legs, Structural repair. Full tarp containment system would be utilized. Ground cover would be laid out around the perimeter of the containment system. Dust collector would be used inside the containment system. A wash station, PPE, Lead training, TCLP test would be included. Spent abrasive would be disposed of at the proper landfill with all the attached paperwork. $390,000 Thank you for allowing Slack Painting, LLC the opportunity to bid this project for you. The total bid price is based on the work reviewed; any alterations or unforeseen circumstances may result in an adjustment to the proposal total. Slack Painting is not responsible for moving or removing any materials or objects that interfere with the proposed work. If you have any additional questions or concerns please contact me directly. Thank you. Tom Slack PROPOSAL 61 TMI Coatings, Inc. 3291 Terminal Drive, St. Paul, Minnesota 55121-1610 Phone: 651-452-6100 Fax: 651-452-0598 Painting & Restoration Contractors Kodet Architectural Group, LTD. NOTE: This proposal may be withdrawn by TMI if Attention: John Brandel not accepted within 30 days. 15 Groveland Terrace Minneapolis, MN 55403 Date: February 23, 2018 Phone 612-377-2737 E-mail Ibrandel@kodet.com TMI Coatings, Inc. hereby provides budget pricing to repaint the 100,000 -gallon lattice leg tower on Jackson Street in Elk River, MN. Scope: • Option 1— Wash and Paint o Power wash at 3,500 psi. o Spot clean and prime rusted areas. Includes up to 5% of surfaces only. o Apply two full topcoats. • Option 2 — Wash, Spot Repair, and Overcoat o Power wash at 3,500 psi. o Spot abrasive blast and prime rusted areas. Includes up to 20% of surfaces only. o Apply two full topcoats. o Containment is priced as an option. • Option 3 — Full Abrasive Blast and Recoat with Containment o Abrasive blast per SSPC-SP6 all exterior surfaces. o Apply a three -coat system. o Containment is priced as an option. • All options above include installing steel reinforcement at one leg where bowed and at one base plate foundation for additional reinforcement. • All options include the re-application of the tank logos. Pricing: A. Option 1 - $153,000 B. Option 2 - $193,000 C. Option 3 - $385,000 NOTES: 1. Includes lead testing and abatement as required. 2. Prevailing wages are not included. 3. Bonds are not included. 4. Work to be scheduled during average temperature of 50°F and up. P:\Shared\Bid Package\FEBRUARY 2018\Elk River, MN 2-22-18\Elk River PROPOSAL.Doc ACCEPTANCE The undersigned hereby accepts TMI's proposal and authorizes TMI to furnish all materials and labor required to complete the work set forth in the proposal pursuant to the proposal terms and conditions set forth on the reverse side hereof, for which we agree to pay you the amount set forth in the proposal. If the proposal terms and conditions set forth on the reverse side hereof were not provided with transmission of TMI's proposal by facsimile, mail or email, the undersigned agrees to request a copy of the proposal terms and conditions before signing below. The undersigned agrees to be bound by the proposal terms and conditions set forth on the reverse side hereof regardless of whether the undersigned requested a copy or read them before signing below. Accepted: By Respectfully, TMI Coatings, Inc. By Title Ben Nicholson, Senior Estimator Customer: Sign and return copy. Retain original for your files. Porath, Katie From:Allard, Tina Sent:Tuesday, May 15, 2018 8:25 AM To:Porath, Katie Subject:FW: Heritage Preservation Council Hi: Can you save the letter to Councilmember Wagner below to the packet record for May 7? It can be added to Item 10.3. Thanks, Tina From: Wagner, Jennifer Sent: Monday, May 14, 2018 5:46 PM To: Allard, Tina Subject: Fwd: Heritage Preservation Council Here you go! Begin forwarded message: From: Liam Barnes <liambarnes30@gmail.com> Date: May 1, 2018 at 11:41:44 AM CDT To: <jennifer.wagner@elkrivermn.gov> Subject: Heritage Preservation Council Dear Council Woman Wagner, I am writing to you regarding the Heritage Preservation Commission. The first concern I have is regarding the Jackson street water tower, I wholeheartedly agree with the commission and believe that it should be restored to its former glory. I believe the City Council should give the funds that the council requested and allow them to move forward in the process of restoring the tower. The reason that I think the tower should be saved is that it is a landmark of Elk River that is part of downtown Elk River's historic charm. To tear down such a beautiful structure just because it is expensive to maintain is like burning a Van Gogh just because the insurance is expensive. The other reason that I wish to write to you is to express my wholehearted support of the Heritage Preservation Commission's existence. I believe that serve a vital purpose of a being an advocate for long-term thinking by ensuring we don't destroy our past because we cannot think beyond the present. I know that their meetings have been irregular and that doesn't reflect well but I think it is only fair to also acknowledge that they lost 2/5 of their board over last year which is sure to through even most precise and organized organization( and I am sure we can both recognize that city government is almost anything but precise and efficient). In closing, I hope that you will continue to support the restoration Jackson Street water tower and back the continued existence of the Heritage preservation council. Sincerely Righ t- click here to dow nlo… Liam Barnes 1 18266 Monroe Ct. Nw. Elk River, MN, 55330 2