Loading...
5.2 Item # 5.2. cty or Elk -� River MEMORANDUM TO: Planning Commission FROM: Scott Harlicker, Senior Planne DATE: May 22, 2001 SUBJECT: Case No. CU 01-18 Request for Interim Use Permit by Brian Brueske Request Brian Brueske requests an interim use permit to allow the development of industrial • property,which is within the urban service area,prior to the availability of municipal sewer and water. Location 16501 Highway 10, the northeast corner of Highway 10/169 and 165`h Avenue. Zoning/Land Use I1 (Light Industrial) / LI (Light Industrial) Attachments • Location map • Site plan • Copy of Section 900.20.16 of the Zoning Code Overview Mr. Brueske is requesting an interim use permit to develop industrial property prior to the availability of municipal sewer and water. The applicant would like to locate his water purification company"Aqua Pure Solutions" on this property. The zoning code does not allow development of industrial property within the urban service area prior to the • availability of services.The interim use permit would allow for the use of a private well and Memo to Planning Commission/CU 01-18 May 22,2001 Page 2 4111 septic system until municipal sewer and water are available. Once sewer and water are available,the property owner would be required to hook-up to the services and the interim use permit would be terminated. Section 900.20.16 The property is within the urban service area but there are no plans to extend service to this parcel in the foreseeable future. Section 900.20.16 of the Zoning Code does not allow development of industrial,commercial,or business park property,located within the urban service area,prior to the immediate availability of sewer and water.The Zoning Code does however, allow for the construction of a second principle structure or the expansion of an existing building prior to the immediate availability of sewer and water with certain conditions. If the applicants wanted to combine the lots into one lot,Mr.Brueske could then construct his building because it would be considered a second principle structure. However, Mr. Brueske wants to own, not lease his land and building. In the past,the City has allowed the development of industrial facilities on property within the urban service area prior to the availability of services by changing the zoning from industrial to planned unit development.Morrell and LeFebvre Trucking were allowed to develop under this scenario.This is not an option for Mr.Hetland and Mr.Brueske because the lot they want to develop is only 1 acre in size and the proposed development does not • meet the spirit or intent of the Planned Unit Development District. Section 900.20.16 was created so that the city could preserve orderly development in areas of the city that are in the urban service area but sewer and water are not readily available. Development could then be guided so that it would not interfere with future extensions of sewer and water service. Analysis In determining the appropriateness of an interim use permit the following criteria should be considered: A. The period of time for which the interim use permit is to be granted will terminate before any adverse impacts are felt upon adjacent properties. B. There shall be adequate assurance that the property will be left in suitable condition after the use is terminated. C. The use is similar to uses defined in the zoning district in which the property is located. D. The date or event that will terminate the use can be identified with certainty. • S:\PLANNING\SCOTT\CU01-1 S.DOC Memo to Planning Commission/CU 01-18 May 22,2001 Page 3 E. Authorizing the use will not impose additional costs on the public if it is • necessary for the public to take the property in the future. F. The applicant and user agree to all conditions that the City Council deems appropriate for authorization of the interim use. G. The applicant provides assurances deemed adequate by the City Council that the use will terminate as provided in the interim use permit. The City Council may require the applicant to deposit a cash amount with the City,or provide some other form of security, to ensure compliance with this criteria. Staff has reviewed the above criteria and feels that the authorization of this interim use permit is consistent those criteria. An interim use permit would allow the development of the applicant's property prior to the availability of city services in such a way that it would not interfere with the future extension of sewer and water service.The septic system and well could be located to provide a smooth transition to city services when they become available.The interim use would expire upon the availability of services and the property owner would be required to pay assessments and other costs associated with hooking up to sewer and water. Prior to development of this property,the applicant will have to plat the property and will have to go through the site plan review process. • The City Engineer will be attending Tuesday's meeting and will be available to answer questions relating to future connections to sewer and water. Recommendation Staff recommends that the Planning Commission recommend approval of this request for an interim use permit to allow development of the applicant's property with a private well and septic system prior to the availability of sewer and water with the following conditions: 1. The interim use permit is for the private well and septic system and will terminate at the time when city sewer and water become available. 2. The property owner will be required to pay all trunk and lateral costs associated with extending water and sanitary sewer to the site. 3. The property owner will hook-up to City sewer and water within the specified time frame applicable at the time these services become available. 4. Prior to developing the property, the property shall be platted and the applicant shall apply for site plan review. • S:\PLANNING\SCOTT\CU01-18.DOC Aillri4 mirmir .11:\l qiialNkt\ I 'Alliltitig61:10/121111111 kl ; — 175TH -111111111. L • A� .ii 174TH :w,f� X01 .��-- I=Am i'l ®D IP 0 173RD A I i 04 \ TR \ia��10k // 17zrHD it, 1 !° `-lirikit,/ — 11) 62-4:t \7 • 011/C 171ST ,zs \ 111111 •� 1� puts. \ 170TH H m�' ' 189T . E ;.\\ LOCATION n 168TH -- I a 187TH N SWF i Qt) I 188TH N:7 ii)e+e+ I 185TH i - ..o- c3 - �„ a�.i \, 164TH 1 I i Rte ---- .„, _ii...____y L 183RD I • \ o% ,BsrHo f �, ' t � � k 12 1 181ST I N 180TH Ion..ow y // ;, V — 180TH F • i` k 159TH Pfti cLNIsi I/ \4\ ,59TH�\ • N ck/ - .\.( . • LOCATION N HV City of A MAP lie), . . ik '.:.--.‘:-.:'-: t'l River 13065 Orono Parkway • P.O. Box 490 CASE: H e+ 1 and Proeerii Elk River, MN 55330 n J E/ v' cy '. AU 1�.��' ZER L EXISTING ORDINANCE 410(\�, or `\?The use of zero lot line Lor 511.=,101 L..,-...--.„ s an.•.:``'-s a � common wall . -tween buildings may be allowed in commerciand � v j� industrial zo g districts in accordance with the fol;, ing Cr requirements: A. The sha' d parking concept does not - +` cumvent the perimeter setba, requirement or the re ..i' red number of parking stalls. . .�" B. Proper cross assess and cro,-* parking agreements are • prepared and executed. C. Common architectura =`nd design standards for all units within the zero 1•. .'ne development may be required. D. Each zoning lo7:' shall m ;.-t the Performance Standards • of the zoning disict. E. The lan• .°' aping and screeni`` provisions of this ' ordinance si, 1 apply. to the zonin• . lot. • F. F•, the purpose of determining . t 7 placement and • number'of signs for a zoning lot and th uses thereon, the zog lot shall be considered a "lot" a referenced in the n'C' 's sign ordinance. As such, one free-standing or III • •nument sign is permitted on the zoning lot to identify the uses established thereon. 16 DEVELOPMENT WITHIN THE URBAN SERVICE AREA .PRIOR TO THE AVAILABILITY OF CITY WATER AND SEWER The Urban Service Area is defined in the Elk River Comprehensive Plan as the area planned for development with city water and sewer services . As a prerequisite to applying for or receiving any building permit or planning application in all commercial, industrial and business park zoning districts within the urban service area, city municipal utilities (i .e. , sewer and water) must be available for immediate hookup and/or available at the time of occupancy. . The following are exceptions to the above stated requirements: A. Existing businesses (structures) located within the urban service area and not currently served or have the opportunity to hook up to city sewer and water, may apply to expand a principal structure; or add a second principal structure on the same parcel . In addition to all other city ordinances or regulations of the city, the following conditions shall apply to an • expansion of an existing structure or construction of an additional principal structure on the same parcel: 9.76 i. An application for a conditional use permit must be • submitted in accordance with the requirements set forth in the Zoning Ordinance. ii . Applicant enter into a developer's agreement stipulating the likelihood of the payment of future assessments for city sewer and water. iii. Applicant sign a waiver of rights to appeal future assessments for city sewer and water on the basis of: a. The permitted expansion or additional structure; or, b. The sufficiency of the existing well and septic system. iv. The proposed addition and/or building expansion shall be consistent with the city's Comprehensive Plan. v. All building improvements shall include provisions for a timely hook up to city water and sewer in accordance with applicable city code requirement. • • • • • • • •• 9.77 7pk ) 7y le, 1/— 0 • Vo /0 re4c re,) vv. Fi'e ,2 y S-00 c2 -1-14 tit tOcA)/ 11,5 14'1 / rcif r ,le S) 6