Loading...
5.4 • ^� Item # 5_4. cty or Elk -�-� River MEMORANDUM TO: Planning Commission FROM: Michele McPherson;'D irector of Planning DATE: April 24, 2001 SUBJECT: Case No. LU 01-04 Request by Heritage Landing Development to Include Property in the Urban Service District REQUEST • The applicant requests a land use map amendment be approved to add property into the urban service district. LOCATION General location- Highway 10 and Waco Street NW, SW 1/4 of the NW 1/4 of Section 31, Township 33, Range 26, Elk River, Minnesota. ZONING/LAND USE C3 - Highway Commercial / HB - Highway Business ATTACHMENTS • Location/Zoning Map • May 19, 1999 City Engineer's memo OVERVIEW In 1999, the City Council approved a land use map amendment to remove the subject property from the Urban Service District. The applicant at that time desired to develop mini-storage on the property with the billboard maintained on its own parcel. The • applicants had,since approximately 1996,attempted to develop the property in a variety of ways prior to the availability of sewer and water,which is prohibited by ordinance. Staff Memo to Planning Commission/0A01-05 April 24,2001 Page 2 • continued to encourage the applicant to wait until sewer and water reached the site in order to encourage higher quality development. In 2000,the City approved a public improvement project to extend Business Center Drive to the west, realign Waco Street,and to extend trunk sewer and water to Waco Street. The property owner to the south, George Sanford, has submitted a proposal for a townhome development titled"West Oaks" and will be installing additional sewer and water through that parcel, making them available to the subject parcel in the future. It has been staff's position that once this parcel was removed from the Urban Service District,it would be the responsibility of the property owner to bear all costs associated with returning the parcel to the Urban Service District and providing water and sewer services to the parcel in question. This includes possible negotiation for easements with the property owner to the south if they desire sewer and water connection sooner than the build out of the development to the south. It is logical to bring the parcel back into the Urban Service District as parcel surrounding it on two sides are in the district. RECOMMENDATION Staff recommends that the Planning Commission recommend to the City Council approval of the land use map amendment to bring the subject property back into the Urban Service IIIDistrict with the following conditions: 1. The land owner/applicant shall bear all costs for providing sewer and water service to the property. 2. The City will not assist the property owner(i.e imminent domain)in providing sewer and water to the property sooner than the development to the south allows. • S:\PLANNING\MICHMC\PLREPRTS\OA01-05.DOC . ..,..‘ L . , . . ... • ... . .• s, .. , . . . . ., , . ___ ... _ ,,, 4 •d„.-17z.-1-71,141 an r 47,77L.o.. dell&Ali&Ail gerig mg aaie eat.01Caniua� w' ' .11:V; CI is > 7_ l E o'� 4 LOCATION .` oPo Vgyi. .______ er-a ORONO __Atf: ..'".. .• ii% el ii,. Ill . . — il„, ilis "i+A.;,e, d 1 ,E.,,,i ' 0.0" .#(1711_11kI (at V r 1 . ,_-_::::,:.7.. _. 'K1 .... fI:(ys. :0,„ 1 .: My. 61.61.10iiia �.7: Bp mi ' -. ... "3 iv .7 , .tyro rain • 74:1 ii ®l e�Ryv 4.��..,, �' � qRic y_ L:�:I`6` "+inn 101 1:rl t��� r irt,4 0. ° .r1 • 4 , Ct. ma+-JI1J' ' pi.�� d2 q� JI�,y10.44' t��•nr ewa : 7 i5...i?„41.4.,tiiiiiiitrolijj. .j �/:Er` , ,r• �I �0� a Jn�Fr. .Ir 4674,10111:01140.'' 1_ ir..- rte:V74i042\ •F.aO".v.:46E7.,:Z.t.i:b;the 4.41rfx.iem4 6.0114. I ji / , Ag fi ir„..d -moti tnt, iri Arras ilfnag livic....: ivi-.4.74,....fur , .4i z , ---,,.... ----7 it infii �.., r / I� i .... ______ Ek./ --\_( \,. ZONING city of I MAP TAk\ River 13065 Orono Parkway • P.O. Box 490 CASE: LU 01-04 Elk River, MN 55330 1111 :edy fr< -s- Howard R. Green Company 01Z1111%MSS IL CONSULTING ENGINEERS Formerly MSA Consulting Engineers May 19, 1999 File: 230000M Mr. Steve Wensman Planner City of Elk River 13065 Orono Parkway P.O. Box 490 RE: HERITAGE LANDING DEVELOPMENT REQUEST FOR REMOVAL FROM THE URBAN SERVICE AREA Dear Mr. Wensman: City Administrator Pat Klaers has asked us to review the request by Heritage Landing Development for the removal of their parcel of land from the Urban Service 0 District. We have done this from strictly an engineering perspective. As you are aware, Heritage Landing Development owns a small parcel of land, adjacent to TH 10 just west of Waco Street. The parcel is triangular in shape and actually has no frontage on a city street. It does, however, have access from the highway. It has been documented by MnDot that this highway access can be continued as the property develops beyond an agricultural use. The west line of this property abuts to Big Lake Township. There is a wetland complex existing approximately in the center of the property. In the future, it is the City's intent to realign Waco Street farther to the east. This is in an effort to provide more room on the north side of the highway to configure an intersection which will ultimately be signalized. This realignment of Waco Street may make access to a city street from this property even more difficult. Given this property's somewhat small size, its location in an extreme end of the Urban Service Area, and its unique road access, we see no problem with removing it from the Urban Service District. We would caution, however, that if the developers petition to be included in the Urban Service District in the future, there may be extraordinary costs associated with providing sewer and water service to this site. These would result from a couple of different items. First of all, the site was always intended to be served by lateral 0 sanitary sewer and water since it is on the ext:_eme west end of the Urban Service District. Most likely this service wo .tld come from the property lying immediately 1326 Energy Park Drive • St. Paul, MN 55108 • 612/644-4389 fax 612/644-9446 toll free 888/368-4389 south of the subject site. If the request to remove them from the Urban Service • District is granted, the design of the sewer and water to serve the site to the south would generally not include a review of what it would take to provide service to this site. Therefore, the sanitary sewer may not be provided with extra depth if that is needed to ultimately serve this site, nor would there be provisions to extend watermain for looping purposes or possibly even easements to extend sanitary sewer to the site. In the future, if the owners would petition to be included in the Urban Service District, the extraordinary costs may include a lift station for sanitary sewer service, easement acquisition for extending the sewer and looping of the watermain and the developers would be required to pay these extraordinary costs and acquire any necessary easements. If you have any questions regarding these comments, please call. Sincerely, Howard R. Green Company , 6(7--/14-er(-e4) Terry J. Maurer, P.E. • • s:\planning\letters\230000m.doc Howarc R. Green Company CONSULTING ENGINEERS