Loading...
5.8. PCS 01-25-2005 . . . Item # 5.8. MEMORANDUM TO: Planning Commission y Scott Harlicker, Senior Plann~ January 25, 2005 FROM: DATE: SUBJECT: Case No. P 04- 11 Request for Preliminary Plat - Carson Business Park Reauest Consider a request by Commonweal Development for a preliminary plat for Carson Business Park. The applicant is proposing to subdivide a 10.59 acre parcel into 5 lots and 1 outlot. The plat includes platting Carson Street as a cul de sac into the property to provide access to the lots. Location The property is located at the Southwest comer of Main Street and Highway 169 Zonina/Land Use C3 (Highway Commercial) / LI (Light Industrial) Attachments . Location Map . Preliminary Plat . Grading Plan . Utility Plan . Preliminary Site Plan . Memo from the City Engineer . . . Carson Business Park/P 04-11 January 25, 2005 Page 2 Overview Existing Conditions The parcel is undeveloped except for a billboard located near the intersection of Main Street and Highway 169 and a small house that has been used as an office at the intersection of Main and Carson Streets. The house will be removed and the billboard relocated to a different area of the property. The property has 1243 feet of frontage on Highway 169 and about 300 feet of frontage on Main Street. With the exception of a couple of small hills and shallow depressions, there is little change in topography across the site. Other than a small group of trees located around the existing house, the site is covered with grass and brush. There is a small wetland located in the northwest corner of the site. The adjacent land uses are mixed. There are twinhomes, an office and undeveloped land to the west. The undeveloped land is owned by Great River Energy and is zoned R3 (Townhouse/Multifamily) as are the twinhomes. The office is zoned C2 (Office). The site is bounded by Main Street on the north and Highway 169 on the east. The uses on the north side of Main Street include SuperAmerica, Burger Time, Pizza Hut and an automotive service plaza. Great River Energy is located on the south and is zoned It (light Industrial). Preliminary Plat The proposed plat for Carson Business Park includes 5 lots, one outlot and platting Carson Street to provide access to the new lots. The lots will have frontage on both Carson Street and Highway 169; the lots will not have direct access to Highway 169. Carson Street will be a cul de sac and will intersect with Main Street opposite the existing Carson Street on the north. Outlot A is an odd sliver of land on the south side of Carson Street adjacent to the Meadow Park plat. It is a remnant piece that will be used for stormwater poneling. Analysis Lots The lots comply with the dimensional requirements of the C3 zoning district. Lots 1-4 will be developed in a similar fashion as the lots on the east side of Highway 169 in Elk River Crossing. Lot 5 will be used as a replacement location for the existing billboard that is located at the intersection of Main Street and Highway 169. Billboards are considered a principle use, and therefore have to be placed on their own lot. There can not be another principle use on the same lot as the billboard. Relocating the billboard will require a sign permit. A stormwater pond will also be located on Lot 5. s: \PLANNING \ Case Files \2004 \P 04-11 Carson Business Pk \p04-11 PC01-25.doc . . . Carson Business Park/P 04-11 January 25, 2005 Page 3 Streets / Access Carson Street will be platted as a cul de sac. Carson Street as proposed exceeds the 700 foot maximum. length allowed by the Subdivision Ordinance. Longer cul de sacs may be allowed if the cul de sac is temporary because the street is designed to extend into adjoining land or because of the irregular shape of the land. There is also a 12 foot jog in the right-of-way along Main Street. There is a sidewalk along Main Street that terminates at the west boundary of this plat. Issues . Eliminate the 12 foot jog along the Main Street right-of-way so that the north line of the plat is straight from Meadow Park 2nd Addition to Highway 169. . The sidewalk along Main Street should be extended from Meadow Park 2nd Addition to Highway 169. . The office building on Lot 1, Block 1 Meadow Park 2nd Addition should be granted an access easement across Outlot A so that they can have access to Carson Street. The existing temporary driveway to Main Street can then be closed. . Since there will be no direct access to Lot 5 from Highway 169, an access easement will have to be recorded across Lot 4 to Lot 5. Traffic The traffic impacts of this project have been the subject of several revisions to the traffic study. The impact of the traffic on the intersection of Main Street and Carson Street has been the focus of these studies. This intersection has also been identified by MnDoT as a potential site for an above grade interchange. Should this interchange be constructed, it will likely have an impact on this development. Issues . The most recent traffic study has been reviewed by the City Engineer. His comments are included in the attached memo. The traffic generated by the development of these lots will adversely affect traffic at the intersection of Carson Street and Main Street. He recommends that approval of this plat be contingent on addressing the transportation issues outlined in his memo. Recommendation Transportation impacts are the main issue with this plat. The traffic that will result from development of the lots and its impact on the intersection of Carson Street/Main Street are outlined the City Engineer's memo. Should the Commission recommend approval of this preliminary plat, the following conditions should be included: 1. A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS AND CONDITIONS OF THE PLAT APPROVAL s: \PLANNING \ Case Files \2004 \P 04-11 Carson Business Pk \P04-11PCOl-25.doc . . . Carson Business Park/P 04-11 January 25, 2005 Page 4 AND INSTALLATION OF IMPROVEMENTS PRIOR TO RELEASING THE PLAT FOR RECORDING. 2. A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% OF THE COSTS OF PUBLIC IMPROVEMENTS. 3. UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25% OF THE IMPROVEMENT COSTS SHALL BE SUBMITTED TO THE CITY FOR A ONE YEAR PERIOD. 4. SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 5. SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY ENGINEER BE PAID TO THE CITY PRIOR TO RELEASING THE PLAT FOR RECORDING. 6. THE NECESSARY DRAINAGE AND UTILITY EASEMENTS BE DEDICATED ON THE PLAT AS REQUIRED BY THE CITY. 7. ALL COMMENTS OF THE CITY ENGINEER BE ADDRESSED. 8. ALL APPROPRIATE WETLAND PERMITS MUST BE OBTAINED PRIOR TO COMMENCING WORK ON THE SITE. 9. GRADING AND EROSION CONTROL PLAN AND DVELOPMENT PLAN BE SUBMITTED AND APPROVEDBY THE CITY ENGINEER PRIOR TO THE ISSUANCE OF BUILDING PERMITS. 10. ALL GRADING WILL NEED TO BE CERTIFIED PRIOR TO THE ISSUANCE OF BUILDING PERMITS. 11. STREET LIGHTS SHALL BE INSTALLED AS RECOMMENDED BY ELK RIVER MUNICIPLAL UTILTIIES. 12. PARK DEDICATION FEES BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 13. APPROPRIATE CROSS ACCESS EASEMENTS SHALL BE APPROVED BY THE CITY AND RECORDED WITH THE PLAT. 14. A TREE PRESERVATION PLAN BE APPROVED PRIOR TO RELEASING THE PLAT FOR RECORDING. 15. ANY TREES OFF SITE OR ON SITE, NEAR THE LIMIT OF GRADING THAT ARE TO BE PRESERVED, SHALL BE FENCED WITH A SNOW FENCE AT THE DRIP LINE TO PREVENT GRADING, COMPACTION, OR STORAGE OF EQUIPMENT, DEBRIS OR MATERIALS. STAFF SHALL INSPECT FENCING PRIOR TO CLEARING OR GRADING COMMENCING. S:\pLANNING\Case Files\2004\P 04--11 Carson Business Pk\P04--11PCOl-25.doc . . . Carson Business Park/P 04-11 January 25, 2005 Page 5 16. ALL NECESSARY TRUNK SANITARY AND WATER ASSESSMENTS, AND LATERAL WATER ASSESSMENTS BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 17. THE USES AND/OR MIXES OF COMMERCIAL DEVELOPMENT RESULT IN A LOS D IN THE WORST CASE SCENARIO FOR ALL MOVEMENTS IN THE A.M. OR P.M. PEAK HOUR AT THE INTERSECTION OF MAIN STREET AND CARSON AVENUE. S:\PLANNING\Case Files\2004\P 04-11 Carson Business Pk\P04-11PCOl-25.doc \1 \ ~ ~I[\ ~IiR ~ 2"PY I\\~\ / ' ''iff! L(J P- ~ =, . ~. \\ \-~-~AV~;; ~ ~ d~ ELK _____ \. i\ ~~~~r ~& \ ~ ~ ~ m > 3 R~~ ~ h ~ . -<,-RIVE R \\\\ \ ~ TH 3T.J. dnJTrtEST~R~lNhJ.) ~~~ z 111~/~J/ ~ \ \ \f2~Vl7: -n~p~fe~l' ~ ~ 7TH T I 71nR ~~"8 ~ 0 l-" PLAZA' ~\ ~-pJt:~ J T ~~ :; ~ I~TT11'm r;t'1 fr~ ~~. --\ (\ L \/' $Til]'" B T ~ -= ~~.j\ ~EJi" K ~ -"1.1 c:: CJ , "- -;=:V <;..1. \ ....r> 6 .;p-- c:J IliA> ~.'I.u 1I.'1l' Kil, "Z "'0 "'>.. 'Z. .1\ ~ /: ~ m ~ 16 3T T 'i 1-.f~3T ./< ~ I~ RI~ER .\ ~7~\ ~~" I~IJ 0 ~ t3 ~tfl I F1' ,;".:!!J j Pl!j Z ~\\ z1IlIJ 0'" F g~f~::'; 5 H lN~' '~f?:tW 'vIVD \~.\ I >~~:: .~!.-J I ~ [!\WY ~?S~ JlJ)'-Q/__. \~~\ (;~ H'), ~ ~C"J '(J~ U.IJ/,,,~ , ",Hf3L ~ S",O~ A- "rifT "'e;.,/ ~, \ ~ '" \ . 1/ 'T 1\ .IJ kT~I~ff:\; =<em \ '\ pD \~ . Y t\O ~ <J>u-" cnO~;,.."4;-_' \\ \\ l'~ \ ~ r f-fu]4'VJ;j En 14 \D 41H 'Qm < C--- "b '':-~ \\ \ \ ~" z ,Y1 ~F R1Ern FFlJ] FR+ill = ~o, b~L~ i . \\\\ c.' ~ ~ 11~~ o:E1i mIDJ m +0 : \v"'~!:,W-- ~ \\11 1 ~'- MU ~ ;;-":::~~.1\OJ.,i .~ET R \ .. ~ ,\\\~ \ r::~ . VJ G1Jlli fi ~ ... .. . '-'~~~ if!'! ~ \\\\ 3RO 'T). J..J L II ! ~"" "-"- . I T=<'fiT u \ \j \ PC , ~ rI'~,~ InoW-I' ,~I\ M^ L ~ , "lM1 bWIH w~ ---'- ~ S ITE ~ ~ ilL" R ~f( (\~v 'i ~~ctrJ ~ 1/ ." \~\ C'~ / \\\ \ UJ H OH LE \ \ ) \\\' "~~~A \ ...... ,\\\\t ~~\ ~~ ~ LU \'\ \~~~ \':..: UJ ~ ~ w ~\ %-0 1J ~ 'n \ \ o%, ~o < .. \ " .... W :::J Z W > <( T[J I. ::c: J(\ ~ ~ River - , Case Number: Location Map .<1f N P 04-11 CARSON BUSINESS PARK 13065 Orono Parkway Elk River, MN 55330 January 19, 2005 File: 809310J-0240 ~. Scottffarlicker Senior Planner City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: CARSON BUSINESS PARK Dear Mr. Harlicker: . As requested, we have reviewed the revised submittal information provided for the Carson Business Park located at the southwest quadrant of Trunk Highway 169 and .Main Street. The information we reviewed was a set of drawings prepared by John Oliver & Associates and dated November 24, 2004. The drawings included a preliminary plat, preliminary grading plan, preliminary utility plan, and preliminary site plan. We also received and reviewed an updated traffic study prepared by Benshoof & Associates, Inc.. dated December 7, 2004. Finally, there was an Application for a Wetland Project prepared by Miller Environmental, Inc. This information was reviewed by the Technical Evaluation Panel on December 9, 2004. Based .on our review, we would offer the following comments: A. Traffic www.cLelk-river.mn.us Carson Business Park December 20, 2004 Page 2 . on this property, that it would develop as 18 townhomes. One thing that the traffic analysis does not deal with but is shown on the site plan is the driveway to the Urista office building ,currently being constructed on the lot just to the west along Main Street. That office building is just over 5,500 square feet and there is a condition on it that its individual driveway onto Main Street be closed when Carson Avenue is. constructed. The traffic analysis concludes based on the information provided above, that the p.m. peak hour will be the most critical. During the p.m. peak hour, it is estimated that 434 trips will be generated by this development, 219 entering and 215 exiting the site. Figure 4 in the report provides a weekday peak hour level of service diagram. In the p.m. peak hour, it estimates that the left turn. and straight-through movements out of the development will operate at Level of Service F. It also estimates that the left turn out of the commercial area north of Main Street will operate at a Level of Service F, as well as the straight -through after the Carson Business Park is developed. . I believe it would be inappropriate to approve a development that their own traffic analysis indicates the main intersection servicing the development, and in this case the only intersection servicing the development, will have two of the three movements operate at Level of Service F at full build out, as well as lowering an existing leg of the intersection's movements to Level of Service F. Their own traffic analysis prepared by Benshoof & Associates states in the text, "Level of Service (LOS) F represents the worst intersection operation with excessive delay. Most agencies in Minnesota consider that LOS D represents the minimal acceptable LOS for normal peak traffic conditions." I would recortunend that the platting of this property have a condition on it that the uses and/or mixes. of commercial development result in a LOS D in the worst case scenario for all movements in the a.m. or p.m. peak hour at the intersection of Main Street and Carson Avenue. B. Other Issues If the development of Carson Business Park is to move forward, we would offer these additional comments: 1. Carson Avenue should be.straightened between the Main Street intersection and at least the first driveway to provide for ease of traffic movements. Currently, the road . alignment is curved through the driveways with a very short tangent prior to meeting Main Street. 2. We would recommend that restricted access be provided around the entire perimeter of the plat with two exceptions, those being where Carson Avenue meets up with . Main Street, and where the driveway is shown to Meadow Park 2nd Addition to service the Urista office building. (No access to the Great River Energy site because this just makes the traffic issues worse.) . 3. The Technical Evaluation Panel. reviewed this proposal and approved the wetland impact for Carson Avenue. It also approved the wetland mitigation plan. It disapproved the wetland impact shown fonhe driveway to the Great River Energy property. S:\PLANNlNG\Case Files\2OG4\P 04-11 Carson Business Pk\12 20 04 Engineer's merno.doc . . . Carson Business Park December 20, 2004 Page 3 4. The drainage analysis which was previously submitted based on a slightly different concept of developing this property needs to be revised to reflect the final proposed development concept of the property reviewed and approved prior to proceeding. 5. The plat should provide additional right of way along Main Street and then facilitate sidewalk construction to 1H 169. 6. The plat should be required to pay $37,950 for the previously constructed left turn lane on Main Street. 7. The plat should be required to pay the current assessment rate for trunk sanitary sewer and water services in Eastern Elk River. If you have any questions regarding these comments, please call. Sincerely, ~JII!adw) Terry J Maurer, P.E. City Engineer S:\PLANNING\Case Files\2004\P 04-11 Carson Business Pk\12 2004 Engineer's memo.doc ..~ BENSHOOF & ASSOCIATES, INC. TRANSPORTATION ENGINEERS AND PLANNERS 10417 EXCELSIOR BOULEVARD, SUITE TWO / HOPKINS,. MN 55343/(952) 238-1667 I FAX (952) 238-1671 December 7; 2004 Refer to File: 03-75 MEMORANDUM TO: Dan Clumpner, Commonweal Development f;pr-- /19 Edward F. Terhaar and Aravind Gottemukkula FROM: RE: Updated Traffic Study for Proposed Development at TH 169 and Main Street in' Elk River, MN PURPOSE AND BACKGROUND The purpose of this memorandum is to present the updated results of our traffic study for the proposed commercial development in the City of Elk River,MN. This report is an update to our report dated May 18,2004. We have updated our work to account for changes in the proposed development plan. . The proposed site is located in the southwest quadrant of the TH (trunk highway) 169/Main Street intersection. The following two questions were addressed inour traffic study: . What would be the traffic impacts of the proposed development af the Main Street intersections with TH 169 and Carson Street during both the a.m. and the p.m. peak hours on a typical weekday? . With the proposed development, what would be the queuing situation on Main Street . between TH 169 and Carson Street? Would these queues be long enough to ,cause blockage at the above two intersections? Figure r shows the project location and the subject intersections. . . . . Mr. DanClumpner December 7, 2004 -2- N t APPROXIMATE SCALE -"^' - o 1600' , COMMONWEAL DEVELOPMENT TRAFFIC STUDY FOR PROPOSED DEVELOPMENT IN ELK RIVER FIGUiRE1 PROJECT LOCATION AND SUBJECT INTERSECTIONS W~ENSHOOF & ASSOCIATES, INC, . ..RANSPORTAnOUENGiMEERSMJDPLANNERS Mr. Dan Clumpner -3- December 7,2004 . Proposed Development Characteristics The proposed development will consist ofthe following uses: e Grocery Store Pharmacy Retail.space Coffee Shop 16,000SF (square~feet) 14,700 SF 19,400 SF 1,800 SF ...I .e e The current site plan is shown in Figure 2. In addition to the proposed development, property located immediately to the south, which is owned by Great River Energy, was assumed to accommodate 18 townhou~es. Access for the proposed development and the Great River Energy property will be provided on Main Street opposite Carson Street. All of the proposed uses are expected to be complete by 2005. Consistent with normal practice, our traffic forecasts and analyses were completed for one year after full completion ofthe proposed development, Le. 2006.. . F ~ . Mr. Dan Clumpner -4- . . '" UJ ~ I \ ij! \ ----l~, '~ :1 1. : ~ I 11 I i! ! !'1i, "',' I I; : "']2> I t~1 : J! E I i' ',~ I [S1; I dJ : I I I I I I I I I I 1 I I I I . I I I I 1 7/5 >- ~/ ~'f;('~</ ~ . /./ \, \" \' \\ 'A '1 \ \ \ \\ ~ \\ \\\ ~ \\1 " . \', \ \\\ <! \\ \ \ \\ \ \ \ \ \ ~ \ \\ ,\,~ \ \ \ \,'\, ' ,C) \\ \ \ \ \ ~ '\.\ '\',' ,\ \, ,ft" '\ ',I" . \ '? ' \\'\ ''''\ \, \ I \\\\ \'\ \ \\ \ .\\ \ \\",\\\ \ \, " .' ,\ \ \ ',\" \ '\\\ \ ,\ \ \ \, ' , \ -' -.i I I I z 5z c..:E lU ~ J-a: -w (/)> h:i2 LLl~ ()...J ZUJ o C) _. - - - ~-'._- ===::> < -=~ --., - - - l.33l:l.lS 'NIV~ _-:... .r- .. ---=-~ r 1. I, -' ( ~ \ < ~ \ '" <..' , 'J) ~~ ~ ~..... ~w V)-~ -- tL:~ ;; :J t- V1 III Q' <!: U . , , I ~ ~ Jo , (I) ; , g I N ~ , I . I , , I i December 7, 2004 J- Z w :2 0.. 9 w > w o ...J i1i 3; Z o :2 :2 o o N W fr ::> C> ii: z <t: ...1 0.. LLI I- - tI) I- Z W 0:: 0:: ,::> () 0: o Z u- - >-01- QWZO: ::>ooww ....0:2> 000..0..0: oog~ ..,..o:w....J U-o..>w ~ ~ .... (/j 0:: W z .:z 0< z-' _<'1. ,",.0 (/)Z w< ~ '~ _ w OUi 0= (f)Cl (f):Z ",<( ~ cd~ tl...t- 0;:: 00:: J:O (/)~ Zz w< roe: ~ Mr. Dan Clumpner -5- December 7, 2004 . EXISTING CONDITIONS The site forthe proposed development presently is undeveloped. North of the site is Main Street, a four lane roadway with a median between Carson Street and TH 169. Carson Street provides access for the development on the north side of Main Street. To the east,. Main Street intersects with TH 169, a four lane highway with a median. Existing geometries and traffic controls at the subject intersections are as follows: -. . . "', . Main StreetITH 169. This intersection presently provides two left turn . lanes; two through lanes, and one right turn lane on all approaches. This intersection presently is controlled by a traffic signal. Although this traffic signal is. setup for coordinated operation withother nearby signalized intersections on TH 169, this signal presently is . . operating uncoordinated. Mn/DOT (Minnesota Department of Transportation) staff has indicated that problems arose due to changes made to this intersection about two years ago. One of the major problems is insufficient space within the intersection for northbound double left turns and the southbound double left turns to operate atthe same time. This led MnlDOT staff to provide lead phasing for northbound left turns and lag phasing for southbound left turns. . With this change in phasing, the existing controller was unable to provide coordination. MnIDOT currently is in the process of evaluating alternative signal timing/phasing plans and controllers to develop a plan that provides coordinated operation for this signal. Mn/DOT's expectation is to develop and implement such a plan by the end of2004. . . Main Street/Carson Street. This intersection presently provides a left turn lane and a through lane on the west approach, a left turn lane, a through lane, and a shared through/right turn lane on the east approach, and one left turn lane and one right turn lane on the north approach. Although the north approach presently is not marked as two lanes, observations at the site indicated that this approach is wide enoughfor two lanes and.motorists were using it as a two-lane approach. This intersection presently is controlled by a stop sign on the north approach.. To better understand existing conditions at the subjectintersections, traffic volumes were collected at these intersections on a typical weekday in January during both the a.m. (7:00 ~ 9:00 a.Iri.) and the p.m. (4:00 - 6:00 p.m.) peak periods. To account for average conditions during.a year, our counts were increased by nine percent, which was based on MnlDOT's seasonal adjustment factors. Existing traffic volumes during both the a.m. and the p.m. peak hours are presented later in this memorandum. . Mr. Dan Clumpner -6- December 7,2004 . TRAFFIC . FORECASTS Trip Generation Trip generation for all uses within the proposed development was developed based on data presented in the Institute of Transportation Engineers' Trip Generation, Seventh Edition, 2003. Trips resulting from this process. are gross trips. Given the mixed..,use characteristics ofthe proposed development, wnichincludes retail and service uses, we expect that a portion of the trips generated by these uses will occur within the site. Based on experience on similar projects, we expect that five percent of the gross total trips generated by the proposed development will be internal trips. Net trips for the proposed development were estimated by applying this five percent reduction to gross trips. The net total trips for the retail uses can be classified into the following three trip types: . New Trips ~ Tbps solely to and from the subject development. . Pass-By Trips- Existing "through" trips on Main Street that will include a stop at the subject development in future. . Diverted Trips - Existing "through" trips on TH 169 that will include a stop at the subject development in future. . Based on data published by the ITE and existing traffic volumes on TH 169 and Main Street, about 50 percent of the net total trips for the supermarket and pharmacy willbe ne~ trips, 30 percent will be diverted trips, and the remaining 20 percent will be passby trips. For the coffee shop, about 30 percent ofthe net total trips will be new trips, 60 percent will be diverted trips, and the remaining 10 percent will be passby trips. For the retail space, about 40 percent of the net total trips will be new trips, 50 percent will be diverted trips, and the remaining 10 percent will be passby trips. The townhouse land use was assumed to consist of all new trips. Table I shows oUr trip generation estimates for the a.m. and the p.m. peak hours on a typical weekday. Comparison of the current trip generation to the previous plan presented in our May 18, 2004 report indicates a decrease in the number oftrips generated in both peak hours with the current plan. . . . = o :+:: eo= "" Q) = Q) G Q.. -i: .....E-- Q) "" - = ..c 0 ~:I: ~ eo= Q) ~ ~ "0 ~ Q) Q) ~ . 0: "" 0 \0 ..... .... ~ CO <J) ..... 0 .... .9 ..... r-- V) 0 \0 0 "" .F 0 .-< .-< r-- .-< .... 0 "" r<'1 r<'1 r<'1 ..... ~ E-< ... E-< E-< 't:: 't:: <ll -= r-- ..... <ll "'::: 1:: V) "" V) 0 ..... 0 r<'1 00 V) 0\ 0 I(') 0 r<'1 I(') ... N .-< .-< .-< t- <ll <ll ;;. ;;. is is ..... ..... <ll ... 0\ C <ll ... "" r-- V) r-- "'l Z ,::; 0\ \0 r<'1 \0 0 \0 ;z: ,::; N .-< ~ .-< 0 t- o: 0 N .... . ~ N ..... N r-- 0 ..... l'- V) "" 0 co .9 0 .-< .-< "'l .9 0 r<'1 N \0 E-< E-< ... ... E-< E-< E ..... E ..... ::: "" ~..\O r<'1 0 "" ::: \0 "" N N 0 "" <J) 0 .... '" 0 .-< .-< ~ <J) '" <:: 0: ~ ~ ..... ..... <ll '" ;z: - \,,0........-1 \0 "" 0 t- Z = \0 r<'1 N 0 "" ,::; .... .... ..... r<'1 .-< "'l . - ~ <:: V) r-- 0\ N C 0 r-- V) ..... V) co ..... r-- c ..... 0\ 0 N r<'1 ..... ..... .... 0 00 N ..... \0 ..... ..... '" E-< .e E-< Q. .C ... E-< ..... E-< ..... ~ ::: 0 r<'1 00 00 0 0\ a: ::: 0\ "" r-- ..... V) \0 0 .-< .-< ..... "" 0 r<'1 ..... r<'1 0\ <ll '" .. z z ..... ..... <ll '" Z = ~ V) 0\ .-< .... Z = ..... r<'1 0 0 M "" N co C .... ..... ..... .-< I(') .... "" .-< r<'1 ,....( .... ~ ll") . M ~ 0\ ..... "" ..... 0\ 0\ N r-- N "" ..... V) 0\ 0 .N V) .... 0 "" .-< .-< r<'1 ..... M 0 ..... \0 V) .-< ..... "" E-< f:-< .9 ..... "" .9 ..... on ... ::: 0\ 00 ..... \0 0 .... ... ::: 00 \0 "" N V) c E-< 0 ,....( \0 .-< ,....( .... E-< 0 r-- r<'1 N \0 M ..... ..... <ll '" Z Z = 0 .-< "" .-< co = ..... r<'1 \0 0\ 0 0\ .... r<'1 ,....( \0 N N M .... 00 r<'1 N ll") ..... c .... M ~ N 0 ..... 0\ r<'1 on ~ r-- r<'1 N t"- V) "" ..... r<'1 I(') ..... \0 N "'l 0 V) N r<'1 .-< 0 t"- ll") ..... E-< ,....( M E-< ..... .-< "" <J) '" .9 .s ... ..... c ... ..... on E-< ::: 0 00 "" r-- ..... M E-< ::: N 00 V) V) V) .... <J) 0 N \0 ,....( .-< .... '" 0 00 r<'1 N \0 M <J) '" 0 0 ... ... 0 0 = N N r-- N I(') = V) ll") r-- N 0 0\ .... r<'1 ..... \0 N N ~ .... 00 r<'1 N \0 ..... .... .-< M . ;<;:: ~ ..... ~ ,,; 1.1-< 1.1-< 1.1-< 1.1-< "2 r.I.. r.I.. r.I.. r.I.. c: if] if] if] if] a if] if] if] if] Cl "E" ;:J ;:J . '" ~. 0 0 0 0 0 0 0 0 So <ll 0 0 0 '" 0 0 0 '- N. 0 "" 0 r-- 00 N 0 "" 0 r-- 00 0 if.i \0" 0\" 000 -.i' .-< if.i v5 0:: 000 ",,0 ,....( 1:i .-< .-< ..... .-< ,....( ..... .-< .-< " ~ " Po .... .... on <l.l E a, ..... e <l.l = <l.l = '" :::.: .... <l.l g '" ~ .... <l.l g '" '" 0 u 0 U <ll en <l.l '" i'i5 <l.l Po ~ <J) ~ t3 G s ~ . '" ~ t3 G a 'E ;:J ~ 0 ....:l ;:J ~ 0 ....:l v Q.....~ .~ tU ~ ..<:: ~ Q....S .~ <l.l ~ ..c: ~ Z ..,.;>;:) () ~ i: c: E- e.> ~ E c: E- .. ""<0 0 0 "-< ro ~ 0 ~o 0 ~ o ~ ~. 0 0 ..c: o ..c: 0 0 0 ~tt: if] Uo. f- E- ~tt: if] uP:; f- E-< . f , ~ Th ~ Mr. Dan Clumpner -8- December 6, 2004 .. Trip Distribution ano Assi2:nment Distribution percentages for the proposed development trips were established based on our traffic counts at the subject intersections, locations of major attractions relative to the proposed site, and the surrounding roadway network. The following are the trip . distribution percentages: · New Trips o 30 percent to ,!nd from the north on TH 169 o 10 percentto and from the south on TH 169 o 40 percent to and. from the west on Main Street o 20 percent to and from the east on CSAH (County State Aid Highway) 12 . Passby Trips o A.M. Peak Hour . 40. percent from the west on Main Street and to the east on CSAH 12 . 60 percent from the east on CSAH 12 and to the west on Main Street o P.M. Peak Hour . 45 percent from the west on Main Street and to the east on CSAH 12 . 55 percent from the east on CSAH 12 and to the weston Main Street . . Diverted Trips o A.M. Peak Hour . 70 percent froll1 the north and to the south on TH 169 . 30 percent from the south and to the north on TH 169 o P.M. Peak Hour . 30 percent from the north and tothe south onTH 169 . 70 percent from the south and to the north on TH 169 Estimated trips for the proposed development were assigned to the surrounding road network based on the above trip distribution percentages to determine development volumes at the subject intersectio.ns. Traffic Volumes As described earlier, we have completed traffic forecasts and analyses for one year after full completion ofthe proposed development, i.e. 2006. Based on historic traffic growth trends on TH 169, we established a five percent per year growth rate for background traffic on TH 169. Similarly, a three percent per year growth rate was established for traffic 011 Main Street. These growth rates were applied to existing volumes at the subject intersections to arrive at 2006 no-build traffic volumes. The 2006 build volumes were established by adding the proposed development volumes to 2006 no-build volumes. Traffic volumes for all these scenarios during both the a.m. and the p.m. peak hours are presented in Figure 3. . . . . ,I'-- <:I" S!? 1::::. I'-- <:I" S!?g1::::. 1010 CQ. 'i'" f'. MAIN 81: JJL 37/39/39 .J '4.2.$/237/230 ~ ~/-/28 ~ FG=,." , EXI8TING,'(200,4} ..r-:= 2006 NO-BUILD I " r- 2006 BUILD XXIXXIXX gs g -..; -..; "" 0 fe.ofe. 0)''''1'-- 10.....10 MAIN 81. JJl 59/63/63.J 504/535/520 ~ ~1-!56 ~ ~ COMMONWEAL DEVELOPMENT W' BENSHOOF & ASSOCIATES, INC. . ' ,,' TllANSPORTATIOHENG1NEERSANDPLAIINERS t-= <f> Z o (/) a: <: Q A.M. PEAK HOUR m '" CD N~~ ~ fO-1:: -...'~ LO ~Ol'~ --....-- 0101;;rl ,0) .... 0') L 34/36/36' ~ '354/$76/366 r +/100 1tr ref?~ :t-~::C . . (/) (/) IJJ Q Q <: IJJ t: (/) r..: (/) z o (/) a: <: Q JJl 36/38/67 .J 144/153/162 ~ 113/1201161 ~ P.M. PEAK HOUR co 10' 0')0 ..-t:.<\! l:\IOlP .:!::.C\l0 coco<\! !g~(;) t!~~ L 32134/34 ~ 375/398/379 r +/153 1tr (/). (/) UJ o o <: UJ 1-. W 1'--0 co 1O'f'-"I:t ::c~.:!:: ,_ - 1 . ..... JJl 12811361217 .J 342/363/382 ~ 90/95/128 ~ TRAFFIC STUDY FOR PROPOSED DEVELOPMENT IN ELK RIVER 0') CD .,,- :I: I- L 143/152/152 +- 240/255/265 r 222/236/236 1ir ('b-oo <\! 0) .c;" <:I" (5:J!?:!:: (OO')<\! --O')'<f' 1010.... (0-.:....'......... ~C;; 10..- 0') CD :I: I- L259/275/275 .~ 263/279/299 r '249/264/264 1ir 1'--"'''' <O.,.....~ ..-0<:1" -... t\t -- CD__'" O'<f'..- .....CD'<f' o-om o~a:J ..-C\Jt") '" co ..- N t NOTTO SCALE FIGURE 3 WEEKDAY PEAK HOUR VOLUMES . TRAFFIC ANALYSES To determine the impacts ofthe proposed development on the subject intersections, capacity analyses were completed for all traffic scenarios described earlier during both the a.m. and the p.m. peak hours. Our capacity analyses were completed using Synchro and the Highway Capacity Software. . For our capacity analyses, we used existing geometrics and traffic controtat the TH 169/Main Street intersection for all three traffic scenarios, existing, 2006no~build, and 2006 build. Although this intersection presently is operating as uncoordinated" Mn/DOT would have operated this intersection as coordinated if a suitable signal phasing and timing plan was developed. Mn/DOT is in the process of identifying a satisfactory plan for this signalto achieve the coordination patterns that were provided to us and implement the plan this summer. Therefore, we used the coordinated signal parameters provided by Mn/DOT staff in our capacity analyses for all traffic scenarios to provide a reasonable comparison of existing and future c6nditions. At the Main Street/Carson Street intersection, we used existing geometrics and traffic control for existing. and 2006 ....... ... no-build conditions. For the 2006 build conditions, we used stop.control on the north and the south approaches, one left turn lane, one through lane, and one right turn lane on the west approach, one left turn lane, one through lane, and one shared through/rightturn lane on the east approach, one shared through/left turn lane and one right turn lane on the north and the south approaches. . Capacity analysis results are presented in terms of Level of Service (LOS), which ranges from A to F. r"OS A represents the best intersection operation, with very little delay for each vehicle using the intersection. LOSF represents the worst intersection operation with e~cessive delay. Most agencies in Minnesota consider that LOS D represents the minimal acceptable LOS for normal peak traffic conditions. Results of our capacity analyses are presented in Figure 4. TH 169/Main Street Intersection. As shown in Figure 3, all movements at the TH 169lMain Street intersection during the. a.m. peak hour are presently operating at LOS D or l:2etter and will operate at D or better for the future scenarios, except for the westbound left turns. The westbound left turns presently are operating at LOS E and will continue to operate at E even after the completion of the proposed development. As indicated in Figure 3, the proposed development will not cause any change in LOS at this intersection during the a.m. peak hour. Although four movements atthe TH 169/Main Street intersection operate at LOSE or F during the p.m. peak hour, the change in LOS from the 2006 no-build condition to the 2006 build condition is minimaL Therefore, it is our opinion that the proposed development will have minimal impacts on the TH 169/Main Street intersection during both the a.m. and the p.m. peak hours. . Main Street/Carson Street. As indicated in Figure 3, all movements at the Main Street/Carson Street intersection are presently operating at LOS D or better and will opewte at LOSD or better for 2006 no-build condition during both the a.m. and the p.m. peak hours, except for the southbound left turns, which will operate at LOS E for the 2006 no-build condition during the . p.m. peak hour. With the proposed development, the northbound and the southbound left turns ,and the through movements willop~rate at LOS F. This situation is not uncommon, especially for left turns and through movements on a minor street approach with stop sign control at a high-volume roadway. Although traffic signal control could provide better operationsat this intersection, this mitigation was not examined given the dose spacing oUess than 400 feet between Carson Street and TH 169. In addition to the capacity analyses, we simulated traffic conditions for the 2006 build condition using the Simtraffic 6 software package. One of the results that the simulation generates is queues for various movements. Our simulation resulted in queuing at both the subject intersections for the 2006 build condition during both the a.m. and the p.m. peak hours. These results clearly indicate that the p.m. peak hour is the most critical period for queuing. The industry practice is to design for the 95th percentile queues. The p.m. peak hour 95th percentile queue for the eastbound movements at the 1'H 169!Main Street intersection is about 276 feet, which principally is caused by through movements. The 95th percentile queuing for the westbound movements at the Main Street/Carson Street intersection is about 74 feet, which . principally is causedby the left turns. These 95th percentile queues are within the available stacking space of about 320 feet on Main Street between Carson Street and TH 169. . Our overall conclusion from the capacity analyses and simulation is that the proposed . development will have minimal impacts on the TH 169!Main Street intersection and on Main Street at Carson Street. We acknowledge that the proposed access plan is not ideal and results in individual movements operating at ppor levels of service. However, given the location of this property and the access constraints that exist, the proposed access location is the best possible solution. . AIthough.other measures such as channelizing islands can be used to improve existing and future LOS E and F operations at the TH 169!Main Street intersection, we understand that - MnIDOT is not planning -on any changes at this intersection. Instead, discussions are underway regarding upgrading TH 169 to a freeway in the future to accommodate the already hightr<jlffic volumes. Considering findings from our analyses and MnIDOT's plans for the future, we do not recommend any changes to Main Street or TH 169 to accommodate the projected 2006 build traJficas the proposed development would not cause any significant . changes in the 2006 no-build operations. . .-. . . . MAIN 81: r-: f./) z .0 (f') a: <( Q ~. <,0 JH~ NAlA~ AlAIA~ +/A~ rfi=...... EXIST.ING... ....<2 004) r-;:=: 2006 NO-BUILD I r 2006 BUILD XXJXXJXX MAIN 8T. ~ ~~ ~~o J!l AlAIA~ AJAlA~ -I-fA, COMMONWEAL DEVELOPMENT W BENSHOOF & ASSOCIATES, INC. .. . TnAHSPOnTJ>,TIONEHGIIlEERSAHDPLANNERS L AlA/A +--. AlAIA r -I-fA ltr OOa::l :J"'-'"'"i""l'"' """i"'~ (/) (/) w o .~ UJ I- m r-: f./) Z o C/) ~ o L A/A/A +-- AlA/A r+/A ~ C'~ ~ C/) (/) uJ o ~ W I- m A.M.. PEAK HOUR ......00 ~-- <<.00 ~oo Jtl Cl:l (0 ...... J: I- L AlA/A +-- C/D/D rEJEJE g~:dllr A/A/A ~ Q.~~ ~~~ P.M. PEAK HOUR <(00 <oc ~oc J!l N t Nor TO SCALE Cl:l (0 .,... J: I- L. AjAJB +-- DIDIO r EJE/E ~~~:d l1r BIBIA -'. W u. 0 V wU::-- -..-..0 wU.iD TRAFFIC STUDYFOR PROPOSED DEVELOPMENT IN ELK RIVER FIGURE 4 WEEKDAY PEAK HOUR LEVE~S OF SERVICE . CONCLUSIONS Based on jnformation presented in this memorandum, we have made the following conclusions: . On a typical weekday, the proposed development will generate an estimated 255 trips (135 entering and 120 exiting) during the a.m. peakhc)Ur and 434 trips (219 entering and 215 exiting) during the p.m. peak hour. The current trip generation for both thea.ill. and p.m. peak hours is lower than the trip. generation for the P!eviousdevelopment plan as presented in our May 18, 2004 report. . Based on our traffic projections, LOS, and queuing results, the proposed development will have minimal impacts. on the TH 169/Main Street intersection and on Main Street at CarsoIi Street. . We.ackIlow1edge that the proposed access plan is not ideal and results in .. individual movements operating at poor levels of service. However, given the location of this property and the access coIlstraints that exist, the proposed access location is the best possible solution. . . , "., r'\.JJt'l'lI> ,.,"\lI......'''........,.\I'"",.,C..,~.;.........,''',..O.,''............:...,I.J.U...... once. I, '''U'C"","" ...O<<.c........... ell\,; . ~ t~/j ry~ G~ %' ~ en I '" ':1 \ U1\ :~i[~~~;[ ~~.g2f:~~g Oct....~.....-:;jnVlVl !!iil!i!!i ..~~ ;~!t~~~ a~ ::0-..0 ~ ~ CARSON BUSINESS PARK ELK RIVER, MN FOR COMMONWEAL DEVELOPMENT PRELIMINARY PLAT z o !iil~illiil!i!!I!!lli~!I!! i ~~!;;~~~~~~tI~~~~~~f~1~;8:~~ ; t::g;:f~2.g;g' lmm 1Il:;j""'C,..J :) ~:;: iii':5 g' ~ 5' 3'~~8:;:S:(b mim ;l 0. <tl 'Q <tl 0 ~H~~n ~'~ij;~~ OC 0.....-0 ~~[~;gi ~~Q~:: ~t5'~ ~ ii ~f~6~g ~~~!~~ i~~~:~ ~2.~~:~ f~~iH ~ :r~'~ g!e.2 ~~ ~ ,~- ~ 2, g: n~ . o~~ C 0 ~ ~gt ~s:-..j 5' Il> ,0 ~~ :~ ~.~ H It ~ " ~ g" ~ ~ ~'~.'g"[~..~g~:'~;'~Qg:2. ~ o , . '5 ~ ~ ~ o ~ o ~ m John Oliver & Associates, Inc. Civil En9ine~ring. Land SUTVliying. Land Planni'/'l.g 580 Dodge Avenue Elk River. Minnesota 55330 763 441 2072 FAX 763 441 5665 Offices in: Elk Rivl?r; Burnsvitle and Brooklyn Center, Minnesota . u !;1g~g! N ~ ~:T' ~.~~~..~~ ~ ..orolll' ..0 ...... <'\1-0 ~"""os'g:~ '0 ~'_ Q 3 '. - 0 ~ ...... ~.~.....mo.::j ~.~ :~ :;:~O~Z;- g: ~2.. zOit~Q 6- [ [0 HiH ~ : o,~ g,S.~~3 0 ~ c.~ ~::;g~: i g :1 ili;i; i t; a!:: ~ ~ g~ ~~~~; Q : ~; fj:'~i g : o ~ <1> 0;;; <II Q Vl <lI 1!l ~-; ~Ha ~ ~.= gill OOlfl::T ~'~ :r~ Oc:g([l.~..... g : !~f~~ ~o 't. 0 ([l 0 ).<1> ~~~~:: ~ ~ ~ HtH 0- .....~ ~ 0 ~ " - ~ [~[f :f' U? g'Q 3 <'\I ~~~ ~ "'.... 0" :0." [[ no z 0-0 ~3=U1 '<.!J't...-< ~'~~ S' S- ~ , " . " " 0 ~~ "-f' '5.Q. :~ ffi.~ Q.~ 0::':; CJ> C ~ ~ 3-it <II _~:!. <1> o " . n~ 2 [ N ~ ~, ~ ~~ "':0. ~[ ,~ ~.~ zO o ~ ~s. .~ x 0 on ~~ ~.'; ?~ 0' Ji. ~'^ ~.-~ "0 2.~" ~ z o ~ ~ o [ " o ii ~ o . " ~ " " . mmm ~~g>~~~~~Q mmm 3 1Il.3 g. ~:::t)0 l~iHH~~ r+ a......(D.a.:F ~~:;~.~~J.i ~~;g~5;g ~e,~ it:g; ~:: ~[~~~~~~ 0" n:) 0 Zc;: ......- :~~~~~:~ ~~[~,~~~'l ~oo~2.gs: ~:f~~ ~.~~~ ~!"'-~iig~;:r ~Iit~~~~ l([l<'\l9.rtI~Oo r61~] [gg: PHHH ~ "'0 ~~;:I ~ ~~ ~CU ~~~ ~~; j':~ g-J~ " " . ~~.~ o 0 i].J ~.~~ 2.~ g~1') o c H -<'~ !.~ ~~ ~V} ~~ ~. g ~\7 c~ ",0 . . ~~ ,u o~ ~~ z' :i ~. ~ ~ ;~~[~:~;[~ K ~ If.[ ['~ ~ K g' ~ ~~~~~~~g~~ e:g~g:~~~o'~ :~~i~ ~ ff.~~~ mm~m 0,......... O.Vl(J'l-l>- !~~~l;[~~g g3~.~.~~~~.~~ J~lf!l!ii! ~?~g~;g~~: Jtt!!fi!! ii: ~ c '2. ::-,0 - e:;J..... no 0- ~ g :;<11 "' ~g ss: o . " 0 ~~ '0 , C ~3. "~ [~ .z~ 00 ~W ~~ , 0 ",0 0" ~p -<'g [ll: iOUJ-'1UJ-l:J> llmr ! 11111 ~~ ~~;...... :'0........ t.~ g~':< s.~ ii(i~ ~ ~ :19.. ~ f;j~ ~ ~o:g~ ~*~~~ 3.NtlI'<. :) ~;~t~ ~~ug e--......:~1Il -<"S- 2, ~~'QgQ~~g g~~~ ~ Ijili!i1!!!! i 6 1"')<'\1 ~ ~ c;'<.:> Cl:;;; ~ mmmm ~~.~~ ~8o g~':~f ti!mmm <,: "' 0 c:.. to c; n .o.::r lilmmt!) ~ ~ a ~ ~~ g ~ ~ ~.g ~~~:lIH ~ [. z- n .;J: "0' ~, Ii :-~ ~.g [; [~i ~. ~ . ~o o C 0 o <'\I ~ ~ !. ::T~ g~ ,>,m o 0 o . ~...... ~~ ~J ~~ ~~ ~~ <D_ , " o "'~ "'''' ~~ ~2. ~. C , Z . 0 g)~ , '" ~~ ~[~ ~ ';C' 9- Cu ~ 3. ~ 0- o I hereby certify that th.ls survey, plan,. or reporl was prepared by me or under rnydirect supervision and that j om' a dul)' licensed Land Surveyor under State of Minnesota Statutes Sections 316.02 326.15. :i VlO-OctJ 1 tnj ~:[e .~~~.~~ :;:~ob1z o ......1Il 0 ~~~H UO'<ll ~: ~ ~,~ !!..:~~~ ;f: ~c: ~ 0 [iHi ~J ~ ~ : :;~~~ ~~~~"~ ~~~.p[ ~HH 8K~~o [~~g~ .....-;g5=.., ;~.~~: i:~g~ a~~t .s. ..... :oi~~~~~ ?~;:l~,~'flQ ~ if '-0 ~~ o ~ ~~ : H i~ ~ ~~ ~ H Vl~ ~~ ~~ ;~ '-~ ~9.. ~8, ;ug: 3. ~~ ~ii o,! ..0 0 ., ;~ ?..o ~: "'if ~g ,,>, }~ p mO ~;; 0' OU1 1l"' ;~ .0 ~;; Of"l"l ~- ',- i~ ~~ ;g ~~ o Z o ~ ~ o " c ii "' c o i ~ DATE 11 /24/04 BK/PG DRAWN BY SMK CHECKED BY' RMB DWG. 7746-12PPLAT3dwQ TEXT, FILE NO: 7746.12-03 Signature: Rick M.. Blom. PlS Date: 11 24/04 lie. No 21729 "":nN <}c: Z ~~- ~ ~ ~.~ 8 ~l; gi; ...' ~c~~ :;J ~ ~<:Y...3 o~ . ~':' ~ ~;; 0 <} ~~~ 3~ ~~ [~~ ~~ :~.~ ~~ o ..... ='! -..j<ll ~~g ~~ g ~.!D ~ '<.10 ~ a.o ~ ~.~ ' ..~~ ~fr~ 3'2. g~; ~6= iii 00 :..:.. ~~~ ~~ ~~~ ~o ~ ~P v 'g.83'~ ~~ o 0 5~g gc[ ~ Ra ~ 5'~1 ~I ii' g, ro - '" ~~E ~~ ~ C;:oo :. =r r:;:;j 0 ~: ::l.1Il" .p.m g~~ ~i :) ~..-..j ~ , ~ <'\I '. Vl-.-; 'U 'U [~ ~ ~ en 0 0 ~3- ~ ~ I r ~ ~ I > t 0 8 ~ ~ 6 z ~~ S ;: .;t<n "' ~g :3s o. " 0 ~~ a-f [~ .. 3 ~ o . . ~g , - ~~ ~ c ~ o o c. o . ! J " "' . ~r ~ ~ o . " -5 '" o ~ ~ m Q,~ . C q~ ~ 0' S'::T . . 0 ~. ~.g ,,!C;:' i~ , ~ ~~ ZC a H ~~ Q~ 5'UJ ~ g if ~f ~.~ ~, ~]' ~~ -<~ s.9" i[% 0' ". c" ~. ~ ~-< ~ ~ REV NO. DATE DESCRIPTION f) OJ>.I U ,...tUJ<>L'", n.o:1f ,..o-,.o:"'...........:-"..'.."'.....n. \I'_I.o:...-r~1 ~."'''''\I, ""''''''''.0:, ,.o:",.o:,^"," ,.oy.U,.,....... 1::.1... j I ..~. ~@.; ~ ;<)8, I ; '''. ' 'c "" J~ .""" 1:" r ..., :t r ,--' j .. , "X~ , o~ f ~.o~ ~, ~~~~~~~n~pt::Jt::J~CJ,-JC)~~ t:Jo .;2566Jj6~~;Q~~~~~~~~ S! .\ h1 f4 n1 ~ r;{ M r~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ., ~ ~ ~ ~ lrl (I) 1.11 ~ (I) lr) lr) vl lI) r~ ~ Ci 2i ~?::~~~~g~~~~~~~I:'!f'>1~~ ~ )~~n~HnH~~)- ~~~ ~ . '" ..) ~ r.) C) C) (;', :~?8:ti~~~~~~~~:.a 2 C') \):ij )~ :~~~~~~;'~;~~~~aJ~~~ Pi ,q~~2~~~s~~~~ ~~~~~ ~r.:; i;';Y1~t;:)r;I:;:JTiri'1F: ~ '101;:(} ~ '-<1 ~~';J;; ~1l~ ~~:.<) ~~~ ~~~' ~ fi:. <: a '/1 ip h1~ f':!"1 ,~ '!;"UO o u.... ;- III g ~~~ ,,~ r~" -0 (,o15='~ z ~ ~~~ 00" ~~. ~ ,.g~ o . o I ( I f , ~ I ~ ~. , <D C I a: , ,~. ~ . I ~ I r ~. ~~S2 Q f:. f:. 2 ~~~~e~0 [ g.o g (J) i:: ~ 8 " ..:1 ~ ~ ~)> :c ~g;5b\f;o~~ [n[0i~~ ~ )> ~ ~ ~ ~ '-< ~ mI~ ~ ~,~ ~ ~ ii~a '" ~ ~ ~ ~ ~~[f~~~l~~ ~ )> I)~ ~.~~,~:~~~ 0 ';l,,5l ~s::;:o.=i~g~ :f E~~~n~~~~~~ . . \N~ e, ~ z o 'ii 01\ o g ~ g ~ . N :~ -gJ "'co,., 0,,"0 c CO" ("1o~ oO~ ~.2-g:' ~g5 . o.~ "'". ;eQ.:U 0-0 -srF ~.~ o u ~. I 16 r- I I ~t i- f" '" : i I r::- ID o , n ~ ~ . -n ., :(> '" c " ~ ~ n :> " '" o c :u \ \ \ ), I \ I \ \ I \ 2,\ \ \ \ \ \ \ --j ~ g '" -< ~ ,., 'il " !il ~ 6 z () I '" North Line of S[ 1/4 of the 1\ r fT1 G'J fT1 Z o // ( ~~, ~C. g ~ ~ ~ ~. ~ .if; ~ * 2 0 g I :;; + I I I I I ~ '::::":':':~l ':'~; I " I,." I '''1 I 1 L_-, ;,; ~ '\. V> !~g~W,~ N - ;~ l~~~~j :T -1 ~NZQ~ !.~ ~ ".go 0 ~ ,~ ~f~~i ". ~ ~~s g~~a~ g :' [~ ~~';it ~ ~ -0 " '" 0 tll!il! ! ~ H a~~: ~ ". ~.~~:[;t~ ~ ~, , ~~~.~~ i I ~;gl n 0 g&~~:? ~ ~!io'H 0 :r ~ l: ::::..--.- ~ 1-" i ~~g: : ~ ~ ~~ t 9" ~ (iI If'..., 'U ~ ~e ;: i~! ; I C, ~ ilIlH!i!! l'>(Qo~o';;(IJa!-g .2~g~g1 l.~~~.~J ;i~f; "';0 (iI ~:~~~ ~ f .;i t ~ n 0 G <b :) ....-n ~:~,i~ 'l: Gle: .., 0 gO;:;:...., o ~ ~.~ a. 9-o~ f ioo:~._ ~ S' c: (fl 't's:~ ".0 0- :. ~"o- ~.-c ~~ ~ u. " 3'~n o 0 ~ ~ ~'~~ ~ K~f o lIlg.... o g<'ll~ (fl ~f~ 0" .. ~~:: ~ ~oii ~~~f \::;:0 r \ U'. ~~ " ~~ ~~ ~ " ~ ~ r ~ " :> r " ,., ~ ~ g ~\ 'll o ~i I '.\ J '~ I' I I , '. -, \ g a . - ~, o 0 ~~ "U' 0"' C . ~[ ~! [~~~~.~~J i~iH~H! . ~ ...." no ~~~ !.~'? .,5.g:g"l It ~.g ~~~ .0 i!i , ;~ no 0- ~~ ~ ~~ . . *~ H ~~ ff I /'.... ,.,)" 3 ~ ~~ i 0. , ~ r a if o o c " [ \ ~ \ f ~ \ ~~l/"- -I ~ ~~, ~ ~ \ ~~~lt \ ~ ~~o8~ Ie !i~_ ~ t;;o~. ::j' , ,'\ \", ,;\S\\\ \~\'t \ ' \8 \: \ .., \ ~,~o_ \ \ =0 . \ ~,O~ \, I '? 't~ \ \, N -"": \ \ \ ~ !:; .\ ~ \ "~"'. '\ I '? ~.._' \ I , "'- , \ >., " ~ \. ~ \ '.:-.- o~ \ ~ ot ' ".~ ~ .~ g,? \.~ .g''b \ ~ ~ '1 SJ ~'. I I \ ~ .~~ -. ,., ~ o. \', '. ... .. I I ,I ~~ 'c_" \ ~s~ .'" ',.l.Q ~ .:.-.':;, '\ , ~ $~ ~.g. ~~ ~~ 1~ ,~ o~ ~~ ~i ~ g I..,'" , . ~ > ,;" \, "ij'.Il~, ~ . ~ o . n ~ , ~ ~ .. . , ' , \ ' ., \'. \ ,U' ~[ ~l ~~ ~ 0 ;0 ~~ ;~ g:i; \ \ \, \ , , , '\ \ \ ~._[ , . I- "\~ ~ t ~:, "l ~\~ '. ~~ I ~\ , ",0, I ~ ~\ \ I : \ ", ;/. ]\,' \ " , " g Q.. z, H .0 ~~ O' ~1 [~ -<~ Q..~ \ \ \ 0 ~ \'''' ~. I ,,- '. ,. , Kl\~ 'J ~ ~\\ t ", 1[ \, c . , ,. iq ..;;:: "- )' ~~ 0' o~ . ~ ~" ~ ". ...., John Oliver & Associates. Inc, Civil Engineering, Land Su,-,,"ying, Land Planning t hereby certify that this survey, plan, or reporl was prepared by me or under my direct supervision and thal I om 0 dul}' Licensed land Surveyor under Stale of. Minnesota Statutes Sections 326.02 '326,15 REV NO CARSON BUSINESS PARK ELK RIVER, MN FOR COMMONWEAL DEVELOPMENT PRELIMINARY PLAT 580 Dodge Avenue River, Minnesota 55330 -441 2072 FAX 763 441 5665 DATE. 11 /24/04 BK/PG, DRAWN BY SMK CHECKED BY: RMB DWG, 7746-12PPLAf3dwq TEXT. 21729 FILE NO, 7746,12 03 Signature: Rick M. 810m. PlS Date: 11/24/04 LtC. No. \ ,-----1,-- \ \ '1----------;-- . \ 100 I \ - I \ % I, \ f1:.\ \ /, ',"- \ 1':/, ',>' , ," '( \ \ \ \ \ ), ~\ ~~ ~\ ~] , "\.,~ \ \ \ \\ \\ \ '\ 00' ... , --- \ , " " ' \ - , " '..-) 'i " , ' -::" "' , '..._J \ \ , '''" , " ". \"\ ". " -\ \ '. " , \1 " .,'''-.- DATE DESCRIPTION . -;~\ , , ,'.... " ",:k, '..I' r1,", \';'...~ ~! \ mr '0~ \ \ \ \ ~~.., '..~"';,. \ \ \ \ \ \ \ \ . d'OJ ,...,,,,.,...... n"'\I'..g-''''.....~..n<;..,m..'''n.\.;..u.,'',...'''"'''............."\l. runnUc.;l, 'U',"'........ ,......'Ut""M, C... J_._._____~~_____" . . . 0' n .l ~ r 1'0 ~ Z g ~ "' I : I : I : I:,;: : ,:,: I 1<:) 1 '" : I'" I : I ij~ : ,..".".,:.:t: . . u IL ~--l ~' ':':-7 - -~ -L ~:7 - JL:~~. ~ 7' 0 ~ -- .' ':g _'-~ 2 "'._ ~~ ~/ "'\ 2 #". \ "Yo/ S:;: 1,,,q, r ..., I I r'..-" r.i'f"~:".,. ,*,'<1./' '" .,_1;1; \ ( \ '" ""I."'" -'Of""" j I' ~ . ." .", ,J' '.L_L_ I .......... _ _ _ _ _, _- _-----r - ---=-=- =- ~ ~~~ ~':--------;,.-:::~~" ~'~I '"'' ." .... l'-- ":"" ~ \, 1 :t~""c",.L_ . "",":',", ,," ",-, -' -"C ",,';;~u, \1 ,. /.\ rr, (:~ ----- :g I :g.,- ,~--~ l---- '- '.,. \ ~2: ~ tb .'},-::.. _u\ t X I Q I '_"J.,. I " \J I =:::11) ~;;: I -., 1 Lt:'hC)r) O-::j ;~I ~ lc:) n.,'~"~- ;......:';~~~ () ~ \ I' ,<: '<( -j $R rT "'1 -Uo g ~ I.u C)PJ~.~ ...-Qg <;;.,/ '~. ;'; S., .'-' ~:<! () I ::I "oL._-A. '"'i ~-~- ~ I' , 'ii', '-CC~----j<'] 3~'f'" I \~~t ~ ):,~:.. I -, '~". - - ',\-,t I ~:] \ I /' :~:;.~ <l,j .-. I .:::. 'tI \ + -~="1="~ I -,-' I < I / ;:::. // \ I ' " 'f I r::'=]-~~~; I/~;'~,:;" I I ",r.J " r "I...~ / " I I ..: c;i I) ...; \ .J l-~lL}--~l J'/ : :",u"lf .'~\,\ It I \~k".Q~n "'n" ',""L' "f- --1' ~ r ~~\",;! ~ l~ /' ~ . /,%,r~ '0 ~..,~- I " ~' -,/ I - - - :00'1""'-'=-".7'-' -" X -/ v-)~, \ 'n I' - \ - / /' '''. .\1 .... /, . ',I T I ....1l ,'V "~: , I~ ' "'1' \ "~~'11- \'. :1,[ 1 --I~\' , "'", 1 . " I ' I \ '\( "", l ,--L------~-1~.~' I: '. .,; I 1 ~, CD! 10' V'" .c~ n I u , , , ) / \ / 1 / \ / 'i\ / 100 u\" \ \ , \ a\ -"L --.i _ _ ,- ~ --\ \ \ \ \ \ , \ \.... I, 1 , \. , \=6 "- 1 , \ ' 1 100' 1 \-________-~ _ _ - - -- \------\--~---- -~- - - ~ - ~\~ - - ~----_. : \ \----,~----;r----- I \ _ .. / I \ 17; /,' .~ \ I,' \-~. I 1 /'-', }. I 1'( -:'.'. ,,' II \ '\ \~\- '-~~:" -';';-~ '-}.~ ',I' I ~ \ 1\\ \: .' \ -'\ ';;, \ \ \,. \ \ \'\ \ \ \':, \ \ \ ::, \ \ \ '\ \ II, \ III , \ \ '\\ \\ '\ '\ -'...j" '...("."';, -~ '-j '" o n ^ n o z (f) -j '" c n -j is z fTI Z -j '" :>> z n fTI \\~. \I " 0. C - 2:"- \ 1 \ I N I \ \ <I" \ \ f' \ \ \ \ :\' S-s: o , x co '=.0 .~ \ , \ \ ...", \, L","\ \ .... \ , , \ \ 1 \ \ \ \ \ \ 1 \ '. \ ~ I~ I I J ~ D ~ ~ ~ ~ ~r ~ " 0 I I Ul 0 ~ z n I~ ~ P Iii a " " " " " " '" " ~ " " ;;J ~ " " " x " " 'il 'il ~ 'il Ui a Ui ~ Z .; " .; ~ 0 " ~ ~ 0 z ~ z ~ ~ is 8 ~ C) 8 C) 0 Ul a " " n " ~ " =i ~ Ul Ul U> .; n 0 9 ~ " .; ~ 0 ~ " ~ '1 ~ z ~ '1 " g ~ .; "< " " U> \1 n \1 ~ ~ g \1 ~ Ul '" ~ '" ~ ~ " ~ .; c 0 '1 z 0 z '" ~ ~ z " ~ fTI '" o !!1 o z n o z -j '" o r (f) r= -j ." fTI Z n fTI , \ 1 1 .. " \",~ \OI~ '9,,~ 1!_r<' ~.~ ~r. ~"" ., \.~~-_.. \ \ '\\\ \ \ \ ...., ___,---. ,n -~--:~. -_',,'..> ~_-"----' -..,--.-.-- \~'" .- ,-,- -~~- -~~ '\ ..-'-~--~--- .-' I.. _ _,-...- '"74 "",\ //~ ~., ~...-'" /-'.~.':= ",' , \~~ c;-; CARSON BUSINESS PARK ELK RIVER. MN FOR COMMONWEAL DEVELOPMENT PRELIMINARY GRADING PLAN . . I ~eby certIfy that thiS pion, spec If- John Oltver & ASSOCIates, Inc. <)6heI~r report wos pre pored by me Cwli Engtneenng, Land SUTVt'lI1-ng Lo.nd Plnnfl1.ng or u, ~ dIrect supervisIon and 580 Dodge Avenue that I I 1 O~t. Licensed PI ofess 0nol Elk RWeT. M1.nnesota 55330 Engineer er ~JT}~ of Minnesota 763-441-2072 FAX 763-441-5665 Statutes See: I :tVt!)-;32615 Offtces 1.n Elk Rwer. Burnsm{le /V~ if and Brooklyn Center, Minnesota. Slgnalure:t): ,Joseph D PelawQ, Dote' 5/24/04 Lie. No 426 3 DATE, 5/24/04 DESIGN BY' DC DRAWN BY, ERW BJC CHECKED BY, DC DWG 774B-12PGRADU TEXT' NONE FILE NO.: 77 46.12 -011 REV NO. 1 DATE 11 29 04 DESCRIPTION DELINEATOR REVISIONS REVISED GRADING U1\ ,....J "".UII:II.i1.O ."""f ,..c-''''''''"\oI..nl;I..'..,''.....n'''~..c- ''''I''"U ',~,u"lI, r-u .,........ 'iI<I""'UU.. .......;;0;;0 1""..... e,.. ---"-' . . . cHe~.CJ ()FZ~ Sl~"l~ Vl>lai-l >l_ -l ~~~o ~5~~ . ~~~ 0, I ~~; 0-<" ~~~ 31 .., ~Jl '" . "",J}- -+ )/1 '" - '""';:"~Q;;;- :'> I I I I,', )> I :~; I ~~: I'" ..j "H .., a~~~~~~ ~~:~~~- .~bm7<-iOi ~~~~d 6Sl !"?< Z;g ~ o :-__JL - () I '" \ \ \ \ \ \ > II \ I \~.), ' I \ II \~ ,., Q \ \ \ \ )>. -T'l " --1 , , \\ '.' ~l ' f ~."'II ",1.~ -,:7 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ..;:- , --' "'...:"" ./ _J -, ,- , I.....).., -, . - -~,-- " ./ :,,-]'-- ---- -" I \1 ...'\ ... t\' I ----~-_-_I_~L~\ , I~~ I " '...,...J ,~~ "', ---- ~ ), :; _-I ( , i $ I \ '" \ \ , I ~ ~ "- :: I I I . '5 '" I x () '" I " -l I . 0 z ~ I I I :: I I "'- " "'- ~ - " ~.f:c I I I I >., r r .,1. ... r Vl "'- :E ,. I ,. z I I if> -1 :; g l f"l ,. I ;0 '" I " -< I ~ ,. Vl , I ... z '" I ~ g; :E if> '" I '" I I I ,. Vl r Z r I ,. OJ r f"l r " f"l 2 ~ '" \'.! g ;0 x x " 0 Vi Vi Vi " " -l -t -l < 0 z z z () Vl " " " '" ~ Vl " Vl :E Vl '" " "1 ;0 Vl -t ,. ,. -1 0 -t Z .g '" 0 ;0 1"1 :; Vl ;0 " :u ,. " Vl " :u Vl 1"1 ,. -< '" :E Z Vl :E 1"1 1"1 1"1 :u :E :u '" ;0, ~ r g '; ~ 10 ~ ~l o...~ .,,'" q,f, ~ ~ ~-~~-~\ \ P'.? - \ 1(- \ ;' / \; / ,I \ I /~ \ // ;/fflRl~ _ r" ./' flh>>QI \ '\\ 'F ~~ ~fi ~ \, I.' !;N \ '"i; )> \ \~ ~ \ 1\ \ 1\\ ,r \ ~\\ 6; \ \';\ r \ ~i ~ \ \\~\ \ \ \'\ '\0. i ~r~. \ \ .\ I'" .. \ \'\, -:';;I, I, I \;\ \~ \ \ >\.~ J I I .-",,,,-~ . \ 0 ,', . --/- .I' \X\ _/'-~-----,/--/'- ::::::~~~ , \ I ,---/ __', \ \\\~\_-'--~~ - - - ------------------ \ \ :\ /-rJO - - _--- I \ ",::\<..-:t:::.:::.::.>___-=::------- \ \ \ ' __---- -"\ I, \ e\\ ';"'" \ I , ,-', .. \ ),"" ------.-----"-,----:':::-~.-----.------------------~ \'0 .. ~.. 0 '< f. \ \ ~ \ g, f I \ . \ "- < \ " .- 5 ~\ \ --- \~ ~ (Jl\ CARSON BUSINESS PARK ELK RIVER, MN FOR COMMONWEAL DEVELOPMENT PRELIMINARY UTILITY PLAN John Oliver & Associates, Inc, ~~ebyrCer~~~rllh~~sl~;eg~~~d ~ec~; Civil. Engineermg., Land Surveym., Land Planning ~x::')ZS- dIrect. supervlsio_n an~ 580 Dodge Avenue. , thot.~~~j O~UIY. Licensed. PtOfeSSlonol Elk River, Minnesota 55330 ' Eng,"eer or !if,I~OI M,"nesOI.a 763-441-2072 FAX 763-441-5665 Slalules ,see 17 VI/J-;26.15 Offices in.~_ Elk River. BurnsviUe. C:' t. / V" and Brooklyn Center, Minnesota ....lgna ure. ... ~ . Joseph D Pelawo~ . . Date: 5/24/04 lie. No.4 6- DATE 5/24/04 DESIGN BY JDP DRAWN BY, BJC CHECKED BY: --tDP DWG' 7746-12PUTlU TEXT: NONE FILE NO,' 7746,12-08 REV NO DATE 0] 4 DESCRJPTlON REVISED GRADING .,,~ '-'UJ"""'" ru:".'..O"I"''''"\lV'""I:LI..,..'''I'l'\lI......''''....';'''~,V'''ij, ....Olle, 'UI,,,,,,^,,, '......lAlr"", e,... . . . w ~O I ~ _r:: : ~ ; ,; '. ; ~ ; { ( : f : 1 I I I I,', 'c. I::; I ~~: I'" ni I ~n ," '" n I '" \ \ I \1 \ It\ I . \ I I \ I I \ I I \ I \ . .~f'._. ,_~ ~"" " . I I I I I I I -;~ (_.I 1 + - - -c- i --r- I :~: I / I I / 'I r - - - 1 ~,; ~ I('/I~ , , " /,., , I ' ,..r- -1 '.' '-- I I '" '.' /1 '-.j "'. I L_J <,/ ~ '" " ...-1 - ---- 'J Ar--' '--- /' \. . / " 0 :0;-1- - ~ . Y)>, 'q\ \ / /' . " \' " / '.' :', \. }l v ,( 1\ ~\. '''11, ..t~l ..\ [ I ~~\ l \ \ l - - - - L - ~ - -1- - L-fs ---- /--\ , ~ $ 'fl \ "- \ ~ I g- o. :: I I I >I- \~ \ \ s f. \ \ \ ~. \ -, S f. \ ' ..... I "" ~ I f. , I \ ~ " \ '--- \ ' ~ II' II' :: \ ~ \ ~ g \ ii -u g f. ~ z \ \ II' \ I I I :: "- "- " L r ~ "-"- \ " ~ II' \ \ f. \ '" n ~ z g ~ '" '" -g; ~ \ ~ \In ~ In\ CARSON BUSINESS PARK ELK RIVER, MN FOR COMMONWEAL DEVELOPMENT PRELIMINARY SITE PLAN John Oliver & Associates, Inc. ~K:by rcer~t~Uh~~st~~.~~~~d ~e~; Ci"it Eng'n..,.ing, Land Su","ving', Land Planning 't:"':'rf;;j.1:'f:- dired., supervision Gn~ 580 Dodge Avenue. ..hot, ~~~O~iUIY . LICensed, Professional Elk. River, Minnesota 55330 Engineer. ~ ~r . t te of Minnesota 763_441_~072 FAX 763-441-5665 Slolutes See , 1~1J-,32615 Offic2S in: Elk Rivl:r, Bu.rnsville Signature: . I V. and Brooklyn Center, MlnnEsota . h D P J;-- . ,Josep.. elowo, Dale: 5/21/04 Lie ~o_ 4 6 DATE' 5/24/04 DESIGN 8Y' DC DRAWN BY: RJH ,ERW CHECKED BY DC OWG 7746-12PSITE3 TEXT' NONE FILE NO,: 7746.12-08 ~~v DATE 2 12 07 04 DESCRIPTION REVISED GRADING