Loading...
5.6 & 5.7 Item # 5.6. & 5.7. ity of Ak River MEMORANDUM TO: The Planning Commission FROM: Stephen Wensman, Planner DATE: June 27, 2000 SUBJECT: Request for Rezoning, Preliminary Plat, and a Conditional Use Permit for Twin Lakes Town homes, Public Hearing Case No. P 00-7 Request Riverside Development requests approval of the following: A. Rezoning of a 24-acre parcel from R3 (Townhouse /Multifamily Residential) to • PUD (Planned Unit Development). B. Preliminary Plat of a 71-lot town house development consisting of 33 single- family detached town homes and 38 twin homes. C. Conditional Use Permit of a 71-lot town house development consisting of 33 single-family detached town homes and 38 twin homes. Location General description: That part of the SW 1/ of the SW 1/4 of Section 35, Township 33, Range 26, north of Twin Lakes Road at the 6th Street NW alignment. Zoning/Land Use R3 (Townhouse/Multiple Family Residential) /MR (Medium Density Residential) Attachments • Location Map • Preliminary Site and Utility Plan, revised on 6/20/00 • Preliminary Grading Plan, revised on 6/20/00 • Preliminary Landscape Plan, revised on 6/20/00 • Preliminary Plat • • Town home and Twin home plans and elevations. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD & Phone: (612) 441-7420 • Fax: (612)441-7425 Memo to the Planning Commission/P 00-7 June 27,2000 Page 2 • Howard R. Green Memorandum • Overview: The applicant proposes to construct a 71-lot townhouse development consisting of 33 single-family detached town homes and 38 twin homes with an internal trail system and an active play area behind some of the lots. The single-family detached town home is a new concept in housing. As with twin homes, the property owner owns the land under the house and some additional setback area with the remaining land under ownership of a homeowners association. With twin homes, all external maintenance is the responsibility of a homeowners association. With the single- family detached concept the property owner is responsible for maintenance of the outside facade, roof and driveway. On May 23, 2000, the Planning Commission tabled this request by Riverside Development for rezoning, preliminary plat and conditional use permit in order to gather more information. The property was rezoned on December 21, 1998 from Ric to R3 in anticipation of a town house project. Since the rezoning, staff determined that the project does not conform to the current R3 requirements and should instead be zoned as a Planned Unit Development in order to better address the issues of private roads, common open space, and lot requirements. 411 The property lies northwest of Twin Lakes Road at the 6th Street NW alignment. It is across Twin Lakes Road from the Trott Brook Farms development where another 35 town homes will be built out of the roughly 300 total townhouse units in Trott Brook Farms. Analysis: Existing Conditions The site surrounds two existing single-family homes with driveway access on Twin Lakes Road. The land is mostly open rolling hills with a ditch, small wetlands and some wooded areas adjacent to existing home sites. The southerly most wetland near 5th Street has open water. Crossing the property is a high-pressure gas line easement and a power line easement. Any grading within these easements will require the approval from the easement holders. Phasing The applicant proposes to develop the property in two phases in order to proceed with a project now leaving wetland issues to be dealt with in the second phase. • \\elkriver\sys\shrdoc\planning\stevewe n\pcmmo\p00-7.doc Memo to the Planning Commission/P 00-7 June 27,2000 Page 3 • Setbacks With town homes and twin homes, the property owner owns the land under the house and some additional setback area with the remaining land under ownership of a homeowners association. As proposed, the single family detached town homes will have setbacks from property lines as follows: • Front - 15 feet • Side - 5 feet • Rear - 5 feet As proposed, the twin homes will have setbacks from property lines as follows: • Front - 5 feet • Side - 5 feet • Rear - 15 feet The setbacks from the property line should be large enough to accommodate any future decks, patios and to ensure a minimum of 3 feet from any building wall opening such as windows or doors. As proposed, all town homes and twin homes will be setback a minimum of 22-feet from the private roads with room for 2 cars parked in the driveway. The detached single-family town homes will have a minimum distance between structures of 12.5 feet with an average distance of around 15 feet. As proposed, the twin homes will have a minimum distance between structures of 20 feet. In the City, typical single- family homes have a minimum distance between structures of 15 feet. The proposed single-family detached town home lots have an area of 3280 SF. The proposed twin home lots have an area of 2660 SF. Town home /Twin home Elevations The Commission and Council should review the town home and twin home plans and elevations, as they are part of the PUD approval. Density The overall density of the 71 total units townhouse project on 24 acres is 2.9 units per acre. This is low compared to the townhouse density of around 6.5 units per acre in the Trott Brook Farms development. Typical single-family residential density is 3.5 units per acre (12,000 SF lots). The overall density in Trott Brook with townhouses and single-family homes is about 2.5 units per acre by comparison. S \\elkriver\sys\shrdoc\planning\stevewen\pcmmo\p00-7.doc Memo to the Planning Commission/P 00-7 June 27,2000 Page 4 Roads • Access to the property will be from 6th Street NW, from the old County Road 13 (to be cul-de-saced) and from County Road 13 (Twin Lakes Road). All roads in the development are proposed to be 30-feet wide (back to back) private roads. This is narrower than the City standard of 30-feet wide (face to face) but wider than other private roads in the City. Due to the narrower width, the roads will need to be signed, "No Parking," on one side. Private roads are held in common and maintained by the homeowners association. The City will not be responsible for maintenance, replacement, or plowing of these proposed roads. To tie into existing utilities, the developer will have to disrupt a portion of the existing 6th Street NW. Presently, a portion of this right-of-way is paved and is being used for parking by the adjacent townhouses. This right-of-way should be restored with turf and the existing use as parking be eliminated. Sherburne County Recommendation The County regulates the amount of right-of-way needed and access points along County Roads. The development proposes to have one access point onto Twin Lakes Road (County Road 113). The plans have been sent to the County for review and their preliminary comments include the need for a right turn lane into the project. Trail/Fire Lane 411 The two main roads in the plat are connected by a trail/fire lane. The trail/fire lane will have to be designed and constructed to the Fire Chiefs specifications with a 20 foot width, maintained free of snow and able to support emergency vehicles. A breakaway barrier will have to be installed to keep cut-through traffic off of the trail and this barrier will have to be approved by both the Police and Fire Chiefs. The barrier should be vandal proof. Trails The proposed trails connect the cul-de-sacs and the central recreation area. The trail along the Northern Natural Gas corridor complies with the Master Park and Recreation Trail Plan. The developer has also provided a trail in the powerline easement that connects 6th Street and Line Avenue. Parking Each unit has a double car garage and room for two additional cars in the driveways. Parking will be allowed on one side of the private road. No additional parking has been provided besides that which is allowed on the roads. The parking provided by the driveways and the roads should provide adequate visitor and guest parking. • \\elkriver\sys\shrdoc\planning\stevewe n\pcmmo\p00-7.doc Memo to the Planning Commission/P 00-7 June 27,2000 Page 5 Wetland Conservation Act • As proposed, Phase One of the project minimizes the impacts on the existing wetlands consistent with the Wetland Conservation Act. In Phase Two, the developer proposes greater wetland impacts requiring a review by the Technical Review Panel and the Army Corps of Engineers. Approval of Phase Two will be contingent on the recommendations of the Technical Panel review and subject to an Army Corps permit. Access to Adjacent Properties Staff determined that there is adequate access to adjacent undeveloped properties and no additional access will be required through this plat. Drainage and Utility Easements A minimum ten-foot drainage and utility easements are required around the perimeter of the entire parcel, over wetlands and public utilities. (See the attached City Engineer's Memorandum) Grading The entire site will be significantly modified leaving little existing vegetation or natural topography. The grading proposed for Phase Two will require significant fill • material and the relocation of the ditch. Phase Two grading will be reviewed in conjunction with the review by the Technical Review Panel. Tree Preservation Roughly 1/4 of the site is made up of lowland trees scattered across the site. Because of the extensive amount of grading proposed, there will be no trees remaining after construction. Trees located on adjacent properties will need to be protected from construction with fencing at the drip line. Landscaping The proposed landscape plan provides more than one shade tree per unit and provides significant screening under the powerline easement and around the existing residential properties. The number of trees, the species and size of trees conform to the Elk River Landscape Ordinance. The cul-de-sac islands will be planted with trees and turf grass. All landscaped areas will be irrigated as per City Ordinance, including the cul-de-sac islands. Development Signs No development signs have been indicated, however a City of Elk River Sign Permit is required prior to construction of a sign. Such signs should be located outside of • drainage easements and maintained by the homeowners association. \\elkriver\sys\shrdoc\planning\stevewen\pcmmo\p00-7.doc Memo to the Planning Commission/P 00-7 June 27,2000 Page 6 Active Park Area • The developer is proposing to construct a private play structure in the active park area. The structure will likely include: swings, slide, and a climber with a pea- gravel surface complying with the ADA requirements. The community trail passes through the recreation area. Park Dedication The Park and Recreation Commission recommended that an easement be granted to the City for trail purposes consistent with the Master Park and Recreation Plan and that the City accepts a cash dedication in lieu of land. The developer is required to grade the site as trail ready. Northern Natural Gas has been contacted regarding the gas easement, however the City has received no response to date. Cash dedication at the current rate at the time of final plat will also be required. Planning Commission At the May 23, 2000 Public Hearing, the Commissioners discussed the following concerns for staff to relay to the developer: 1. Cul-de-sac near Unit#9 town home 2. Sidewalk or trail from Unit#25 around the pond to Unit#57 3. Additional trees • 4. Landscape plan to include turn-a-rounds 5. Trail connection as proposed in Master Park Plan 6. Elevations provided for town homes 7. Detail on theme 8. Active park area 9. Clarify how wetlands fit in with houses 10. Grading plan be provided Other discussion items included: 1. Density 2. Building elevations with brick 3. Location of trails 4. Tree preservation and replacement 5. Parking The revised plans submitted by the developer have addressed many of the concerns raised by the Commission. Recommendation Staff recommends that the Planning Commission recommend to the City Council a zone change from R3 (Townhouse/Multiple Family Residential) to PUD (Planned • Unit Development) for the subject parcel with the following findings of fact: \\elkriver\sys\shrdoc\planning\stevewen\pcm mo\p 00-7.doc Memo to the Planning Commission/P 00-7 June 27,2000 Page 7 1. THAT THE REZONING IS CONSISTENT WITH THE CITY'S • COMPREHENSIVE PLAN. 2. THAT THE REZONING WILL NOT CREATE ADVERSE IMPACTS TO ADJACENT USES. 3. THAT THE REZONING TO PUD WILL ALLOW FLEXIBILITY OF DESIGN AND HOUSING TYPES TO BETTER MEET THE NEEDS OF RESIDENTS. Staff also recommends that the Planning Commission recommend approval of the preliminary plat and conditional use permit for Twin Lakes Townhomes, P 00-7, with the following conditions: 1. THAT THE COMMENTS OF THE COUNTY HIGHWAY ENGINEER BE INCORPORATED INTO THE DEVELOPMENT PLANS AND THAT AN ACCESS PERMIT BE OBTAINED FROM SHERBURNE COUNTY FOR THE PROPOSED ACCESS ONTO COUNTY ROAD 13 PRIOR TO CONSTRUCTION. 2. A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS AND CONDITIONS OF THE PLAT APPROVAL. 3. THAT THE DEVELOPER PROVIDES HOMEOWNERS ASSOCIATION DOCUMENTS FOR THE CITY ATTORNEYS REVIEW AND APPROVAL PRIOR TO FINAL PLAT. • 4. SURFACE WATER MANAGEMENT FEE BE PAID IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT PRIOR TO RELEASING THE PLAT FOR RECORDING WITH SHERBURNE COUNTY. 5. PARK DEDICATION FEE AND TRAIL FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING WITH SHERBURNE COUNTY. 6. THAT AN EASEMENT BE PROVIDED FOR A CITY TRAIL AS RECOMMENDED BY THE PARK AND RECREATION COMMISSION OVER THE EAST AND WEST TRAILS TO ALLOW PUBLIC ACCESS. 7. THAT THE TRAIL/FIRE LANE BE DESIGNED AND CONSTRUCTED AS APPROVED BY THE FIRE CHIEF INCLUDING A BREAK-AWAY BARRIER APPROVED BY THE POLICE AND FIRE CHIEF'S. 8. THAT THE CITY ENGINEER'S COMMENTS BE INCORPORATED INTO THE PRELIMINARY PLAT AND SITE PLANS. 9. THAT ALL LANDSCAPED AREAS BE IRRIGATED. 10. THAT PHASE TWO BE CONTINGENT ON THE RECOMMENDATIONS OF THE TECH PANEL REVIEW AND ARMY CORPS OF ENGINEER REVIEWS. 11. THAT THE DEVELOPER OBTAINS WRITTEN APPROVAL FROM THE 0 UTILITIES TO GRADE IN THE GAS AND POWER LINE EASEMENTS. \\elkriver\sys\shrdoc\planning\stevewen\pcmmo\p00-7.doc Memo to the Planning Commission/P 00-7 June 27,2000 Page 8 12. THAT THE PARKING AND PAVEMENT BE REMOVED FROM THE 6TH S STREET BOULEVARD WHERE DISRUPTED BY UTILITY WORK AND RESTORED WITH TURF. 13. THAT ANY PROPOSED DEVELOPMENT SIGNS BE SHOWN ON THE DEVELOPMENT PLANS AND THAT A SIGN PERMIT BE OBTAINED FROM THE CITY PRIOR TO INSTALLATION OF ANY SIGNS. 14. THAT THE ROADS BE LIMITED TO PARKING ON ONE SIDE OF THE STREET WITH SIGNS INDICATING NO PARKING. 15. THAT ANY TREES ON OR OFF SITE, NEAR THE LIMIT OF GRADING, THAT ARE TO BE PROTECTED,BE FENCED WITH A SNOW FENCE PRIOR TO TREE REMOVAL OR CONSTRUCTION OF THE PUBLIC IMPROVEMENTS AT THE DRIPLINE TO PREVENT DAMAGE TO TREES BY INADVERTENT GRADING,EROSION, SOIL COMPACTION AND STORAGE OF DEBRIS OR EQUIPMENT IN THE TREES. 16. THAT THE PLAT INCLUDE THE DRAINAGE AND UTLITY EASEMENTS AS DETERMINED BY THE CITY ENGINEER. • \\elkriver\sys\shrdoc\planning\stevewe n\pcm mo\p00-7.doc - .... .. • ________. - i ',--Kr„:,, ' • . IC* '-':A..' Nib.'Alan' ••11=I nom• / .1..•,• • : it A i '". 11 S. .02.T. 4% ,0 Sok VI' lilt "i II la ... i LOCATION • c Ric r *Airmilli • 1 _ • . ., IN.411fil Ilt - - i-4 5. ••N Emiiim ,,9-0:11-=-11 111111',•:. freitriS AN mak,i iiiiii -. =...• -.-rmu, .,,,,, iiia •tvrti ','I"' Aililosiwrov4re rove.7,...4.400,vff, LION'S ••=ri 4.!..',It All zi•i.i.V.:• =mr: 71 • =MI - luir. 11. 41144‘ '.... qiit =4:17.0 Ir.. • o. • .10 A E :_•':'-ir.e..1t. • • PARK — ME ua1smtBaunilmltviagirea—ksit1ualr.%o.p-ft,-.P.d;!vA-1.41.::4 l7 eRArakE4p;k'.''tr.,:.,%v'I14MiC::.;g11d;iLcX:47.1...;7_;.;4.'V,,A44i.,I,-„avf1g1.1rA"44v1e4..0L,q110 ,- .4t - -11 •~MIEllt16 4 al BE eng umi tmh.• '<Z- ear',IMF iii4 •÷°,-., . ligl wan. Ric r:-..ii zos a . cum 41,;.,,, ... ____:_. iutprivit • , .. - . il, k 1.4" 1101 , • -mtkegn ID L._. m ".;• . . 1, iii reilia mom AT !Ian_ .11!ii ,;1,4 • , "Di.. 4.. ,. •,,,,,,,,:::: ...MB allf illibi 1 C16 111U1 0 OTri • . ,...{...:,''', - I 1 P1-444,0;14 r -J1ww..11.: e IME 4•;1:, 4.- . 077•PLOLA. Ft ‘ malik ri 4"as isig am,It* -,:V al It<•. -.411211111i-'anl PRII IL VIM .; ...._.. ....mg.11.....1_ .--.• PENEFORA S, .'Ill 1114 IlliX; iii-.61111t--- ,-,,-,,,.:• – :- — flg7Pit ilr" X. / I •-‘k vim, t mind --, i ri 1 0 ! •;.. Iiiti 12"4"....t .'"k, P\ 1 11. an ...,.• S.. 11, .... :45.- • i ....._ ......... .... 0 . RD ; ,. , Rid .. • _ . .. .. . .._ ...4;oit, , 1 cir ' *L 178TH "4,44 -- ..-.5-4, .. 177Th . t '-'1i?' -7.%, • -- , % ro i'• .-.. , • IV • L 175Th 1--- . ., '14, •:,A T 1 • ? 175Th cc i.' U • ,... •=, lz 1..,. ..:.; r.-... • \ ' • .. 1 • . . • 4 / \(' ( ZONING N • i 44, '..•m ..C_Ity of . /.1„-..„. MAP ..,:. ... ..' River CU 00- 19 • 13065 Orono Parkway • P.O. Box 490 CASE: P 00-7 Elk River, MN 55330 ZC 00-5 0 0 . /1 Me.PrMr RP,' KIAOIED 101M11/C•ES-S.1 .: ,,/1./. TWIN LAKES TOWNHOIVTE-;1 TM KY'S-30 --.Wr-2. •-2-J— k-r- K...K.... • ,j ••• / if ELK RIVER, MINNESOTA / NU/ft_,:14E.AerF,, i , , iii, ,SITE MIR ---j ;1 I/I ' •• I * ,.. _._ ,.. , 1 .11111 /Ilk VP:W i„,.....____,.......____/fr' .N. 'i.(1,sb4, •Airriar"-"'"' DC.DOM BMW.POSt .. In • ..., 1 1 ON 414 4.W. / Alik i& ' 401 14-r-v.-aiocK 1 A N.... -----</i4411* - - _ , , - litliff44*-- ,. ,., =,,,....._.,.. ,, ... ,, , , • ,, / i , ... I lip 401 - ilit .Titiefts, itipr47. , „•••_ esti '-**w .,.://‘ - . .. ,, ___, ) //// . Ait ,.., ) .,. , it •-.' 00 „,...__„_____„ ,:s„ 04 _____ __ _ _ _._ ,.. / / . , . .", , ,..., --,/*/ •//t/ /-.. E ../ • I 24 *AI - 1-;:i. 11,4_A 1 r 44114 o0 i.,..) -1 ; - ar /t i r BLOCK 1 i .r.,— i NI t/t/ / 1 I e. I Pdpr , i Pi ( ,. 34 / // ‘ EIIII -\'`..... / ItAl I 111 . gi i .- —— —------—-- ;;::--;---OfJeltj- '4"edllMMV":Vll. "D4 LAKES DDAD- M I A0 pi p ___---- — -- — ---- --.t.: _/-4s6,-------.--1, t -:-7-7- :--.:7::: .-• --r- , _ _ _ ._._------------ _.__•----, 7 1 1 I Alif N. / f ....b./4- ... i ,-' •. ,,,/ I . N-, /1 ,d,e / ...... . I ... ,1171",- , _ 1 ... ------- ,-,-,...=...-..LL.--:.,:-.• ::„.- _ i_ '.„. _ r"" PRELIMINARY MI&UTILITY PLAN 17'..' P",,gtv-ZO: '''''' DWI LAKES TOLW4HOMES . .. .,„ • , L C i e 9 y` Y Y Ai --s— , a j se ,, : .. ---. g.., : i„ f g Weill il ///��//�i°%��r�1Q```� .�Ac.,,_:_ ::,.....z.,..„____,..1,N, f _ iE`, 1 •-, , ��%h. -\ moi i, .1. "--< € 1111 i l ,y, .--oh tip-----,-444N1 1 .‘,,N ,., ,,., ,,,,,,,,,,1„,.., 4 i '1-•1 i A ��\ � *`°454 1 is \ AA vkal ila;tip 0/4►r �� e// w��� *t, ,,ice 1 i 1, :1 i�- 4v el' tAlfr <z")",) "1r fit/$17-1-611 vutwa t .44 1 1 i 1 m Hili- •11,1401.4 4 1- 1 ii 7 411,v4, \44k, ittg mprApplo 11 1 ' ,/ v. , , w4 Irfira D , , , , el, 464114kVilka 4-. Asid "..411 r• il I ' I 2 ��A ,, ,,A0 P 1 I '.; '.,',,\, . 1 Zit ��'�'.\`%tea- ;Its 4(1141 NkNNO*Viyak Vfr L *„ .A,Iik‘ 4,-‘,-ATivl lkfli;IE 41 IIC-4111111-41 c__,..ii4mvp 1 . . 1 , .. it ,,, ,,4\\**, vokt\ ,.. ‘ .,,......t ,..... 1 \VW. 1k .~k\ .ti`s\ �pII 1 . u :r q i9 41V,_. 4,\� �� • iii -.. ..:-_.iiiit..'0# _� < �I ��� , �.•:\ Iia �c k silv: iiii vesgml p,. NN.szt....,,..,...,,..„,144,:t \N sire.„„,,,orrir 1 \'=� (Pli'�.) -ma � ..i fiat low,A ii 4:- , • it 441041•1 - .ii \ I 1 1 reAktVer . g ig; \ .1 1 g at Illr*Vir— ,S7 2 T,:i I I le( '•••., : e I i i.‘di .-:-. -5_,MAg°400.4.ii\-, Agimr----,T.:7 1 .. :4 if."V4ii --7.;) ';6\. telt ''''.-'''-- ' \ . I PA i i kV / ;'i o �. ,h OHIO / —NN.......„,.....)iT t !:O!gyd: `s Eisl3ii#2 !lid A- 4/1"/,:lliklk ' . t..) liF • ,{{ -a- I:C 11 1 ,{ , t r WAf =z M g"aqll'l1 id l,{IPlip%t1+,k3hi(g • 11g a !>, NE t�4 f. !i 1 iit gi N 111ti10 1 x:c m a V z t[.�=i'i 11 �t IAl'1.1 l t1 I - • st4{ �t1�i� ,�� l ? lhl�Ell latlth +i g € a n�n.at,,1,.F.1�, ir,ll:tilF•«f.tl,,. i J 1h ue ' a i A, 6; _ N3 ..1;.. �, , • N O -sem"-" 11W.-17.3"'"---"1"..". 1 t3e��. .:�!;O t\. `,1'2i I V`4 ,moi �I�, .\";�`� VLIP!,- -3/14.°7'14 A _ �1�° fit^ 4 -riliNrri*,4010,-,,eliz: ' 'N.s 414 viiietk---mes.,..,_=_-..v,.;;--. ;Ave .....--- \ \ \ 1;e it,..t. - .V.itkri .--2....F.:0, '--,- \ \' \ 4. 'er ...._ _:::::__ _____„__ . ___:...-..-- r ____ ? 5: ii, , , ee '0 01A 40 4*1 re /lilt • ) ►�1.. `7 I / ) n U �. , J (1 r, f t 1,7 L:.D s Y'� '. yi d� ��Qp YJ J% % �5S \• .11 . ..,„ tIN•iek.:lit e'•• __--- /FA I 77---- ' -'' 44\\ 1 1. �1' "-�/s, . h illt- Ili./' ='� �/ � \ i.0..a,+e`°�_ 1 1,1 XotIkkk, s taw 44 pp o]L749i 5-., ' $killekti '5?! /�1 \ dTiH it C r4N\\\\\ .t \\ WOE r \•. \`.,, Is1 �i \ d'- totagtow4 c �\ '>`�..\ �'`. Hi - `17......0-_p. \ ' 04.10 .-_&:2, rm MIR kia.‘11211, 1 pvigi Atic...ALN 0,. N.•N§s-10 ., ,.... 4;12 !.._1131.4 Tic:*tw.ikg, • t:,.\ - .k..'z.•\\''71'i,-4-t.:•`,MM'C.*** ...:„_,,,,* •„:42.---.... 1 114. rle 5 .' .1Lo ''''',- VIA tti:Irtriropir V't - - - •lR ?a°5=o-ttO., v y. ...'t "v's ~152 :ar`e•.I \-- . -- \ ..'% .( =`ter-1', r--� /I \. :•�\ V I \ �` \ - :,,,--=-t------,. r :15;n , • • • r 06/22/2000 THU 10:51 FAX 612 241 1399 RIVERSIDE Z004/007 BO/22/2008 07:29 6127SF75SB DOWt•S DESIGNDRAFTING PAGE 03 • 1--T--ill, - i r !I • ,I 1'' ' ► 1 ii , 1 il : 1 I I1 4 1 I 1� , I I 1 II! 1• . D II 1 , , 1 J 4111111 IIfl1& - I r + 1111111, lii I. • 06/22/2000 THU 10:51 FAX 612 241 1399 RIVERSIDE Z005/007 a../.1n :e :' eareB tea,:'�"„�••°„r•'";,; 3D1A43517N11 Cl S''-lOH NIfni - �Bf1z1 .0 1 9....+,.•01P'+-11'1 4,141+600 al w1..w+w 0.•44w1.1�,3-Z, S,lJf1�'1f17�6J Wb'd .�11/�/��w� G 'Jr.._••�.0.,0. 1110,.!✓.•.•YN�+I/.-.V V..a.1�A• a V 1 ✓ Mi M.I P 10(mem* .Me VI/OM V.O,M MIMI TJX� .CW .19 W11F1i7 1 'H7dJ �+JlYd . .---^..--_..— '61i�JYy""N3�Idl0-IT►114n�f-_ 410-. .../..--.... IR 0 z , Mil 1 II Imp I/ - -------__". 3 ill1-- i,' 1111 M _ , �) t 1 �� ;� J > �i , .. I. ) - J ,ill lilZ y , � % JIragirproiroQ�� ® / 11 1• 1� Q1 1 L1 1 1 1 1 11111J7.1. ./.1.1.1./.1.1./� ^'s'x A1}r�i; 1 Ili:1111IIII11/ln ��• � '1 �� It ZI �� Q 1 0 P i I' - . L ,\ 0 .J 1111 Li— 31 H I6,_ p „....„. r 11 1 ,, i I.EL'. ��, •► I,111 . llil11 ¶ 1 > mai 1 ------ --- / _ .. 111 l lE o 4 \ ‘46E/-/,4 r , . • - oiori-7 Ai ,/ g y .t'/y61 zob Z ilmt inD0P7 mg d 06/22/2000 THU 10:52 FAX 612 241 1399 RIVERSIDE 0007/007 _ - to...act...,,,,,....,...• . )= .r.....V.::*"1,".,...4 5"'"'"1",..V=X3,1:, 31A2:iag DN11. 9C . .. r::""::"" .4%.717,•":" vi..«""'". G.L4r117rrint-1 1.iteci C-1011 M G -3.l.'..7 '5140t5r411.110'My J.....iremA ...1.61 1.~:i '3997d i . • & i gi f:1 41 ni 11 4" ;---- - 13Z-1. 4,- Oi I. .1- - = .1. ....-ilt-,....,,„ 1- i -4L <1. ill vr . 4 L id z 3.01".Lwr,.re t .... nmLIMCIIIILINLIMEMI 3 N 1 I-4 11E . e 14 L LI 1 0 1 0u !1I ti ..°' I ' :..!7:'-• 1 I L ' ' '. -- 1 I ! 1 1 F It LII i NI .4 I,!I _."L'" ml!i 1 4.----"ir-l• . - ••- r..,. 7. u_ --, 4 ..1 -.1 .i. •• , :1_. ..5.1111;....m.: isi -4 .-----* Ml, . 1:2-.4:2ribtilli j I••• ;Co ':1 I , y e. , _.... ...,-.7.z., .; _____........_ ...=,N, .,. S .. • , io. 111 -i › II. i , •, .. . I i 1 .- . • • - il . •----:A.7--71 z• .-' .4°— 5i i71:. (;y,li . •,, . , l-a-1 Li 1 11 10 .c•-.0 - • : --''• :L ..0._ L s '0 1 ltrili . 4111 -SI It , :, L- • e._. s'a —• ---! __ 1--...,- - .i,i. : .-:...... ..f.: , li'.:*':, '.,.:-..6..!":; :1"-•'-:.,4i'r;'.1. 4 '-.-1..:":'' ..,';'.•.i. -I • -•.\ r -,.....-7. 1 . k) IJ -° ' I'..-.' ';ii k .„, , 1,„,--.... ..... ,.„ . 2..] , i - _riri. Xe 11 (i)1:.;,1 izi I 1 , ![ -)as ..! .. Dv CI V ,..".' i :.:;,' .---6;; ‘-'/ -T t„ .t; i . , I,'. I ai `•,.....i'A - ... -N, 11 'It ,. . : %. 1! : ...1 .4? 1 ' . ;. _.................--...::=7. : • 1.. • 0. _.1 c) j11 I :1 U 1 I I.4 • b. ii I F-71-.7=-_ -_-_ .tt . lk.i. ill I 1 1 111211 I (Til• f'2, I I ....... T.=a ssiont), .„ ... --....i _ vorme i T-t 5 1 l:`'- .....-- , I.1 .1. • b -T1 -T-- • .104 - 2 ..- 1).- ------- Ili 0 i- II- 19A 1 1 t. It lI.F .,z •_I L __ J 'L -.. . . .., . 17.0.re .UI r2 set di i '61 ,e•,4 .e-,, or — — .Q-.rt ._...... 1 .c-.V. ___ __; n1 2 0 -D oi u_ -i. :00m uu,Inpow uud zttzvcv ZT9 XVJ 69:91 NOM Do/ 0/1,0 06/22/2000 THU 10:52 FAX 612 241 1399 RIVERSIDE Z006/007 . -...-__ E.,.......,.....,.,,...., 4. 1.magi 10..'Reno.•14•••••••.4.••••••001 •Ormar••••• prir Artkad 15orli•Lel brimaastai.i ea 3SIAV2g 1,N1.1. 1;r6C:1 0....-...,1...d.....,-.....,...1.....-....,.....01...•••,•d1.010 RA. it OD WI s,wniinw mrd y_ •••••■••••••••AP••••?•/Su,••••••.1 Moo...isij•Opp el.11l.;••1.0.mair 0 10M M G ...,•2 Kn....,0 'EV11'cri j i 1 10 • r'. 1;W iii ,... ..N_ -_....--_- ---.. -- ,0-.)'£ •• .0...0! Z ! - . - 6 0 •,0.1.1• . T _Ne. ,............-.....,._ - •--.,_... •26.....m. .. •,. -stangazonacr--- -Ir- 4. ; . 01 "'•, i 6... F• 1 • 7-. 1 1 1 Lill .., i .. I__ 1 i •._.- .1 4 .1 1 •I 31_ .. i re.'araimardni j -. 71. ' .611inr. 1 'i -: 1 IM11011.NM GIIII. I''. in 1: 1 NS!beim• i... k) 1112MI IIIIISC g .. =MU MIMI.' • •. O ii 1 -6 •' r d imam mai' iii, --,... k-ft I I • 1 . - 0 1 .1, a . 11.... fi! :2:1 I • if:A. ,„ 4 , 1 S' it h l 0 S h. ell 6 Fl V 2 1 I 1 ;Z .:c .i (.4 -1 • I I 6 si• .ki II. • z irW-•-• k 711. 1 1.1 ; ;a:W•;:l i• D i , . . ._, nl • li., 1 .1. W' 1-.11 l'ili Al. , "111/5 i ...aLM MN - 1... :5 ., . . ....1 : rwi......_r_ ..— ----.....:-...,. 1.41-.14-.....-;374,41. t.ti-izili:1::...:-:.'-12z.........:-:!--4.4--,;:..,:::: -.Tc!rz- ,:.:-.-- - -.....-3.-.; . . .t.41-.Fr *Mlle MN' '11 inn igli' - . 1.1, .... A I Ili 1 . • I. ....ii ;It • f 1 : ,11....... ; ! 1 : c!.. II ..i, rd !F.• I ia .IC 1 , . E ., . ...I - , 1 i ;" =1 : .• . , :,, : . 1 %,.• , rm . 1 9 . j 1 -1 1 iirmitiiHIET: ''• nualiint.-mli lig . . . ., .1 , . is=..,...:, .., , win m,m. B 4 : "Mak 1 -. ,ISIIiiirMil-j• i IBERECINIE 3.1..! "T a 1: a - 1 .0-1. % il ;I I sisimiguraiaqi IN ... i' (11 ; .' .. 1 I .-/ ' I — '*-- : ....--- .• . t , i _ 1 .•. . _CI 1 ,- -' I .cr .; L.) 7C...f• • 3 Agfill - ..-----,-- ,., - __... ‘1, ..f1- ' • _101 64.13.2 / i 0 0 : so C-.V • 9 ; ,1 ,r:, .. .i-A. — .., 11. 11110 -L---- P00 Vj cini"Tn03i9 mud Ztrztvp zi9 rvs 0072,T NOR 00/C0/1,0 06/22/2000 THU 10:50 FAX 612 241 1399 RIVERSIDE U002/007 06/22/2000 67:29 6127667558 DOWNS DESIGNIDRAFIING -_ PAGE._01 _ _ • t.- a `42 V~� ,—...J J V1:�J.11 J 01 v III i 1_'.0,► :__ - 1 is Iii---: - _1 1 -- Pit . . . • i . it -- j�ll1111111I4,, : _ UT • = I�r IIIIIII1I1II1IXIIIAl.... - MIIIIIMMIIIMIIIBIONIIMMIIIIIIMIIII 1.• tiliii;:. 1 '.- mil in ■m_=-_,� , 11"ddJ ". -J • 06/22/2000 THU 10:51 FAX 612 241 1399 RIVERSIDE Z003/007 fl6/ 2 2600 07:29 6127067550 DOWNS DESIGNIRAFTING PAGE 02 • r 1 r ,-- 1 I -Jf UIQ 1 - . I2I I. � t nt i 1t , II JL� ! � , • I ! , , � -� M 1 I .0 ,� i ' 1 I1 1 1 0 r4;5400• -., Howarc R. Green Comoany v L_ CONSULTING ENGINEERS June 22, 2000 File: 809790J-0240 Ms. Michele McPherson Director of Planning City of Elk River 13065 Orono Parkway Elk River, Minnesota 55330 RE: TWIN LAKES TOWNHOME DEVELOPMENT CITY OF ELK RIVER, MINNESOTA Dear Ms. McPherson: As requested, we have reviewed the submittal package for the Twin Lakes Townhome Development. The plan set contained three sheets: preliminary site and utility plan, preliminary grading plan, and preliminary landscape plan. All three plans were prepared by Pioneer Engineering and had a revision date of June 19, 2000. Based upon our review, we offer the • following comments: A. Preliminary grading plan 1. There are several locations on the grading plan with rear yard storm sewer inlets and storm sewer which flows through side yards. In each of these locations an emergency overflow elevation needs to be established and shown on the grading plan. City policy is that all adjacent buildings to these emergency overflows need to have the lowest opening at least one foot above the emergency overflow. 2. The large wetland complex in the southwest corner of the site has a hundred year high water level shown at 908.8. It appears from the existing topography that this elevation may come very close to flooding the building located just west of the site on 5th Street. More information is needed relevant to this high water level. 3. There are wetland impacts shown in the east corner of the plat where the existing ditch flows. These will need to go through Steve Rohlf's office relative to the wetland process. It is my understanding that the developer's intent is to take that portion of the plat and make it a second phase so that there is adequate time allowed for the wetland process to be followed. 4. Building 34/35 has been lowered slightly so that the proposed retaining wall between that building and the adjacent property is lower in height. It appears that the retaining wall will be approximately four feet in height. As discussed at the last Planning Commission meeting, no grading should be allowed within the drip line of trees along the perimeter of the two private properties located in the 4110 Ltr-062200-McPherson.doc 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Ms. McPherson June 22, 2000 • Page 2 center of the site. This location appears to meet that requirement with that retaining wall located approximately ten feet from the neighboring property and no grading needed between the retaining wall and the property line. This is not true of the proposed retaining wall behind building 40/41 and 42/43. Here there are missing contours between the retaining wall and the property to the south. The original grading plan dated May 15, 2000, showed approximately six to eight feet of fall from the neighboring property line to the retaining wall. There were contours throughout the area between the retaining wall and the property line. Clearly, this area would not meet the requirement of no grading under the drip line if in fact this area of the neighboring property is treed. This is difficult to determine because nowhere on the Pioneer submittal is existing vegetation showing. 5. Crossing under Twin Lakes Road (CSAH 13) near Building 71 there is an existing 66" RCP culvert. The storm sewer plan shows building a manhole over this structure and extending storm sewer each direction. It is unclear how this will be accomplished since a manhole structure around a 66" pipe would need to be huge. Another issue in this location is the fact that the storm sewer shown will be a private utility but it is shown constructed partially in the Twin Lakes Road right-or-way. We question whether or not there is even sufficient room for this construction with the other utilities which may be located here. We also question • whether a private utility should be built in a public right-of-way. 6. Elsewhere throughout the site, the private storm sewer is constructed through the driveways of the various homes. We would suggest that it would be a better design to add an additional manhole structure where necessary and keep the storm sewer construction in the street locations, rather than having it shortcut through the driveways. 7. On Thursday, we just received revised storm drainage calculations which we have not yet reviewed. We will advise you of our findings after the review is complete. B. Preliminary site and utility plan 1. The road layout in the development provides for cul-de-sacs coming from various directions. City staff asked for these roads to be constructed as cul-de-sacs to eliminate any potential cut-through traffic from CSAH 13 to Barrington Place in an attempt to shortcut the collector roads in the area. The site plan does show a 20'-wide fire lane access detail for construction linking the two cul-de-sacs in the northern part of the development. This should adequately address emergency vehicle concerns. 2. The water main is looped throughout the site connecting at two locations to the existing water main on CSAH 13 and in a third location to the existing water main in 6th Street. There appeared to be adequate hydrants and valves shown on the • Ltr-062200-McPherson.doc Howarc R. Green Company CONSULTING ENGINEERS Ms. McPherson • June 22, 2000 Page 3 plans. These will be reviewed in greater detail with the Fire Chief and the Elk River Municipal Utilities when construction plans are prepared. 3. This area will ultimately be served by the high pressure water zone in the City. Therefore, each water service should be provided with a pressure-reducing valve when installed. 4. Sanitary sewer service is provided from two locations off of Twin Lakes Road. The layout appears adequate to provide service to the proposed units. 5. The sanitary sewer and water systems within this development will be considered public. Therefore, adequate drainage and utility easements need to be provided so that the City and Elk River Municipal Utilities can legally access the site to operate and maintain the public utilities. This can be accomplished either by creating a drainage and utility easement over the entire common space or by describing a specific drainage and utility easement to encompass the sewer and water. 6. Eight-foot wide trails have been added throughout the development as discussed at the last Planning Commission meeting. We question whether 8' is wide enough or would the Park and Recreation Commission prefer 10', which is typically their standard. 7. The street section shown which will be private is 28' wide. At this width, parking would be allowed on one side of the roadway. At the last Planning Commission • meeting, there was some discussion about whether or not additional off-street parking stalls are needed throughout the development. We would suggest that they are not needed because of the long stretches of roadway with no driveways or units on one side. This will provide ample space for on-street parking at four or five locations throughout the development. 8. The site plan shows providing the additional half of cul-de-sac for Line Avenue in the northwest corner of the development is also providing sewer and water stubs extending at one location to the property line to the north. If you have any questions regarding any of these comments, please call. Sincerely, Howard R. Green Company 7Y/444ZA Terry J.7Vlaurer, P.E. Cc: Daryl Thompson, Riverside Development • Ltr-062200-McPherson.doc Howarc R. Green Corn oany CONSULTING ENGINEERS •t�� 111- 00- • ih wti Sherburne County ��A'�i0'1 PUBLIC WORKS DEPARTMENT v.rtit.� Rhonda F. Lewis, P.E. -------� 425 Jackson Avenue May 31, 2000 Elk River, MN 55330 (763) 241-7030. 800-594-5208 Stephen Wensman City of Elk River Planning Department 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: Twin Lakes Townhomes Dear Mr. Wensman; After reviewing the proposed preliminary plat, an access permit will be required with the following conditions: 1) The County is very concerned with the access location as shown and how it ties into the realignment • of CSAH 13. Specifically, the access is very close to where the curve ends, where the median ends, and where the four-lane transitions to two-lanes. This is not a good location to introduce an access that will be generating so much traffic. 2) Since the access will be generating a fair amount of traffic, the County will be requiring turnlanes. In this location we feel it would be best to put in a left turnlane and a right turnlane. From the copies of the proposed plat that we received it is extremely difficult to see just how this requirement might be met. 3) Based on the information submitted the County will NOT grant an access permit. If you have any questions or concerns please do not hesitate to call me at the above phone number. Sincerely, 4000,2 ` nda F. Lewis, P.E. Assistant County Engineer Occ: Kathy Heaney, Co. Atty. Nancy Riddle, P&Z John Oliver, Co. Surveyor Dave Schwarting, Co. Eng.