Loading...
9.3. SR 05-21-2018 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 9.3 Agenda Section Meeting Date Prepared by Work Session May 21, 2018 Cal Portner, City Administrator Item Description Reviewed by Chamber of Commerce Building Reviewed by Action Requested Provide direction to staff and the Elk River Area Chamber of Commerce. Background/Discussion The Elk River Area Chamber of Commerce had a lease with the City of Elk River for the property the currently inhabit. They chose not to renew the lease with the intent of moving to a new location. The existing building and property is owned by the city and leased for a nominal annual amount. The lease requires the Chamber to maintain ongoing maintenance and repairs. A number of the building's systems are age-worn to the end of their lifespan such as HVAC,roofing,windows, etc. The building was originally a residential home and office functionality is severely limited. Utilizing their business resources, the Chamber Board was able to get current pricing to make needed repairs and some minimal work area enhancements to improve office functionality. The Chamber Board is seeking the Council's interest in assisting and participating with repair financing and in selling the building to the Chamber for a nominal value while the city maintains the land ownership and a building option in a situation where future TH10 improvements would require use of the property for highway right-of-way. Financial Impact N/A Attachments ■ Chamber Building Improvements The Elk River Vision A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By service, and community engagement that encourages and inspires prosperity INAMIRE1 February 28, 2018 Elk River Chamber of Commerce 509 us 10 Elk River MN 55330 XtraMile CONSTRUCTION 630 Proctor Ave. Suite A Elk River MN 55330 763-286-5900 www.xtramileconstruction.com Scope of work This scope of work contains six areas, 1. Mold and drainage issues, 2. Conference room remodel, 3. Replacement of doors and windows, 4. New furnace and air conditioning, 5. Front of building decor and painting exterior of building, 6. 1. Mold, drainage issues on back side of building due to lack of grading issues. Building a retaining wall create a swale for water to drain around building. And landscape with poly and rock. Exterior Excavation company • Remove two bushes and haul off site • Build a retaining wall across back • Drain Tile both down spouts and day light around the corner • River Rock and fabric between wall and building add sock drain tile under rock • Two loads of soil cover and leveled • Allowance for irrigation repairs $600 • Allowance for sod $1,440 Siding contractor • Remove bottom row of aluminum siding from back of building • Seal up any holes between foundation and wall framing • Install flashing • Reinstall siding Interior Demo Labor, Dumpster, Insulation company, sheet rocker of carpenter • Remove items from storage rooms • Demo sheetrock and insulation from entire back wall of building (north wall) • Dry and seal wall where mold was present. • Install close cell foam in wall cavities and joist spaces. • Install sheetrock Total for all above project $14,577.00 2. Conference room remodel, goal is enlarging the existing room and create a hallway. Demo labor, Dumpster, carpenters, electrical, plumbing, heating sheet rockers, tapers Painters, Material suppliers, him carpenters, flooring • Demo walls interior walls of conference room and wet bar wall in hallway. • Frame in new wall to accommodate a new hallway and door opening into conference room. • Wire for new light switches for conference room and three-way switch for hallway, outlets and install light fixtures. • Sheetrock, tape, sand and spray ceilings • Install 6' oak full glass double door into conference room with oak Princeton casing and base. • Stain and varnish doors and trim, paint walls • Install carpet in conference room and vinyl flooring in hallway. Total for all above project $17,466.00 3. Window and door replacement Window supplier, dumpster, carpenter, sheet rocker, painter and sider • Lower level entry door, 3-0 right hand, steel door with Aluminum frame, full light with double bore • Replace 6-0 patio door on upper level with a 6' window. o Remove door o Frame in window opening o Install window o Install window wrap and flashing o Patch in siding o Insulate o Patch sheetrock and tape o Paint and stain jambs, casing and Base • 2 -Upper level entry door, 3-0 right hand, steel door with Aluminum frame, full light with double bore • Replace 2- 6' three wide window with a vinyl casement window • Replace window in Debbie's office with a vinyl glide • Replace 3- single wide double hung window with vinyl double single hung Total for all above project $13,860.00 4. Front of building decor and deck with stairs Demo labor, dumpster, concrete guys, building supplies, carpenters, electrician, siders, roofing and painting • Remove existing front deck and post on front of building • Use existing footings and pour concrete sidewalk • Frame post and beam structure and roof • Install can lights under porch roof • Install white Aluminum Soffit and Facia • Install metal roof • Frame new stairway and railing to match existing to 2°d floor entry door • Patch in siding where old deck was. • Move existing stairs back • Move Light for flag light Total for all above project $20,790.00 5. Replace and install new furnace and A/C Heating contractor and electrician • Remove existing furnace and A/c and haul way. • Install new 90% furnace and new 2 -ton A/c unit • Option to move to new location Total for all above project $6,800.00 6. Painting exterior of building Labor to power wash building, Painter • Power wash exterior of existing aluminum siding • Paint siding only, no windows or soffit and fascia Total for all above project $5,500.00 L ) § � ) { } , )S \ ) � { ®!; ! / L ) § � ) { } , ,rQ"y{e xS�S n Ni