Loading...
5.5 LIBSR 05-22-2018 Library Zones Report Elk River Public Library Board The Library Board serves in an advisory capacity to city of Elk River for issues related to the Elk River Public Library grounds, the physical building and interior fixtures. The city is responsible for scheduling and coordinating all work to be completed. Zone Assigned Specifics Zone Issues Zone 1 Mary K. Entrance; butterfly garden;windmill, prairie grass; rain garden in • Kiosk at front door(Will be parking lot, planter boxes for Master Gardeners summer installed when ground thaws per gardening program T. Sevcik 3/16/18) ■ Update on the missing windmill. (pending part from artist 3/16/18) Zone 2 Willie Front door,front garden, concrete pathways, patio,flag • Handicap parking sign backed turnaround into and bent(Per Tim S.Temp sign placed, permanent sign when frost gone 4/4/18) Zone 3 Mary E. Rain garden, book drop turnaround, employee parking lot; being a good neighbor Zone 4 Mick Being a good neighbor,grass & rock areas • Benches with wood seats need to be refinished when weather permits. (Will be completed in spring per T. Sevcik 3/16/18) Zone 5 Rita Rain garden, interior and exterior building maintenance, interior furniture and shelving NOTE:At such time the board votes for a new CIP ITEMS IN PROCESS item or for an improvement,the Board takes 1. Permanent patio furniture—funded;will be ordered in Spring 2018 it to Robbie Schake,Robbie takes it to Michael 2. LED Lighting in parking lot—funded;will be completed in 2018 Hecker and Michael Hecker forwards to the appropriate city staff for remediation or recommendation. PRIORITY CIP ITEMS 1. New projector for community room (4/4/18: Reported to Gary Lore, Building Maintenance Super) 2. New armless computer chairs in the Computer Area (4/4/18: Reported to Gary Lore, Building Maintenance Super) 3. Handicap curbing at the drop off area (4/4/18: Reported to Tim Sevcik, Park Maintenance Super) 4. Caterpillar upholstery and chairs replaced in Children's area (4/4/18: Reported to Gary Lore, Building Maintenance Super) 5. Reupholster couches in Teen area (4/4/18: Reported to Gary Lore, Building Maintenance Super) CIP ITEMS IDENTIFIED BUT NOT RANKED FOR PRIORITY 1. More comfortable chairs or comfortable flooring in the Children's area cave 2. Cork floors replaced in the Teen area 3. New rug in Fiction lounge 4. New shelving units (or check for warranty) in Teen area 5. New DVD shelving units or hardware to anchor shelves together(tip over easily) 6. Diamond plated sheets (or something like that) installed on numerous walls in the Staff Area to protect the walls from cart damage (4/4/18: Reported to Gary Lore, Building Maintenance Super in case he wants to fix to prevent drywall damage. Not a high riority to the Board because it is out of public view.) 6. New hand dryers in bathrooms, relocated closer to sinks; urinals in some or all of the unisex bathrooms. (3/27/18: On hold at this time per information received at meeting from Gary Lore, Building Maintenance Supervisor.) N:\Departments\Parks and Recreation\Library\Library Board\Library Grounds\Library Zones Report-Updated for May 2018 Meeting.docx