7.6. SR 07-16-2018 EGty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 7.6
Agenda Section Meeting Date Prepared by
Public Hearin� 1july16, 2018 Zack Carlton,Planning Manager
Item Description Reviewed by
Ordinance Amendment: Wetland Setbacks, City of Chris Leeseberg, Senior Planner
Elk River Reviewed by
Cal Portner, City Administrator
Action Requested
Approve,by motion, the proposed changes to the wetland setback ordinance, Sec. 30-1852.
Background/Discussion
Case No. OA 18-06 -The wetland setback ordinance was approved on June 19, 2006, and as adopted
applied to all properties within the city regardless of when they were platted. Implementation of the
ordinance created a number of issues to platted lots served by city sewer and water which were designed
to utilize all of the property outside of a delineated wetland edge or constructed stormwater pond.
After making changes to the wetland ordinance as a result of numerous variance applications and
requests,we continue to see unique circumstance arise as a result of the original adoption of the
ordinance. Planning, environmental, and stormwater staff have discussed potential changes to the
ordinance that will provide residents with additional flexibility,but preserve the environmental and water
quality goals intended with adoption of the ordinance.
Planning Commission
Staff suggested utilizing the site plan review process, staff review, and approval for encroachments into
either wetland setback. Using this mechanism, staff will work with each applicant to preserve to the
greatest extent possible the goal of the wetland ordinance. Disagreements will be addressed via the zoning
appeals process,which functions the same as a variance (cost, timing,review).
The Commission discussed the options presented and decided the site plan review process for impacts to
both the setback and the buffer was the best option.The Commission unanimously recommended an
ordinance amendment adding a staff site plan review for future impacts to the wetland ordinance.
Additional comments have not been received.
Financial Impact
Recording fees
Attachments
■ Planning Commission Packet dated June 26, 2018
■ Ordinance
The Elk River Vision
A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By
service, and community engagement that encourages and inspires prosperity INAWRE1
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity
Request for Action
To
Planning Commission
Item Number
5.4
Agenda Section
Public Hearings
Meeting Date
June 26, 2018
Prepared by
Zack Carlton, Planning Manager
Item Description
City of Elk River – Ordinance Amendment
Ordinance Amendment relating to wetland
setback regulations, Case No. OA 18-06
Reviewed by
Chris Leeseberg, Senior Planner
Reviewed by
Action Requested
Recommend, by motion, approval of the proposed changes to the wetland setback ordinance, Sec. 30-
1852.
Background/Discussion
The current wetland setback ordinance was initially approved in June of 2006. The ordinance, as adopted,
applied to all properties within the city, regardless of when they were platted. Implementation of the
ordinance created a number of issues that the city has worked to address over the past few years,
specifically impacts to platted lots served by city sewer and water. These plats, recorded prior to adoption
of the ordinance, were designed to utilize all of the property outside of a delineated wetland edge or
constructed stormwater pond.
After making a number changes to the wetland ordinance as a result of numerous variance applications
and requests from residents we continue to see unique circumstance arise as a result of the original
adoption of the ordinance. Planning, environmental, and stormwater staff have discussed potential
changes to the ordinance that will provide residents with additional flexibility, but preserve the
environmental and water quality goals intended with adoption of the ordinance.
Staff proposes a separate review process for all properties platted prior to adoption of the wetland
setback ordinance. The review process for these properties will be separated into two pieces:
1. Wetland buffer setback (25 – 45 feet from wetland/pond edge): A site plan review application
must accompany building permit applications impacting the buffer setback. This is a staff review,
Planning Commission and City Council will not see the permit, which will allow staff to look
closely at the uniqueness of the individual property and find solutions with the property owner to
preserve the intentions of the buffer setback ordinance.
2. Wetland buffer (0 – 25 feet from wetland/pond edge): A Conditional Use Permit (CUP) must
accompany any building permit application impacting the wetland buffer. This is the most critical
setback as impacts are close to environmental features and will concentrate runoff. The review
will include a public hearing and discussions at the Planning Commission and City Council. As
CUPs are permitted uses that have the potential for greater impacts than otherwise permitted
uses, conditions imposed as part of the review process will relate directly to mitigating impacts to
adjacent environmental features.
N:\Departments\Community Development\Planning\Case Files\OA\OA 18-06 Wetland Setback Regulations\4-Planning Commission\5.4 sr
Wetland Setbacks.docx
Staff continues to strive for improvements to this ordinance which reduce the burden on individual
property owners, but also continue to protect the city’s natural environment – which is in the best
interest of all residents of the city.
This is a city initiated ordinance and we are not tied to the 60-day review period. If the Commission is
comfortable with the proposed changes we ask that you make a recommendation of approval. If
additional information or adjustments are needed, please provide staff with specific direction, and
continue the item to July 24, 2018.
Financial Impact
Recording fees
Attachments
None
WAStfikethfoughs to be removed
Underlines to be added
City of
Elk -�-�
River
Ordinance 18 -
An Ordinance Amending Chapter, 30-1852, Performance Standards, of the City of
Elk River, Minnesota, City Code
The City Council of the City of Elk River does hereby ordain as follows:
SECTION 1. That § 30-1852, Performance Standards of the City of Elk River Code of
Ordinances shall be amended to read as follows:
Sec. 30-1852. - Performance standards.
(a) Vetland buffer strip. A minimum 25-foot buffer strip from the delineated boundary of a
wetland or ordinary highwater level of a stormwater pond is hereby established. Wetland
buffer strips shall meet the following standards:
i. No principle or accessory structures,patios,paving, or other impervious surfaces
shall be permitted within the wetland buffer strip.
ii. Alterations are prohibited within the wetland and wetland buffer strip, unless a
vegetation management plan or other approval is granted by the city.
ill. The applicant shall establish and maintain wetland and wetland buffer strip
vegetation in accordance with the requirements found in section 30-1853.
iv. The applicant shall maintain the required wetland buffer strip monuments at each
lot line where it crosses a wetland buffer strip and at 200-foot intervals along the
edge of the wetland buffer strip. Each monument shall state "Wetland Buffer:
Under the City Code,no mowing, clearing or removal of vegetation in the buffer
area is allowed. Call the City of Elk River for more information." The city
reserves the right to eliminate this requirement if it deems it impractical.
V. The city, at its sole discretion, following the city's master park trail plan, may
allow nature trails comprised of natural materials, to be located within the wetland
buffer strip.
vi. Leisure activities such as hiking, nature studies, canoeing, boating and horseback
riding, including facilities such as nature trails and docks which allow for such
activities are permitted in the wetland buffer strip.
vii. Final plats for all subdivisions shall provide an easement over all wetlands and
wetland buffer strips for the purposes of identification and protection.
viii. Properties platted prior to June 19, 2006, shall be exempt from the vegetation
management requirements described in subsections iiiv above.
(b) Wletland buffer strip setback. A minimum 20-foot setback from wetland buffer strips is
hereby established by the city.
i. No principle or accessory structures,patios,paving, or other impervious surface
shall be located within this setback.
P a N E R E R R Y
Last Updated March 2014 litm§AfVR
to be removed
Underlines to be added
ii. Nature trails, at the city's approval, may be located within the wetland buffer strip
setback.
ill. On property that was platted prior to June 19, 2006, uncovered decks and
permeable pavement can be located within this setback.
(c) Exceptions. Properties platted prior to adoption of the wetland buffer strip and wetland
buffer strip setback performance standards set forth in this section may not be
configured to accommodate the required performance standards. For this reason,
exceptions to the performance standards for properties platted prior to June 19, 2006,
may be approved by the Planning Manager pursuant to the Site Plan Review Process.
Applicants for Site Plan Review shall pay the fee specified in the city's fee schedule. Site
Plan approvals and required conditions shall be made by the Planning Manager on a case
by case basis,with the goal of maintaining consistency with the performance standards to
the maximum extent reasonably possible. Appeals from staff determinations and
conditions may be made pursuant to the appeal procedures set forth in Section 30-634.
(O(d) Fences. Fences may encroach into the wetland buffer strip setback, but at no time shall
they be allowed within the wetland buffer strip or in delineated wetlands. Properties
platted prior to June 19, 2006, shall be exempt from this requirement.
SECTION 2. That this ordinance shall take effect upon adoption and be published as provided by
law.
Passed and adopted by the City Council of the City of Elk River this 16th day of July, 2018.
John J. Dietz,Mayor
ATTEST:
Tina Allard, City Clerk
MUR
Last Updated March 2014
Ordinance Amendment
Wetland Setbacks
Background
Ordinance adopted in 2006 established limits to
improvements within 45’ of wetland or stormwater
pond
0 -25’: “No touch”
25 -45’: No structures or impervious surfaces
Numerous variances and questions
Exempt decks
Allow turf and fences
Continue to receive questions and variances
Protect environmental features from fertilizers,
sedimentation, erosion, other impacts.
Maintain protections and reduce process?
Recommendation from PC
Site plan review for those without current exceptions
City application
Lower cost
Staff approval
Faster review
Maintain oversight of environmental concerns
Appeals through BOA with zoning appeal (variance)
Unanimously recommended approval
Action Requested
Approve, by motion, the proposed ordinance
amendment to the wetland setback ordinance.
Language
Exceptions. Properties platted prior to adoption of the wetland buffer
strip and wetland buffer strip setback performance standards set
forth in this section may not be configured to accommodate the
required performance standards. For this reason, exceptions to the
performance standards for properties platted prior to June 19, 2006,
may be approved by the Planning Manager pursuant to the Site Plan
Review Process.Applicants for Site Plan Review shall pay the fee
specified in the city’s fee schedule. Site Plan approvals and required
conditions shall be made by the Planning Manager on a case by case
basis, with the goal of maintaining consistency with the
performance standards to the maximum extent reasonably possible.
Appeals from staff determinations and conditions may be made
pursuant to the appeal procedures set forth in Section 30-634.