06-04-2002 ERMU MIN ELK RIVER MUNICIPAL UTILITIES REGULAR MEETING OF THE ELK RIVER MUNICIPAL UTILITIES COMMISSION June 4, 2002 Members Present: James Tralle, President; John Dietz, Vice Chair; George Zabee, Trustee Staff Present: Bryan Adams, General Manager; Glenn Sundeen, Line Superintendent; David Berg, Water Superintendent; Patricia Hemza, Office Manager Others Present: Kurt Kragness, and Pat Dwyer, of the Heritage Committee 1. Call meeting to order President James Tralle called the meeting to order at 4:00 PM on June 4, 2002. 2. Consider Utilities Agenda James Tralle moved to approve the Utilities Agenda for June 4, 2002, moving Item#5.1 to be discussed after 5.4. John Dietz seconded the motion. Motion carried 3-0. George Zabee moved to approve the Consent Agenda as follows: May 2002 Check Register May 14, 2002 Minutes Financial Reports 5.2 Review MMUA Safety Program A letter of information of the results of the annual Audit of the ERMU Safety Program through MMUA was reviewed. It was noted that the Overall Rating is Very Good. 5.3 Review and Consider Street Light Alternative Connexus Energy has requested that ERMU offer many different styles of poles and fixtures for street lighting. Presently Connexus offers the same Traditionaire fixtures on Fiberglass poles, with Cobra Heads on Fiberglass poles at major intersections, that the ERMU offers. After checking with several developers, Glenn Sundeen concluded that the present fixtures and poles are very appropriate, and well received. John Dietz asked why Connexus would like to offer a larger choice. Staff responded that the marketing campaign by Connexus would be a revenue generating venture for them. Staff further added that increasing the choices would mean increasing inventory of poles, fixtures, and parts, causing a problem with the stocking of parts, as well as all the choices. Glenn Sundeen advised that Connexus may be contacting the Elk River City Council with the request. Page 2 Regular meeting of the Elk River Municipal Utilities Commission June 4, 2002 James Tralle moved to continue the present policy for Street Lighting. John Dietz seconded the motion. Motion carried 3-0. 5.4 Review Need for Policy on Street Banners In response to a request for installation of banners on street light poles on Hwy 10, by St. Andrew's Catholic Church, Commission and Staff reviewed the present informal policy. The ERMU has installed banners for national holidays, and community sponsored events. The opinions of John Dietz, and James Tralle, are to stay with community-wide events, and Federal Holidays. George Zabee asked if charging for the services could be an option. John Dietz replied that he thought it would be easier to limit the installations, rather than charging. Staff was directed to return with a formal policy limiting installation of banners on street light poles to City, and Community events, and to Federal Holidays. 5.1 Update Jackson Street Water Tower Pat Dwyer, and Kurt Kragness of the Heritage Preservation Commission spoke on their request to preserve the Jackson Street Water Tower. The meeting between the ERMU General Manager, the Heritage Preservation Commission, and Doug Derr, representing Vertical Partners was reported on. It appears that revenue could be generated by using the tower as a future antenna site. Discussion then moved to the question of the last possible date for a decision on demolition, and tower maintenance schedules of painting. Bryan Adams advised that fall would be a final date, and that the tower would need painting every ten to twelve years. John Dietz moved to delay a decision on demolition of the Jackson Street Water Tower until the October, 2002 regular meeting of the Elk River Utilities Commission. George Zabee seconded the motion. Motion carried 3-0. 5.5 Update North Substation Bonding The Commission was advised that the interest rate for the $500,000 issue of equipment Certificates will be 4.9%, rather than the initial estimate of 3.75%. John Dietz explained that the reason for the increase is because the bonding requirements of the City will exceed $10,000,000.00. Page 3 Regular meeting of the Elk River Municipal Utilities Commission June 4, 2002 5.6 Review Water Main—Grace Addition Grace Assembly of God is building their church adjacent to County Road 13. The ERMU is obtaining a utility easement through this lot to construct a water main for 190th Street to County Road 13. Staff is advising that ERMU construct the water main now, while the church is under construction. The estimated cost of$38,000.00 is not budgeted in 2002, but there is the possibility of some cost sharing with the church, if construction could be done. George Zabee moved to proceed with the construction of a water main for 190th Street to County Road 13. John Dietz seconded the motion. Motion carried 3-0. James Tralle left the meeting at 4:55 PM. 5.7 Tour of Large Projects The meeting continued with a road trip to the large projects underway by the ERMU Commission. The next regularly scheduled meeting of the Elk River Municipal Utilities Commission will be July 9, 2002 at 4:00 PM in the Utilities offices. Vice Chair, John Dietz adjourned the meeting of the Elk River Municipal Utilities Commission at 6:00 PM. Respectfully submitted, G-Pacz:e_e.CU 4111040-' ice.'q/ Patricia Hemza Office Manager