Loading...
Item 5.4 . Item #5.4 �j iik River MEMORANDUM TO: Planning Commission FROM: Chris Leeseberg, Planner�/ DATE: May 28, 2003 -� SUBJECT: Case No. CU 03-I I Request by STM Development for a Multi-Tenant Building Request STM Development requests a Conditional Use Permit to allow the construction of a Multi- Tenant Retail Building. 111 60-Day Rule To comply with the 60-day rule,without and extension,this item needs action by June 23, 2003. Location East of Highway 169, south of Main Street and west of Zane Street. Lot 2, Block 1, Elk River Crossing 4th Addition Zoning/Land Use PUD (Planned Unit Development) /FIB (Highway Business) Attachments • Location map • Memo from City Engineer • Elk River Crossing PUD Development Standards • Preliminary Site Plan • Preliminary Grading Plan • Preliminary Utility Plan • • Preliminary Landscape Plan Planning Commission/CU 03-11 May 27,2003 Page 2 • • Elevations of Proposed Building dated May 3,2002 • Elevations of Panera Bread Building dated May 3, 2002 Overview The request consists of a one-story 7,950 sq. ft. building. The proposed building will be treated with an Exterior Insulating Finish System (EIFS) and Rockface Concrete Masonry Units (CMU). It is the same design as the existing multi-tenant building that houses Panera Bread. Building setbacks are not defined in the Elk River Crossing PUD but the building does meet the C3 zoning setbacks. Building Design The Elk River Crossing PUD Development Standards for Architectural Character states, "...development will represent the eastern terminus of the Main Street corridor which connects Highway 169 and the Central Business District. Facades should be articulated to reduce the massive scales and uniform impersonal appearances of large retail buildings and provide visual interest..." Staff feels that repetitive designs do not reduce the uniform impersonal appearances and does not provide visual interest to the Elk River Crossing area. The Central Business Districts • (downtown) character does not have repetitive buildings. Staff feels that the Development Standards are trying to encourage creative unique designs. Landscaping The submitted landscape plan does not meet the City's requirements. It shows a total of 22 trees: 15 new trees and seven existing boulevard trees. There needs to be a total of 28 trees: seven conifers (two are shown), seven ornamentals (13 are shown) & 14 overstory trees (four are shown). Ten additional overstory trees are required and six ornamental trees,that are not boulevard trees, can be removed. Snow fence at the drip line will be required to be installed to prevent any construction activities or disturbance of soil within fenced area Parking and Circulation Based on the square footage of the building and the City's requirement of one parking stall for every 200 sq. ft. of floor area, a total of 40 parking stalls would be required. The proposed layout exceeds this requirement with a total of 112 total stalls. The minimum 10' setback from the property line is also maintained. Five (5) accessible-parking stalls are required for the building. The submitted site plan does not indicate any accessible-parking stalls. For parking lots with 101-150 stalls,there is a minimum requirement of five accessible stalls. The site plan will need to be revised to provide the required accessible spaces. S:\PLANNING\Case Files\2003\CU 03-11 STM\CU03-11 PC-Table.DOC Planning Commission/CU 03-11 May 27,2003 Page 3 • The proposed layout provides a shared access to the site off of Zane Street and a second separate access that does not line up directly across from the access to the Wal-mart parking area. The access points should line up with each other, and an adjustment will consequently affect the layout of the parking area. Drainage and Utilities The City Engineer's memo, dated May 19, 2003, addresses items that need clarification. The applicant has submitted new drawings addressing these concerns. Recommendation Staff recommends that the Planning Commission table this item to the June, 24 meeting to address the following conditions: 1. THE BUILDING SHOULD REFLECT THE DEVELOPMENT STANDARDS FOR ARCHITECTURAL CHARACTER AND NOT BE A DUPLICATE OF AN EXISTING BUILDING IN THE ELK RIVER CROSSING PUD. 2. ACCESS,CIRCULATION AND PARKING ISSUES NEED TO BE ADDRESSED. 3. LANDSCAPING REQUIREMENTS NEED TO BE BROUGHT INTO COMPLIANCE WITH THE ORDINANCE REQUIREMENTS. • If the commission tables the request,the 60-day review window will be extended to August 22, 2003 (another 60 days) • S:\PLANNING\Case Files\2003\CU 03-11 STM\CU03-11 PC-Table.DOC •IVER4k rillpirVilar ooa aaoo p�OQ s o PLAZA '' '_ lifiter7717.671",d.r• 2, � �,`� s 1 k 13 , .-; El. "ii, ?0,_, Iffik44. - . q `'3 N' A % . , g .gi 0, , Z� RIVER `, �;--� ._L 4,74 ® o o �1 s Q. A \ ;;;11,4r ♦ 1,---, . �i� 1111 Oo ♦ .♦♦♦ , r PLAZ_ Z _ 0 �i 1 ail I4DD . i Go ‘ <11111 ��I� �IQ �� M. ES &'1p _ ill � ilk+_ r`9ffrI ' r ,r 'W°.6144 i W' 0 , - lit maw. a 0 la ME m? a vI. "7,� OW 1111111 A",T1, ip �s. .-. r�; :Ilii Rin II /. main I7 ., i' inplii Si 0 tf), s - 4,6 , X1111 INA A ,s,, i imin Ewa S' ,/, ot ,<,,, .„.._____....a.wi prairial Eiteo , ra. 'i �No. , ' FARCE OLE 11 : SITE ,.�_ 000 0 .��� 1 a TO :��! w UPA .• � ii\i, _ OCHE ,4`% 3 ®� � a I I.► 'ji g w Tile Ws°1j� 0, II ui I �% Z Z My — it ° <�O (1, N o� 9 �° sII ! G I 1 `����� •— =1P FP Q s I ���� — .11 -9 °p C 9th AVENUE NW sL, • ®_ .�I '`� - ��®- til s 7 0 1,/ \ JRIALCIRCLE, �00^�A) 2f II Location Map:fiL4- _, N P1 .....„. River Case Number: CU 03-1 1 STM DEVELOPMENT • Howard R. Green Company May 19, 2003 File: 820875J-0240 Mr. Chris Leeseberg City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: LOTS 2 AND 3, BLOCK 1, ELK RIVER CROSSING 4TH ADDITION SITE PLAN REVIEW Dear Mr. Leeseberg: As requested, we have reviewed the submittal for the proposed development on Lots 2 and 3, Block 1, Elk River Crossing 4th Addition. The submittal was prepared by John Oliver and Associates and dated May 2, 2003. It consisted of a preliminary site plan, preliminary grading plan, preliminary grading plan, preliminary utility plan and a preliminary landscape plan. Based on our review and comments received at the staff review meeting, we would offer the following comments: • 1. Although the development submittal is titled Lot 2 and 3, Block 1, Elk River Crossing 4th Addition, there is no Lot 3 in Elk River Crossing 4th Addition, only a larger Lot 2. 2. This site is encumbered by drainage and utility and easements in the southern portion for the trunk sanitary sewer and water servicing the eastern area. There is a major lift station just south of this property with a deep sanitary sewer line exiting the lift station to Zane Street. Trunk watermain also crosses this area. The easement and the sewer and water lines should be shown on the plans. Also there is a gas line easements that crosses from the highway to Zane Street and a United Power Association easement that runs along the rear lot line parallel to TH 169. These easements should also be shown on the site plan. 3. The gate to the lift station located to the south is accessed through this site. The gate location should be shown on the plan and a driveway constructed at that location. There may need to be adjustments made to the landscaping plan so that the driveway access is not blocked. 4. This site will need to apply for and receive an NPDES permit from the City prior to any site work beginning. There is silt fence shown on the site plan along the west and south boundaries. We question why there is no silt fence shown along the frontage with Zane Street or the north lot line. 5. The existing driveway on the east side of Zane Street accessing the Wal-Mart site needs to be shown so that the proposed southerly driveway into this site is lined up with it. Ltr-051403-Leeseberg 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 . Mr. Leeseberg May 19, 2003 Page Two 6. The fire chief has asked for an internal hydrant to be located in the southerly island defining the parking row closest to the building site. 7. The landscaping plan will need to be reviewed once the alignment of the sanitary sewer water and gas main is shown on the plan to ensure that there is no major vegetation placed on top of or near these utilities. 8. There is no dumpster location shown on the site plan, as has been the case with all of the sites adjacent to the west side of Zane Street. Dumpster locations have not been allowed behind the buildings in an effort to keep a clear corridor for vehicles traveling from lot to the other. If you have any questions regarding any of these comments, please call. Sincerely, Howard R. Green Company 2;1;7-7/4„/240:,(} Terry J. Maurer, P.E. • TJM:sw 1111 Ltr-051403-Leeseberg Howard R. Green Company • DEVELOPMENT STANDARDS Architectural Character 1. Facades and Exterior Walls The Elk River Crossing development will represent the eastern terminus of the Main Street corridor which connects Highway 169 and the Central Business District. As such, the exterior appearance of the buildings should include elements of buildings found along the corridor and in the Central Business District. Facades should be articulated to reduce the massive scale and uniform impersonal appearances of large retail buildings and provide visual interest. Buildings over 100 feet in length should incorporate recesses, off-sets, pilasters or angular forms so that no uninterrupted length exceeds 50 feet. The wall projection or recess should be a depth of approximately 3% of the length of the uninterrupted building length. Buildings should have architectural features and patterns that provide visual interest at a pedestrian scale. The features should be an integral part of the building fabric, and not be applied trim, graphics or paint. Variations to roof lines and cornice details should also be used to add interest to buildings. Exterior building materials and colors comprise a significant part of the visual impact of a building. Therefore, they should be aesthetically pleasing and compatible with materials and colors used in the Central Business District and along east Main Street. Facade colors should be subtle, neutral or earth tone colors. The development shall use a consistent palate of materials and colors throughout. Facades of a building which are visible from adjoining properties or public streets shall include certain design elements found on the front facades. Predominant exterior facade materials should include, but not limited to, one or more of the following: • brick • native stone • tinted, textured, integrally colored concrete masonry units. • stucco • tilt-up concrete panels with exterior facades as referred to in these standards • Predominant exterior building materials shall not include the following: • smooth faced concrete block • • smooth faced or raked faced tilt up concrete panels • prefabricated steel panels. 2. Entryways Entrances should be clearly defined and visible. They should incorporate devices such as canopies, overhangs, recesses/projections, arcades, raised parapets over the doors, peaked roof forms, display windows, architectural details such as tile works and moldings which are integrated into the building design. Lighting General site and street lighting (excluding general parking lot lighting) shall be a design that is compatible and connects with the lighting utilized in the Central Business District. It shall be at a pedestrian scale. Wall lighting fixtures shall be consistent with the pedestrian and general site lighting. General parking lot lighting shall be at a height no greater than 30 feet. Poles and fixtures shall be a design that compliments the street and general site lighting standards and fixtures. • Loading Areas, Trash Collection and Outdoor Storage Loading docks, truck parking, HVAC equipment, and other service functions should be incorporated into the overall design of the building and screened from view of adjoining properties and streets. Trash compactors and dumpsters should be within an enclosure constructed of the same materials and colors as those used in the building. Outdoor areas used for the sale and/or display of seasonal inventory shall be permanently defined and screened with walls and/or fences and landscaping. Outdoor sales and display areas, except for garden centers, shall not exceed 5% of the ground floor area of the building. Canopies Canopies located over pump islands are allowed provided the architectural design, colors and character of the canopy shall be consistent with the principle building on site. The fascia of the canopy shall not be illuminated. Canopy lighting shall consist of canister spot lights recessed into the canopy. No portion of the light source or fixture may extend below the bottom face of the canopy. • Signage • Signs shall be an integral part of the overall architectural design of a building and the project, rather than contrasting with it. They must consist of materials and design which compliments the architectural elements of the building and project. Signs must not be visually distracting or tend to dominate by means of location, size, color or lighting. All signs shall be internally illuminated. All freestanding signs shall be setback a minimum of 10 feet from all property lines and shall not obstruct visibility or encroach in any drainage or utility easements. Development Sign One freestanding development sign identifying Elk River Crossing will be permitted at the corner of Main Street.and Highway 169. The sign shall be a monument style sign with a maximum height of 30 feet and a width of 16 feet. The number of tenants allowed on this sign shall be limited to 4. Total sign area shall not exceed 225 square feet and shall not exceed 10 feet in width. The sign shall be constructed of brick, face brick or colored rock faced block and may include decorative brick and/or decorative glazed block as accents. 1111 Entry Signs Two entry signs shall be allowed, one at the Main Street and Zane Street intersection and one at the Tyler Street and 179th Avenue intersection. These signs shall be a monument style sign with a maximum height of 8 feet and a width of 16 feet. Total sign area shall not exceed 128 square feet. The sign shall be constructed of brick, face brick or colored rock faced block and in may include decorative brick and/or decorative glazed block as accents. These entry signs may identify no more than 4 tenants. Monument Signs for Freestanding Sites Each of the freestanding buildings within Elk River Crossing will be allowed to have a freestanding sign. The freestanding sign must be a monument style with a maximum height of 10 feet and a maximum area of 100 square feet. The sign shall be constructed of brick or face brick and in may include decorative brick and/or decorative glazed block as accents. Wall Signs for Freestanding Sites Wall signs for each freestanding building must consist of individual letters • and shall not have more than 1 wall sign for each principle building, except that where a principal building abuts 2 or more public streets, 2 wall signs • will be allowed. Awning signs and canopy signs, including canopies over gas pumps, shall be included as wall signs. Awning and canopy signs shall not be illuminated. The sign area shall not exceed seven (7) percent of the area of the building wall, including doors and windows, to which the sign is to be affixed Wall Signs Retail Building North Side of Home Improvement Store Wall signs for the retail building attached to the north side of the proposed home improvement store shall consist of individual letters. Capital letters shall not exceed 36" high, lower case letters shall not exceed 24" high. Signs shall be for store identity only and shall not be allowed on the rear or side of building. Signs shall not extend closer than 3 or 4 feet from the projected lease line. If the space is leased by a single tenant, sign area shall not exceed 10 percent of the area of the building wall, including doors and windows, to which the sign is to be affixed Major Tenant Wall Signage Total wall sign area for major tenants should not exceed 7% of the front facade of the principle structure and must consist of individually mounted letters and corporate logos. Letters shall not exceed 6 feet in height and logos Ill shall not exceed 10 feet in height. All signage shall be internally illuminated. Other Signs All other signage that may occur within Elk River Crossing and not specifically mentioned herein shall comply with the City of Elk River Sign Ordinance. All requests which are not consistent with conditions, character and intent of the Elk River Crossing PUD may be denied by the City. • G\Land Projects R2\813G-16\dwn\PRELIMINARY\8136-16SITE.dwg,Layoutl,05/21/03 06 49 31 AM,Dale S' �A' r/\ S' IC--.-- . _------ \ j --- Is� i �� • r KH-22 e41/ - % r N 1 uJ, , __,„, \\ \ \\ \ \\ \\ \ " \ \\ E R\ \ 7 g 11�\l-, \ ' :\'' \I ,, ,,,\) 1 ,1 __,:__,==' le' . 1, --� Iv I$ X12\ \_ ` j / m g I ,;'..g 8 \\'i ;' 'A' � 4g* ' �_ 'I" 8'-ii--1 1 rg--„\ 8 \\v ",� �7• -:'. • ..... ./ �L 8�_, I y� ,i. \-/ ;/,'; '. 4 ' ';'' E \ //• C %w�iI' ' \, 8 VII„, riii ,-, , ,•! ,, v w. F iS '-' 11:11;i1P"--.'' • LOT 2 BLOCK I John Oliver A Associates ha ,,1.,:H'' •Km -wic 5/D2/a3 Ho w,E DESC DOD n......w.�...w—w w.:+. a..n w o6sKa+?El DEC 5l20/03 un nEhvoHs ELK RIVER CROSSING FOURTH ADDITION o aar.=la •a''p1e �,,,,,_,M••^.o os€ er nD R ELK RIVER, MN is�'a41,072IAma-ea np J� /`/_ ��' CHECKED Ex DEC u/-arra \ VSI CONSTRUCTION, INC. RI"... ru....., , ,N w owc 5135-1asrtEe.� and In.t{M C.nk.Ynw..i• 511^rWr. ry 1ENi PRELIMINARY SITE PLAN Date 6!02/03 r„ r NU No 11136-16 G\Land Projects R2\813F-16\dwg\PRELIMINARY\8136-16PGRD.dwg,Layout],05/21/03 06:5047 AM,Dale i 4 :rj�/ aha - : •. . „......A.-��. •is s \ \ s/ it ,its * \ a alga } bap z sgtt till , , q , \.:11.;,;,,,,,,. A d8.h \ , ...\.2...\ \ \ x s \ F • ste e�%G 1i 1 v. > aNNM = .ejs g , �— " tt;" 'i V Er.a ' + 7_---\__.-----4_,--'-'„":---" 1� /ter/ / n._ 8 S,.i SE L. ,,,t/ / S/ . :% a Y1 E R N e tl $IQ -R E \\ �_, e/12 ‘ H.:. : 8_ „ 0 114t 8 r. N i s ,;//)1 nm '�i=w° E e L_3: ° / a :• /// r. � ��/ i --------_,,,,,,,,,, /.. Ay 1 1 ii I , : ' ' ir�� Ili" 4S � S fuck 1 i ; S • \N LOT 2 BLOCK I John Oliver`L Aaaociiatel,Inc. E r...c.°�o.:«.�`-wrt 5/avo3 w*E DESCRIPTION ELK RIVER CROSSING 4TH ADDITION ^ ^ `�^ mM +%eeie DES CN n DLV 5/DO/m VNr NEM5LVV ELK RIVER, MN t++^was"'""„' 1i c"."•+ °I' FOR: ra"14e`ru ru oa-..,-••° "�' '° f^' CNEGICED�Y ac VIS CONSTRUCTION, INC. °m.«•" •o e... •..au. q °E" "36 won \ PRELIMINARY GRADING PLAN '""" ""`"" "'"" " "" L Pole 5/02/03 Fp No / FILE NO 4136-16 G\Land Projects R2\613P-16\dwg\PRELIMINARY\6136-16UTILITY dwg,Layoutl,0521/03 06'49:05 AM,Dale if 'I %'j' ` \ s c.A iii _ i T 8 Is L .....,!"1\ , —4' \-% \ \ \ \ \ so a••\ b� \b V g$ h \\� A \ A `�'�**41.1.. �• Wig 1 j /i /' •---2'f / , ` '/ ". I �� , , i /+j �// // _ � E / I "/)�% ,' /47 ir C ,' „;yy • / '\ii III11II' '''/:/'''/:/ z, 'VR ;; kfo . � I x r. t i M <5 - - 4 y '<_ pt A ” €7 p F. A F • t-9 i nt q A t. 9 = 3 n o g L Fg t " 6 ' 9 0 ""'' ''' 's i 3 i! 'i 1 ! 9 e S \(„t A LOT 2 BLOCK I John Oliver i Aaaoc/wNa Inc. �,1`��o : .°.M�� R� ^I� °1O ti er'NT, s/oz,a3 Ho EWE ocscnwrro. 7 .M....ti °....... rr.... me r "°. ''''N m 0LC 1 5/20/03 OTr 11E`ISKKlS ELK RIVER CROSSING FOURTH ADDITION nw. 'Jr'''. �. ` LK.O w Po ��\ ELK RIVER, MN isai:Mii:"ii`r`2i's'-'^....'..s u'..mi.. }e^'arv ` CHEacm BY Du V51 CONSTRUCTION, INC. i••••n. role ' q� °M: °13`-"'mL"Y O"' .,...y,,,c......r. s�.IMS rEn PRELIMINARY UTILITY PLAN sole /02/03 .y r ME NO n36-Is G\Land Protects R2\913E-16\dwg'PRELIMINARY\8136-16PLAND.dwg,Layoutl,05/21/03 06:50:09 AM,Dale \ 'i€ • :rj 10. 101 .- 11 g, .1 41 1 f, i k a �x Fy t C� i . aio ill 11 11 £ £ £ £ R F £ £ a R I0 iii 1 \— i i i a • - - • - - sok S.c . i `. \ \ • \ ., \ \ . \ In D ' .c e \ y 0 /-rr, ' ‘ 17-\yr/ '.' ' '-':' -,----;;;;-- \ \,...1\------- :----„:1:==' I 1 \ • ., „,, , E 4 ' � ell! g" 1 I '' i •,/z • „,;-'".2 • • II • ,. I _ -,, jQ ;- a J i - 0 i*, I ___ A. (1:74/. \ 41pr ,./, ;I , , ' Olt, /i i � , / 74 i li — j - , ' ;i � /I "a i Sr" s33jne•s{•1_ ii sill, $ F c a r � •3 s5 n3�s•x01 fr_ 5x.c t 5 7.---=,---.--",===''''''''[' / X ys sig3, tr`a-t!!sj-r. „ lap . e t f- • j;��� y_-F 71 333 / !S i! :'S I . C'€�L ESigt�lii c IP/ 4 S; �i.�) 55 S ! iC 3x3 €51331 LGE _ fa O'i Alt tr3Dif Z i ifa f s- Y „, � 3 WIN r _ i I tff �S¢ Q {�====== ' - ifs y il i 3�x ggiE [ 1� 1111; ° I 1'iJ I e 3 m Lt /n s E 9 ��i �3 ;r d gg3�: ciiB t �y r r rti h 0; iI i lip Iti in . \,,"= LOT 2 BLOCK I 'lei Oliver A Aar loCiiates Inc' P_.44'4.,7:::::7":":;;;;';:747-Dcre s,avQ. "0 0°re °E"'"'"+ 6 ELK RIVER CROSSING FOURTH ADDITION •�•• .� r. 00000 e, oLL s/To(D3 cm NCHswNs ELK RIVER, MN Y510 0 'Amuse auo ...a ���uuu°"E i"i,.�a:.:� °"^"Tan wH FOR T J-..,-T°TT FAI - ,.-(��.5 11. lole o �� CHECKED m' INC \ VSI CONSTRUCTION, INC. I 7,,,I,::-..,:::."..".;;;;..'7,..= +WJE-IS LANDL -06 PRELININARY LANDSCAPE PLAN s..,rw. q/- rErr D.1• 5/02/03 Po. No i,i Y'rILE No 8136-15 ,-.., _ PROPOSED ELEVATIONS „._____ FS GORN1C,E , T 0 P • • - . J- • - • ... SIGN AREA . ; -1 ..=-... . tii-Z4,IW•.; p-aa-,1•J;i,-. ( 7.,,,,,,le-., b 411i' TENANT '74_....:L:t. ---,4 . ---METAL CANOPY' TE i\•;'A N T 2,-,. r piAlif 0.....,„ :ilk,* tklf.;.i.i:4' 4"HI.-3H --...-- --.......--- ;TfriZ arcuarg ,,=_31.cr-r...a,-1:r„.-_,,,,,,-.,,,1_,,,--,--z:.-.....::::::,.---: . 4 - .;"--,''-'!•:•'7'''4.,4-`-.P.4 s...-:-- ."i. -. .1--, 4•?.. :'; •. ---:-...,; -: „...,:_.:,-.....,',-I r..a F.1-.., ..,,,LT-9.1.--f•..? -4th----a'. --4:j4'131—•' - ---4'P.'-ifti--------- --1,t,-73-Al '---'--- I I . I 1 ,i),.,___--ALUtlINIUM 5TOREFRC . -tr:17'.'”'' 0.--ki".i J '''',1. --Rip-.9.1 --6'.•-",e.-.15. 0 7,,.i .1 6 ,ER,I,T2i.ti i .7i,',-e+ -,''Ti.-4."':!. ..•1::',-1, -*.-------ROCAIF-A0E(.-.1 IU 3,--?Z41,'-- 1-------1 3,FFE riSI;k:f.--' I I- 'iit----4%; )'-nt7.11 A-ALAIIMIll=111111111 Pr-•":-T,S. 111111111v".:..,- 77i __ /-71.1 _1 .f-,:,: i,.• 1-•100.-0.. . OFRONT ELEVATION . - • `,,---.,-7- . ... E;FS CORN1c.--E 1-'122-0" - E1FS 516N AREA .. •-trit-,- 7i-J4T".--4 PIA fi' (--•14%.4 1ENANTP-_,•414-,' — rE 1 L L'A\'-'fr'' PALte 'IP girt •- • 3•.it,s1 ,,..,,,4 ..,.- __.4-1-A1-1- -_.7-_,_ , •i'r4•1 - ,,1,... ---- R.-0,KF.,6.: ,-, 'VV.,- ,......,,r''J."•,,. -.•.-;••41.T1„" -.-.-...,..-...: .1 ;4'.._'._ir qm-,,,.._,,.-7.--1T-T:77...;;.C1.77' qtflii-g- - '' -'- i ;.•.--.J., - i- VW1,12, V.......---ALUNINU:,5-OREFRONT ,V;;7.,.."• I ;iTry,',11 I ,.:i•4 ,_„.. a- .•-- '14-4-;,u, 6--------'•ir- ••2.0.0-F-.\OE 1-1L; FFE .t.1;• - ---T----‘..- 1*.i.4-C, 4 .:1;:.-:_ell, • . '1",,,i-f,---,..: _,-....., . 1-''100'-0" • MMMMMM.Mit., lik - iO . . 0':'P'- TYPICAL SIDE ELEVATION , ,.;.: •• '."`• •i" • -.. •-... -. .-•.• .., /32" . I'-0" ::,‘, - ...t1'...v,„.''..>-,,,.4 .:,-••'., .„- , • . " -,"..,_;.:-,-",,,,,••el--.i-'''• - '-- ' • ,TOP , V 1 ia'-(2" . ) 1 , - , I I ' f ' ..._ TENANT .._ - TENANT . „. . :•.,- ,.. • ••••-•• .7, -7-- -- .;--,...T.,::-•,- ; ------,-----...-..-----,----=.57 --'-‘.44.-•;..- ------- -••..":-...-a-`7'-7 ---.-f-c--.=-77-7.7 .7."-'•;--.F...-7.-..-•:-•.-7_,..:.1.4.---....1." -•;.,..,-.sin-....,/,,,T,:,•4.,.s,--ss,....'..''.. ::.:-----.„'" `..-.„r-",,,,-4.., -A-. . ,7, 7.',....':,:.;-",",--,.:-_,ii!:,'D WI!7.7.2_•.4 -'-,;1.1,,,,,,-.t..7,?.?-4.....a6v,,:v......-:,--,-----:-.=_-t,,,,.- -•,,--.,-.1.74-,,,,,,s,,,,,,,,,,4,, ,-.4,.....-,--4-,,,,--._••,-,-,:no.„,',.;•,,,-- ------,c,i*,-z.---'4-1...--'---'''''--:'.'4'6.9'' ri.,„- ,,,s- ,j,1, ....,,_••siss •-1,,"•-: c.•-•-•f,4. -C::•---;.r-V-./..12. -ezl''',.,,V,r,.7,P-,r-,''.;s_5••,•!ril'?..--'.-,.„,:-,-.-,,,'W,_„..,,,-- , --,4,...Ves.:es--se-e:i•- •ea-7....:S.,•^•.-2%;,,.'2:b.,;:-..,*.j„..nri•s.1",r ,-,-.5„i•,,,,4-3-PV,e1,-:::•.1's 2,-.:`,1?-:<.:::,-,1-. - - t 4- '. .---------. - •:_ii i 4,w,-.:::„?..14r,_—:‹.....r...is,*----g..,--.3,4-4;r.... i-,..),-, -,...,:itac._-ip -,-.,----;,,-„_.- r.,,,-.,,,-,... .,9,-.._...,...,.....,--g....,,,,,,,..,,,,,,,,,,,,,,,„„-„z...,,,...a,„..„--,,n.,.„,.,,s., , .,.. ....... .,_...„..i..., . ... 4.-,_______,_ ,p.tzi gqi-'---..---F.?,----x0.„.,*5--p-4-!-1,.;11i-iiitf -lat ..r.f.••-•'-'. *--..!'Mk.A.„c't ,,- ',-, '"---:. --,.-7:0:g;5-'::',==ii."*„.;';57L!:,.: 7 -,--::.,- ..,:_cif. I 47,...;.'. , • IM1 'tii ii4F. ...f14. ''.;.1,1,44.---0'...;45;r14,4 4 1.0..!AY.,:.,.11.A9...:,.V.ka,,,,,f, 1 cf. ,.,-,,,,WEIr2Z.,-,ift .V,c,17-v-4,4Anr,":::.:6,-...-.1-,____ ,,,-..,-, i_A A , .g-,,4 !:,.,;,.4''if ___I I I_ - 6-,...., 'Ig'--1,- ''''-'210'*7--i'''''"74',..414;',--.4*??4-5--5:"-,4.7'1';.."t'%4Vr;:..'",-.HV4f.'•••,:i••01J44-;;4-'7.74‘.',..+-1-'''',..,2-:4."...4-‘...ilf712-'-Vit77.•22''-',11•7::-:'We-r.:7-'-' -•-•-%;g:f2:'''P1'4'(4'-.7:'-r.s1'..-.• '''''171'; "'''il 'tgir''''' '-•": "P'11.4,r?.."'-' ''.5,7,-1' k:::i-s-1-'---:-,,--_-!,a-,7-'7.. ,--- - ';41.42 ----,4,-..,,,a,„,..,„b--,,,,,,,_,,,,....1,-,,,-,-..t.,,,,, ...,,,,,..,,,,,..,-.-_,A4L.,---,...,-,-...,4-1, i ..1t4R• FFE ,,,mt r-r--- I., .v....c.,,,,,-,-/...:7 ..,-.2,,,z-I,-7-4_ ,, ,!-,-,..1,,::,,,I,,-tr.,,:a,„., , ,,-. ,Aa„.... ,.,.s., ,,„ ,...-I--,,c, — - -1 i a....1 1 lo"-".. - - 0 REAR ELEVATION 100" te kKE Malteds.Inc ELK RIVER Project 0203113101 Drawing Nurnbel ISIS a 300 test menu.noilh minneepas.ree 55401 CROSSINGDate NA(5 200.2 EE 612/339-4200 Diavm by TH architects 412/342 9261 tax MAIN STREET Checked by KA 01 ZANE STREET Copyright 0 2002 by KK E Architects,Inc. T.O. EXISTING BUILDING IFS CORNICE 122 . 5 SIGN AREA ° TENANT -_-_-- TENANT METAL CANOPY 4"HIGH -II 1 � - ROCKFACE CMU - — ALUMINUM STOREFRC O s - - 5"HIGH ROCKFACE CMU dik F.F.E. \ _ G_- �— 100'-O" OFRONT ELEVATION 3/32" = t'-O" T.O.P EIFS CORNICE Y Vf Z-0" 1 ` 1 EIFS SIGN AREA -------- E- TENANT TENANT METAL CANOPY ____-4"HIGH ROCKFACE CMI) „----ALUMINUM STOREFRONT — 1/4"------:: 8”HIGH -ROCKFACE CMU oik F.F.E. li } 100'-0" OTYPIGAL SIDE ELEVATION 3/32" = I'-0" T.0 P. IF 119'-O" TENANT TENANT - 11I 11II 111 !WWI =1111== - =- == - M- F.F.E. �. C�� '� 100'-0" OREAR ELEVATION . - 5/52" = I'-0" r KKE AMitwle.Inc •.I,,.�, ELK RIVER ^ OJObJPJ,O .. - KK , ,o , CROSSING ' HAY53OM /ESE architects HII/M2-217 to MAIN STREET Qrd'ad Fri K., 01 ANE STREET Copyright 2002 by Ka Architects,Inc