Loading...
03-10-1998 ERMU MIN ELK RIVER MUNICIPAL UTILITIES REGULAR MEETING OF THE ELK RIVER UTILITIES COMMISSION HELD AT THE ELK RIVER MUNICIPAL UTILITIES OFFICE MARCH 10, 1998 Members Present: President, George Zabee; Vice Chairman, James Tralle Members Absent: Trustee, John Dietz Staff Present: Bryan Adams, General Manager; Glenn Sundeen, Line Superintendent; Robert McCartney, Water Superintendent; Patricia Hemza, Office Manager 1. Call meeting to order at 4:00 P.M., March 10. 1998 2. Consider Utilities Agenda James Tralle moved to approve the March 10, 1998 Agenda as presented. George Zabee seconded the motion. Motion carried 2-0. 3. *Consider Consent Agenda Mr. Tralle moved to approve the Consent Agenda as follows: 02-10-98 Minutes February Check Register Financials 5.1 Review and consider fencing of Power Plant Commission and Staff reviewed the necessity of fencing the area around the Pole Yard at the Plant. Options were presented and discussed. George Zabee moved to install the scaled down version of the fencing around the south end of the pole pile. James Tralle seconded the motion. Motion carried 2-0. 5.2 Up-date on Electronic Technician and Security System Sales Person Bryan Adams reported that Charlie Conway, Utility Worker(Electronic Technician), began employment with the ERMU on 3-3-98. The Security System Sales Person has declined the offer made. The search for a Sales Person will continue. 5.3 Up-date Miscellaneous Water Issues Bryan Adams up-dated the Commission on several miscellaneous Water Issues. Well #2 is back in operation after completion of repair work. Well #3 has been removed from service for inspection and necessary repair. Repair cost estimates Page 2 Regular meeting of the Elk River Municipal Utilities Commission March 10, 1998 have not been received. KLM Engineering, Inc. will be doing a float down inspection of the Freeport Avenue water tower on April 1, 1998, which will tell us if and when the tower will need repair work to the paint coating system and estimated costs. The test well for Well#6 has been done and it has been determined that there is a good source of water. Final pump tests and water sample tests have not been received yet. Engineering and inspection proposals for construction of Well #6 have been received. These proposals define cost of engineering along with determining the correct approach, proper technique and technology. It was recommended and authorized that Howard Green Company prepare drawings and specifications for this project. The issue of using engineering firms other than the City Engineer will be discussed at a future meeting. 5.4 Up-date Methane Gas Generation and Wind Turbine Project The ERMU has not received the proposed power purchase agreement from Power Strategies. United Power Association has not acted on Northern Alternative Energy's proposal to install a 750 kW Micon wind generator for our avoided cost of 33 mils, and are looking at other alternatives. Spiegal & McDiarmid have responded to our query on the legality of not accepting Northern Alternative Energy's proposal. Spiegel &McDiarmid recommended that ERMU establish a wheeling rate for Qualifying Facilities, and embody the rate in contractual agreements with QFs, including the ERMU/RECO agreement. 5.5 Up-date on purchase of Electric Line Truck On October 21, 1997, a contract was awarded to Amador Aerials to furnish and deliver an electric line truck for $79,860. It now appears that Amador Aerials is in the process of going out of business and will be unable to deliver the product to us. Mr. Tralle moved to award the bid to the next lowest responsive bidder, Aspen of Bloomington, MN at their bid price of$95,052. Mr. Zabee seconded the motion. Motion carried 2-0. 6.1 OSHA Inspection The Elk River Utilities, the City Street Department and Sewage Treatment Plant all had OSHA inspections on February 9, 1998. All three units were cited with one citation. We have not received the written citation, or the amount of the fine for the exact violation of having a window fan without a three-prong grounded plug. Page 3 Regular meeting of the Elk River Municipal Utilities Commission March 10, 1998 6.2 1998 Electric Wire Bids Bids for 1998 Electrical wire will be received on March 17, 1998. James Tralle moved to authorize Bryan Adams to award the contract to the lowest responsive bidder. George Zabee seconded the motion. Motion carried 2-0. 6.3 Station 14 Transformer Bryan Adams reported that we have a used transformer being retired, and that the transformer will be put in storage for several years. Princeton Municipal Utilities has contacted ERMU with the possibility of purchasing the transformer for their immediate use. Bryan Adams, General Manager recommends the sale of the transformer to Princeton Utilities. James Tralle moved to sell the transformer to Princeton for $42,500.00, but not . less than $40,000.00 George Zabee seconded the motion. Motion carried 2-0. 6.4 Spare parts for Unit#4 Worthington Diesel Generator Bryan Adams advised the Commission of the availability of spare parts, a head and piston liner for Unit#4. Since parts for this engine are difficult to find, it is recommended that purchase be made. James Tralle moved to have the General Manager verify the price and to purchase the spare parts. George Zabee seconded the motion. The City Manager has suggested the Commission have a joint meeting with the City Council in April. The Elk River Utilities Commission is agreeable to the proposal, and directed the General Manager to set a date in April. James Tralle moved to adjourn the March 10, 1998 meeting of the Elk River Utilities Commission. George Zabee seconded the motion. Motion carried 2-0. The March 10, 1998 meeting of the Elk River Utilities Commission adjourned at 5:00 P.M. The next scheduled meeting of the Elk River Utilities Commission will be on April 14, 1998. _Respectsubm. ed, Patricia Hemza, Office Manager