09-11-1996 ERMU MIN REGULAR MEETING OF THE ELK RIVER
MUNICIPAL UTILITIES COMMISSION
HELD AT THE ELK RIVER MUNICIPAL
UTILITIES OFFICE
SEPTEMBER 11, 1996
Members Present : President James Tralle, Vice Chairman John
Dietz, Trustee George Zabee
Others Present : Terry Maurer, MSA Consulting Engineer; Bryan
Adams, General Manager; Glenn Sundeen, Line Superintendent;
Robert McCartney, Water Superintendent; Patricia Hemza, Office
Manager
1 . Call Meeting to Order
Pursuant to due call and notice thereof, the meeting of the
Elk River Utilities Commission was called to order at
3 : 00 P.M. by President Tralle.
2 . Consider Utilities Agenda
Mr. Dietz moved to approve the 9-11-96 Agenda. Mr. Zabee
seconded the motion. Motion carried 3-0 .
3 . Consider Consent Agenda
Mr. Dietz moved to approve the Consent Agenda as follows:
3 . 8-13-96 Minutes -- approved
4 . Check Register -- approved
5 . 1 . MSA Presentation on Water System Expansion
Terry Maurer summarized the engineering study to identify
potential sites and estimated costs for a well, filter
plant, and water tower to serve the northwest area of the
water system, and evaluated a trunk watermain extension
from the northeast area of the water system to the north-
west area of the water system. Trunk watermain extension
will delay the need for future water tower #6 .
Mr. Zabee moved to direct MSA to prepare a proposal to
complete the Wellhead Protection Plan. Mr. Dietz seconded
the motion. Motion carried 3-0 .
Mr. Dietz moved to direct MSA to complete the preliminary
design for the trunk watermain extention. Mr. Zabee
seconded the motion. Motion carried 3-0 .
Regular meeting of the Elk River Utilities Commission
September 11, 1996
Page 2
Mr. Zabee moved to direct MSA to analyze the Water Tower
sites, and to consider an additional site outside the urban
territory. Mr. Dietz seconded the motion. Motion
carried 3-0 .
5 . 2 Up-date, R.W. Beck electric rate study
Mr. Adams discussed the progress of the rate study with
the Commission, indicating the biggest challenge will be
determining future capital costs.
5 .3 Up-date Elk River Utilities Office Building
Mr. Adams advised the Commission that bids will be opened
September 16, 1996 for the re-roofing project . The
present roof has been temporarily patched by Skyline
Roofing, who installed the rubber membrane in 1993 .
5 .4 Resolution for Public Power Week (Oct. 2-13,1996)
The Commission was up-dated on plans for the recognition of
Public Power Week. The Mayor will be proclaiming the week,
we will have newspaper coverage, and the Current will
devote part of its October publication to the Utilities .
5 . 5 Street Light Construction standards
Mr. Adams recommended offering three choices to customers,
as follows:
A. Standard 35' wood pole with 6' galvanized steel mast
and a 100 or 250 watt HPS cobra head lamp. Used in
existing areas with overhead line construction and
existing areas with underground construction with no
street lights . Installation Cost @ $700 . 00 each.
B. 30' direct buried fiberglass pole with 6' aluminum mast
and a 250 watt HPS cobra head lamp. Used in new
developments with underground electrical system at
intersections of major roads . Installation cost
@ $1, 200 . 00 each.
C. 23 ' direct buried fiberglass pole with 6' aluminum mast
and a 150 watt HPS traditionaire lamp. Used in new
developments with underground electrical systems of
minor street intersections and mid-block lighting if
desired. Installation cost @ $900 . 00 each.
Regular meeting of the Elk River Utilities Commission
September 11, 1996
Page 3
Discussion of future considerations for mid-block lighting
took place. No action taken at this time.
Mr. Zabee moved to accept the three recommendations as
presented for street light standards . Mr. Dietz seconded
the motion. Motion carried 3-0 .
5 . 6 Elk River Utilities Office Building signs
Mr. Adams presented quotes from six companies for signs for
the Utility office building.
Mr. Zabee moved to approve the quote from Signs Unlimited
for a 2' X 5' sign for the west side of the building and a
3' X 7' 6" sign for the north side of the building. Mr.
Dietz seconded the motion. Motion carried 3-0 .
5 . 7 Hydrant and water valve replacement
Quotes for installing 4 valves and 1 hydrant were
considered.
Mr. Zabee moved to approve the quote of $12, 894 . 00,
for the installation of 4 water main valves and to
replace a hydrant at the Utilities office building.
Mr. Dietz seconded the motion. Motion carried 3-0 .
6 . 1 12 .46 KV Electric Line Extension, Twin Lakes Rd.
Recommendations to replace budget item 96-30 with a line
extension to service a new church being built this fall
requiring 3 phase, and to be utilized in the acquisition
of additional territory from AEC were presented.
Mr. Zabee moved to replace budget item 96-30 with a line
extension on Twin Lakes Rd. Mr. Dietz seconded the motion.
Motion carried 3-0 .
6 . 2 Elk River Municipal Utilities Priorities
Mr. Adams presented a priority list, with the top 6
priorities, and asked for review by the Commissioners .
It was recommended that conservation programs, both
electric and water, be added to the list .
Mr. Zabee moved to receive and file the priorities . Mr.
Dietz seconded the motion. Motion carried 3-0 . A list
of the priorities to be filed with the minutes of this
meeting.
Regular meeting of the Elk River Utilities Commission
September 11, 1996
Page 4
6 . 3 Proposed Elk River Municipal Utilities Safety Program
Mr. Adams explained the AWAIR act and presented the
documents and manuals that will keep the Utilities in
compliance. He also reviewed the program that the
Utilities has contracted with MMUA, to insure that we
stay in compliance.
Mr. Zabee moved to adopt the safety program as presented
on a preliminary basis, until a permanent program is
presented. Mr. Dietz seconded the motion. Motion
carried 3-0 .
6 .4 Anoka Electric Cooperative FERC filing
Mr. Adams discussed the submittals by AEC to the Federal
Energy Regulatory Commission regarding the rate schedules
between AEC and the Elk River Municipal Utilities . An
intervention will be filed on behalf of the Utilities to
give more time to determine why this filing is necessary
and what the impact will be .
Other Business
Power to the gazebo being constructed in the downtown
plaza has been requested by the downtown committee to
be donated. Mr. Zabee moved to ask the Committee to do the
wiring, which is secondary, and the Utilities to donate
the usage. Mr. Dietz seconded the motion. Motion
carried 3-0 .
The next scheduled regular meeting of the Elk River
Utilities Commission will be October 8, 1996 at 4 : 00 P.M.
Mr. Dietz moved to adjourn. Mr. Zabee seconded the motion.
Motion carried 3-0 .
The meeting of the Elk River Utilities Commission adjourned at
5 : 10 P.M.
Respectfully submitted,
Patricia Hemza
Office Manager
PRIORITIES
1 . Develop long range plans to address the needs of both
water and electric utility in anticipation of future
growth and development .
2 . Work closely with the City Administrator in developing
marketing strategies and information for economic
development .
3 . Explore joint powers options . Work with Anoka Electric
Cooperative on a transfer of territories and in
planning for long range improvements .
1* 4 . Conduct a study to determine the need for rate
adjustments in the water and electric utilities .
5 . Develop and implement a regular maintenance program
for the water utility.
6 . Address space needs for utility operations .
6* 7 . Develop a mapping system to record the overhead and
underground facilities of the electric utility.
8 . Clarify reporting relationships and develop job
descriptions. Establish a performance evaluation
system.
9 . Evaluate the benefits of initiating an apprenticeship
program.
3* 10 . Computerize the utility' s inventory and purchasing
systems .
5* 11 . Develop a safety program.
12 . In conjunction with the City' s Civil Defense Director
(Fire Chief) , develop an Emergency Preparedness
Program.
4* 13 . Develop Utility policy and procedure manual .
14 . Phone system between the power plant and office, so
calls can be transferred.
15 . New truck for Scott Nielsen.
16 . Update water maps .
Page 2
PRIORITIES
2* 17 . Resolve power supply arrangement with UPA/AEC, or
possibly other suppliers and determine future of
3000 Kw diesel generation.
18 . Conservation Programs for the Electric and Water
Departments .