Loading...
05-16-1995 ERMU MIN ELK RIVER MUNICIPAL UTILITIES 322 King Avenue Elk River, Minnesota 55330 Phone (612) 441-2020 UTILITIES COMMISSION MINUTES May 16, 1995 4 :00 P.M. Present Were: George Zabee President James Tralle Vice Chairman John Dietz Trustee Others Present: Bill Birrenkott General Manager Bob McCartney Water Superintendent Glenn Sundeen Line Superintendent Paul Erich Olson, Theilen Terry Maurer Maier, Stewart Irwin Stobbe D & E Homes Wade Lovelette Lead Lineman Mike Thiry Lead Lineman Mark Fuchs Lead Lineman 1) The meeting was called to order at 4 :00 P.M. by President Zabee. 2 ) Motion by Mr. Tralle, seconded by Mr. Dietz to approve the agenda as amended. The Motion carried. 3) Motion by Mr. Tralle, seconded by Mr. Dietz to approve the minutes of the previous meeting as distributed. The motion carried. 4 ) Irwin Stobbe a local homebuilder, Complained about the cost to install underground to clear an overhead line from a house he was building. Motion by Mr. Tralle seconded by Mr. Dietz to do the work requested without charging equipment hours to bring the total cost of the project to $1403.02. The motion carried. 5) John Busonick, who had requested time from the Commission failed to show up. 6) Paul Erich of Olson, Theilen and Associates, presented and reviewed the 1994 audited financial statements. Motion by Mr. Tralle, seconded by Mr. Dietz to receive and file the 1994 audit. The Motion carried. 7 ) Terry Maurer of MSA presented a summarization of the bids received on the Hillside Water Treatment Plant. Motion by Mr. Tralle, seconded by Mr. Dietz to award the construction of the Water Treatment Plant to the low bid of Richmar Construction, Inc. in the amount of $416,400. The Motion Carried. 8) Wade Lovelette, Mike Thiry, and Mark Fuchs, representing the outside workers presented the Commissioners with proposals concerning wages and working conditions. The wage and benefits Survey conducted by Management was discussed. Motion by Mr. Dietz, seconded by Mr. Tralle, to increase wages by 3% and modify the vacation policy and clothing furnished as presented. After some discussion, Mr. Tralle withdrew his second and Mr. Dietz withdrew his motion. Motion by Mr. Tralle, seconded by Mr. Zabbe to increase the wages by 3 .74% as per the average wage survey and modify the vacation and clothing policy as attached. The motion carried 2 - 1. Mr. Dietz opposed. 9) The General Manager presented the Commissioners from the Youth Hockey organization to purchase tickets for an upcoming circus. The Commissioners decided to take no action at this time. 10) The Line Superintendent reviewed the status of construction projects and other operating conditions. 11) The General Manager reviewed the April financial statements with the Commissioners. 12 ) Motion by Mr. Tralle, seconded by Mr. Dietz, to approve the check register. 13) The General Manager reported that someone was putting together proposals to move the old courthouse to Becker. He reported that the utilities had prepared two estimates of the moving costs. 14 ) The General Manger presented an estimate to place the line along Hiway 10 underground. Staff was directed to obtain other estimates for other scenarios. 15 ) The next meeting was set for Tuesday, June 13, 1995 at 4 : 00 P.M. at the Utilities office. 10) Motion by Mr. Tralle, seconded by Mr. Dietz to adjourn. The motion Carried. Meeting adjourned at 5:50 P.M. Bill Birrenkott General Manager 1995 PROPOSED VACATION SCHEDULE REVISION IN AN EFFORT TO BRING PART OF OUR VACATION SCHEDULE CLOSER TO THE METRO AVERAGE, WE WOULD LIKE TO CHANGE THE FOLLOWING: PRESENT PROPOSED AFTER 11 YEARS 15 DAYS 16 DAYS AFTER 12 YEARS 15 DAYS 17 DAYS AFTER 13 YEARS 15 DAYS 18 DAYS AFTER 14 YEARS 15 DAYS 19 DAYS 1995 REQUIRED CLOTHING POLICY AS IT STANDS THE COMPANY WILL FURNISH EACH OUTSIDE EMPLOYEE : 2 NOMEX IIIA WORK SHIRTS PER YEAR. AND WILL REPLACE AS NEEDED: NOMEX IIIA LINED BIB OVERALLS NOMEX IIIA LINED PARKA AND HOOD NOMEX IIIA LINED BOMBER JACKET OUR CURRENTLY FROZEN 1994 POLICY INCLUDED THE FOLLOWING ADDITIONAL ITEMS: LINEMANS CLIMBING BOOTS SUMMER WORK BOOTS OR SHOES RUBBER BOOTS RUBBER OVERSHOES INSULATED WINTER BOOTS COVERALLS (USED FOR MAINTENANCE ON TRUCKS) WE WOULD LIKE TO HAVE THESE ITEMS REINSTATED ON THE REQUIRED CLOTHING POLICY, UNDER THE SAME GUIDELINES: 1. WORN OUT ITEM TO BE TURNED IN. 2. E.R.M.U. TO ISSUE A CHECK TO THE SUPPLIER. M St May 16, 1995 File: 235-009-30 Mr. Bill Birrenkott CONSULTING ENGINEERS General Manager Elk River Municipal Utilities 1326 Energy Park Drive 322 King Avenue St.Paul,MN 55108 Elk River, MN 55330 612-644-4389 RE: WATER TREATMENT PLANT NO. 5/NORTHEAST AREA 1-800-888-2923 CONSTRUCTION BIDS Fax:612-644-9446 Dear Mr. Birrenkott: We have tabulated the bids received on April 25, 1995, for construction of the northeast area water treatment plant. There were a total of 5 bids. The following table lists the bidders and their total bid: 1. Richmar Construction, Inc. $416,400.00 2. Moorehead Construction, Inc. $489,669.00 3. Sheehy Construction, Inc. $494,300.00 CIVIL ENGINEERING. 4. Barbaroosa & Sons, Inc. $497,000.00 ENVIRONMENTAL 5. American General, Inc. $582,900.00 MUNICIPAL PLANNING The construction of this water treatment plant is very similar in nature to the water SOLID WASTE treatment plant recently completed on Gary Street. It is a pressurized filter system with a STRUCTURAL pond for discharge of the backwash water. The low bidder, Richmar Construction, Inc. SURVEYING was the Contractor for the Gary Street project. The Gary Street project was originally bid TRAFFIC approximately 2 years at $477,110.00. Change order #1 was prepared at the time of the TRANSPORTATION bid award, which changed the design to a pond for backwash water, lowering the total price to $384,365.00. In comparing that project to this low bid, it appears that the single largest ELECTRICAL/MECHANICAL increase is due to the cost of the concrete building. There has been approximately a 17% ENGINEERING: increase in the cost of this type of product in the last 2 years. The remainder of the items HVAC included in the project would reflect normal increases over the 2 year period. POWER DISTRIBUTION SCADA Based on Richmar's performance on the Gary Street water treatment plant, we are prepared SYSTEM CONTROLS to recommend award to them as the lowest responsible bidder in the amount of $416,400.00. If you have any questions regarding this project, I will be in attendance at your Tuesday, May 16, 1995, Utilities Commission meeting. Sincerely, MSA, CONSULTING ENGINEERS OFFICES IN: 1. )1*-ar �.� MINNEAPOLIS Terry J. Maurer, P.E. PRIOR LAKE TJM:pd ST.PAUL WASECA 009-1604.may