Loading...
6.2 ERMUSR 08-16-2005 Elk River Municipal Utilities 13069 Orono Parkway phone: 763.441.2020 Elk River,MN 55330 Fax 763.441.8099 August 4, 2005 To: Elk River Municipal Utilities Commission Jerry Takle Jim Tralle ' John Dietz From: Bryan Adams ' Subject: Up Coming Projects During the last couple of Elk River Municipal Commission meetings, we have been discussing Otsego's growth and the potential Target Data Center facility. These two items along with our normal growth have initiated a number of possible projects for the 111) electric department. Below for your review are listed several projects, costs, and need for these projects. Some of these projects we may be building sooner than necessary, but ' they still need to be built. 1) New feeder from West Substation to Target $825,000 2) New feeder from Station 14 to Target $900,000 ' Less Target Contribution ($375,000) Target sub-total $1,350,000 ' 3) Upgrade Substation West with larger transformer— $550,000 2006 budget item to support system growth. Will also support Target. ' 4) Upgrade Station 14 with New Substation—originally $850,000 budgeted for 2010 time frame. Will be used to support Target but not immediately needed with Otsego Substation addition. Proposed to be constructed now to preserve space at Great River Energy facility. 5) New Substation in Otsego needed to support growth. $250,000 Will replace budgeted feeder in 2007. 1 I 6) Bury existing overhead feeder along CSAH 39 per $ 75,000 0 Otsego CUP conditions. I 7) New feeder from Otsego substation to support Otsego $150,000 growth and reduce load on Station 14. I 8) New second feeder from Otsego substation. Can get $150,000 along without, but system operation much easier with I second feeder and less customer disruption when installing with other new feeder. I 9) Continue new feeder from plant to Elk Path Business $300,000 Park, budgeted for 2006-2007. I 10) Purchase land for future Substation at Waco and Co. $105,000 Rd. 35 (original location of new substation to serve I Target). Owner is uncertain about selling. $3,780,000 Additional normal construction items: I 11) New feeder from north sub south to Co Rd 33 to $210,000 prepare for service area take over 17 and 18. NI 12) Continue replacing URD cable in area 16 $ 70,000 I(Knollwood Addition). 13) Continue replacing URD cable in area 21 $ 90,000 I (Greenhead Addition) From staffs' perspective, items 4, 8 and 10 could be delayed if absolutely necessary but I not recommended. Staff solicits your comments. We are bringing these projects to your attention so we can more accurately assemble the capital budget for the September meeting. I 1 ill 1