Loading...
4.8. SR 09-04-2018 Request for Action To Item Number Mayor and City Council 4.8 Agenda Section Meeting Date Prepared by Consent September 4, 2018 Justin Femrite, P.E., Public Works Director Item Description Reviewed by Street Reconstruction Quote for 6 ½ Street and Cal Portner, City Administrator Quinn Avenue Project Reviewed by Action Requested Approve, by motion, authorizing the quote received for work on the 6 ½ Street and Quinn Avenue improvements by Omann Brothers Paving, Inc., in the amount of $174,057.82 for street construction. Background/Discussion In 2017, a Tax Increment Financing (TIF) district was approved for the area between Quinn Ave. and Proctor Ave. just south of the railroad tracks. As part of this TIF district, additional public improvements were approved as part of the redevelopment. 6 ½ Street is to be constructed with a connection to Proctor Ave. (opposite the Beaudry Gas Station and office) and connect to Quinn Ave. Quinn Ave. will be reconstructed in this area at and north of the 6 ½ Street intersection. The street quote package was sent out to four contractors and two were returned. Staff is recommending authorization of the low quote received for the street construction. The street quote package includes the construction of the street base, bituminous paving, and final restoration of the boulevards. The work is anticipated to be completed by the end of October, weather permitting. Financial Impact Tax Increment Financing (Redevelopment) District No. 24 Attachments  Omann Brothers Paving, Inc. Quote The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Quote 61/2 StreeNQuinn Avenue Elk Rider, Minnesota Street 1 Common Excavation/Embankment (includes subgrade preparation) CY 1,834.00 $ I F ,q'S' $ 3'- 8oq, 32 2 Curb Removal LF 100.00 $ � , oo $ (000 00 3 Remove Bituminous Pavement SY 1,400.00 $ $ 4 Salvage & Re -spread Topsoil LS 2,SS 1.00 $ 'F tpp,eO $ 3 szo, CA 5 Class 5Aggregate Base Course- 10" Depth TON 2,200.00 $ IZ,�{S $ $ rpo.ao 2 6 Aggregate Surfacing (to match existing Driveways) TON 40.00 $ $ 7.340,oa 7 Bituminous Wear Base Course - 2.5" Depth TON 24,So 615.00 $ %<},�p $ I t no -06 8 Bituminous Wear Course - 2" Depth TON 500.00 s 9 Tack Coat GAL 200.00 $ �.ac $ Gm m� 10 Seeding - Boulevard - Mix No. 25-121 SY 3,100.00 $ $3 $ Z, 573 a o 11 Hydraulic Soil Stabilizer - Type 5 SY 4,200.00 $ 1,14 $ 12 Adjust Casting (New CBs, Ex Valves, Ex, San Sewer) EA 11.00 $ '430.00 $ 4 -730-an TOTAL Quote - Street $ 1-74P Respectively Submitted Sign; Company