Loading...
5.1. SR 05-02-2005 I tern 5. 1. 13065 Orono Parkway Elk River, MN 55330 April 22, 2005 File #: 824180J-0060 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, :rvtN 55330 RE: 2005 STREET RECONSTRUCTION PROJECT AWARD OF BIDS Dear Council Members: At the close of the assessment hearing on April 18, 2005 the City Council tabled action on the award of the bid for the street reconstruction portion of the project to the May 2nd City Council meeting. The two issues that the City Council were still debating were the location of sidewalks throughout the project and the proposed closing of Seymour, Rush and Quinn Avenues at Trunk Highway 10. For the Council's information, I have enclosed the two PowerPoint exhibits shown at the assessment hearing that detailed the locations throughout the project where sidewalks are currently proposed. As I indicated at the assessment hearing, the design criteria that was used for placing sidewalk was if there was not mature vegetation that needed to be removed and/or topographic prohibitions, a sidewalk was included. At the assessment hearing, the City Council received two petitions against sidewalks on the north side of 5th Street between Proctor Avenue and the west end. If it would help the City Council's deliberation on this issue, I have reviewed with Phil Hals, Street Superintendent, and the actual site and determined that the proposed sidewalk could be located immediately behind the curb, eliminating any grass boulevard and moving the sidewalk as far away from the homes on the north side of 5th Street as possible. On the second issue of the proposed closing of Seymour, Rush and Quinn Avenues at Trunk Highway 10, the City Council has heard consistently from Mr. Ken Mi11slagle, 417 5th Street, that he is opposed to the closing of Rush and Quinn Avenues. When we performed our walk-thru of the neighborhood we discussed the closing with several of the neighbors along 5th Street. Generally, there was no opposition and in fact, a few of the neighbors in close proximity to the proposed closings indicated they were in favor of closing the access points at Trunk Highway 10. The one issue that was brought up that I believe we have resolved during the walk-thru was the neighbors in the proximity of the Seymour Avenue closing indicated they used this right of way to access the rear of their properties for boat Phone: 763.635.1000 Fax: 763.635.1090 www.cLelk-river.mn.us 2005 Street Reconstmction Project April 22, 2005 Page 2 storage, leaf removal in the fall, and other similar type periodic reasons. We have agreed to depress the curb along 5th Street to allow these types of periodic accesses to the rear lots along the Seymour Avenue right of way. This seems to have dealt with this issue, as the Council heard no objections at the assessment hearing. Just to reiterate the information provided in my April 13, 2005 memo, there were a total of eight bids received for the street reconstruction portion of the project. Universal Enterprises was the lowest responsible bidder at $925,054.90. Universal Enterprises has previously completed similar type projects within the City of Elk River. We would recommend award to them. Attached is a resolution for the Council's consideration accepting the bid and authorizing execution of the contract with Universal Enterprises. I will be in attendance at your May 2, 2005 Council meeting to answer any questions you may have regarding this project. Sincerely, ~pI~ Terry J. Maurer, PE City Engineer S:\EngineerImprovProj\2005 Improvement Projects\Pavement Rehab 2005\04 22 05 cc memo.doc RESOLUTION 05- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE STREET RECONSTRUCTION IMPROVEMENT OF 2005 WHEREAS pursuant to a City Council Resolution 05-26, passed at the March 21, 2005 meeting, competitive bids were solicited and received for the 2005 Street Reconstruction Improvement; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Universal Entetprises, is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Universal Entetprises, as is approved by the City Attorney, for the completion of the 2005 Street Reconstruction Improvement according to the approved plans and specifications designed by City Council Resolution. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract specified above. Passed and adopted this 2nd day of May 2005. Stephanie A. Klinzing, Mayor ATTEST: Joan M. Schmidt, City Oerk ZOO o~ ....w t;~ ::)w ~~ tia: Z o u w w a: J- 00 LLlll) Co ....0 U)C\1 NOlcJ 1 ~ ~ ~ ~ ~ ~ . ONt17dn J- C/) ~ LL - LL ~~ o ~ - 3/\ \1 a~o=,xo >170 ~o I- ZOO l1j 01- ~ ....2 (J) I-W U~ ::)W ~> 1-0 /\ \1 OlJO~d U)O: ZrL ~ O~ .....:l <r: ~ UI- ~ ~W ~ """"'" ....W r.J) CO: ~~ ~ WL() >- ~ Co :x: 3/\ \1 NNtnO ....0 (!) U)C\I i: ~ I- l1j ~ C/) 3/\ \1 Hsn~ ! 3/\ \1 ~nO""A3' / ~ IJ.. i:i: ;-.,