5.3 ERMUSR 10-09-2018 Elk River Municipal Utilities ' UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Troy Adams, P.E.—General Manager MEETING DATE: AGENDA ITEM NUMBER: October 9, 2018 5.3 SUBJECT: 2019 Utilities Fee Schedule ACTION REQUESTED: Discussion on 2019 Utilities Fee Schedule BACKGROUND: Annually ERMU staff reviews its fees for the upcoming year to make sure they are fair, reasonable, and proportionate to the actual cost of the service for which the fee is imposed. The addition of any new fees is also considered at this time. DISCUSSION: The 2019 proposed utilities fee schedule will be presented at the November 13 Commission meeting. Staff is considering the addition of two new fees and would like discussion on the following: Opt-Out Fee ERMU has been approached by a customer that would like to opt-out of the automated meter reading(AMR)process we currently offer. Presently we do not have an opt-out option for our customers. There are a few different options we can consider. Staff is interested in talking through the pros and cons of each of the options and getting Commission direction before proceeding forward. • Continue to not offer an opt-out option • Offer an option to opt-out where the customer covers all costs associated with meter change out and manual meter reads • Offer an option to opt-out where the customer covers some of the costs associated with meter change out and manual meter reads • Offer an option to opt-out where ERMU covers all costs Residential Application Fee Staff is also considering implementation of a residential application fee as customers are often moving from apartment to apartment and ERMU incurs costs for credit checks, meter reading, account setup, etc. ERMU currently has an application fee only for our commercial customers. This was implemented as a way to recover costs associated with the application process when it was redesigned a few years ago. This is a standard practice amongst utilities and staff would like discussion with the commission and feedback on whether they are Page 1 of 2 60 interested in implementing this fee. The following are some examples of other utilities' fees: • Connexus Energy: $21 • Wright-Hennepin Electric Cooperative: $15 • Shakopee Public Utilities: $15 Management will review the philosophy of allocation of cost, and aid to construction for water and electric connection fees next year for consideration in the 2020 fee schedule. Attached for reference is ERMU's current fee schedule. ATTACHMENTS: • 2018 Utilities Fee Schedule—for reference only Page 2 of 2 61 Elk River 2018 Utilities Fee Schedule Municipal Utilities ELECTRIC New Residential Electric Connection -Developer-Lot with ERMU water service $475.00 New Residential Electric Connection -Developer-Lot without ERMU water service $575.00 New Residential Electric Connection -Builder $875.00 New Wire Footages over 200'(per foot) $4.00 New Service Frost Trenching(per foot) $5.00 New Commercial&Industrial Electric Connection 50% Service Upgrades or Additions for Existing Customers 100% Minimum Temporary Electric Service Fee-Existing Transformer $150.00 Minimum Temporary Electric Service Fee-Without Existing Transformer $500.00 Street Light-30' Decorative Pole with 6'Arm and Fixture $1,850.00 Street Light-23' Decorative Pole with Traditionaire Fixture $1,500.00 Security Light-Wood Pole with Fixture $975.00 Security Light- Existing Pole $125.00 Pole Attachment Fee(per pole) $6.50 WATER Water Access Charge=Water Connection Charge+Water Availability Charge $3,633.00 Water Connection Charge(Per Plumbing Unit)- Builder $3,278.00 Water Availability Charge(Per Plumbing Unit)- Developer $355.00 Abandoned Water Service $2,500.00 Hydrant Water Sales- Rental (per week) $50.00 Hydrant Water Sales- Units(per 1000 gallons) $4.00 Deposit for 5/8"Hydrant Meter $150.00 Deposit for 2 1/2"Hydrant Meter $1,000.00 Private Hydrant Maintenance Program Monthly Fee $5.00 ADMINISTRATIVE Administrative Fee for Continued Submission of Checks After No-Check Notice Given $20.00 Billable Cost of Materials Markup 15% Billable Labor Markup 55% Billable Vehicle/Equipment(per employee per hour) $30.00 Commerical Application Fee $20.00 Electric Service Disconnect/Trip Fee- Meter Technician $50.00 Electric Service Disconnect/Trip Fee- Line Crew $150.00 Energy Audit $150.00 Meter Tampering Fee $250.00 Meter Testing Fee $50.00 NSF Fee $30.00 Penalty Amount 10% Photocopies (per page) $0.25 Red Tag Handling Fee $20.00 Water Shut-Off Fee $100.00 Adopted by the Utilities Commission on October 10,2017 under authority per Minnesota Statute 412.361-Amended April 10,2018 62