Loading...
7.1. SR 11-19-2018 ��i Eof lk — - Request for Action River To Item Number Mayor and City Council 7.1 Agenda Section Meeting Date Prepared by Public Hearinj November 19, 2018 Chris Leeseber , Senior Planner Item Description Reviewed by Conditional Use Permit to Operate a Microbrewery, Zack Carlton,Planning Manager Aegir Brewing Co. LLC Reviewed by Cal Portner, City Administrator Action Requested Approve,by motion,the Conditional Use Permit for a microbrewery at 19050 Industrial Blvd as the standards set forth in Section 30-654 have been satisfied and with the following condition: 1. The Conditional Use Permit shall not be recorded until the building official and fire marshal have inspected, and signed off on,the building for compliance with all state and local building codes. 2. All state alcohol licenses and regulations are satisfied. Background/Discussion Case No. CU 18-17 1 The property is 1.46 acres in size, has a land use designation of J industrial, and is zoned Light Industrial (I-1) where microbreweries Y require a Conditional Use Permit (CUP).The applicant is seeking a \\ CUP to operate a microbrewery in a portion of an existing 9,000 `-`-R 33 square foot industrial building. �9 Planning Commission The Planning Commission had no concerns, questions, or comments RR • and no one spoke for or against the request. H I Staff hasn't received any comments since the Commission meeting. -1�CR Iz The Commission unanimously recommended request approval. Statutory Review Period tiw Per State Statute 15.99, the required 60-day review period ends on y% 11 November 13, 2018. A 60 day letter was provided to the applicant extending the review period until January 12, 2019. Figure I Attachments ■ Planning Commission Memo dated October 23, 2018 The Elk River Vision A avelcoming community with revolutionary and spirited resourcefulness, exceptional P U W E H E o s r service, and community engagement that encourages and inspires prosperity /` UR Elk Request for Action River To Item Number Planning Commission 5.1 Agenda Section Meeting Date Prepared by Public Hearings October 23, 2018 Chris Leeseber , Senior Planner Item Description Reviewed by AEGIR Brewing Co. LLC— 19050 Industrial Blvd. Zack Carlton,Planning Manager NW, #1 Reviewed by ■ Conditional Use Permit to operate a microbrewery facility Action Requested Approve,by motion,the Conditional Use Permit as the standards set forth in Section 30-654 have been satisfied and with the following condition: 1. The Conditional Use Permit shall not be recorded until the city building official and fire marshal have inspected, and signed off on,the building for compliance with all state and local building codes. Background/Discussion Case No. CU 18-17 The property is 1.46 acres in size,has a land use designation of industrial, and is zoned Light Industrial (I1) where microbreweries require a Conditional Use Permit (CUP). The applicant is seeking a CUP to operate a microbrewery in a portion of an existing 9,000 square foot industrial building. Transportation/Circulation Access to and from the site will occur at the one existing access on Industrial Boulevard. There is sufficient on-site circulation for the business, customers, and emergency vehicles. Parking The building is 9,000 square feet in size with the applicant utilizing approximately 2,600 square feet of the overall space. The ordinance states: Manufacturing fabricating general industrial.•six stallsplus one off-street parking space for eacb 500 square feet of floor area. The floor area of the subject building is 9,000 square feet requiring 18 plus 6 parking stalls for a total of 24 parking stalls. The site has 32 striped parking stalls and what appears to be room for 8-12 more stalls. Landscaping The ordinance requires 26 trees for the property. The exiting tree inventory satisfies this requirement. The Elk River Vision A n.,elcoming community nvitb revolutionary and spirited resourcefulness, exceptional p o w E R E o e r service, and community engagement that encourages and inspires prosperity11"N'ATURE] Applicable Regulation In approving a Conditional Use Permit,the council may impose such specific conditions with regard to the development or operation of the proposed use as it considers necessary to satisfy the seven standards set forth in Section 30-654 and the requirements contained in this article, and to promote compatibility with and minimize any potentially adverse effects upon adjacent properties, the neighborhood, or the city. The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 7. mill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral n,e fare of the neighborhood or the city. The proposed industrial use,within the industrial park,will not endanger,injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience, or general welfare of the neighborhood or the city. Staff does not see a need to impose specific conditions to satisfy this standard. 2. bill be consistent with the comprehensive plan. The property is guided for industrial and the proposed use is considered industrial. The use will be consistent with the Comprehensive Plan. Staff does not see a need to impose specific conditions to satisfy this standard. 3. WIN not impede the normal and orderly development and improvement of surrounding vacant property. With the exception of a city-owned (EDA) parcel,there are no other vacant properties in the development. The use will not impede the normal and orderly development and improvement of surrounding vacant property. Staff does not see a need to impose specific conditions to satisfy this standard. 4. Vill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, mater and sen,,er systems,parks and schools;and mill not, in particular, create traffic congestion or interference n4th traffic on adjacent and neighboring public thoroughfares. The facility does not require any specialized services. The use will be served adequately by and will not adversely affect essential public facilities and services including streets,police and fire protection,drainage, refuse disposal,water and sewer systems,parks and schools; and will not,in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. Staff does not see a need to impose specific conditions to satisfy this standard. N:\Departments\Community Development\Plaiuning\Case Files\CUP\CU 18-17 AEGIR Brewing Co.LLC\4-Plaiuung Commission\5.1 CU 18-17 sr PC 10-23-18.docx 5. mill not involve uses, activities,processes, materials, equipment and conditions of operation that mill be detrimental to any persons or property because of excessive traffic, noise, smoke,fumes,glare, odors, dust or vibrations. The operation of the proposed use will not involve uses, activities,processes, materials, equipment and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes,glare, odors, dust, or vibrations. Staff does not see a need to impose specific conditions to satisfy this standard. 6. 1Vill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. No exterior construction or site work is being proposed so the use will not result in the destruction,loss or damage of a natural, scenic or historic feature of major importance. Staff does not see a need to impose specific conditions to satisfy this standard. 7. 1Vill fully coVynvitb all other requirements of this Code, including any applicable requirements and standards for the issuance of a license orpermit to establish and operate the proposed use in the city. The use will fully comply with all other requirements of this Code,including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. Staff does not see a need to impose specific conditions to satisfy this standard. If denial of such a permit should occur,it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. Financial Impact None Statutory Review Period Per State Statute 15.99, the required 60-day review period ends on November 13, 2018. A 60 day letter was provided to the applicant extending the review period until January 12, 2019. Council Meeting If acted on, this item will go to the November 19, 2018, City Council meeting. Attachments ■ Location Map ■ Applicant's Narrative ■ Site Plan ■ Building Plan N:\Departments\Community Development\Plaiuung\Case Files\CUP\CU 18-17 AEGIR Brewing Co.LLC\4-P1aiuung Commission\5.1 CU 18-17 sr PC 10-23-18.docx a^ r 4 p s ti 9 r._ s �A N 1 FJ ' p Pm �,, c'I} Lf'$ 21 _ l 47} rtU5f r -- Lj ; r SC r` c in f .4- ■ r � l Job o r 'f IVU L1 VD SEP 14 2018 AEGIR Brewing Company LLC Project Narrative AEGIR Brewing Company LLC, is proposing to open a microbrewery manufacturing location at 19050 Industrial Blvd NW #1, Elk River, MN 55330. This location would not have a taproom connected to it and would be for production purposes. There would be no signage referencing our company on the building. There is more than adequate parking to accommodate the 2-4 people working at the facility at any given time. Thank you for considering the expansion of our current Elk River business. Tim Jones AEGIR Brewing Company LLC 707 Main St NW, Elk River, MN 55330 (626) 513-6366 AegirBrewCo@gmail.com m CIO Parking Spots 0 u l71 i IK Ail I 12'x16' roll up door xisting Storage Electrical Hot Water Cold Water `--� Gas , Floor Drain rTI Cold Storage Room 9 Floor Drain i 220V 220V Brite ank Iry Sink r- E�Isting Heater CO 48 Ln E U CO cc Glycol —Y System in OIMU -0 a water 2. 5bbl Brewing Heate Tankiess system Water- Heater