Loading...
10.1. SR 12-03-2018 Request for Action To Item Number Mayor and City Council 10.1 Agenda Section Meeting Date Prepared by Work Session December 3, 2018 Chris Leeseberg, Senior Planner Item Description Reviewed by ERX Motorpark Platting Fees Zack Carlton, Planning Manager Reviewed by Cal Portner, City Administrator Action Requested Discuss Park Dedication and Surface Water Management Fees with the owners of ERX. Background/Discussion Chris Carlson and Todd Plaisted, owners of ERX, would like to discuss platting fees due with the thth previously approved plats of Aggregate Commercial 4 (2016) and 5(2017). The city requires Park Dedication and Surface Water Management Fees be paid prior to recording. Recording these two plats was a condition of approval for their 2018 Conditional Use Permit (CU 18-10) for Off-Road Racing, Active Recreation and Physical Endurance, Live Entertainment, Festivals, Research and Development, Conference and Event Center, and Swap Meets. The fees due with the two plats are: Park Dedication $18,323 and Surface Water Management $44,763.82. Both the preliminary and final plat applications have an informational sheet included showing possible fees associated with platting property. Park Dedication Park Dedication is a local government requirement imposed on subdivisions mandating the dedication of land for a park and/or the payment of a fee to be used by the governmental entity to acquire land and/or develop park facilities. For commercial properties, this is calculated as 8% of the county-assessed value of the property. The fee calculation was redesigned in 2016, due in part to questions raised by ERX, and used to be $7,440/acre. The two plats combine for a total of 32.77 acres and would have been required to pay $243,803.08 in Park Dedication fees. Surface Water Management The Surface Water Management fee was established, by Resolution 94-110, in 1994. For commercial properties, this is calculated at $1,366/acre. The resolution does not differentiate between hardcover/buildings or dirt/natural properties. The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity The fee is for protecting and improving the quality of our water resources. Surface water management projects investigate local flooding issues such as flooding from sewers, drains, groundwater, and runoff from land, small watercourses and ditches that occur as a result of heavy rainfall. ERX states that they understand the reason for the Surface Water Management Fee if they were actually building houses or buildings. The land they platted is dirt, is not permanent, and can change. The property can be turned back into a natural landscape. Regardless of the development timeline, these fees are collected at the time of platting, per resolution, to ensure the funds are in place for future development. There is no mechanism to collect these fees after land is platted. Attachments  2018 Fee Schedule (portion)  Resolution 94-110  Informational Fee Sheet N:\\Public Bodies\\Agenda Packets\\12-03-2018\\Final\\10.1 sr.docx filing fees at loan closing HRA BLIGHTED PROPERTIES COMMERCIAL/INDUSTRIAL Processing fee of $2,000 FORGIVABLE LOAN PROGRAM Any remaining funds will be returned to the applicant. Applicant pays all legal and filing fees at loan closing. HRA BLIGHTED PROPERTIES RESIDENTIAL Processing fee of $500. FORGIVABLE LOAN PROGRAM Any remaining funds will be returned to the applicant. Applicant pays all legal and filing fees at loan closing. MOVING STRUCTURES(A building permit is required for foundation, garage, and remodeling work) $150 Moving HousesInor Out $45 Moving Outbuildings In Over 120 sq. ft. $275 ORDINANCE AMENDMENT $1,000 Escrow for Consulting/Engineering/Staff Services OUTBUILDINGS $12 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price PARK DEDICATION FEE Residential $1,425.93/dwelling unit o Low Density (<4 DU/acre) $1,075.79/dwelling unit o Medium Density (4 to<7 DU/acre) $4,897.04/dwelling unit o High Density (>7 DU/acre) 8% of county assessed valueof property Commercial 6% of county assessed valueof property Industrial PLANNED UNIT DEVELOPMENT (PUD) Charge for required planning applications, i.e. conditional use permit, rezoning, etc. PLATTED EXEMPTION $100 $100 Escrow for Consulting/Engineering/Staff Services PLATS, PRELIMINARYAPPLICATION $275 $1,500 Escrow for Consulting/Engineering/Staff Services PLATS, FINALAPPLICATION $275 $1,000 Escrow for Consulting/Engineering/Staff Services Fee shall be the greater of $45 plus state PLUMBING PERMIT surcharge or 1.5% of the valuation of the work material and labor POOL $45 plus state surcharge Above Ground $75 plus state surcharge In Ground RE-ROOF $75 plus state surcharge Residential 6 $2per square foot for valuation for permit Commercial/Industrial fee plus state surcharge, minimum $75 RENTAL DWELLING Fees listed under Fire section RESIDENTIAL FIXTURE/APPLIANCE REPAIR OR REPLACE $15 minimum or 5% of the cost, whichever is greater $75 plus state surcharge RE-SIDING(Residential) SANITARY SEWER USER FEE $ 4.59 Charge Per 1,000 Gallons $ 10.66 Minimum Charge $ 18.34 Apartment Unit Charge $ 24.10 House Unit Flat Charge SEPTIC INSTALLATION & REPAIR PERMIT$130 SEWER AVAILABILITY CHARGE (SAC) $5,020 per unit SEWER & WATER HOOKUP/REPAIR PERMIT $150 commercial plus $2,000 bond in favor of the city Storm or Sanitary $65 residential plus $2,000 bond in favor of the city SIGN/ZONING PERMITS $30 Permanent Sign (separate building permit and fee may apply) $40 Temporary SITE PLAN REVIEW APPLICATION $100 $500 Escrow for Consulting/Engineering/Staff Services STAFF SERVICES $50 an hour STREET/ RIGHT-OF-WAY DISRUPTION PERMIT $100 plus ($5,000 letter of credit or bond in favor of the city or equivalent) (cable, phone, gas, electric, etc.) SUBDIVISION EXEMPTIONS $100 $100 Escrow for Consulting/Engineering/Staff Services SURFACE WATER MANAGEMENT IMPACT FEE $119/residential lot (rural) $240/residential lot (urban) (3% annual increase per resolution 94-110) $1,366/acre (multifamily, commercial, and industrial) TAX ABATEMENT $10,000 Projects which require additional professional services in excess of $10,000 shall be required to reimburse the city for additional expenses 7 This page is for the applicantÔs reference, it does not need to be submitted. 2018 Meetings & Fees Meetings Date Concept Review Meeting (city staff review) _______________ Parks and Recreation Meeting (open to the public) _______________ Planning Commission Meeting (preliminary plat Ï public hearing) _______________ City Council Meeting (preliminary plat Ï public hearing) _______________ City Council Meeting (final plat Ï meeting open to the public) _______________ ***See page 5 of the Land Use Application Form for meeting schedules Costs/Fees These are typical fees associated with a development; there may be additional fees depending upon the scope of the development. Preliminary platting fee $275.00 Escrow for consultants $1,500.00 List of property owners $___________ (fee based on label sheets printed at the county) Within 350 ft. **see page 4 of the land use application form Park dedication Residential: $1,425.93/dwelling unit - Low Density (<4 DU/acre) $1,075.79/dwelling unit - Medium Density (4 to <7 DU/acre) $4,897.04/dwelling unit - High Density (>7 DU/acre) Commercial: 8% of county assessed value of property Industrial 6% of county assessed value of property Surface Water $119 per residential lot (rural); Management Impact Fee $240 per residential lot (urban) $1,366 per acre (Multi-family, commercial & industrial) Sewer Availability Charge (SAC) $5,020 per unit Sewer & Water Hookup Permit $150 commercial + $2,000 bond in favor of the City of Elk River $65 residential + $2,000 bond in favor of the City of Elk River Elk River Municipal Utilities Fees Water Connection Charge $3,278 per Plumbing Unit (Builder) Water Availability Charge $355 per Pluming Unit (Developer) Please contact Elk River Municipal Utilities directly for electrical connection fees or other costs that may be involved in connecting to services (763.441.2020) 100% LETTER OF CREDIT FOR THE PUBLIC IMPROVEMENTS A warranty bond in the amount of 25% of the cost of the public improvements is required to be provided to the city for a one (1) year period after city acceptance of the public improvements. Page 4 (Last Modified 11/29/2018)