5.5. LIBSR 11-27-2018 Library Zones Report 5.5
Elk River Public Library Board
The Library Board serves in an.advisory capacity to City of Elk River for issues related to the Elk River Public Library groundr,the physical building
and interior fixtures. The city is responsible for scheduling and coordinating all work to be completerL
Updated for November r.
Assigned - 1Pr
To
Zone 1 Mary K. Entrance;butterfly garden;windmill, prairie grass;rain garden in • Butterfly Garden weeded:The
parking lot,planter boxes for Master Gardeners summer butterfly garden is maintained by
gardening program the master gardeners,staff has
weeded them a few times,but
the library may want to reach out
to the master gardeners about
maintaining this better. Another
option is for the library to solicit
the assistance from the Adopt-a-
Park volunteers for the
property. Weeding landscape
beds and general grounds clean-
up are common activities
conducted by these types of
rou.
Zone 2 Willie Front door,front garden,concrete pathways, patio,flag • Pavers in front of building need
turnaround to be replaced: Staff did conduct
replacements of the pavers that
were chipped and broken earlier
this spring as well as resetting the
pavers at the concrete/paver
transition areas. I checked the
site out today and it looks like
there are 5 more pavers that the
surfaces have chipped again. We
will have someone in the next
couple of days go out there and
replace those as well. This may
become an ongoing issue over
the next several years as these
pavers are beginning to age and
with the salt usage to keep them
safe for walking in the winter
they will continue to degrade
Zone 3 Mary E. Rain garden, book drop turnaround,employee parking lot;being • Clean out the flower beds by the
a good neighbor drive thru backdrop and the front
of the building and add new
mulch: iese beds are
maintained every two weeks as
part of our schedule. In addition,
the shrubs in these areas were
trimmed back about a month
N:\Departments\Parks and Recreation\Library\Library Board\Agenda's,Minutes,Packets\Agenda Packet Docs\2018\2018-11-27\5.5 Library Zones Report
November Meeting.docx
Library Zones Report 5.5
Elk River Public Library Board
Zone Assigned Specifics
To
ago.Additionally, all of the
landscaping at the library has
been re-mulched twice this
summer. Mulch is a
biodegradable wood product that
will always break down and get
bleached from the
sun. Generally we would only
top dress the mulch once per
year so we have already gone.
above and beyond standard
maintenance practices. They wil
receive a fresh coat of mulch
2019.
Zone 4 Mick Being a good neighbor,grass&rock areas Spruce tree's In the back of the
building need to be replaced: i ric
spruce trees in the back of ie
building that were removed last fall
will not be replaced. These trees
were removed because they had
overgrown their location and would
soon be causing structural issues for
the back sidewalk and parking lot
area. Additionally,these trees
inhibited snow removal around the
grounds. This was discussed at a
previous meeting and was the reasc
we .d them
Put in fill over the roof drainage
trench in the back of the building This
is ultim,. ,y a design issue gave
addressed this area several times
throughout the summer,the
downspout was just not designed
properly for the volume of water flow
it puts on the ground. We will install
some addition granite rock over the
area expanding upon the work that
has already been done there to
hopefully prevent continual washouts
from occur Put new mulch
around the trees in the back of the
building The city has discontinued t
practice of mulching around
trees. This practice has been found
to be the leading cause of girdling
roots vi ov mr y resul
N:\Departments\Parks and Recreation\Libra ry\Library Board\Agenda's,Minutes,Packets\Agenda Packet Docs\2018\2018-11-27\5.5 Library Zones Report
November Meeting.docx
Library Zones Report 5.5
Elk River Public Library Board
Zone ' Assigned Zone Issue
To :4
death of the a or failure ;he
tree during wind storms. The spruce
trees that fell over during 2017's
storm were perfect examples of this
as the entire root mass was
contained completely under the
mulched rings thus leaving the tree
susceptible to toppling in a strong
wind event.
Zone 5 Rain garden, interior and exterior building maintenance, interior • Re-seal windows on back of
Ell
furniture and shelving building,Check roofing over the
fireplace area
CIP ITEMS IN PROCESS
1. LED Lighting in parking lot—funded;Building Maintenance is working with the vendors to get the work
PRIORITY CIP ITEMS
1. New projector for community room($9240.17 Schake has included in 2019 budget)
2. New armless computer chairs in the Computer Area '2280-2500 Schake has included in 2019 budget)
3. Caterpillar upholstery and chairs replaced in Children's area ($900-$1000 Schake has included in 2019 budget)
4. Reupholster cushions in the window seat in Teen area ` -hake has included in 2019 budget)
CIP ITEMS IDENTIFIED BUT NOT RANKED FOR PRIORITY
1. More comfortable chairs or comfortable flooring in the Children's area cave
2. Cork floors replaced in the Teen area
3. New rug in Fiction lounge
4. New shelving units(or check for warranty) in Teen area
5. New DVD shelving units or hardware to anchor shelves together(tip over easily)
5. Diamond plated sheets(or something like that)installed on numerous walls in the Staff Area to protect the
walls from cart damage /4/18:Reported to Gary Lore,Building Maintenance Super in case he want_
;rywaii Oar Not a high priority to the Board because it is out of public view.)
6. New hand dryers installed-done,urinals in some or all of the unisex bathrooms.(3/27/18:On hold at this time
per h mation, „at meeting from Gary Lore,Building Maintenance Supervisor.)
NOTE:At such time the board votes for a new
item or for an improvement,the Board takes
it to Robbie Schake,Robbie takes it to Michael
Hecker and Michael Hecker forwards to the
appropriate city staff for remediation or
recommendation.
N:\Departments\Parks and Recreation\Library\Library Board\Agenda's,Minutes,Packets\Agenda Packet Docs\2018\2018-11-27\5.5 Library Zones Report