8.2. PRSR 12-12-2018 Item: 8.2 City of Elk Memorandum River To: Parks and Recreation Commission From: Tim Sevcik, Street and Park Superintendent Date: December 12, 2018 Subject: Staff Report Outdoor Ice Rinks Staff began flooding the outdoor ice rinks on December 4 with the goal to have Handke Pit open prior to Christmas and the remaining ice rinks ready for skating by December 31. For the 2018-2019 skating season the City will have outdoor skating at Handke Pit, Lion John Weicht Park,Mississippi Oaks Park, Riverplace Park, and Kliever Lake Fields. Ice making is on track with last winter;however the warmer temperatures that are forecast will slow down progress. Buckthorn Management Staff will be working throughout this winter to remove buckthorn from Section 1 at Hillside City Park. During the past two winters staff conducted initial removals of buckthorn in Sections 2 and 3. The goal over the next couple of winters will be to complete Sections 1 and 2 in order to eliminate all mature buckthorn. Follow-up spot spraying of buckthorn seedlings will be required for several years to prevent re-infestation. Trail Gates Staff installed new trail gates along three sections of trails over the past month. Parks staff worked with Street Division staff to install gates at the trailhead in the lower parking lot at Rivers Edge Commons Park to prevent vehicles from driving on the trail and parking on the stage. Another set of gates was placed along the short section of trail at the end of Island View Drive to prevent vehicles from using the trail between the two neighborhoods. Additionally a gate and signage was added at the trailhead next to the parking lot at Hillside City Park. This gate will be utilized by the volunteers to more easily open and close the trail dependent on conditions. POWERED BY N:A Departments\Parks and Recreation\Commission\Packets\2018\12-12-18 PRC Packet\8.2 Street and Park NATURE Superintendents Report.docx