Loading...
5.3 ERMUSR 12-11-2018 Elk River k Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Troy Adams, P.E.—General Manager MEETING DATE: AGENDA ITEM NUMBER: December 11, 2018 5.3 SUBJECT: 2019 Annual Business Plan (Budget, Schedule of Rates & Fees) ACTION REQUESTED: Adopt the 2019 Annual Business Plan BACKGROUND: In November,the preliminary 2019 Annual Business Plan was presented to the commission. There have been several changes due to finalizing of projects and expenses, and the most significant change is implementation of electric rate reductions at the direction of the commission. DISCUSSION: Electric Budget and Rates There are multiple reasons that supported the commission's consensus to implement electric rate reductions. The top three are as follows: First, in October 2008 ERMU received a ten-year notice for the termination of our wholesale power contract. After five years of research and consideration,the ERMU commission approved joining the Minnesota Municipal Power Agency (MMPA). In October 2018, Great River Energy(GRE) stopped providing power to ERMU and ERMU began receiving power from MMPA. And 2019 will be the first complete budget year where ERMU is receiving power from MMPA. Second, starting in 2015 Connexus Energy has been transferring electric service territory within the corporate boundaries of the City of Elk River to ERMU as part of a negotiated agreement. In 2019, ERMU will be receiving the transfer to the remaining electric service territory areas as identified in the 2015 transfer agreement. In the end,the electric service territory transfer agreement will have resulted in an approximate 20% growth in customers for ERMU.And third, ERMU has recognized significate efficiencies as a result of the 2018 change to multi billing cycles and administratively have been able to reduce staff through attrition lowering fixed costs. The change from GRE to MMPA,the growth in customer base and service territory, and the efficiencies gained through the change to multi billing cycles have put ERMU in a unique and unprecedented situation to lower electric rates. The reset of rates affect consumers differently based on usage. A residential customer with typical electric usage will experience a 5%reduction in electric costs. For commercial customers,the service size and usage can vary drastically which had a varying effect on the rate reset impact. Commercial customers should experience a rate reduction between 5%and 4%. Included new this year in the Schedule of Rates & Fees section of the Annual Business Plan are a Large Demand Electric Service Rate, a Residential Clean Energy Choice Program Rate, and Page 1 of 3 81 Commercial Clean Energy Choice Program Rate; these rate sheets will be submitted for approval in January. Notable items in the electric budget for 2019 are: • 3%cost of living adjustment(COLA) for Office, Field, and Management pay plan groups; 2.85% COLA for Lineworker pay plan group; • Replacement of bucket truck#8 • Delay in replacement of digger truck#10 until 2020; • Shared cost in the replacement for Pickup Truck#14 for Technical Services; • Shared cost in a technology upgrade for the Utilities Conference Room; • Replacement of the decorative downtown street lights; • Electric Service Territory acquisition plant and reintegration costs for Areas 7 & 8 from reserves; • Electric Service Territory acquisition loss of revenue for Areas 1, 2, 3, and 4 from reserves; • Construction of new storage building adjacent to the West Substation from reserves. Water Budget and Rates The water budget and rates reflect the continuation in budgeting philosophy and rate design that continues the direction of shifting to more fixed cost recovery to mitigate revenue recovery volatility related to weather. Additionally,the budget includes a longer consideration of capital improvement projects. This longer vision planning helps to smooth out the impact of water system capital improvement projects as many of these project have substantial cost in ratio to the annual water expense budget. Considering a rolling 5 to 10 year window of capital improvement projects allows for financial planning and budgeting using reserves similar to a sinking fund to buffer and mitigate the volatility of capital outlay. In 2019 there are two larger capital improvement projects,the rehabilitation of the Auburn Street Water Tower and the construction of a new Well #8 building. Because of this planning strategy, the water tower project and the well building project are being funded from reserves rather than issuance of bonds. The proposed 2019 residential water rates are a 2% increase to the 1st Tier and a 2% increase in the basic monthly charge. These rate changes result in a projected 1.72% annual water cost increase for a typical residential customer. This is the equivalent to a$4.90 per year increase for these customers. For commercial customers, it is more difficult to classify typical users. The 1st Tier and basic monthly charges are increased by 2%in the proposed budget. But because the 2nd and 3rd Tiers are not being increased,the amount of usage will result in commercial customer blended rate increase of 2%or less. Notable items in the water budget for 2019 are: • 3% COLA for Office,Field, and Management pay plan groups; • Conservative estimate for usage growth; • Shared cost in the replacement for Pickup Truck#14 for Technical Services; • Shared cost in a technology upgrade for the Utilities Conference Room; • Joint Urban Services District Study with the city funded from trunk funds; • Rehabilitation of the Auburn Street Water Tower; • Construction of new Well #8 building. Page 2 of 3 82 Submitted for approval is the 2019 Annual Business Plan which includes the 2019 Budget and the 2019 Schedule of Rates & Fees. The 2019 fees were already approved by the commission in October and are being presented here unchanged for formal adoption in the Annual Business Plan. The adoption of the of the 2019 Schedule of Rates & Fees through the adoption of the Annual Business Plan shall supersede and replace all previously adopted tariffs, rates, and fees. ATTACHMENTS: • Proposed 2019 Annual Business Plan o 2019 Budget o 2019 Schedule of Rates & Fees Page 3 of 3 83 >.L Elk River -.. -- Municipal Utilities 2019 Annual Business Plan 84 TABLE OF CONTENTS 2019 BUDGET • Summary of Budgets • Electric Revenue and Expense Budget • Water Revenue and Expense Budget • Electric Capital Budget • Administration and Technical Services Capital Budgets • Water Capital Budget • Training and Travel Budget • Dues and Subscriptions Budget • Conservation Improvement Program Budget 2019 SCHEDULE OF RATES& FEES • Residential All Electric Service Rate • Residential Electric Service Rate • Residential Clean Energy Choice Program Rate —to be developed • Non-Demand All Electric Service Rate • Non-Demand Electric Service Rate • Demand All Electric Service Rate • Demand Electric Service Rate • Large Demand Electric Service Rate—to be developed • Commercial Clean Energy Choice Program Rate—to be developed • Off-Peak Demand Electric Service Rate • Commercial All Electric with Ground Source Heat Pump Service Rate • Ground Source Heat Pump Program Rate • Electric Vehicle Charging Rates • Energy Management Program Rates • Dispersed Generation/Interruptible Load Program Rate • Street/Security Light Service Rate • Water Service Rates • Fee Schedule 85 .L ' Elk River ---- Municipal Utilities 2019 Budget 86 ELK RIVER MUNICIPAL UTILITIES SUMMARY OF YEAR 2019 BUDGETS ELECTRIC BUDGET SUMMARY 2019 ELECTRIC REVENUE $ 39,490,338 ELECTRIC EXPENDITURES (37,896,680) ELECTRIC NET FOR CAPITAL 1,593,658 4.04% 1,109,893 110%annual avg debt svc 2.81% DEBT RETIREMENT (975,000) PROMISSORY NOTE TO COUNTY (200,917) NET LESS DEBT PRINCIPAL PMTS 417,741 CAPITAL EQUIPMENT/CONSTRUCTION (3,859,715) FUND FROM RESERVES 100,000 * Territory Acquisition Areas 7&8 Plant and Reintegration 699,735 * Territory Acquisition Areas 1&2,3&4 Loss of Revenue 250,000 * Equipment storage building at west sub NET (2,392,239) DEPRECIATION 2,895,535 NET TO RESERVES 503,296 * Note that this is separate from above funding of draw on reserves WATER BUDGET SUMMARY 2019 WATER REVENUE $ 2,768,491 WATER EXPENDITURES (2,912,986) WATER NET FOR CAPITAL (144,495) -5.22% DEBT RETIREMENT (260,000) NET LESS DEBT PRINCIPAL PMTS (404,495) CAPITAL EQUIPMENT/CONSTRUCTION (1,273,320) FUND FROM RESERVES 700,000 * Auburn Tower 300,000 * Well#8 building FUND FROM WATER TRUNK FUND 25,000 BONDING - NET (652,815) DEPRECIATION 1,175,214 NET TO RESERVES 522,399 * Note that this is separate from above funding of draw on reserves *Currently,target reserves are met. 2019 BUDGET SUMMARY2019 87 00 op 74 F _ nb 3 8' 888 8A 88.8888888 55 888888 AA 888888888 8888888888888888E 88 88 :88 §8 8 m§ 8280 888 g§8oe §gm sa888 Me §§§§§§SSE§M§§ §8 '8 „. 8 _ „m „m„ Es m n^e m„ ^" „ m m .^.8" . J' . . ' „„ 8a- 88 8 88 888 ,82 8888888882 88 888888 88 888888888 88888888888888888888 88, ;e8 88 8 m§ 88 § 8 8 m"^. § e§x §m2S:r�N8 8N$Nm 8_8 „8 as88888m „ 8 ^N „ " 8 " m „ mS8U18222 8 :$Sa. 58 888 88888 888 8888 88 8888888888 88 888888 88 888888888 88888888888888888888 88 888 88 8888888888 88 88888 88 88888 8888888888888 88 I:ARR.:C 88 mSRmome og &a m�'ma!��rm .."" . , m " 8.„„ ..„. „ 25 e 4 22 „ " " „ " ..„m mae . "" 22 �9 stoga w8W E - _ `Nd S 86 aGg @a o�a 8 a8Ga �W 8N. i3 a -_ B zg 7' a 8 F o2� 38- -; _ < - - r ,qa Naoz ag r _oaa gr.iiEB„ >pM oai„ inl a. d' 0' Ss MIAOWsgkmggthifiRg zig eg :2-s. \( // //\// /\ \ \// / \ ) \ /04 /\ - /-\ \/\ \/\/\\\) \/\§ \ \// ,/ \ \ ( --88 } 8 8 _ . , rl , „ -.(\(/}\} 8 §()}(\§ / . , . . , 01 \/_ \ ~ \� 2 \\/ / 8 \ / \\, \ \ \ \ \ } } \ : , \ ' 2 \ \ 8og, / 88 \ /\} \ \ // \\ / ///// \(§ /\ ////\---.} \/ { ) 88 828 \ -/ ( 82.888 / \\//\\ // /\ //22888 \\ et !|}![,! :|,;,! - : m •- ( !;}. §!§! !;!!.|.W _ d2b//#2\ - _ - \\! d[: Rg: = \SQg) R/ !![!};; [!}§i|i))) ) _ -- / 22)#)|! §[)) \)!)): i);));(i,lj)) ))i} \! 2n21 )H ifi));;! 'H,!,(\) Og ('A n- ) ()(()(i-Ji !! §;§! iVa'tn§ nAlig ng.E, !!;! F 888888 asosffis 88888888 8 EPAPPPO 8888888$ 8 2 888 8 8 i m m o 8 F !En. uuuuuuwir 1 g Elk River Municipal Utilities Business Plan/Budget 2019 Electric Department Capital Budget Capital Construction Projects-Non-Recurring Normal Distribution,Feeders,and Substations Cost Description $ 200,000 Downtown Street Lights $ 250,000 Equipment storage building at west sub Reserves $ 100,000 Edison street rebuild $ 150,000 Jarvis street rebuild $ 50,000 Area 5&6 rebuild $ 180,000 Area 7&8 prep $ 50,000 Otsego Street Lights $ 500,000 Miske Meadow Feeder $ 100,000 199th rebuild $ 175,000 185th Ave rebuild $ 75,000 Cty Rd 13 Roundabouts Subtotal $ 1,830,000 Capital Construction Projects-Recurring Cost Description $ 200,000 Transformers and Meters $ 350,000 New Development Distribution Installation $ 50,000 Ongoing OH Equip Replacement(Poles,Switches,Cut-Outs) $ 100,000 Ongoing URD Equip Replacement(Switches,J-Boxes,Fuse Pads) $ 30,000 Street Lighting Replacement $ 500 Territory Acquisition-Loss of Revenue payment(1991 contract) $ 699,735 Territory Acquisition-Loss of Revenue payment(2015 contract-Area 1&2,3&4) Reserves $ 100,000 Area 7&8 Acquisition Reserves $ - Additional Feeders Subtotal $ 1,530,235 Administration Noteworthy Non-Recurring Expenses Cost Description $ 1,200 Sit/Stand Desk $ 5,000 Chairs in plant breakroom Subtotal $ 6,200 Capital Equipment Needs Cost Description $ 9,000 Laptop Computers, (pads,Software,Accessories $ 2,000 SCADA equipment $ - Pickup Trucks None for the electric department this year. Replace Digger Truck#10 with new 2020 $275,000 $ 250,000 Replace Bucket Truck#8 with new $ 75,000 Vactron $ - Frostchain purchased 2018 $ 20,000 Multi-purpose utility vehicle(80%) 20%water dept $ 137,280 80%share of Administration and Technical Services Subtotal $ 493,280 Total $ 3,859,715 92 Elk River Municipal Utilities Business Plan/Budget 2019 Administration and Technical Services Departments Capital Budgets Administration Capital Equipment Needs Cost Description $ 17,000 Computer, Software,Accessories-Upgrades $ 5,000 Network upgrade for firewall failover Subtotal $ 22,000 Administration Noteworthy Non-Recurring Expenses Cost Description $ 30,000 Office Furniture (includes a tech upgrade for the commission room) $ 1,000 printers/scanners $ 15,000 Handicap accessibility front entrance . Subtotal $ 46,000 Total $ 68,000 Technical Services Capital Equipment Needs Cost Description $ 10,200 Computers, Software,Accessories-Upgrades Diesel Engines Emission Retrofit $ 350,000 Currently designated as emergency standby, Diesel Plant to run on Natural gas. $ 20,000 Deferred until MMPA transition upgrade tanks per inspection issues $25,000 Deferred until 2020 or later $ 20,000 Fiber Extension Buildout $ 45,000 replace truck#14 $ 6,000 radio upgrades Subtotal $ 81,200 Technical Services Noteworthy Non-Recurring Expenses Cost Description $ 2,400 Sit/Stand desks ?Mobile Access Software 10,000 deferred until 2020 or later $ 20,000 AMI Pilot testing 58 Subtotal $ 22,400 Total $ 103,600 93 Elk River Municipal Utilities Business Plan/Budget 2019 Water Department Capital Budget Water Capital Construction Needs Cost Description $ 20,000 Well#6 Roof Replacement $ 20,000 Sandblast/Paint Freeport Booster Station $ 12,000 Wash Freeport Tower $ 700,000 Recondition Auburn Tower Reserves $ 10,000 New Fall Protection for Johnson Tower $ 300,000 Well#8 building Reserves $ 100,000 Facility Repair $ 15,000 Gary Street reconditioning plans and specs Subtotal $ 1,177,000 Water Noteworthy Non-Recurring Expenses Cost Description $ 7,000 Computers $ 10,000 Meters/ERT $ 15,000 Miscellaneous Tower Repairs/Maintenance $ - Jackson Water Tower $90,000 Reserves $ 25,000 Urban Services District Study (funded from trunk funds) Subtotal $ 57,000 Capital Equipment Needs Cost Description $ - Trucks None for the water department this year. $ 5,000 Multi-purpose utility vehicle(20%) 80%electric dept $ 34,320 20%share of Administration and Technical Services $ - Field Services Facility site work Subtotal $ 39,320 Total $ 1,273,320 94 ELK RIVER MUNCIPAL UTILITIES TRAINING AND TRAVEL BUDGET FOR 2019 Budget Budget Budget ELECTRIC 2017 2018 2019 MMUA Overhead Hot Line School 3 people 3,165.00 3,165.00 3,165.00 MMUA Underground School 3 people 3,165.00 3,165.00 3,165.00 MMUA Transformer School 3 people 3,165.00 3,510.00 3,510.00 MMUA Substation Workshop 2 people 2,110.00 2,110.00 2,110.00 1st Line Supervision 1 person 1,470.00 1,700.00 1,700.00 Apprenticeship 3 people 1,602.00 2,200.00 1,650.00 4 Apprentices in 2018 MMUA Meter School 2 people 1,940.00 1,940.00 1,940.00 MMUA Locator Workshop 2 people 720.00 720.00 720.00 Regional Workshop 10 people 650.00 650.00 650.00 Infrared Camera training 1 person 750.00 750.00 GPS 1 person 750.00 750.00 750.00 APPA Linemen Rodeo team 3 people 4,284.00 4,284.00 4,284.00 Colorado Springs 2019 Cross Training SchoollDiesel Workshop 2 people 1,910.00 1,910.00 PCB Training 1 person 1,428.00 1,428.00 1,428.00 Member Information Conf(NISC) 1 person 1,800.00 1,800.00 1,800.00 MMUA T&O Conference 2 people i 850.00 Inventory Foreperson attending partial Additional Training 2,000.00 2,000.00 2,001.00 28,249.00 32,082.00 32,383.00 1% WATER Water Certification Continuing Education 3 people 2,000.00 2,000.00 2,000.00 Wastewater Certification Continuing Education 3 people 1,500.00 1,500.00 1,500.00 Additional Training 2,500.00 2,500.00 2,500.00 6,000.00 6,000.00 6,000.00 0% TECHNICAL SERVICES MMUA Locator Workshop person 750.00 750.00 MMUA Staking Workshop person 750.00 750.00 MMUA Diesel Workshop person 750.00 750.00 750.00 Engineering seminar person 2,000.00 2,000.00 Engineering MPSYCON person 875.00 UMMA Meter Workshop person 1,806.00 903.00 903.00 CAD Workshops/GPS 2 people 750.00 2,000.00 ESRI User Conference 1 person 2,845.00 Substation School 1 person 890.00 890.00 Power Quality training 750.00 751.00 Infrared Camera training 1 person 700.00 1,000.00 UMMA winter mtg 2 people 653.00 800.00 800.00 UMMA summer mtg 1 person 653.00 400.00 400.00 1st Line Supervision Electrical Licensing 1 person 360.00 360.00 361.00 Cross Training School 1 person 890.00 890.00 Apprentice Meter Program(2) 4,800.00 Additional Training 1,000.00 1,000.00 1,001.00 11,472.00 13,088.00 14,121.00 8% ADMINISTRATION AW WA Water Certification Continuing Education 1,600.00 1,700.00 1,700.00 MRWA Water Certification Continuing Education 500.00 Wastewater Certification Continuing Education 500.00 100.00 100.00 MV-RS Meter/Software training 1 staff - AWWA National Conference 3,000.00 2,100.00 - Water Utility Management Institute 605.00 Engineering MPSYCON 1 staff 875.00 MMUA Annual Summer Meeting 3 staff/5 comm 4,525.00 7,090.00 7,090.00 MMUA Legislative Round-up 2 staff/0 comm 1,370.00 870.00 870.00 APPA Legislative Round-up 1 staff/1 comm 4,650.00 2,950.00 2,950.00 MMUA T&O Conference 4 staff 2,400.00 2,400.00 2,400.00 Clerk's Conference 950.00 950.00 800.00 MMUA Leadership Academy 1 staff 3,000.00 6,220.00 3,110.00 APPA E&O Conference 3 staff 4,140.00 4,140.00 6,185.00 Colorado Springs 2019 APPA National Conference 1 staff/0 corner 4,940.00 1,800.00 1,800.00 Texas 2019 1st Line Supervision 2 staff 3,400.00 3,400.00 Member Information Conf(NISC) 3 staff 3,600.00 5,400.00 New OT position attending APPA Training(Mgmt,CS,Fin,Eng,CIP,etc) 2,140.00 2,500.00 2,500.00 Management Training 3,000.00 5,000.00 5,000.00 Additional Training 1,000.00 1,000.00 1,000.00 37,715.00 45,820.00 45,785.00 0% OFFICE Member Information Conf(NISC) 2 staff 9,000.00 5,400.00 3,600.00 OT position under admin group Customer Service 3,500.00 3,500.00 1,750.00 Publishing and Design Software trng 1 staff 1,000.00 1,000.00 New Communications position attending Chamber Leadership Program 1 person 350.00 400.00 400.00 FinanciaUAccounting(APA,CPA,SHRM&General) 2,925.00 2,925.00 Additional Training 1,000.00 1,000.00 1,001.00 14,850.00 13,225.00 10,676.00 -19% SAFETY TRAINING Safe Driver Training 2,100.00 2,100.00 2,100.00 Hearing Test 700.00 700.00 700.00 MMUA Monthly Safety Meetings 26,600.00 28,850.00 29,200.00 29,400.00 31,650.00 32,000.00 1% EDUCATION 3,000.00 3,000.00 3,000.00 130,686.00 144,865.00 143,965.00 Increase 8.6% 10.8% -0.6% Page 1 95 ELK RIVER MUNCIPAL UTILITIES DUES/SUBSCRIPTIONS/FEES BUDGET FOR 2019 Budget Budget Budget 2017 2018 2019 MMUA Membership Dues 28,500.00 28,850.00 30,679.20 MMTG Dues 5,942.33 5,942.33 6,550.00 APPA Dues 15,500.00 15,500.00 15,500.00 APPA DEED Program Dues 2,600.00 3,100.00 3,100.00 APPA Customer Survey Benchmarking 1,200.00 new,participation provides report for comparative information MCMU Membership Dues 250.00 - - CRC Membership 250.00 - - Rotary 250.00 300.00 300.00 Drug and Alcohol Random Testing 900.00 961.00 961.00 Software Support 135,600.00 135,600.00 135,600.00 Bond Administrative&Management Fees 1,350.00 1,350.00 1,700.00 Miscellaneous 1,000.00 1,000.00 1,000.00 SCADA OSI Fee(GRE) 7,000.00 14,000.00 25,000.00 Increased per agreement review(undercharged previously) 800 Mhz Radio Licensing 2,700.00 3,675.00 3,675.00 Publications 600.00 387.00 387.00 Quarterly MN Dept of Health Water Connection Fee 32,000.00 32,000.00 32,000.00 MRWA Annual Fee 235.00 250.00 270.00 AWWA Annual Fee (Dues and Updates) 1,050.00 1,082.00 2,126.00 Annual Report on Water Use-DNR(WTP) 11,000.00 11,260.00 11,755.00 MPCA Permit Fee-WTP 500.00 345.00 345.00 MPCA Permit Fee-Engines 500.00 586.00 586.00 Homeland Security(Hazardous Chemical Fee) 700.00 700.00 725.00 SUSA Membership 125.00 125.00 125.00 Annual Report on Water Use-DNR(Engines) 140.00 140.00 140.00 1-94 Chamber Membership 500.00 Elk River Chamber Membership 500.00 500.00 500.00 Economic Development Association 250.00 295.00 295.00 GASB Subscription 250.00 250.00 265.00 BNSF Railway Crossings 2,250.00 - - ESRI Maintenance Support 1,900.00 2,281.00 2,752.00 AutoCAD Maintenance Support 1,590.00 2,150.00 Inframap Software Maintenance 3,200.00 new in 2018 Itron Software for Metering Billing 4,086.77 12,705.00 13,165.00 Vistapoint Phone System Support 1,010.00 1,010.00 Charging Station Warranty&Service 1,000.00 3,860.00 5 year warranty service portion for 2019 Adobe Creative Cloud software 900.00 1,800.00 upgrade to allow editing of files Adobe software 52.00 Border States Electric Barcoding Support 550.00 550.00 Resource Training&Solutions membership 190.00 190.00 Munici-pals Membership 25.00 25.00 Survey Monkey 300.00 300.00 Partnership Safe Water 300.00 new 2019 Drive Electric 500.00 new 2019 CIP Mobile Workforce-implementation 2018 tbd tbd tbd App Suite-potential implementation 2018 tbd tbd tbd iVue Connect(one time purchase) 9,000.00 Mosaic(one time purchase) 7,744.00 275,173.10 278,749.33 304,638.20 19.3% 1.3% 9.3% Page 1 96 2019 CIP Operating Budget Required Spending and Savings Goals Total Spending Requirement 1.5% of GOR $ 529,797.21 Low Income .2% of Residential GOR $ 23,784.94 Minimum Conservation Spending Requirement $ 264,898.61 Maximum Load Management Spending Requirement $ 264,898.61 Customer Side of the Meter Savings Goal (kWh) 2,664,162 Distribution Savings Goal (kWh) 1,332,081 Total CIP Budget 2019 Direct Labor $ 107,059 General &Administration $ 47,775 Advertising $ 33,600 Equipment $ 21,125 Contract(Includes$25,000 MN PUC Assessment) $ 59,500 Total $ 269,059 ERMU Rebates $ 264,750 Great River Energy Rebates (Estimated) $ - Total all Expenses and Rebates $ 533,809 Total Estimated kWh Savings 2,820,287 Total Operating CIP Budget No Rebates Only Direct Costs Direct Labor $ 107,059 Advertising $ 33,600 Equipment $ 21,125 Contract(Includes$25,000 MN PUC Assessment) $ 59,500 Total ERMU Operating Expenses $ 221,284 *Note: $47,775 is not included in $221,284 Total Rebate Budget ERMU Self Funded $ 264,750 Great River Energy $ - $ 264,750 Total Requested Budget Direct Labor $ 107,059 Advertising $ 33,600 Equipment $ 21,125 Contract(Includes$25,000 MN PUC Assessment) $ 59,500 ERMU Self Funded Rebates $ 264,750 Total Requested 2019 Budget* $ 486,034 *No General and Administrative Included 97 Elk River -- .-- Municipal Utilities 2019 Schedule of Rates & Fees 98 ELK RIVER MUNICIPAL UTILITIES Residential All Electric Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: To single-family residences and individually metered apartments for all domestic purposes with electric energy as a sole source of heating and lighting and when all service is supplied through a single meter, provided ratings of individual single- phase motors do not exceed five (5) horsepower. Character of Service: AC, 60 cycles, 120/240 volt, three wire, single-phase. Special Conditions: Residential service to a multiple dwelling or apartment house through a single meter is allowed for existing services only. Service under this rate schedule shall not be sub-metered and resold to the individual tenants on the basis of usage and the cost of electric service to the tenant must be furnished without specific charge or price which varies with the quantity of energy used. Any apartment or dwelling unit which has separate permanent kitchen facilities shall be considered as one single family private residence. Meter to be accessible to our service department at any time. Residential All Electric Service Rate: Basic Monthly Electric Charge: $13.50 per month Summer Winter $0.1270/ kWh / month $0.1160/ kWh / month Summer Rate: Applicable during the five monthly billing periods of June—October. Summer rates are subject to sales tax. Winter Rate: Applicable during the seven monthly billing periods of November— May. Winter rates are sales tax exempt. Rates are subject to application of Power Cost Adjustment (PCA). Minimum Bill: The Basic Monthly Electric Charge. Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted on the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate or changing from summer to winter or from winter to summer rates. 99 ELK RIVER MUNICIPAL UTILITIES Residential All Electric Service Rate 2. Service will be furnished pursuant to Elk River Municipal Utilities' customer service rules. 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rates set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 100 ELK RIVER MUNICIPAL UTILITIES Residential Electric Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: To single-family residences and individually metered apartments for all domestic purposes when all service is supplied through a single meter, provided ratings of individual single-phase motors do not exceed five (5) horsepower. Character of Service: AC, 60 cycles, 120/240 volt, three wire, single-phase. Special Conditions: Residential service to a multiple dwelling or apartment house through a single meter is allowed for existing services only. Service under this rate schedule shall not be sub-metered and resold to the individual tenants on the basis of usage and the cost of electric service to the tenant must be furnished without specific charge or price which varies with the quantity of energy used. Any apartment or dwelling unit which has separate permanent kitchen facilities shall be considered as one single family private residence. Meter to be accessible to our service department at any time. Residential Electric Service Rate: Basic Monthly Electric Charge: $13.50 per month Summer Winter $0.1270/ kWh/ month $0.1160/ kWh/ month Summer Rate: Applicable during the five monthly billing periods of June—October. Winter Rate: Applicable during the seven monthly billing periods of November— May. Rates are subject to application of Power Cost Adjustment (PCA). Sales tax is applicable. Minimum Bill: Basic Monthly Electric Charge. Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted on the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate or changing from summer to winter or from winter to summer rates. 2. Service will be furnished pursuant to Elk River Municipal Utilities' customer service rules. 101 ELK RIVER MUNICIPAL UTILITIES Residential Electric Service Rate 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rates set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 102 ELK RIVER MUNICIPAL UTILITIES Non-Demand All Electric Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with actual or projected demands of less than 50 kW for the previous 12 consecutive months if applicable. When the Customer achieves an actual maximum demand of 50 kW or greater, the Customer will be placed on the Demand Electric Service rate in the next billing cycle. The Customer accounts shall be in compliance with all policies, procedures, and safety requirements, and shall be taken through one meter. Rating of individual single-phase motors and other single-phase power and heating units served under this schedule shall not exceed ten (10) horsepower(or 7.355 kW) except by special permission. (Not applicable to resale, standby or auxiliary service.) Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480 volts, three-phase. Four wire, 240 volts three phase will only be applicable to existing customers now being served by this voltage. A Customer requiring voltages other than that already established by Elk River Municipal Utilities shall be required to provide suitable space and location for Elk River Municipal Utilities' transformers, metering and associated equipment. Special Conditions: One meter shall be installed to service one class of business. If additional buildings are required for a given business, they shall be interconnected by the customer to obtain one meter. If additional meters and services are requested by the customer, each shall be treated as a separate customer and billed individually. Installation of Demand Meter: At the option of Elk River Municipal Utilities, a demand meter may be installed on any customer whose monthly usage exceeds 15,000 kWh. Meter must be accessible to our service department at any time. Non-Demand All Electric Service Rate: Basic Monthly Electric Charge: $30.00 per month Summer Winter $0.1230/kWh/ month $0.1030/kWh / month Summer Rate: Applicable during the five monthly billing periods of June—October. Summer rates are subject to sales tax unless an exemption is filed. Winter Rate: Applicable during the seven monthly billing periods of November— May. Winter rates are sales tax exempt and may require an exemption to be filed. Rates are subject to application of Power Cost Adjustment (PCA). Minimum Bill: The Basic Monthly Electric Charge plus $1.00 per kVA per month of excess transformer capacity requested by customer. 103 ELK RIVER MUNICIPAL UTILITIES Non-Demand All Electric Service Rate In case of equipment having abnormally low annual utilization factors or unusual operating characteristics, special minimum charges may be prescribed by Elk River Municipal Utilities. Power Factor Adjustment: The rates set forth in this schedule are based on the maintenance by the Customer of a power factor of not less than 95% at all times. If the power factor, as measured by the electric department, is lower than 95%, the monthly demand charge may be multiplied by the ratio 95% divided by the measured power factor, or at Elk River Municipal Utilities' option, the power factor may be corrected at the Customer's expense. Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous demand, such as welders and X-ray machines, shall be required to pay all non- betterment costs of isolating the load from the balance of Elk River Municipal Utilities' lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across-the-line started without notification and written authorization from Elk River Municipal Utilities. In addition, Customers who fail to provide adequate corrective equipment shall be required to own and maintain their own transformers. Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted on the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate or changing from summer to winter or from winter to summer rates. 2. Service will be furnished under the Elk River Municipal Utilities' rules. 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rate set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 104 ELK RIVER MUNICIPAL UTILITIES Non-Demand Electric Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory.. Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with actual or projected demands of less than 50 kW for the previous 12 consecutive months if applicable. When the Customer achieves an actual maximum demand of 50 kW or greater, the Customer will be placed on the Demand Electric Service rate in the next billing cycle. The Customer accounts shall be in compliance with all policies, procedures, and safety requirements, and shall be taken through one meter. Rating of individual single-phase motors and other single-phase power and heating units served under this schedule shall not exceed ten (10) horsepower (or 7.355 kW) except by special permission. (Not applicable to resale, standby or auxiliary service.) Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480 volts, three-phase. Four wire, 240 volts three phase will only be applicable to existing customers now being served by this voltage. A Customer requiring voltages other than that already established by Elk River Municipal Utilities shall be required to provide suitable space and location for Elk River Municipal Utilities' transformers, metering and associated equipment. Special Conditions: One meter shall be installed to service one class of business. If additional buildings are required for a given business, they shall be interconnected by the customer to obtain one meter. If additional meters and services are requested by the customer, each shall be treated as a separate customer and billed individually. Meter must be accessible to our service department at any time. Non-Demand Service Rate: Basic Monthly Electric Charge: $30.00 per month Summer Winter $0.1230/ kWh/ month $0.1030/ kWh/ month Summer Rate: Applicable during the five monthly billing periods of June—October. Winter Rate: Applicable during the seven monthly billing periods of November— May. Rates are subject to application of Power Cost Adjustment(PCA). Sales tax applicable unless exemption is filed. Minimum Bill: The Basic Monthly Electric Charge plus $1.00 per kVA per month of excess transformer capacity requested by customer. In the case of equipment having abnormally low annual utilization factors or unusual operating characteristics, special minimum charges may be prescribed by Elk River Municipal Utilities. 105 ELK RIVER MUNICIPAL UTILITIES Non-Demand Electric Service Rate Power Factor Adjustment: The rates set forth in this schedule are based on the maintenance by the Customer of a power factor of not less than 95% at all times. If the power factor, as measured by the electric department, is lower than 95%, the monthly demand charge may be multiplied by the ratio 95% divided by the measured power factor, or at Elk River Municipal Utilities' option, the power factor may be corrected at the Customer's expense. Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of isolating the load from the balance of Elk River Municipal Utilities' lines. No motor larger than ten (10) HP (or 7.355 kW)will be allowed to be across-the-line started without notification and written authorization from Elk River Municipal Utilities. In addition, Customers who fail to provide adequate corrective equipment shall be required to own and maintain their own transformers. Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted on the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate or changing from summer to winter or from winter to summer rates. 2. Service will be furnished under the Elk River Municipal Utilities' rules. 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rate set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Installation of Demand Meter: At the option of Elk River Municipal Utilities, a demand meter may be installed on any customer whose: monthly usage exceeds 15,000 kWh. Adopted December 11, 2018 Effective January 1, 2019 106 ELK RIVER MUNICIPAL UTILITIES Demand All Electric Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with actual or projected demand greater than or equal to 50 kW. A Customer account with a billing demand of less than 50 kW for 12 consecutive months will be given the option of switching to the Non-Demand rate. The Customer accounts shall be in compliance with all policies, procedures, and safety requirements, and shall be taken through one meter. (Not applicable to resale, standby or auxiliary service.) Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480 volts, three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now being served by this voltage. A customer requiring voltages other than that already established shall be required to provide suitable space and location for Elk River Municipal Utilities transformers, metering and associated equipment. Special Conditions: One meter shall be installed to service one class of business. If additional buildings are required for a given business, they shall be interconnected by the customer to obtain one meter, unless an exception is approved by management. If additional meters and services are requested by the customer, each shall be treated as a separate customer and billed individually. Meter to be accessible to our service department at any time. Demand Service Rate: Basic Monthly Electric Charge: $75.00 per month. Summer Winter Demand Charge: $15.50 $11.50 in kW/month Energy Charge: $ 0.0651 $ 0.0651 in kWh/ month Summer Rate: Applicable during the five monthly billing periods of June—October. Summer rates are subject to sales tax unless an exemption is filed. Winter Rate: Applicable during the seven monthly billing periods of November— May. Winter rates are sales tax exempt and may require an exemption to be filed. Rates are subject to application of Power Cost Adjustment (PCA). Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kVA per month of excess transformer capacity requested by customer. Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected for power factor if required) during any fifteen (15) minute period occurring in the current billing period. But in no month shall the billing demand be 107 ELK RIVER MUNICIPAL UTILITIES Demand All Electric Service Rate greater than the value in kW determined by dividing the kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m. Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of isolating the load from the balance of Elk River Municipal Utilities' system so that the load will not unduly interfere with service on Elk River Municipal Utilities' lines. In addition, Customers who fail to provide adequate corrective equipment shall be required to own and maintain their own transformers. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across-the-line started without notification and written authorization from Elk River Municipal Utilities. Power Factor Adjustment: For loads of 50 kW or more, or at the option of Elk River Municipal Utilities for loads of less than 50 kW, power factor adjustments may be made in the billing demand, when the power factor, as determined by test, at the time of the Customer's maximum use is less than 95%. If the power factor, as measured by Elk River Municipal Utilities' electric department, is lower than 95%, the monthly demand charge may be multiplied by the ratio 95% divided by the measured power factor, or at Elk River Municipal Utilities option, the power factor may be corrected at the Customer's expense. Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate. 2. Service will be furnished under Elk River Municipal Utilities rules. 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rates set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 108 ELK RIVER MUNICIPAL UTILITIES Demand Electric Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with actual or projected demand greater than or equal to 50 kW. A Customer account with a billing demand of less than 50 kW for 12 consecutive months will be given the option of switching to the Non-Demand rate. The Customer accounts shall be in compliance with all policies, procedures, and safety requirements, and shall be taken through one meter. (Not applicable to resale, standby or auxiliary service.) Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480 volts, three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now being served by this voltage. A customer requiring voltages other than that already established shall be required to provide suitable space and location for Elk River Municipal Utilities transformers, metering and associated equipment. Special Conditions: One meter shall be installed to service one class of business. If additional buildings are required for a given business, they shall be interconnected by the customer to obtain one meter, unless an exception is approved by management. If additional meters and services are requested by the customer, each shall be treated as a separate customer and billed individually. Meter to be accessible to our service department at any time. Demand Service Rate: Basic Monthly Electric Charge: $75.00 per month. Summer Winter Demand Charge: $15.50 $11.50 in kW/month Energy Charge: $ 0.0651 $ 0.0651 in kWh/ month Summer Rate: Applicable during the five monthly billing periods of June—October. Winter Rate: Applicable during the seven monthly billing periods of November— May. Rates are subject to application of Power Cost Adjustment (PCA). Sales tax applicable unless exemption is filed. Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kVA per month of excess transformer capacity requested by customer. Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected for power factor if required) during any fifteen (15) minute period occurring in the current billing period. But in no month shall the billing demand be 109 ELK RIVER MUNICIPAL UTILITIES Demand Electric Service Rate greater than the value in kW determined by dividing the kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m. Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of isolating the load from the balance of Elk River Municipal Utilities' system so that the load will not unduly interfere with service on Elk River Municipal Utilities' lines. In addition, Customers who fail to provide adequate corrective equipment shall be required to own and maintain their own transformers. No motor larger than ten (10) HP (or 7.355 kW)will be allowed to be across-the-line started without notification and written authorization from Elk River Municipal Utilities. Power Factor Adjustment: For loads of 50 kW or more, or at the option of Elk River Municipal Utilities for loads of less than 50 kW, power factor adjustments may be made in the billing demand, when the power factor, as determined by test, at the time of the Customer's maximum use is less than 95%. If the power factor, as measured by Elk River Municipal Utilities' electric department, is lower than 95%, the monthly demand charge may be multiplied by the ratio 95% divided by the measured power factor, or at Elk River Municipal Utilities option, the power factor may be corrected at the Customer's expense. Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate. 2. Service will be furnished under Elk River Municipal Utilities rules. 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rates set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 110 ELK RIVER MUNICIPAL UTILITIES Off-Peak Demand Electric Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with actual or projected demand greater than or equal to 50 kW. A Customer account with a billing demand of less than 50 kW for 12 consecutive months will be given the option of switching to the Non-Demand rate. The Customer accounts shall be in compliance with all policies, procedures, and safety requirements, and shall be taken through one meter. (Not applicable to resale, standby or auxiliary service.) Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480 volts, three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now being served by this voltage. A customer requiring voltages other than that already established shall be required to provide suitable space location of Elk River Municipal Utilities transformers, metering and associated equipment. Special Conditions: One meter shall be installed to service one class of business. If additional buildings are required for a given business, they shall be interconnected by the customer to obtain one meter, unless an exception is approved by management. If additional meters and services are requested by the customer, each shall be treated as a separate customer. Meter to be accessible to our service department at any time. Off Peak Demand Service Rate: Basic Monthly Electric Charge: $75.00 per month. Summer Winter Demand Charge: On-Peak $15.50 $11.50 in kW/ month Off-Peak $ 6.25 $ 6.25 in kW/ month Energy Charge: $ .0680 $ .0680 in kWh/ month On-Peak Demand: Actual demand during On-Peak Periods On-Peak Period: 3:00 PM -10:00 PM weekdays Off-Peak Demand: Actual demand during Off-Peak Periods less On-Peak Demand Off-Peak Period: All non On-Peak Periods Summer Rate: Applicable during the five monthly billing periods of June—October. Winter Rate: Applicable during the seven monthly billing periods of November— May. Rates are subject to application of Power Cost Adjustment(PCA). Sales tax applicable unless exemption is filed. Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kVA per month of excess transformer capacity requested by customer. Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected for power factor if required) during any fifteen (15) minute period occurring in the current 111 ELK RIVER MUNICIPAL UTILITIES Off-Peak Demand Electric Service Rate billing period. But in no month shall the billing demand be greater than the valve in kW determined by dividing the kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m. Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of isolating the load from the balance of Elk River Municipal Utilities' system so that the load will not unduly interfere with service on Elk River Municipal Utilities' lines. No motor larger than ten (10) HP (or 7.355 kW)will be allowed to be across-the-line started without notification and written authorization from Elk River Municipal Utilities. In addition, Customers who fail to provide adequate corrective equipment shall be required to own and maintain their own transformers. Power Factor Adjustment: For loads of 50 kW or more, or at the option of Elk River Municipal Utilities for loads of less than 50 kW, power factor adjustments will be made in the billing demand, when the power factor, as determined by test, at the time of the Customer's maximum use is less than 95%. If the power factor, as measured by Elk River Municipal Utilities' electric department, is lower than 95%, the monthly demand charge may be multiplied by the ratio 95% divided by the measured power factor, or at Elk River Municipal Utilities' option, the power factor may be corrected at the Customer's expense. Terms of Payment: Bills are due and payable upon receipt and delinquent if not paid by the due date noted the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate. 2. Service will be furnished under Elk River Municipal Utilities rules. 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rates set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 112 ELK RIVER MUNICIPAL UTILITIES Commercial All Electric with Ground Source Heat Pump (GSHP) Service Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: To commercial customers having a single meter that includes a GSHP in excess of 50 kW but no more than 150 kW in aggregated name plate capacity of the GSHP equipment(condensers and pumps). Character of Service: AC, 60 cycles, 120/240 volts, three wire, and three-phase. Special Conditions: This Program is available to commercial customers. A GSHP will be the only central heating and/or cooling system for the commercial work spaces. Commercial structures that are classified as Utility and Miscellaneous Group U by the International Code Council are not eligible for this rate. GSHPs that qualify for this program will not be interrupted. A GSHP paired with another heating source such as natural gas, fuel oil, or propane may qualify for the Dual Fuel Program. To qualify for the special rate, the customer shall provide: 1. The GSHP is the only heat source. Only closed loop GSHPs are eligible for this rate beginning September 1, 2016. 2. ERMU and the customer will agree on a meter location prior to the meter socket installation. 3. Commercial customers may have a separate meter to determine the energy and demand of the GSHP. Electric usage for the non-heating/cooling energy use of the building may be metered and priced using the appropriate rate (demand, or non-demand) schedule. 4. Accommodations for a meter and associated wiring installed according to the applicable electrical codes and will be installed by a qualified electrician. 5. Inspection by a State certified inspector and representative of ERMU. 6. Customers on this rate will not be eligible for the Cycled Air Conditioning or Dual Fuel Programs. Meter to be accessible to our service department at any time. Ground Source Heat Pump Service Rate: Basic Monthly Electric Charge: $30.00 per month Summer Winter $.0909/kWh $.0909/ kWh Summer Rate: Applicable during the five monthly billing periods of June —October. Summer rates are subject to sales tax. Winter Rate: Applicable during the seven monthly billing periods of November— May. Winter rates are sales tax exempt. Rates are subject to application of Power Cost Adjustment (PCA). Minimum Bill: Basic Monthly Electric Charge. 113 ELK RIVER MUNICIPAL UTILITIES Commercial All Electric with Ground Source Heat Pump (GSHP) Service Rate Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted on the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Terms and Conditions: 1. Usage may be fractionalized on the actual days of service for application of a change in rate, or changing from summer to winter or from winter to summer rates. 2. Service will be furnished pursuant to Elk River Municipal Utilities' rules. 3. Extensions made for service under this schedule are subject to the provisions of Elk River Municipal Utilities' rules governing Extension of Service and Facilities. 4. The rates set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 5. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 114 ELK RIVER MUNICIPAL UTILITIES Ground Source Heat Pump Program Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: To single family residences, non-demand and demand customers receiving service under another rate, who add a second meter for any of the following controlled loads: Ground Source Heat Pump Rate: This Program is available to residential and commercial customers. A ground source heat pump (GSHP) is a central heating and/or cooling system for residential living spaces or commercial work spaces. Residential living spaces will meet all the applicable Minnesota state building codes. Commercial structures that are classified as Utility and Miscellaneous Group U by the International Code Council are not eligible for this rate. This program is available to residential or commercial customers with a GSHP as their sole heat source. GSHPs that qualify for this program will not be interrupted. A GSHP paired with another heating source such as natural gas, fuel oil, or propane may qualify for the Dual Fuel program. To qualify for the special rate, the customer shall provide: 1. The GSHP is the only heat source. Only closed loop GSHPs are eligible for this rate beginning January 1, 2016. 2. ERMU and the customer will agree on a meter location prior to the meter socket installation. 3. Commercial customers may have a separate meter to determine the load of the heat pumps. Electric usage for the remainder of the building will be metered and priced using the appropriate rate (Demand, or Non-Demand). 4. Accommodations for a meter and associated wiring installed according to the applicable electrical codes and will be installed by a qualified electrician. 5. Inspection by a State certified electrical inspector and a representative of ERMU. 6. Customers on this rate will not be eligible for the Cycle Air Conditioning Rate Program. Elk River Municipal Utilities shall provide: 1. All electric energy consumed by the primary electric heating system at$.0909 per kWh. 2. The rate is subject to the application of the Power Cost Adjustment (PCA). 3. A meter socket to accommodate the meter in a mutually agreed to location. 4. A meter to measure electricity consumed by the electric heating system. Adopted December 11, 2018 Effective January 1, 2019 115 • ELK RIVER MUNICIPAL UTILITIES Electric Vehicle Charging Rates Electric Vehicle Charging Rate: This Program is available to all customers of Elk River Municipal Utilities (ERMU) that own an electrically powered vehicle used for on road transportation. Charging of the vehicle can occur any time but will be subject to on-peak and off-peak energy charges per hour daily. Off peak hours typically occur between 10 PM and 10 AM and all other hours are considered on-peak. To qualify for the special rate, the customer shall provide: 1. Electric vehicle charging station that is used for the sole purpose of charging electric vehicles. This charging station must be 240 volt. 2. Customer is responsible for installation of the additional meter socket in a mutually agreed upon location. 3. Inspection by a State Certified electrical inspector of all metering equipment and provide an affidavit to ERMU when completed. Elk River Municipal Utilities shall provide: 1. All on-peak electric energy consumed by the electric vehicle charging equipment will be at the summer rate of$0.1270/kWh for the five monthly billing periods of June—October, and the winter rate of$0.1160/kWh for the seven monthly billing periods of November— May. 2. All off-peak electric energy consumed by electric vehicle charging equipment will be at the rate of$.0602/kWh. 3. The rate is subject to application of the Power Cost Adjustment(PCA). 4. This equipment will be available for charging at applicable rates 24 hours per day and is not subject to any load control strategies. 5. Electric meter. 6. Final inspection prior to meter activation to ensure only qualified loads are being supplied through the electric vehicle charging equipment. Public Electric Vehicle Charging Rate: This rate is available to anyone charging an electric vehicle or plugin electric vehicle at a public electric vehicle charging station owned and operated by ERMU within the ERMU service territory. All persons must have an active ChargePoint account or have the capability to create a ChargePoint account prior to utilizing the charging equipment for an electric vehicle or plug-in hybrid electric vehicle. To charge at the public charging stations customers shall: 1. Utilize their existing ChargePoint account or create a new account using a credit or debit card prior to charging the electric vehicle or plug-in hybrid. Elk River Municipal Utilities shall provide: 1. Access to public electric vehicle charging stations located in the ERMU service territory. 2. The chargers will be either level two (240 volt) or DC Fast Charging (480 volt) charging equipment. 116 ELK RIVER MUNICIPAL UTILITIES 2019 Electric Vehicle Charging Rates 3. Electric energy consumed at the level two charging stations will be at a rate of$0.1500 per kWh at all times. 4. Electric energy consumed at the DC Fast Charging station will be at a rate of$0.2000 per kWh at all times. Adopted December 11, 2018 Effective January 1, 2019 117 MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS ELK RIVER MUNICIPAL UTILITIES Energy Management Program Rates Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: To single family residences, non-demand and demand customers receiving service under another rate, who add a second meter for any of the following controlled loads: Dual Fuel Space Heating Rate: This Program is available to residential customers only. A dual fuel space heating system consists of an electric heating system and a secondary non- electric space heating system both capable of heating the living space at design conditions. Interruptions of the electric heating system will usually occur for up to 12 hours daily on peak winter days and a maximum of 400 hours per heating season. To qualify for the special rate, the customer shall provide: 1. An electric space heating system which can be interrupted by a single 5 amp rated relay. 2. A secondary non-electric space heating system capable of automatic start-up and continuous operation upon interruption of the electric heating system. 3. Obtain a load control device furnished by ERMU. 4. Accommodations for a meter and load control device and associated wiring installed according to the applicable electrical codes, and installed by a qualified electrician. 5. Inspection by a State certified electrical inspector and a representative of ERMU. 6. Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage. 7. Dual Fuel is not allowed in garages, pole sheds, or any structure that does not confirm to the residential building code. 8. Exceptions by management approval only. Elk River Municipal Utilities shall provide: 1. All electric energy consumed by the primary electric heating system at$.0602 per kWh. 2. The rate is subject to application of the Power Cost Adjustment (PCA). 3. During peak load conditions, ERMU will turn customer controlled electrical heat off for extended periods of time as stated above. 4. A meter to measure electricity consumed by the electric heating system. 5. A load control device and meter socket to accommodate the meter. Electric Thermal Storage (ETS) Space Heating Rate: This Program is available to all ERMU customers. An ETS space heating system is designed to store heat produced by electricity generated during eight off-peak hours for use in heating during the remaining on-peak hours daily. Off-peak hours typically occur between 11 PM and 7 AM. Qualifying ETS configurations may be central storage furnaces, room storage heaters or slab (deep heat) systems including combinations of same. To qualify for the special rate, the customer shall provide: 1. An ETS space heating system listed by UL or some other nationally recognized testing agency which can be interrupted by a single 5 amp rated relay. 118 MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS ELK RIVER MUNICIPAL UTILITIES Energy Management Program Rates 2. Obtain a load control device from ERMU. 3. Accommodations for a meter and load control device and associated wiring installed according to the applicable electrical codes, and installed by a qualified electrician. 4. Inspection by a State certified electrical inspector and a representative of ERMU. Elk River Municipal Utilities shall provide: 1. All electric energy consumed by this ETS system at$.0463 per kWh. 2. The rate is subject to application of the Power Cost Adjustment(PCA). 3. This equipment will be energized only for 8 off peak hours daily. Additional on-time is provided on weekend days and holidays. 4. A meter to measure electricity consumed by the ETS space heating system. 5. A load control device which will automatically control ETS space heating system during on-peak hours. Electric Thermal Storage (ETS)Water Heating Rate: This Program is available to all ERMU customers. An ETS water heater is designed with extra storage capacity to provide total domestic hot water needs from electricity consumed only during eight off-peak hours daily. Off- peak hours typically occur between 11 PM and 7 AM. Qualifying ETS configurations may be a large single tank, dual tanks plumbed in series, or an electric and non-electric tank plumbed in series with the electric placed on the cold water side. Electric water heater must have an energy factor of.91 or more and a minimum of 80 gallons of storage capacity. To qualify for the special rate, the customer shall provide: 1. An ETS water heating system which can be interrupted directly by a single 30 amp rated relay. 2. Obtain a load control device from ERMU. 3. Accommodations for a meter and load control device and associated wiring installed according to the applicable electrical codes, and installed by a qualified electrician. 4. Inspection by a State certified electrical inspector and a representative of ERMU. 5. This rate is not available for hot water use in any production process for Commercial and Industrial users. Elk River Municipal Utilities shall provide: 1. All electric energy consumed by the ETS water heater at$.0463 per kWh. 2. The rate is subject to application of the Power Cost Adjustment(PCA). 3. This equipment will be energized only for 8 off-peak hours daily. 4. A meter to measure electricity consumed by the ETS water heater. 5. A load control device and meter socket to accommodate the off-peak meter. Cycled Air Conditioning: This Program is available to all customers served by ERMU who have central air conditioners. Program participants must allow installation of a utility supplied 119 MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS ELK RIVER MUNICIPAL UTILITIES Energy Management Program Rates load control device so air conditioning demand can be reduced at critical times. This Program is subject to the following terms and conditions: 1. The Customer must have a conventional central air conditioner, ASHP or GSHP, of at least 2 tons capable of being interrupted with a 5 amp relay. 2. ERMU will furnish the load control device and pay to have it installed by a licensed electrician. Separate metering is not required. 3. The Customer must allow access for installation of the load control device during normal business hours. 4. The Customer must allow access for load control maintenance and compliance inspections by ERMU personnel during normal business hours. 5. Customers must agree to allow ERMU or its designee to remotely cycle their central air conditioner, ASHP or GSHP, off for approximately 15 minutes out of each 30 minute period at critical peak use times during the cooling season (May through September). Except for extreme emergencies, duration of said control will not exceed 6 hours per day and more than 200 hours total per cooling season. 6. Customers who elect to participate in this Program must remain on it for at least one cooling season or part of the load control installation costs may be assessed to the customer. 7. Customers with central air conditioners, ASHP or GSHP, that are grossly oversized for the conditioned space will not be allowed to participate. Such systems do not provide ERMU sufficient load reduction relief at critical peak use times. 8. The rate is subject to application of the Power Cost Adjustment (PCA). 9. Cycled AC Program participants will receive a $3 per month credit for allowing ERMU to interrupt their air conditioners as outlined above. Such payments will be provided in the form of a bill credit during the five monthly billing periods of June—October. Adopted December 11, 2018 Effective January 1, 2019 120 MORATORIUM EFFECTIVE JUNE 1, 2014 ELK RIVER MUNICIPAL UTILITIES Dispersed Generation/Interruptible Load Program Rate Available: Within Elk River Municipal Utilities (ERMU) established service territory. Applicable: Existing Customers, or to new Customers receiving all electrical power from ERMU and with demands between 100 kW and 1,500 kW of connected load. Customers with on-site generation greater than 1,500 kW may also qualify, but special terms and conditions may apply on a case by case basis. Customer must agree to operate on-site generation and/or limit load to a mutually agreed to Predetermined Demand Level (PDL) upon notification by ERMU or its designated agent. Customer must be served by ERMU under the Demand Electric Service Rate. Customer must execute a Dispersed Generation Agreement or Interruptible Service Agreement to participate in either program. Customer is subject to the terms and conditions of the applicable Agreement. Not applicable to resale, standby or auxiliary service. Special Conditions: Customer must conduct normal business practices between the hours of 3:00 PM to 10:00 PM, Monday through Friday. Customer must provide access to a phone line or reimburse ERMU for all costs associated with providing program interruption notification and remote metering needs. Customer must have the means to operate on-site generation and/or reduce load to the PDL within 30 minutes following notification by ERMU or its agent. Credits apply only during months in which the Customer is fully operational. Customer represents and warrants that interruptible load of at least 100 kW shall be available for interruption upon request by ERMU or its designated agent twenty-four hours per day, seven days per week, three hundred sixty five day per year in order to receive credit. Dispersed Generation/Interruptible Credits: ERMU shall compensate Customer for load interruptions maintained at or below the PDL when requested by ERMU or its designated agent, at the rates indicated below: Monthly Credit/Kw* Summer(June, July, and Aug) $14.00 per kW Winter(Dec, Jan, and Feb) $10.00 per kW Spring/Fall (Mar, Apr, May, Sept, Oct, Nov) $ 6.00 per kW *Credit applies only during months in which Customer coincidental demand is at least 100 kW over the PDL. The difference between Customer's coincidental peak demand at the time of notice to interrupt and the PDL shall be used as a basis for establishing Customer's monthly credit. In months in which no notice to interrupt is given, the difference between Customer's coincidental peak demand and the PDL shall be used as a basis for establishing Customer's monthly demand credit. 121 MORATORIUM EFFECTIVE JUNE 1, 2014 In the event that participating customers are not controlled during the monthly coincidental billing peak demand hour, the customer will receive applicable demand credits only for metered demand that exceeds the PDL and is greater than 100 kW. The demand credit is based on the applicable rates above to the kW difference between the metered demand and the PDL using hourly interval meter data measured one hour prior to the monthly coincidental billing peak demand hour. In the event the participating customer is not operating at the time of the coincidental billing peak there is no credit calculated in that month. The customer must be operating at least one hour prior to the coincidental billing demand peak or the time designated for interruption to receive credit. Example 1: Notice for disconnect or interruption is given at 11:00 a.m. for disconnect or interruption at 3:00 p.m. The participating customer begins shut down at 2:30 and has a peak demand for that month on the day of the interruption at 2:15 with a total load of 350 kW. The customer has a PDL of 50. For this example the participating customer would receive a credit for the difference between the Customer's coincidental peak demand (350 kW) and the PDL (50 kW). The customer would receive a credit for the 300 kW reduction times the seasonal rate indicated above. Example 2: There is no notice to disconnect or interrupt for this example month. The coincidental billing peak occurs on a Tuesday night at 11:00 p.m. The customer had a demand of 45 kW at the time of the coincidental billing peak (11:00 p.m.). In months with no notice the difference between the participating Customer's coincidental peak demand (45 kW) and the PDL (50 kW) shall be used to calculate the monthly credit. The difference between the coincidental billing peak and PDL in this example is -5. Since the participating customer was not operating and did not have any demand in excess of 100 kW to interrupt there is no credit given for this month. In any month in which the difference between the Customer's coincidental peak demand and the PDL is not at least 100 kW, no credit will be given. If the difference between the Customer's coincidental peak demand and the PDL remains less than 100 kW for two or more consecutive months, a new PDL may be established or ERMU shall have the right to terminate the Dispersed Generation or Interruptible Service Agreement. If Customer fails to interrupt load down to the PDL for the specified length of time of the control period in any calendar month a $5.00/kW demand penalty will be added to the Customers bill. The demand penalty will be determined using the maximum uncontrolled kW demand, defined as the highest hourly interval above the PDL recorded during all control periods in the billing month. The Customer will not receive the monthly credit for that month or any succeeding months until performance has been demonstrated to the satisfaction of ERMU personnel. If Customer fails to perform more than two times in any calendar year, ERMU reserves the right to terminate the Agreement. Adopted December 11, 2018 Effective January 1, 2019 122 ELK RIVER MUNICIPAL UTILITIES Street/Security Light Service Rate Available: To any customer meeting Elk River Municipal Utilities criteria for service under this schedule, and whose lighting needs are not being furnished under any other schedule. Installation costs will be determined by Elk River Municipal Utilities per the Utilities Fee Schedule or on a time and materials basis. Applicable: As determined by Elk River Municipal Utilities, but generally to non-metered roadway and area lighting. Character Of Service: 120/240 volts, AC, as available. Street/Security Light Service Type Monthly Rate Per Fixture Low Output (<249 Watt HPS, <74 Watt LED) $9.00 Medium Output (250-399 Watt HPS, 75-124 Watt LED) $15.00 High Output (400 Watt or larger HPS, 125 Watt or larger LED) $21.00 Rates are subject to sales tax. Ownership of Equipment: Elk River Municipal Utilities will install, own, and operate the lights, including fixtures and control equipment, unless otherwise agreed upon by Elk River Municipal Utilities and the Customer. Lamp Replacements: Lamp replacements will be made by Elk River Municipal Utilities when and as requested by the Customer. Terms of Payment: Bills are due and payable upon receipt and are considered delinquent if not paid by the due date noted on the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. General Terms and Conditions Applicable To Non-Metered Lighting Service: 1. Area lighting installed on Elk River Municipal Utilities poles shall not be of the type that interferes with climbing room, work space, or wire clearance as defined by the National Electrical Safety Code and is to be installed below the secondary line and service drops, all per Elk River Municipal Utilities' specification. 2. All area lights installed under this schedule shall be equipped with a photo-electric control which will limit the hours of illumination from dusk to dawn (approximately 4,400 hours per year). 3. The rates set forth herein may be modified by the amount of any governmental changes imposed and levied on transmission, distribution, production, or the sale of electrical power. 4. Exceptions by management approval only. Adopted December 11, 2018 Effective January 1, 2019 123 ELK RIVER MUNICIPAL UTILITIES Water Service Rates Available: To all customers who have municipal water service available at their property, lying within the corporate limits of the City of Elk River. Special Conditions: Each customer served by one meter. Multiple living entities, such as apartments, may be served by a combined meter upon approval of the Elk River Municipal Utilities and acceptance of applicable charges. Special Charges: A basic monthly water charge shall be applied to each meter based on the meter size according to the schedule below, and is separate from any water use. Included in the basic monthly water charge is $0.53 that is collected on a monthly basis from each service connection (excluding irrigation only accounts) to recover the total annual cost of$6.36 for the State of Minnesota Safe Water Testing Program (Minnesota Statutes 144.3831). Water Rates: BASIC 1st TIER 2nd TIER 3rd TIER METER TYPE MONTHLY Cost per Cost per Cost per CHARGE 1000 gallons 1000 gallons 1000 gallons Residential $ 9.22 $ 1.85 $3.50 $4.00 Commercial 3/ $ 11.06 $ 1.85 $3.50 $4.00 Commercial 1 $ 12.30 $ 1.85 $3.50 $4.00 Commercial 1 % $ 13.54 $ 1.85 $3.50 $4.00 Commercial 1 '/2 $ 14.76 $ 1.85 $3.50 $4.00 Commercial 2 $ 19.68 $ 1.85 $3.50 $4.00 Commercial 3 $43.03 $ 1.85 $3.50 $4.00 Commercial 4 $ 59.02 $ 1.85 $3.50 $4.00 Commercial 6 $ 86.07 $ 1.85 $3.50 $4.00 Commercial 8 $116.81 $ 1.85 $3.50 $4.00 Commercial Irrigation Seasonally $ 19.68 $3.50 $4.00 or Permanently Installed Residential water- exempt from sales tax. Commercial water- subject to sales tax unless exemption is filed. Residential Rate Tier Definition: First Tier Rate = 0- 9,000 gallons per month. Second Tier Rate = Between 9,000 and 15,000 gallons per month. Third Tier Rate = Above 15,000 gallons per month. 124 ELK RIVER MUNICIPAL UTILITIES Water Service Rates Commercial Rate Tier Definition: First Tier Rate = 0— 1.1 X previous year's winter measurement period average monthly consumption. Second Tier Rate = Between 1.1 X previous year's winter measurement period average monthly consumption to 1.1 X previous year's winter measurement period average monthly consumption + 40,000 gallons. Third Tier Rate = Above 1.1 X previous year's winter measurement period average monthly consumption + 40,000 gallons. Winter Measurement Period Definition: December—April billing cycles. For new customers, if a minimum of 3 winter months previous year's history is not available to establish the Tier amount, the First Tier rate shall be utilized until a minimum of 3 months history is established. Commercial irrigation is not eligible for First Tier Rate as there is no winter use. Minimum Bill: Basic monthly water charge plus any charges applicable to multiple living entities. Terms of Payment: Bills are due and payable upon receipt and delinquent if not paid by the due date note on the bill. There will be a ten (10) percent late payment charge added to all accounts that are not paid by the due date. Adopted December 11, 2018 Effective January 1, 2019 125 • E1kRiver . 2019 Utilities Fee Schedule Municipal Utilities ELECTRIC New Residential Electric Connection - Developer-Lot with ERMU water service $475.00 New Residential Electric Connection -Developer-Lot without ERMU water service $575.00 New Residential Electric Connection -Builder $875.00 New Wire Footages over 200' (per foot) $4.00 New Service Frost Trenching(per foot) $5.00 New Commercial&Industrial Electric Connection 50% Service Upgrades or Additions for Existing Customers I00% Minimum Temporary Electric Service Fee- Existing Transformer $150.00 Minimum Temporary Electric Service Fee-Without Existing Transformer $500.00 Street Light-30' Decorative Pole with 6'Arm and Fixture $1,850.00 Street Light-23' Decorative Pole with Traditionaire Fixture $1,500.00 Security Light-Wood Pole with Fixture $975.00 Security Light- Existing Pole $125.00 Pole Attachment Fee(per pole) $6.50 WATER Water Access Charge=Water Connection Charge+Water Availability Charge $3,764.00 Water Connection Charge(Per Plumbing Unit)- Builder $3,396.00 Water Availability Charge(Per Plumbing Unit) -Developer $368.00 Abandoned Water Service $2,500.00 Hydrant Water Sales- Rental (per week) $50.00 Hydrant Water Sales-Units (per 1000 gallons) $4.00 Deposit for 5/8"Hydrant Meter $150.00 Deposit for 2 1/2"Hydrant Meter $1,000.00 Private Hydrant Maintenance Program Monthly Fee $5.00 ADMINISTRATIVE Administrative Fee for Continued Submission of Checks After No-Check Notice Given $20.00 Billable Cost of Materials Markup 15% Billable Labor Markup 55% Billable Vehicle/Equipment(per employee per hour) $30.00 Commerical Application Fee $20.00 Electric Service Disconnect/Trip Fee- Meter Technician $50.00 Electric Service Disconnect/Trip Fee- Line Crew $150.00 Energy Audit $150.00 Meter Tampering Fee $250.00 Meter Testing Fee $50.00 NSF Fee $20.00 Penalty Amount 10% Photocopies (per page) $0.25 Red Tag Handling Fee $20.00 Water Shut-Off Fee $100.00 Adopted by the Utilities Commission on November 13,2018 under authority per Minnesota Statute 412.361 126