Loading...
East TH 10 Area Informational Hearing 06-15-1993MIA, NAM Im JUNE 15, 1993 PROJECT HISTORY Growth Management Plan Draft East Highway 10 Corridor Improvements Study City Decision to Extend Utilities West Construction of Western Area Improvements Wastewater Treatment Plant Upgrade ■ Expansion of Urban Service Area ■ Update of Growth Management Plan East TH 10 Area Informational Hearing August 1988 March 1990 December 1991 1992 Current June 15, 1993 i-� U U) z .? OCA r �- O w Q f� H=mood ag0cL 0 x LLJ w TSEGO IUWNSHIP \C ✓ LOT \\ y�G yERNMEN� \ J?: THE r #3 Al ` 0 400 i CROSSROADS 2 O\ Maier Stewart MnD®T MO TRAFFIC COUNTS City 4iver & Associates Inc. Elk 1 ,�-ex I • . • 0 Z ZCL o< N2 1: ---mq;iou 15 E = LL �5 m m 3 O m L L S O a C N 01 Q, O 4. N s = J U) LLOC ENE ® Z ZO o CC w p Q Q° > U J CO I- ��O w=� m F-- z cc �— a20a COCOU) X �W w=U� a.ao w a F- =� N ' Cc >-Ow aoco I—=xpc W _ W w=v� O -O w N Ce) V) W O uJ $ ,LO 'I EEO Z~W g & w=og Qw ■ X to c!1 W VJ cur � W Z V o > 2 E... �_o Y cc m _rem FW— _ •--• C� a. W w=�� � 3� w ESTIMATED COSTS` Estimated Sanitary Sewer Construction Cost Estimated Water Improvements Construction Cost ESTIMATED CONSTRUCTION COST Construction Contingencies (10%®) ESTIMATED TOTAL CONSTRUCTION COST Administration, Engineering, Fiscal & Legal (28%) ESTIMATED TOTAL PROJECT COST $ 843,200 13783j00 $2,626,900 262,700 $2,889,600 809,100 $3,698,700 * Cost estimated from March 1990 Draft East Highway 10 Corridor Improvements TYPES OF ASSESSMENTS/CHARGES 1. Trunk Sanitary Sewer/Water Area assessment on a per acre basis. The only area reduction is for classified wetlands. 2. Trunk Storm Sewer Area assessment on a weighted area basis. The weighting is as follows: Residential 1.00 High Density Residential 1.25 Commercial 1.50 Industrial 2.00 3. Lateral Sanitary Sewer, Water, and Storm Sewer Assessed based on front footage. 4. Commercial/Industrial or Residential Street Assessed based on front footage. Slightly higher assessable front footage for corner lots. 5. Sewer Availability Charge Charged based upon the number of residential equivalent units. 6. Water Access/Connection Charge Charged based upon the number of residential equivalent units. 7. Connect of Sewer/Water To Building This is the responsibility of the property owner and cost will vary dependent on property specifies. 8. Abandon Existing Sewer System It is the property owners responsibility to fill in the existing septic tank for safety purposes. ESTIMATED ASSESSMENTS/CHARGES These estimates are based on similar type projects recently completed in Elk River: Trunk Sanitary Sewer Trunk Water Trunk Storm Sewer Lateral Sanitary Sewer Lateral Water Lateral Storm Sewer Residential Street Commercial/Industrial Street Sewer Availability Charge Water Access Fee Water Connection Charge $1,800/Acre $2,000/Acre $21-$25/Front Foot $18-$21/Front Foot $8-$10/Front Foot $60-$90/Linear Foot $75-$150/Linear Foot $1,300/REU** $300/REU** $700/REU** * No similar projects recently, estimated range only ** REU = Residential Equivalent Unit 'Vahnson OUTBOARDS TEL. (612) 441-3222 14 June 1993 aNothing Runs ,o��oEEaE Like a Deere, DEWS W OMM HA Dear Mr. Mayor & Concil Members, BOX 55 17369 HWV 10 ELK RIVER, MINNESOTA 55330 I am sending this letter to this meeting because I am unable to attend and I would like to voice my opinion on the proposed sewer and water improvements for our area. At this time I am not in favor of the improvements because I feel they would be of little or no benefit to us for the cost involved. Our well and septic system have been performing perfectly for the past 23 years and because of the lack of use of these systems compared to say a restaurant or a hotel, we don't anticipate any problems. Thank you for taking the time to listen to my concerns and considering them. s 4 Sea o s Hq. Inc. v1h S . ath Dehn Sr.