East TH 10 Area Informational Hearing 06-15-1993MIA, NAM Im
JUNE 15, 1993
PROJECT HISTORY
Growth Management Plan
Draft East Highway 10 Corridor
Improvements Study
City Decision to Extend Utilities West
Construction of Western Area
Improvements
Wastewater Treatment Plant Upgrade
■ Expansion of Urban Service Area
■ Update of Growth Management Plan
East TH 10 Area Informational Hearing
August 1988
March 1990
December 1991
1992
Current
June 15, 1993
i-�
U
U)
z
.?
OCA
r
�- O w
Q
f�
H=mood
ag0cL
0
x
LLJ
w
TSEGO
IUWNSHIP
\C ✓ LOT
\\ y�G yERNMEN�
\
J?:
THE
r
#3
Al
` 0 400
i
CROSSROADS
2
O\
Maier Stewart MnD®T MO TRAFFIC COUNTS City 4iver
& Associates Inc. Elk
1
,�-ex
I
•
. •
0
Z
ZCL
o<
N2
1:
---mq;iou
15
E
=
LL
�5
m
m
3
O
m
L
L
S
O
a C
N
01
Q,
O
4.
N
s
=
J
U)
LLOC
ENE
®
Z ZO
o CC w p
Q Q° > U J CO I-
��O w=� m
F-- z cc �—
a20a COCOU) X
�W w=U� a.ao w
a
F-
=�
N
' Cc
>-Ow aoco
I—=xpc W _
W w=v� O -O w
N
Ce)
V)
W
O uJ $ ,LO
'I
EEO Z~W g &
w=og Qw ■ X
to c!1 W
VJ
cur
� W Z V
o > 2 E...
�_o Y cc m
_rem FW— _
•--• C� a.
W w=�� � 3� w
ESTIMATED COSTS`
Estimated Sanitary Sewer Construction Cost
Estimated Water Improvements Construction Cost
ESTIMATED CONSTRUCTION COST
Construction Contingencies (10%®)
ESTIMATED TOTAL CONSTRUCTION COST
Administration, Engineering, Fiscal & Legal (28%)
ESTIMATED TOTAL PROJECT COST
$ 843,200
13783j00
$2,626,900
262,700
$2,889,600
809,100
$3,698,700
* Cost estimated from March 1990 Draft East Highway 10
Corridor Improvements
TYPES OF ASSESSMENTS/CHARGES
1. Trunk Sanitary Sewer/Water
Area assessment on a per acre basis. The only area reduction
is for classified wetlands.
2. Trunk Storm Sewer
Area assessment on a weighted area basis. The weighting is as
follows:
Residential 1.00
High Density Residential 1.25
Commercial 1.50
Industrial 2.00
3. Lateral Sanitary Sewer, Water, and Storm Sewer
Assessed based on front footage.
4. Commercial/Industrial or Residential Street
Assessed based on front footage. Slightly higher assessable
front footage for corner lots.
5. Sewer Availability Charge
Charged based upon the number of residential equivalent units.
6. Water Access/Connection Charge
Charged based upon the number of residential equivalent units.
7. Connect of Sewer/Water To Building
This is the responsibility of the property owner and cost will
vary dependent on property specifies.
8. Abandon Existing Sewer System
It is the property owners responsibility to fill in the existing
septic tank for safety purposes.
ESTIMATED ASSESSMENTS/CHARGES
These estimates are based on similar type projects recently completed in
Elk River:
Trunk Sanitary Sewer
Trunk Water
Trunk Storm Sewer
Lateral Sanitary Sewer
Lateral Water
Lateral Storm Sewer
Residential Street
Commercial/Industrial Street
Sewer Availability Charge
Water Access Fee
Water Connection Charge
$1,800/Acre
$2,000/Acre
$21-$25/Front Foot
$18-$21/Front Foot
$8-$10/Front Foot
$60-$90/Linear Foot
$75-$150/Linear Foot
$1,300/REU**
$300/REU**
$700/REU**
* No similar projects recently, estimated range only
** REU = Residential Equivalent Unit
'Vahnson
OUTBOARDS
TEL. (612) 441-3222
14 June 1993
aNothing Runs
,o��oEEaE Like a Deere,
DEWS W OMM HA
Dear Mr. Mayor & Concil Members,
BOX 55
17369 HWV 10
ELK RIVER, MINNESOTA 55330
I am sending this letter to this meeting because I am unable
to attend and I would like to voice my opinion on the proposed
sewer and water improvements for our area.
At this time I am not in favor of the improvements because
I feel they would be of little or no benefit to us for the cost
involved.
Our well and septic system have been performing perfectly
for the past 23 years and because of the lack of use of these
systems compared to say a restaurant or a hotel, we don't
anticipate any problems.
Thank you for taking the time to listen to my concerns and
considering them.
s 4 Sea o s Hq. Inc.
v1h S .
ath Dehn Sr.