4.3. SR 12-17-2018 EGty1� ,.,�� Request for Action River To Item Number Mayor and City Council 4.3 Agenda Section Meeting Date Prepared by Consent December 17, 2018 Justin Femrite P.E.,Public Works Director Item Description Reviewed by Pay Estimates Lori Ziemer, Finance Director Reviewed by Cal Portner, City Administrator Action Requested Approve,by motion, the pay estimates detailed below. Background/Discussion The following pay estimates have been reviewed and found to be accurate and in accordance with the approved contracts. Financial Impact PROJECT PAY EST. # CONTRACTOR AMOUNT 6 '/2 & Quinn - Storm Sewer 3 - Final New Look Construction $10,806.00 6 '/2 & Quinn—Street 3 Omann Contracting Companies $59,890.54 Attachments ■ Pay Estimates The Elk River Vision A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By service, and community engagement that encourages and inspires prosperity INAMIRE1 PE #3 - FINAL 6112 StreettQuinn Avenue - Site Grading and Storm Sewer New Look Contracting, Inc. 14045 Northdale Boulevard Rogers, MN 55374 Date of Work Performed: Site Grading and Storm Sewer 1 Mobilization and Traffic Control 2 Rock Construction Entrance (2015 Detail Plate) 3 Salvage 8 Re -spread Topsoil 4 Silt Fence (2009 Detail Plate) 5 Inlet Protection (2511 Detail Plate) 6 Tree Removal 7 Curb Removal 8 Common Excavation/Embankment- Pond 9 Pond Filtration Material 10 15" RCP, Class 5 11 48" Diameter CBMH With Casting, All Depths (2502) 12 Outlet Control Structure 13 15' RCP FES With Trash Guard (2504 Detail Plate) 14 Connection to Existing Manhole in Proctor Avenue 15 Inlet Protection (2511 Detail Plate) 16 Concrete Erosion Mat (2513 Detail Plate) 17 Seeding - Pond Site - Mix No. 33-261 18 Erosion Control Blanket- Pond Site - Cat 3 Straw 2S C01 CBMH #7 (increase to 60") Nov. 1-31.2018 LS EA LS LF EA EA LF CY CY LF EA EA EA EA EA SF SY SY LS 1.00 2.00 2,100.00 2, 120.00 1,071.00 1, 10.00 1.00 4.00 1.00 10.00 300.00 1,100.00 1, 1,100.00 1, 1.00 $ 1.00 $ 1.00 $ 000.00 $ 2.00 $ 1.00 $ 120.00 $ 100.00 $ 120.00 $ 102.00 $ 10.00 $ 1.00 $ 4.00 $ 1.00 $ 300.00 $ 589.00 $ 589.00 $ 1 10.00 $ 10.00 $ 10.00 $ 2.00 $ 5.00 $ 0.00 $ 7.00 $ 3.75 $ 0.00 $ 5.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 5.00 $ 1.00 $ 1.00 $ 3.00 $ 1 1 Total Earned $ 169,023.46 Less Previous Payment $ 158,217.46 Total PE 3 FINAL - SITE GRADING AND STORM SEWER $ $ 10,806.00 Original Quote: $ 165,485.00 Previous Payements: $ 158,217.46 Approved by: ikt2 PE #3 61/2 Street/Ouinn Avenue -STREET Omann Contracting Companies 6551 Labeaux Avenue NE Albertville, MN 55301 Date of Work Performed: Street November 1-31, 2018 1 Common Excavation/Embankment (includes subgrade preparation) CY 1,834.00 1,834 $ 18.98 $ 2 Curb Removal LF 100.00 101 $ 6.00 $ 3 Remove Bituminous Pavement SY 1,400.00 1,400 $ 2.55 $ 4 Salvage & Re -spread Topsoil LS 1.00 1.0 $ $ 8,100.00 5 Class 5 Aggregate Base Course -10" Depth TON 2,200.00 2,809.01 $ 12.45 $ 6 Aggregate Surfacing (to match existing Driveways) TON 40.00 18.6 $ $ 29.50 7 Bituminous Base Course - 2.5" Depth TON 615.00 572.57 $ 74.50 $ 8 Bituminous Wear Course -2"Depth TON 500.00 7.39 $ 79.80 $ 9 Tack Coat GAL 200.00 0 $ 3.00 $ 10 Seeding - Boulevard - Mix No. 25-121 BY 3,100.00 2,800 $ 0.83 $ 11 Hydraulic Soil Stabilizer- Type 5 SY 4,200.00 2,800 $ 1.14 $ 12 Adjust Casting (New CBs, Ex Valves, Ex, San Sewer) EA 11.00 11 $ 430.00 $ Less Previous Payments 76,207.84 TOTAL PE 3. STREET $ 59,890.56 Approved by: Ir Original Quote: $174,057.82 Previous Payements: $ 76,207.84