3.2 ERMU MINUTES 01-12-2010ELK RIVER MUNICIPAL UTILITIES
REGULAR MEETING OF THE
UTILITIES COMMISSION
HELD AT UTILITIES CONFERENCE ROOM
December 15, 2009
Members Present: John Dietz, President; Jerry Gumphrey, Vice Chair;
Daryl Thompson, Trustee
ERMU Staff Present: Troy Adams, Director of Operations;
Theresa Slominski, Finance Director/Office Manager,
Mark Fuchs, Line Superintendent; David Berg, Water Superintendent;
Wade Lovelette, Technical Services Superintendent;
Judy McSpadden, Recording Clerk; Richard Wagner
City Staff Present: Lori Johnson, City Administrator; Terry Maurer, City Public Works Director
Others Present: Mark Mathison, Attorney from Gray Plant Mooty Law Firm
1. Call meeting to order December 15.2009
John Dietz called the December 15, 2009 meeting to order at 4:00 p.m.
2. Consider Utilities Agenda
Daryl Thompson moved to approve the December 15, 2009 Utilities Agenda. Jerry
Gumphrey seconded the motion. Motion carried 3-0.
3. Consider Consent Agenda
John Dietz had questions on the check register and financials, staff responded.
Jerry Gumphrey moved to approve the Consent Agenda as follows:
3.1 November Check Register
3.2 November 17, 2009, Regular Meeting Minutes
3.3 Financial Reports
Daryl Thompson seconded the motion. Motion carried 3-0.
4.1 Review and Consider 2010 Budget, Rate, and Fee Changes
Troy Adams reviewed the electric and water budget for 2010. ERMU's purchased power rate via
Great River Energy has been finalized with no changes from the preliminary numbers used by staff
during the electric rate design process. The proposed budget reflects the new 80/20 Electric/Water
split for the applicable accounts and resulted in a slight rate increase to absorb additional expenses.
The revised electric rates recommended were a minor increase for winter energy (kWh) charge for
Page 2
Regular meeting of the Elk River Municipal Utilities Commission
December 15, 2009
residential and non -demand small commercial, as well as a minor increase in energy (kWh) charge for
demand commercial accounts. For typical customer loads it is an approximate 5.9% residential rate
increase, 5.7% non -demand customer rate increase, and 4.7% demand customer rate increase.
Terry Maurer informed commission that the change of the 75/25 to 80/20 split for applicable
accounts has helped the bottom line for the water department. As for water rates, a water rate study
will be performed and brought back to the commission for recommendation.
Jerry Gumphrey moved to approve the 2010, Budget, Rate, and Fee Changes as presented.
Daryl Thompson seconded the motion. Motion carried 3-0.
4.2 Review and Consider Electric On -Call Cell Phone
At the November 17, 2009, Elk River Municipal Utilities Commission meeting, after hours
reconnects were discussed. During that discussion the topic of the on-call cell phone came up. The
cell phone used for the on-call is passed from employee to employee as the on-call weekly rotation
occurs. This cell phone number has been provided to Great River Energy, Sherburne County
Dispatch, Elk River Police, Elk River Fire, and others. During the discussion pertaining to the after -
hour reconnects it was noted that customers have been calling the on-call phone directly. The
commission felt the on-call electric employee should not be getting these calls. The commission
directed staff to change the on-call phone number.
After discussion with staff, it was noted that the disconnect forms have the on-call number on
them. Staff believes Us is the reason for the direct calls. Due to this, changing the on-call number
has been delayed pending commission review. The forms have been revised to reflect policy change
eliminating after-hours reconnects as well as removing the on-call phone number. Staff recommends
the commission allow the current on-call phone number to remain the same. Consensus was to not
change the on-call cell phone number at this time.
5.1 Review Boot Purchase Procedure
At the November Elk River Municipal Utilities Commission meeting, during the review of the
check register, there were questions about boot purchases. The Cormnission directed staff to bring
back, for finther review, a history of past boot purchases. A four year history of boot purchases was
reviewed.
Boots are included with the personal protective equipment (PPE) provided to outside employees.
This is addressed in the employee handbook under the Clothing Policy. This policy allows for
climbing boots, summer work boots, rubber boots, rubber overshoes, and insulated winter boots.
Approval for new boot purchases has been at management discretion. Commissioners thanked staff
for the information. No action taken.
Page 3
Regular meeting of the Elk River Municipal Utilities Commission
December 15, 2009
5.2 Review and Consider Water Department On -Call
The current water department on-call policy pays an employee eight additional hours (overtime
rate) each week for carrying the on-call phone. If the employee is called after hours and needs to
respond, they receive a minimum of two additional hours or whatever the respondent requires for
time. The on-call pay for the water department amounts to approximately $18,000 per year.
In recent years there have been very few call -outs not related to the SCADA system or shut -offs.
ERMU no longer responds to non -emergency call -outs for shut -offs. A laptop computer has been
budgeted for 2010 which will allow for responses to the SCADA alarms remotely. Well over 50% of
the 2009 call -outs will be eliminated by the purchase of a laptop computer. It will no longer be cost
effective to continue the on-call procedure for the water department. If a call -out is necessary and
management is unavailable, a water department employee will be dispatched and compensated the
minimum two hour call -out pay or whatever the respondent requires for time. Staff recommends
discontinuing the water department on-call policy when the laptop computer is fully functional.
Jerry Gumphrey moved to eliminate the water department on-call policy as of the closest pay
period on or around March 1, 2010. Daryl Thompson seconded the motion.
Motion carried 3-0.
5.3 Review Industry Rate and Finance Challenges
At the October 13, 2009, ERMU Commission meeting, staff was directed to comment on an
article published in the September 2009 Public Power magazine. Troy Adams asked the commission
if they had any special topics they wanted to discuss. The Commission commended Troy for the
interest he showed regarding all the topics of this article and if he has an area of interest he should
bring this back to the Commission for discussion at any time.
5.4 Review and Consider Street Lighting Fee (Verbal
At a previous ERMU Commission meeting John Dietz asked staff to look into the possibility of
having neighborhoods pay for their own street lighting instead of the City of Elk River. Troy Adams
stated that ERMU boundaries go beyond the City limits. John Dietz asked what the street lighting
cost was each month. Troy Adams stated approximately $20,000 is donated each month; the City of
Elk River is not actually incurring this cost. In order for fees to be collected, ERMU would have to
somehow create a way for it to pass through to the City of Elk River. The disproportion of rate payers
to City tax base payers complicates that. Lori Johnson stated some cities do not have a local power
company to aid in the street lighting fees and have to actually pay a vendor to maintain. The City of
Elk River is in a much better situation and didn't think anything needed to be done at this time.
Page 4
Regular meeting of the Elk River Municipal Utilities Commission
December 15, 2009
5.5 Review and Consider Clothing Policv Revision
ERMU provides personal protective equipment (PPE) for employees. This includes, but is not
limited to: FR Clothing, boots, safety glasses, safety vests, hard hats, rubber gloves, and leather
gloves. These are items required for safe implementation of the employees' job duties. These items
are the property of ERMU and not employee compensation.
The PPE clothing for the employees has the ERMU logo on it and is not for personal use. There
is not specific language in the Clothing Policy to require employees to tum in their PPE items when
leaving employment with ERMU. Staff recommends adding the following to the Clothing Policy in
the ERMU Handbook.
Upon the end of employment with the Utilities, an employee must return all Utilities clothing
items that were issued to him or her that were paid for by the Utilities with the exception of boots.
Daryl Thompson moved to approve the revised Clothing Policy as presented. Jerry Gumphrey
seconded the motion. Motion carried 3-0.
6.1 Staff Updates
Troy Adams said the result of the state gas bids were not still not available. Lori Johnson
commented they should be available by the end of the week. John Dietz asked Troy Adams for more
information regarding a commercial electric meter. Troy Adams reviewed the issue with the demand
meter. The old demand meters will be replaced with the newer radio read meters but they are very
expensive so this will be phased in over time. Wade Lovelette said the meters are budgeted for and an
area will be changed out so meter reading can be done more efficiently. Troy Adams also stated that a
new computer program has been implemented to recognize repetitive demands.
Theresa Slominski relayed information that has been received regarding the new eco -envelopes.
Terry Maurer briefed the Commission on a topic that was discussed at the November 17, 2009,
ERMU Commission meeting regarding a water assessment for a contractor that repaired a service line
to a house, billed the property owner, and has not received payment. The ERMU Commission
approved the assessment providing the homeowner sign a waiver. Terry Maurer reported this had
been done and the property will be assessed. The contractor has asked when he would receive funds
for this work. Consensus was ERMU would forward the funds to the contractor when funds are
received.
Mark Mathison reviewed the Water Tower Antenna Lease agreement changes.
Jerry Gumphrey moved to approve the amended Water Tower Antenna Lease. Daryl
Thompson seconded the motion. Motion carried 3-0.
David Berg displayed three water meter radio read devices. John Dietz commented they all
looked the same. David Berg said staff will be marking them to ensure they are properly installed on
the right size meters.
Page 5
Regular meeting of the Elk River Municipal Utilities Commission
December 15, 2009
Mark Mathison gave an update of the status of the Waterfront East properties. Discussion
followed.
Jerry Gumphrey moved to have Gray Plant Mooty draft an agreement to Rock Solid regarding
the Waterfront East property and attach document for permanent record to the December 15,
2009 ERMU commission meeting minutes. Daryl Thompson seconded the motion. Motion
carried 3-0.
Mark Mathison informed the commission that he has met with management regarding union
organizing and activity in the workplace. Discussion followed.
6.2 Set Date for Next Meetine
The next regularly scheduled meeting of the Elk River Municipal Utilities Commission will be
Tuesday, January 12, 2010, at 4:00 p.m.
6.3 Adiourn Reaular MeetinE
President John Dietz adjourned the regular meeting of the Elk River Municipal Utilities
Commission at 5:50 p.m.
Minutes prepared by Judy McSpadden.
Tina Allard
City Clerk